HomeMy WebLinkAboutBLD97-146~~
CITY OF PORT TOWNSEND ~~(~ ~ ~ ,
BUILDER'S PERMIT & INSPECTION RECORD i i ~ ~,~ ~1 '~
~,~icV t~i,i
„;_ .~. THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number BLD97-D0146
Job Address 3300 San Juan Ave
i
Issued 12101!97 Treas. No.
Zoning RR_3 Type V-1 HR Occupancy R-1lA-3!B
Nature of Work New Aaartment Building Use of Building Dwelling UnitslCommon ArealOffice
Owner Hearthstone Group Contractor LBR Const Inc (LBRCOI.142NFI
SEPARATE PERMITS REQUIRED FOR`:
STREET & UTILITY DEVELOPMENT PERMIT (See Public Works)
SPRINKLERS
ALARM SYSTEM
ELEVATOR (See WA STATE)
ELECTRICAL (See WA STATE Labor & Industries)
REf,~UIRED INSPECTIONS
TEMPORARY
EROSION & SEDIMENT
CONTROL (TSS<SC)
(Prior to ANY other
const.)
See Spe Cond No 1
See Spe Cond No 2
See Spe Cond No 3
APPROVED/DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 8
FOOTINGS ~N~N~/ Cou2z'~A.Qp
Ekr~,2~02;"TGS i5'~
See Spe Cond No 4 nn
N ~ ~I~Co ~ ((2~~4 ~ W
See Spe Cond No 5
See Spe Cond No 6
FN D1- lA/A!L 1~~in/(~
(
iO~R,-ryp,Qp tf~,lnl~gr{~
See Spe Cond No 7
r
~M r
/
Dig pr ~(Z3(g7
Ec.~v~r T
r- ~
p
Setbacks 6 ~~ ~ ~~ ~
' p r/ n n
~NTL Q 1~81z ~'CCoS ~'S ~1h/t~W L(P Z~ l 0 C~
S
Footings y'~~rBL ~C~S /~ ~~/Jta L~ZfI~~P~J
Reinforcement
Interior Footings
Reinforcement
Anchor Bolts
Elevator Pit
UFER
FOUNDATION WALLS ~(O(,pOWgps A~Pss vu+~s E'kT~fOR y~~
See Spe Cond No 4
See Spe Cond No 8
Reinforcement
Holdowns
Elevator
GROUNDWORK
PLUMBING
Building Drains
Water Supply
Sleeving in Concrete
Pipe Bedding
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 8
sT•ao~as
SLAB
R-10 Insulation @ perimeter
(4" down & 20" horiz.)
PLUMBING
Rough-In
(Drain-Waste-Vents & Clean
Outs)
Hose Bibs (Back Flow
Protection required)
Water Supply
Insulation
Barrier Free in bathrooms
Water Heater (LPG)
Storage Tank
Hot Water Circulator
Backflow Preventor
Supply Regulator
LPG Piping
MECHANICAL
See Spe Cond No 9
See Spe Cond Na 10
See Spe Cond No 11
LPG Appliance venting
LPG Gravity Drain
Combustion Air
Whole House Fans
Source Specifc Fans
ill.-~+~ 17~'.ar~,t L~n„r 5~'v~frnlE, z(z.lrs r_~C.,,~
uw:~~ /~ 4
,~~„~~/ Sar'~n wt./~ G,U 3 ~l~eis UPS: '/ d
// ~ ~
.~. , ..
Call 48 hours before you dig for utility line locates
i-soo-aaa-ssss
Page 3 of 8
-1g ,Qo6 G
97.00146
FRAMING Alp~rrt~'.vr~ .2s`F~°R-tFlw~~.~.5r~en,x~uAi~ ct /o
See Spe Cond No 12 ~~ ~~ ~~~ r~Lpe~- I F Z u.1R6i~v~ `yu~~
See Spe Cond No 13
See Spe Cond No 14 ,~/ / '/
r
~jE}~A7/fi~n~j ~ ~'rFcva~~C'e~'"^-°
~~Q~- 6~l~d
See Spe Cond No 15
e Cond No 16
See S ~
/
~ 1~l~EST ~'~~/~~-- ~f ~`~ b'
p
See Spe Cond No 17
See S
e Cond No 18 ~~ ~•C°4"U`.,~7-• ~/~ rj,~jN•(s FLT /Z/t%3 $/~'J
~ `~Y
p
See Spe Cond No 19
See Spe Cond No 20
See Spe Cond No 21
~'.~s F(Et','~ ~Il~rc, 3 3~ -r/
~d ~GnDIL l ~~~j 1N~ S l ~ ~ ~
T
R
t
d
B
ildi
V
I H n~ ~
3~~L06R~~R'oNS~il'C~i4 `J('/cd~% l'~'r~-'~5 ~ Zf~
ype
a
e
u
ng -
-
r (
walls, floorlceiiings, corridors, ~' (.002 /UoRTrf l~/n~6 SH~~~ i/t6/yCt, ~~~~/ ~~~
doors, stair welt enclosure 8
elevator shaft)
ST ~'ot,DOwg1S ~id ~L70'~°' CJ• ~Vil/'tJ(~ ~/Zy~4~
M
Engineered elements
(holdowns, shear walls; etc.) .
