HomeMy WebLinkAboutBLD97-178• City of Port Townsend
Building and Community Development
540 Water Street
Port Townsend, WA 86168
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 900 JACKSON
Parcel No: 001012001
Project:
-CONTRACTOR/OWNE
CLEARWATER CONSTRUCTION
1243 TREMONT
PORT TOWNSEND, WA 98368
Issued: 12/2/97
Lot: Block:
PERMIT # BLD97-00178
WNER
CITY OF PORT TOWNSEND
540 WATER ST
PORT TOWNSEND, WA 98368
-PROJECT DESCRIPTIO
Public Building: Repair/replace roof of kitchen shelter at Chetzemoka Park.
City Contact: JLZ Construction TypelOce UselOcc Load
Type of work REP Construction Occupancy
Type of use: PUB Type t: 5N Group t: Load 1:
Census Category: 437 Type 2: Group 2: Load 2:
Estimated Value: $4,800.00
Type 3: Group 3: Load 3:
Zoning: P-i
Type 4; Group 4: Load 4:
SI Code:
SPECIAL CONDITIONSIRESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector
FRAMING
Insp-See Special Conditions #~
-Roof ~ l.~ !Z !
- Blocking
CHIMNEYS
-Chimney Demolition ~/ ~,
FINAL
Final-Building
SPECIAL CONDITIONS /RESTRICTIONS
1 . FRAMING: The framing inspection may be done at the time of final if all elements (framing
. members, blacking, connections, etc.) requiring inspection will be exposed at time of final
inspection.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend
Building and Community Development
540 Water Street
Port Townsend, WA 98388 0
y
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 900 JACKSON
Parcel No: 001012001
Project:
GENERAL CONDITIONS
Issued: 12/2197
Lot: Block:
PERMIT # BLD97-00178
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
City of Port Townsend
Building and Community Development
t
540 Water Street
Port Townsend, WA 98368
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 900 JACKSON
Parcel No: 001012001
Project:
-CONTRACTOR/OWNE
CLEARWATER CONSTRUCTION
1243 TREMONT
PORT TOWNSEND, WA 98368
Issued: 319/98
L Block:
~Irt~ BLD97-178R1
OWNE
CITY OF PORT TOWNSEND
540 WATER ST
PORT TOWNSEND, WA 98368
-PROJECT DESCRIPTIO
Kitchen Shelter, Revision No 1; Add two collar ties at building center.
City Contact: RNS Construction Type/Occ Use/Occ Load
Type of work: REP Construction Occupancy
Type of use: PU8 Type 1: SN Group is Load 1:
Census Category: 437 Type 2: Group 2: Load 2:
Estimated Value: $4,800.00
Type 3: Group 3: Load 3:
Zoning: P-I
Type 4: Group 4: Load 4:
SI Code:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector
FRAMING
Insp-See Special Conditions
-Roof
(FINAL 7
SPECIAL CONDITIONS /RESTRICTIONS
1 . FRAMING: See approved Rev No 1 plan for details.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend Port Townsend tWA 98366
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD ~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 900 JACKSON
Parcel No: 001012001
Project:
GENERAL CONDITIONS
Issued: 319198
Lo ~ BI
~LhT ~ BLD97-17 R1
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per yeartc
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2