Loading...
HomeMy WebLinkAboutBLD97-178• City of Port Townsend Building and Community Development 540 Water Street Port Townsend, WA 86168 BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 900 JACKSON Parcel No: 001012001 Project: -CONTRACTOR/OWNE CLEARWATER CONSTRUCTION 1243 TREMONT PORT TOWNSEND, WA 98368 Issued: 12/2/97 Lot: Block: PERMIT # BLD97-00178 WNER CITY OF PORT TOWNSEND 540 WATER ST PORT TOWNSEND, WA 98368 -PROJECT DESCRIPTIO Public Building: Repair/replace roof of kitchen shelter at Chetzemoka Park. City Contact: JLZ Construction TypelOce UselOcc Load Type of work REP Construction Occupancy Type of use: PUB Type t: 5N Group t: Load 1: Census Category: 437 Type 2: Group 2: Load 2: Estimated Value: $4,800.00 Type 3: Group 3: Load 3: Zoning: P-i Type 4; Group 4: Load 4: SI Code: SPECIAL CONDITIONSIRESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector FRAMING Insp-See Special Conditions #~ -Roof ~ l.~ !Z ! - Blocking CHIMNEYS -Chimney Demolition ~/ ~, FINAL Final-Building SPECIAL CONDITIONS /RESTRICTIONS 1 . FRAMING: The framing inspection may be done at the time of final if all elements (framing . members, blacking, connections, etc.) requiring inspection will be exposed at time of final inspection. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend Building and Community Development 540 Water Street Port Townsend, WA 98388 0 y BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 900 JACKSON Parcel No: 001012001 Project: GENERAL CONDITIONS Issued: 12/2197 Lot: Block: PERMIT # BLD97-00178 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 City of Port Townsend Building and Community Development t 540 Water Street Port Townsend, WA 98368 BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 900 JACKSON Parcel No: 001012001 Project: -CONTRACTOR/OWNE CLEARWATER CONSTRUCTION 1243 TREMONT PORT TOWNSEND, WA 98368 Issued: 319/98 L Block: ~Irt~ BLD97-178R1 OWNE CITY OF PORT TOWNSEND 540 WATER ST PORT TOWNSEND, WA 98368 -PROJECT DESCRIPTIO Kitchen Shelter, Revision No 1; Add two collar ties at building center. City Contact: RNS Construction Type/Occ Use/Occ Load Type of work: REP Construction Occupancy Type of use: PU8 Type 1: SN Group is Load 1: Census Category: 437 Type 2: Group 2: Load 2: Estimated Value: $4,800.00 Type 3: Group 3: Load 3: Zoning: P-I Type 4: Group 4: Load 4: SI Code: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector FRAMING Insp-See Special Conditions -Roof (FINAL 7 SPECIAL CONDITIONS /RESTRICTIONS 1 . FRAMING: See approved Rev No 1 plan for details. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend Port Townsend tWA 98366 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD ~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 900 JACKSON Parcel No: 001012001 Project: GENERAL CONDITIONS Issued: 319198 Lo ~ BI ~LhT ~ BLD97-17 R1 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per yeartc keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2