Sksa~. 1a(at,c. Ala~u~ Fca~zS ltZ&3~-a•~-c~,~a yl
Walls 3
Ceilings _n
'
Oi
• S/~f
s
~/
J
~
'
j(
J,,,
j
~(.Ao
N.bwV S(
~
CK/
~""~
Roof r~~ S. 1Alfvr~ ~l/zr~Q ~' ~
Attic Ventilation
e~ be7~. ~c~~AAb F~ 1 ~ 2 S.br1/u~ '(/Z~
Window U Factor .40 RRiog~~j6/L!~ FLR (~Z /~, 4~[/N~ ~~~ QY
(Electric heat) f gTfLOoR. ~1G7~(/aLCS ~eA/~lEs4 ~1,~, y/lsk>~
CT ''l ~
Window Ports (Fresh Air)
Window Safety Glazing
t
ri
t
60
D
U F (~~Q
IP'"^- ~~71OC~rI~~~P C'~~9 ~ - `-'
2 `JtA(
or
ac
or (.
ex
e
oor
doors) .
(
~
t.~i~,/
~Ft-+e?, NES Ott/+~~s s/27^[4d
3
ilrR S~~a[~
Air seal "
,~
/
~
'
pC_ -y teak. /l/~ `S I~IlA.4'i.~j ~DjL ~
{t/Q 5€
Fire Blocking ~
7
, /
~~j, f'LUtw-~ ~GA1ETi~~7/DtJ~-~tZ,t/ f ~Z,S ~/~1,~ y~
3YOl ~laor e~.\Y eabE w~.,.,~ tLb ~vu.w s~a-~. -6r<....~~~
Penetrations fire safed
Shaft
El
t ~/ /~ ~J
~(~(/e~TBR- S~RFT' NArrrw tp~~(~,/'C~° `~~~
_
eva
or G
INSULATION ~ `u~'e :t.5
ExtKtaT~.nC'uer'E'^~®Ti~B°5rto
l S~~ 2d ~ TvQ sctee s/z/t~?
mkt 2 tq L~suristieN~GW C3~
Wall R-19 ~
~ ~C.2. C~.Y \(.(ttcLS ~- ~ rP t~vt~
'Zt
't
!Zt 7 [~'9~
t
'
Ceiling R-38 u
V
sk
f5 ~
F'I U~IN(n UNf
~eyr ~Lo•9'n' Co~^'~~--e~rs 2l4 ~kcGS 1~/S~Q~ 1.:~A-/
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 8
'~ ~ 1
~,~~
i
~r/
~d
l__/
~~r~~~
s-•, ~g5 R~ G .
~__
87.00146
~~
SHEETR0CK/NAILING C°~~ t2 TvBE~~'~- `-'•'~~'~'b~~~ iZj~'3 ~~~ i
See Spe Cond No 22 ~~~ ~~,~~.RS ~`~~d~tn/~t~~h'/L'e~~17~~'~~'~L-
Drywall is 5/8" Type X GWB
Walls I~Ywat1
(~Ua,~1S-~~ ~'~~1~{ 6r 3rd:..,~o',;r-IVQ~~ ~K
0d
Ceilings ~(~/r~^L!~ d"v/1
2~ ~ ~( G``C ~ ~~ ~/
Corridors
Stairwell Enclosure ~~~~JS
`~~l?~~
Elevator Shaft ~L'-~/~~ j {-~~ f^ ~ ~ j~' ~~
VAPOR BARRIER rJ2t xt~riir.a. '3 a Wit, in/i1_`. Ftrc
`;~,~~„~ N~~(1~~~'..J2~ F_I t,t/ rrs_ Viy
Vapor Barrier Paint ~ -
(Provide certifcate @ Final)
T-BAR GRID CEILING
Inspection required prior to
ceiling file placement
Rated Assembly
LIGHTING
See Spe Cond No 23
MOTORS
See Spe Cond No 24
LANDSCAPING
See Spe Cond No 25
t°-fib ~b~.
