Loading...
HomeMy WebLinkAboutBLD97-100Waterman & KaLZBuilding 181 Quincy Street. Sw[e 301 Port Townsend, WA 98368 Phone: (360J 379-3208 Fax: (360)379-6923 7 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Calf 385-2294 for Inspection Permit Number: BLD97-lOO Issued: 6/17/99 Job Address: 1629 Jefferson Zoning: R_II Type: V-NR Total Occupant Load: NA Owner: Souzon, Jane Occupancy: R-3/U-1 Nature of Work: Construct Deck with storage under. Contractor: Townsend Builders GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIl2ED: Electrical- Contact Labor & Industries @ 360-417-2702 RR(1TTTRFTI TNCPF.("TT(lNC APPRnVED/DATE FOOTINGS (Poured Prior To Inspection) Setbacks Footings Forms Reinforcement FOUNDATION (Poured Prior To Inspection) Stem Wall Forms Reinforcement Anchor Bolts FRAMING (okay @ final) Girders Joists Positive Connection Treated Wood to Concrete Positive Connection Girder to Concrete Anchor Bolts & Washers Parcel Number: 989706405 Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 RF(liTiRF,T> TNRPF,CTinNS APPROVED/DATE • Pertni[ # BLIJ97-100 FRAMING (continued) Guardrails Handrails FINAL Smoke Detectors House Number Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction sha116e temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. • 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. • 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2