Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLD97-102City of Port Townsend b40 Water Street
Port Townsend, WA 88368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD 8~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 725 18TH ST
Parcel No: 101344005
Project:
-CONTRACTOR/OWNE
GERALD VAN AUSDLE
725 18TH STREET
PORT TOWNSEND, WA 98368
-PROJECT DESCRIPTIO
Residential Addition: Construct pole building for shop.
City Contact: JLZ
Type of work NEW
Type of use: SF
Census Category: 434
EsOmated Value: $7,500.00
Zoning: R-II
SI Code:
Issued: 7/28/97
Lot: Block:
PE~M~T ~# BLD97-00102
WNE
GERALD VAN AUSDLE
72518TH STREET
PORT~TOWNSEND, WA 98368
Construction TypelOcc Use/Oce Load
ConsWCtlon Occupancy
Type 1: SN Group 7: U-2 Load 1:
Type 2: Group 2: Load 2:
Group 3: Load 3:
Group 4: Load 4:
Type 3:
Type 4:
5
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
FOOTINGS -Roof
Insp-See Special Conditions #~ FINAL
-Setbacks Final-House Number
-Footings Final -Building ! =
J ,,~
-Reinforcement
-Post Hole ~~' ~
SLAB
-Reinforcement
FRAMING
Insp-See Special Conditions -#~
-Walls
'smic Anchors
-ceiling
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page t of 2
City of Port Townsend 540 Water Street
Port Townsend, WA 98768
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 725 18TH ST Issued: 7128197
Parcel No: 101344005 Lot: Block:
Project: PERMIT # BLD97-00102
SPECIAL CONDITIONS /RESTRICTIONS
1 . FRAMING: See engineered plans for details re: specified nailing, hlocking, rafter to column
connections, etc. Gable end rafters speed @ 2 - 2 x 8 DF #1. Endwall, comer and sidewall
columns speed ~ HF #1.
2. FOOTINGS: See Sheet #1 and hair pin detail, Sheet #2, far footing/resteel detail.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
~i
•
r,
LJ
Page 2 of 2