Loading...
HomeMy WebLinkAboutBLD97-088' City of Port Townsend 540 Water Street Port Townsend, WA 96J68 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2412 SEAVIEW DR Parcel No: 993800014 Project: -CONTRACTOR/OWNE DISCOVERY BAY CONSTRUCTION P. O. BOX 1410 PORT TOWNSEND, WA 98368 Issued: 7124/97 Lot: Block: PERMIT ## BLDS7-aooss WNE RICHARD RUGGLES 2888 HOLLEMGAY CT NW GIG HARBOR, WA 98335 Residential -Construct new home (2320 sq ft) with attached garage (480 sq ft) and porches. City Contact: JLZ Construction Type/Occ UselOCe Load Type of work NEW Construction Occupancy Type of use: SF Type 1: SN Group 1: R-3 Load t: 8 Census Category. 101 Typa 2: Group 2: U-1 Load 2: 2 Estimated Value: $210,000.00 Type 3: Group 3: Load 3: Zoning: R-1 SI Code: Type 4 Group 4: Load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS • Inspection Date Inspector Inspection Date Inspector TEMP EROSION & SDM'T CON -Interior Footing p, 3. ~5 Insp-See Special Conditions ~f~ -Parch Bay Piers ~•3• -Silt Fence -LIFER ,?, -Drive Off Mat FOUNDATION C ,~~ _4 x -Tire Wash Insp-See Special Conditions #f3 -Sweep Paved Surfaces -Stem Wall GROUNDWORK PLUMBING -Forms FOOTINGS -Reinforcement Insp•See Special Conditions #~ -Anchor Bolts 3'paGi Ill'( f-f1.1i5 ~ ___~ -Setbacks -Vents ) - -Footings -Crawl Access - ~$- -Forms -Lat. Restraint Holdown Hdwr -Reinforcement FLOOR FRAMING (Q. ~.~ ~S Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 City of Port Townsend Water Street ~ Port Townsend, WA 9868 Building and Community Development ` BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2412 SEAVIEW DR Issued: 7IZa197 Parcel No: 993800014 Lot: Block: Protect: PERMIT # BLD97-00088 Inspection Date Inspector Inspection Date Inspector Insp-See Special Conditions ~ ~ • -Source Specific Fan -Girders /p.3,~ S -Environmental Air Exhaust -Joists FRAMING -Blocking Insp-See Special Conditions -Shield Under Posts Insp-See Special Conditions .~f g -Int. Braced Wall Supports Insp-See Special Conditions ~ 9 -Positive Connection lnsp-See Special Conditions ##~p -Girder to Concrete -Walls -Treated Wood to Concrete -Braced Wall Panels -Anchor Bolts & Washers Q.71 • „J Seismic Anchors -FDN Vents -Ceiling PLUMBING -Roof Insp-See Special Conditions ,~~r -Attic Venting -Rough-In (D-V-T & Ctn Outs) -Windows: Egress -Water Supply -Window U Value -Gas Supply ' -Window Safety Glazing -Hose Bibs (bckflw pro. regd) -Air Seal -Water Heater -Door(s) -Seismic Restraint -Door U Value MECHANICAL -RaftedTruss Pos. Conn. Insp-See Special Conditions ,~t~ -Fire Blocking -LPG Heater -Weather Resistive Barrier -Exhaust INSULATION -Heat Ducts Insp-See Special Conditions ~~/ -Remote Manifolded Fresh Air -Floor (R-79) -Duct Insulation -Wall (R-19) -Whole House Fan -Ceiling (R-38) ~:' •~ . - Ca1148 hours before you dig for utility line Locates 1-800-424-5555 ` Page 2 of 4 ' City of Port Townsend 540 Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2412 SEAVIEW DR Parcel No: 993800014 Project: Issued: 7/24/97 Lot: PERMIT # Block: BLD97-00088 Inspection Date Inspector -Ceiling (R-30) -Satfles VAPOR BARRIER -4 Mil Poly -Crawl Space - 6 Mil Poly DRYWALL NAILING -Walls -Ceiling -Garage/House Occ. Separation -Enclosed Space Under Stairs L~ ;~ DRAINAGE See Special Conditions #-~~ -Engineered Plan FINAL Insp•See Special Conditions ~j~ Insp-See Special Conditions #~~ Final-House Number Final-Plumbing Fin a I-M ech a ni cal/Heati ng Final-Insulation Certificate Final-Smoke Detectors Final-Public Works Sign-Off Final-LPG (Fire Dept.) Final -Building ""f ~~ j . s~ / / Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 City of Port Townsend 540 Water Street. Port Townsend, WA' 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2412 SEAVIEW DR Issued: ~nat9~ ParoetNo:993800014 PERMIT #~ Block: Project: BLD97-00088 SPECIAL CONDITIONS !RESTRICTIONS 1 . TESC: Engineered plan required prior to framing per Shoreline Perrnit Exemption. Prior to that plan, applicant shall employ all necessary small parcel erosion control measures to control run-off from the site. (see attached DOE BMP's) , 2. FOOTINGS: See architectural plans for footing details and locations. 3. FOUNDATION: See sheets A-7 (footing details and hold-down schedule}, A-8 (shear wall schedule for anchor bolt spacing) and A-9 (footing details) for foundation specifics. All engineered elements require inspection prior to cover e.g., anchor bolts, specified nailing, etc. 4. FLOOR FRAMING: See sheets A-7 and A-8 for double joist locations and anchor bolt spacing. 5. PLUMBING: If water pressure exceeds 80 psi, pressure reducing valve required. 6. MECHANICAL: HVAC contractorto provide certification for fresh air damper setting per WSVIAO 303.1.2 standards. Whole house fan timer to be installed at furnace. Whole house fan requires minimum 120 cfm. 7. FRAMING: Engineered stormwafer plan to be approved prior to framing inspection. 8 . FRAMING: Blocking required at shear walls; see sheet A-8. Pony wall at shear wall requires blocking; see detail #3, sheet A-9. 9. FRAMING: Plans spec 4x and 6x beams and posts at DF #1 ar better. 10. FRAMING: Truss engineering to be reviewed by architect of record. Truss/non-bearing wall fastener to be "STC" anchor, truss/bearing wall fastener to be "H7"anchor. 11 . INSULATION: Plan indicates R-38 blown-in (~ flat ceiling; R-30 required. 12. DRAINAGE: See condition #7 for engineered erosion and stormwater control plan requirement 13. FINAL: HVAC certificate required for fresh air damper setting; see condition #8. 14. FINAL: File copy of recorded Hold Harmless Agreement req'd. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2, Reinspections are required after any corrections are complete. 3, Final Inspections and approvals are required prior to occupancy. 4, All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 G.L._- City of Port Townsend LPG Aoglication & Certificate Of Final Inspection Installer: _~ ~. ~~ on, at A ;, . ~,2 ~// ,2 /~-~=c-~-J bygp CXy, 61tY by fTVr Mechanical Permit No. Building Permit No. 6L D 9~- - 0 00 BB II1StallatSOn Type: ^ New ^ Container Change ^ Other. Insoection Data. 1. Historical District Determination: /U,/rl 2. U.B.C. Use Classification: /Z-3 3. Elements: Cam!"Conraarer(a> a'Piping 'Appliance(s) ^ 4. Container Size/Type: %t5-o :SINE 5. Container Serial No.: d/~f -~<f S 0 6. Container Mfr. Date: ~ _ _ 7. Other tank(s) Type, Size, SB: ~~- 8. Piping Size/Type(s): (~~' PF. (lG 9. Test Pressure,Type: .2 /~ t!Y 10. Appliance Mfr.(s)/Model/SN(s): TJ2ANE Nom fI ~rnE n/.,n /1 ~i3G~ ,t` fl S EP /L! /~ ~°%L (si / 11. Appliance Location(s): GA/lFI 6~ 12. Listing(s): ,~ 13. Miscellaneous: w c ~~~11 2 sru // ~' s~4aBl ~7'~ E P R Schematic Inspection Items PASS Fail N/A Comment /Code Reference Container(s) ® ^ ^ ~-~--~ Piping G~' ^ ^ Regulator(s) a' ^ ^ Apurtenances ^' ^ ^ Setbacks ^ ^ ^ Appliance(s) ^ ^ ^ Other ^ ^ Approval To Render Service: Approved ^ Conditional Approval: ^ Not approved ..Inspected Bv: s,p~.o.. Date: ^ /_ / Time: Stamp Mechanical Fee (2008): State Code Fee (2005): Total Fee: Port Townsend fire Department -LPG Fonn V 6.D - 12J17J97 ~ - ~~ ~ ~-. -.~ .~3 ,~'~°I ~~