HomeMy WebLinkAboutBLD97-113r-r
.,,~ City of Port Townsend
- Building and Community Development
540 Water Street
Port Townsend, WA 98358
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 2335 35TH ST
Parcel No: 959700201
Project:
-CONTRACTOR/OWNE
TERHUNE HOMES
PO BOX 97
POULSBO, WA 98370
Issued: 8126/97
Lot: Block:
PERMiT #~ BLD97-00113
WNE
DON LANDSTRA
2516 HASTINGS AVE
PORT TOWNSEND, WA 98368
-PROJECT DESCRIPTIO
Residential -Construction of new single family home (1406 sq ft) with deck (256 sq ft) and porch (192 sq ft)
City Contact: JLZ
Type of work: NEW
Type of use: SF
Census Category: 107
Estimated Value: 3107,399.36
Zoning: R-I
SI Code:
Construction TypeJOcc UselOcc Load
Construction Occupancy
Type 1: SN Group 1: R-3 Load 1:
Type 2: Group 2: Load 2:
Type 3:
Type 4:
Group 3: Load 3:
Group 4: Load 4:
5
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Call 48 hours before you dig for utility line locates
1-800-424-5555
Inspection Date Inspector Inspection Date Inspector
Insp-See Special Conditions ~~ -Stem Wall
TEMP EROSION & SDM'T CON -Forms
Insp-See Special Conditions ~}'~~ -Reinforcement
FOOTINGS ` ~b -Anchor Bolts
-Setbacks -Vents
-Footings -Crawl Access
-Forms -L~t. straint Holdtlwn Hdy/r
U/J' l+L
-Reinforcement FLOOR FRAMIN ~ j
-Interior Footing Insp-See Special Conditions ~,3
-Porch/Deck Bay Piers Insp-See Special Conditions,~J
-LIFER Insp-See Special Conditions ~f
FOUNDATION -Girders
p-See Special Conditions ~,Z -Joists
Page 1 of 4
,,r
City of Port Townsend
Building and Community Development
640 Water Street
Port Townsend, WR 98368 t
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 2335 35TH ST Issued: ans/97
Parcel No: 959700201 Lot: Block:
Project: PERM [~ ~ BLD97-00113
Inspection Date Inspector Inspection Date Inspector
-Blocking -Roof
-Int. Braced Wall Supports -Attic Venting
-Positive Connection -Windows: Egress
-Girder to Concrete -Window U Value
-Treated Wood to Concrete -Window Safety Glazing
-Anchor Bolts & Washers -Air Seal
-FDN Vents -Fresh Air Intake (Wall Ports)
PLUMBING -Door U Value
-Water Supply ~ p W =Fire Blacking
-Hose Bibs (bckflw pro. regd) t 'L n~ -Weather Resistive Barrier
-Pipea-isaFelion ~~ ~ I t p/ INSULATION
-Water Heater -Floor (R-30)
-Seismic Restraint -Wall (R-21)
MECHANICAL -Ceiling (R-30)
-Duct Insulation -Baffles / ~~
-Whole House Fan ./ VAPOR BARRIER
-Source Specific Fan 3 -Paint
-Environmental Air Exhaust -Crawl Space - 6 Mil Poly
FRAMING j 13 DRYWALL NAILING 2 iU
Insp-See Special Conditions „~~ Insp-See Special Conditions.#
Insp-See Special Conditions ~f' -Walls
Insp-See Special Conditions ~f8 -Ceiling
-Walls -Interior Braced Wall Panels
-Engineered Shear Walls -Enclosed Space Under Stairs
-Blk'g for GWB IBW Panels FINAL
-Seismic Anchors Insp-See Special Conditions # Q
-Ceiling Final-House Number
Calt 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
.~
. City of Port Townsend
I Building and Community Development
540 Water Street
Port Townsend, WA 98368
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 2335 35TH ST
Parcel No: 959700201
Project:
Inspection Date Inspector
Final-Plumbing
Final-Mechanical/Heating
Final-Insulation Certificate
Final-Vapor Barrier Cert.
Final-Smoke Detectors
Final-Public Works Sign-Off
Final -Building ~
v
Issued: 8!26/97
Lot: Block:
PE~M~T BLD97-00113
SPECIAL CONDITIONS /RESTRICTIONS
~I . BLDG. CONSTRUCTION: Any change or deviation from stamped plans requires written
authorization from design professional and revision to plans through Building Department.
2. FOUNDATION: See foundation/main floor framing plan, sheet 2/5, for holdown types and
locations.
3. UPPER FLOOR FRAMING: See Sheet 4/5 for unsupported floor ply. panel edge blocking.
4. FLOOR FRAMING: See main floor framing plan, sheet 2/5, for holdown types and locations.
5. UPPER FLOOR FRAMING: See upper floor framing plan, sheet 4/5, for TJI and GLB
connection specs.
6. FRAMING: Signed and recorded Restrictive Covenant required prior to framing inspection.
7. FRAMING: See floor plans, Sheet 3/5, and attached engineering for engineered shear walls.
8. ROOF FRAMING: See roof framing plan, sheet 4/5, for rafter/top plate and rafter/ridge
connections.
9. GWB: See floor plans, sheet 3/5, for interior braced wall panels.
10. FINAL: Recorded No-Protest Agreement required prior to final inspection approval.
11 . TESC: Applicant is responsible for installing erosion and sediment control measures as
needed during construction, including but not limited to: silt fencing, graveled construction
entrance, sweeping of paved surtaces, etc.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
w
City of Port Townsend
Building and Community Development
540 Water Street
Port Townsend, W/h 98368 ~
r
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME i
Call 385-2294 For Inspection
Site Address: 2335 35TH ST Issued: 8!26/97
Parcel No: 959700201 Lot: Block:
Project: PERMIT # BLD97-00113
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, ar if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 or 4