y
~~ie~3
Call 48 hours before you dig for utility line locates
1-800-424-5555 8 7 0 0 1 4 6
Page 5 of 8
FINAL
See Spe Cond No 26
See Spe Cond No 27
\~°1,
Parking
Public Works
Street & Utility Development
Permit
Fire Dept.
Key box
Sprinklers
Fire extinguishers
Smoking designation
Final Electrical
Final Elevator
Final Building
Building
Smoke Detectors
Address Numbers
Plumb
-Mechanical
Barrier Free
Post occupant loan
SPECIAL CONDITIONS
1. TE&SC: Inspection and approval required prior to any other work. See Public Works approved TE&SC
plan for Engineering Design Standards requirements. Call 385-2413 to schedule a TE&SC inspection.
2. TE&SC: In addition to TE&SC measures noted on approved plans, other TEBSC measures per Dept. of
Ecology Storm water Management Manual (DOE SWMM) Best Management Practices(BMP's) to control
runoff rate and erosion from construction site.
3. TE&SC: Maintain TE&SC measures throughout term of construction.
4. FOOTINGS: Special Inspectors required for footings and walls for resteel and concrete placement. Special
Inspectors to have WABO Register certification or obtain Building Department approval (show °Reinforced
Concrete" credentials) prior to site inspections.
5. FOOTINGS: Geotechnical Engineer to verify soil under bearing surfaces prior to footings.
6. FOOTINGS: Concrete mix approval by engineer or architect required prior to concrete placement.
7. FOOTINGS: Footing depth is 18" minimum below grade.
8. STEM WALLS: See approved engineer's notes for stem wall resteel requirements. No "wetsticking" of
resteel-accurately placed and supported prior to concrete placement.
i
9. MECHANICAL: See approved mechanical plans for mechanical room design and requirements.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 6 of 8 8 7 0 1 4 6
~ 10. MECHANICAL: Dwelling unit fans (bathroom and kitchen) to have fire dampers.
•' 11. MECHANICAL: Verify bathroom fan (Whole House Fan) @ 50-75 CFM @ .25" W.G. with sone rating of
1.5 @ .1"W.G. Verify kitchen fan @ 100 CFM @ .25"W.G. All other Source Specific Fans to be 50 CFM @
1" W.G.
12. FRAMING: Street 8 Utility Development Permit to be issued by Public Works prior to Framing Inspection.
13. FRAMING: Posts, beams and stringers to be graded DF-L No. 1.
14. FRAMING: All engineered elements (holdowns, shearwall nailing, etc.) requires inspection prior to cover.
15. FRAMING: Contractor to assist Building Department in verifying maximum height of 35' at Framing
Inspection per UBC height measurement method.
16. FRAMING: Elevator hoist way venting per plan. Manual damper.
17. FRAMING: Attic venting-provide colts for system used (ridge vs. eave or combination) prior to Framing
Inspection.
18. FRAMING: Provide roof ng specs describing installation to verify Class A fire rating.
19. FRAMING: Provide spec sheets on fire stopping material used for firesafing penetrations prior to Framing
Inspection.
20. FRAMING: Meth/Elect. Room 128-isolate for 1 Hr. F.R. Const. And WSEC insulation between conditioned
and unconditioned spaces.
21. FRAMING: See Spe Cond No 27 for WAC 51-30 Type A 8 B unit requirements.
22. SHEETROCK: Priorto nailing inspections, submit UL specs for design type used for 1 Hr. F.R. Const.
• 23. LIGHTING: Approved plans OK per NREC.
24. MOTORS: Approved plans OK per NREC.
25. LANDSCAPING: Call Jeff Randall @ 385-3000 for inspection prior to Final Inspection.
26. FINAL: Post occupant load sign (56) in Common Area.
27. FINAL: WAC 51-30(Barrier Free) requirements for Type A and Type B Dwelling Units:
Type A Type B
Units Required 3 48 (all others)
Dodrs All 32" net; lever handles; meet all All 32" net: lever handles;
Maneuvering clearances @ all entry door only to meet
doors. maneuvering clearances.
