Loading...
HomeMy WebLinkAboutBLD97-157City of Port Townsend Water Street Port Townsend, WA 98S&~ Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2233 WALNUT ST Parcel No: 930300201 Project: BLD97-00157 COLBY A FOX MARY WALLACE 2233 WALNUT ST SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection ' Date ~ Inspector Inspection Dat Inspe r TEMP EROSION & SDM'T CON I -Anchor Bolts Ilnsp-See Special Conditions ~ ~ -Vents iFOOTINGS~~r~n~~ ~ ~~. ;' t ';~-? ~ -Crawl Access 'r}j~ g~7~ Insp-See Special Conditions '~- ~ ,Q ,,,~- ~; ~y le $t1EAtz WA~~: Holdown Hdwr '-Footings -Alt BWP Holdown Hdwr > Z ' '-Forms FLOOR FRAMING - !:.*~ I ~y? , -Reinforcement -Girders '-LIFER -Joists FOUNDATION ~j . {-F ~'Cur~:'arJ ~ ~ S/ -Blocking Insp-See Special Conditions ~ ~- e`.~z.~- r- r.~ Positive Connection -Stem Wall ~ ~ ;;n ~ (~~ -Treated Woad to Concrete orms -Anchor Bolts 8 Washers~+blLaurN j ~inforcement r _ ('• ~N L) ~ )~fJ.~,L „~,~,.; i1 , ~~ (~ -FDN Vents I Call 48 hours before you dig for utility line locates ~~~ ~~ 1-800-424-5555 ~r~°<?'~t~x (~cr;~?,C'C"-~'!cc?-~°~ rnl. {.) F>,r,r-.~.~ (~(r> (-Y Page 1 of 3 ~-._1.9~',1t/L`%% Af~:`a L-/[,C~~~$ (~~ City of Port Townsend Water Street ~: Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2233 WALNUT ST Parcel No: 930300201 project: Inspection Date Inspector Inspection Date nspector I-Rough-In (D-V-T 8 Cln Outs) -Windows: Egress -Water Supply -Window U Valu c~ ~J•~Ry~ 5~) j-Gas Supply ~~ Z p ~ -Window Safety Glazing -Pipe Insulation -Air Seal ~ ~ G -Pressure Reduction Valve -Fresh Air Intake (Window)>~~- r -Water Heater -Door U Value (MECHANICAL -RafterlTruss Pas. Conn. jlnsp-See Special Conditions ~ (~ -Fire Blocking i !Insp-See Special Conditions ~5 ' -Firestopping -LPG Heater ~ -Weather Resistive Barrier ! ~~ ~~ ~~ ~ (~ -Exhaust INSULATION I ',-Heat Ducts -Floor (R-25) i-Combustion Air -Wall (R-19) ~/ -Duct Insulation l ~-g~ ', -Ceiling (R-30) j -Whole House Fan ', /~ /Z T+ -Baffles Z ~ ~ -Source Specific Fan ! -Fill Exposed Cavities I~ dndNta Z ~ ~ ~ f' I-Environmental Air Exhaust jps11o015 VAPOR BARRIER FRAMING ~ ~ -Paint -Crawl Space - 6 Mil Poly DRYWALL NAILING I -Walls ~" insp-See Special Conditions ~ (p ! -Ceiling ~ 2 ~~/ %~ -Walls ; FINAL -Engineered Shear Walls Final-House Number '-Alternate Braced Wall Panel Final-Plumbing , -Roof Final-Mechanical/Heating -Attic Venting (~y~ Ri~E~ ~ Final-Insulation Certificate Issued: 11/26/97 Lo ~ ock: ~PhilT~ BLD97-00157 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 or 3 R City of Port Townsend ty Building and Community Development b40 Water Street Port Townsend, WA 98368 BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2233 WALNUT ST Parcel No: 930300201 Project: 'Inspection Date ' Inspector Final-Vapor Barrier Cert. !Final-Smoke Det. Througout (Final-LPG (Fire Dept.) ,Final -Building ~ f~~ //~ Issued: 11126197 Lot: Block: ~{ rs ~ BLD97-00157 SPECIAL CONDITIONS /RESTRICTIONS 1 . TEMP EROSION & SEDIMENT CONT'L: Install TE&SC measures on site during construction as needed. Measures to include but not limited to gravel construction entrance, fire wash, silt fencing, sweeping paved surfaces, etc, per Best Management Practices, DOE Stormwater Management Manual. FOOTING: Field verify engineer's assumptions for existing footing size. 3. STEMWALL:, Holdowns speed per approved engineered plans for Alternate Braced Wall Panels and engineered shear walls. Special resteel required in existing stem walls for holdown anchorage. 4. MECHANICAL: LPG heater or applicances not to be located in pit or basement. MECHANICAL: 1"W G Whole House Fan required; 80 - 120 CFM @ .25" W.G. & 1.5 Bones FRAMING: All engineered elements require inspection prior to cover. See approved engineered plans for ABWP's, engineered shear walls and special connectors in roof system. GENERAL CONDITIONS t. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5' POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 or 3 ~~ • City of Port Townsend Port ownsendtWA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2233 WALNUT ST Issued: 2/9/9a Parcel No: 930300201 L Block: Project: {~~~I-(-~ „BLD97-157R1 PAUL HESS COLBY A FOX 1807 KUHN MARY WALLACE PORT TOWNSEND, WA 98368 2233 WALNUT ST -PROJECT DESCRIPTIO Revision No. 1 to BLD97-00157: Wall veneer changed from fake stone to river rock; increase foundation footing to meet perscriptive size; and fireplace footing increased to perscriptive size. City Contact: RNS Construction Type/Occ UselOcc Load Type of work: ADD Construction Occupancy Type of use:, SF Type 1: SN Group 1: RJ load 1: Census Category: 434 Type 2: Group 2: Load 2: Estimated Value: $790,000.00 Type 3: Group 3: Load 3: Zoning: R-II Type 4: Group 4: Load 4: SI Code: REQUIRED INSPECTIONS Inspection Date (Inspector (FOOTINGS GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of Z 5 i