Kitchens 60" dia. Circle clear floor space. 30" x 48" clear space which
30" wide x 24" deep x 34" high allows parallel approach for
work surface w/ 27" knee wheelchair at range and sink.
clearance underneath. 30" x 24" x 34" work surface may
have cabinetry underneath if
easily removed.
Call 48 hours before you dig for utility line locates
1-soo-aza-ssss 8 7 0 0 1 4 6
Page 7 of 8
Bathrooms 60" dia. Circle clear floor space. 30" x 48" maneuvering space; ~ _
Doors may not encroach into
this space.
Easily removable cabinet OK under Same as Type A except edge _
lav. Lav must stand on its own of lav to be not Less than 15" .'
when cabinet removed or be from centerline of water closet.
replaced with free-standing lav.
Tub or shower to have seat. No seat requirement.
Grab bars may be omitted but Same as Type A.
must install blocking for future
grab bar installation.
Parking Two required accessible parking spaces need not be identified by signage.
GENERAL CONDITIONS
1. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
2. Reinspections are required after any corrections are completed.
3. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have been
made by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
7. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. i
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 8 of 8
87.00146
540 Water Street
_a-~ City of Port Townsend Port Townsend, WA 98368
. ~ Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-22~J4 For Inspection
Site Address: SAN JUAN AVENUE
Parcel No: 1022004
Project: SAN JUAN COMM
-CONTRACTOR/OWNE
LBR
618 S PEABODY, SUITE H
PORT ANGELES, WA 98362
Issued: 1!14/98
L Block:
~t3'1~{tT BLD97-146R1
OWNE
HEARTHSTONE GROUP
PO BOX 1274
PORT ANGELES, WA 98382
-PROJECT DESCRIPTIO
Residential -Multi-family apartment (51 units). Revised "construction set" plans, dated 12/18/97 replaces "Building
Department" plans dated 11/20/97. Attachments to original plan set (ex. Fire Dept. Memo) may still apply.
City Contact: RNS Construction TypelOcc UselOcc Load
Type of work: NEW Construction, . Occupancy
Type of use: MF Type 1: 5-1 HR Group 1: R-1 Load 1:
Census Category: Type 2: Group 2: B Load 2:
Estimated Value: $1,679,292.00
Type 3:
Group 3: Load 3:
Zoning: R-III
Type 4:
Group 4: -Load 4:
I SI Code:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
SPECIAL CONDITIONS /RESTRICTIONS
1 . Revised "Construction Set" plans (dated 12/18/97) are issued and replace existing.
2. No Engineer required inspections for resteel or concrete placement, only soil bearing surfaces
for footing.
3. Copy of concrete design mix approved by Engineer.
4. Revised Wattsun (dated 1/8!98) calcs out of R-10 perimeter slab insulation requirement.
5. 1 Hr. Fire Resistive Const. wall assembly sheets detailing construction of walls noted on A5.0
6. Detail 22, sheet S7: Bent bars from slab to foundation wall are deleted.
7. Detail 5, sheet S7: Header detail.
8. Special Condition No 18 - PABCO spec sheet verifies class A fire rating with assembly
requirements including underlayment.
9. Greenheck ceiling exhaust fan spec sheet details correct Bone level (<1.5) for bathroom
exhaust fans.
10. Revised Roof Vent calcs. Gable end vents not required.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend P rt wo5e~atwase:fes ~
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: SAN JUAN AVENUE
Parcel No: 1022004
Project: SAN JUAN COMM
Issued: 1/14/98
GENERAL CONDITIONS
LoY c
~'~T~ BLD97-146R1
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy
4. All building permits expire if no progress has been made within six months, or if no inspections
have been made by the Building Department within one year. Call for at least one inspection
per year to keep your building permit active.
5. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
r
~..~-_
City of Port Townsend
Building & Community Development -Permit Center
Waterman & Katz Building 181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)379-6923
CERTIFICATE OF OCCUPANCY
Building Permit Number: BLD97-00146
Owner: Hearthstone Group
Location: 3300 San Juan Avenue
Use(s) Permitted: R-1 (Residential), A-3 (Assembly) & B (Business)
The above-referenced building or portion complies with the applicable requirements of the Port
Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and
occupied in the use and manner indicated above.
Approved: Date: ~~ ~
Ro Sears, 'ding Official
City of Port Townsend
Building & Community Development
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
(360) 379-3208 Fax: (360) 379-6923
MEMO
November 16, 1998
To: C.L. Flint
From: JeffRandall
Re: San Juan Commons; LUP 97-15
C1TY H
~s~r~
I have inspected San Juan Commons and all the planning related conditions have been satisfied,
Additional landscaping was installed recently and the landscaping now in compliance with the
approved plan..
Sincerely,
CITY Of PORT TOWNSEND
181 Quincy Street, Port Townsend, WA 98368
360-379-3208 Fax 360-379-6923
TEMPORARY CERTIFICATE OF OCCUPANCY
September 30, 1998 through January 1, 1999
Building Permit No.: BLD97-00146
Owner: Hearthstone Group
Address: 3300 San Juan Avenue
Location: Port Townsend, WA 98368
Use(s) permitted: R-1 (Residential), A-3 (Assembly) & B (Business)
The above-referenced building or portion complies with the applicable requirements of the Port Townsend Building
Code (PTMC 16.04), has passed all required inspections and may be used and occupied prior to completion and final
inspection without substantial hazard, and is hereby granted this Temporary Certificate of Occupancy, provided
substantial progress is being made toward completion and fmal inspection is passed by the date entered above.
This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except
by the building official.
Approved: _ ' ~• f
Building Official
Complete Remaining Items for Final
BUILDING DEPARTMENT CONDITIONS
1. Complete parking per plans.
2. Install grab bars in accessible restrooms.
3. Insulation certificate.
4. Install handrail 2d-floor mezzanine.
5. Complete fireplace in Commons area.
FIRE DEPARTMENT CONDITIONS
1. Complete curb painting at fire hydrant.
2. Install fire extinguisher tags.
3. Install as built plans box in mechanical room.
Date
SEPA NIDNS CONDITIONS
1. Final approval of landscaping per approved landscape plan by BCD.
2. Final approval of parking lot layout as per approved parking plan.
3. Final approval of the exterior lighting system (modified as agreed); and review of pole mounted
1/2
lights for compliance with SEPA performance standards.
4. Final approval ofmulti-family design review by BCD.
5. Submission and approval of sign permit application by BCD for monument sign and approval
of downward pointed lighting on top of sign (if sign is to be lit.)
6. All exterior service elements shall be screened and landscaped (garbage receptacles, utilities,
mechanical equipment) per landscaping and parking plans.
PUBLIC WORKS CONDITIONS
1. An approved bacteria test for the looped public water line serving Lots 1-4.
2. All maintenance holes, catch basins and pipes must be grouted, cleaned and free from debris.
3. Provide final record drawings certified by your engineer.
JEFFERS ON COUNTY ASSESSOR'S OFFICE
1. Deed exchange after final plat approval to correspond ownership with short plat lot legal
descriptions (legal descriptions of land prior to short plat differed) -provide copies of
recorded deeds to BCD.
cc: JeffRandall, Planner
Tom Aumock, Fire Marshall
Alex Angud, Public Works Inspector
File
2/2
04 QoaT ro~~
DEPARTMENT OF PUBLIC WORKS ~ ~~
ENGINEERING ° _'r = -
WATERMAN S~ KATZ BUILDING ~ ` _ "-
18 I UINCY STREET SUfTE 20 I ~~w~
Q ,
PORT TOWNSEND, WASHINGTON 98368
(360) 385-72 12 (360) 385-7675 FAX
September 15, 1998
LBR Construction
618 S. Peabody Suite 11
Port Angeles WA 98362
Dear Bob:
Subject: San Juan Commons
We received your letter dated September 14, 1998, regarding a Certificate of Occupancy for San
Juan Commons. We remind you that the water system looping must be completed before our
Public Works sign-off on the infrastructure and street development permit will be processed.
Other punch list items prior to Public Works approval are:
Place an asphalt patch in the bike lanes in the road cut at the future north entrance to your
site.
All maintenance holes, catch basins and pipes must be grouted, cleaned and free from
debris.
Provide final record drawings certified by your engineer.
If you have any questions please feel free to call Alex or me.
Sin rely,
avid . Pe r n
City Engineer
cc. Rob Sears
C.L. Flint
Jeff Randall
Tom Aumock
Alex Angud