HomeMy WebLinkAboutBLD97-072City of Port Townsend 540 Water Street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
• Call 385-2294 For Inspection
Site Address: PORT14 ND CPORT OF PORT TOW Issued: 615!97
Parcel No: 1013001 L ock~
Project: ~EeHIT BLD97-OOJ72
-CONTRACTOR/OWNE
WATERWORKS INC.
2123 EAST BAKERVIEW ROAD
BELLINGHAM, WA
PORT OF PORT TOWNSEND
PO BOX 1180
PORT TOWNSEND, WA 983680980
-rrcv~c~, t uca~,rvr i wrv
Commercial -Boat Wash Building at Port of Port Townsend.
City Contact: Construction TypelOcc UselOcc Load
Type of work: NEW ConsWdion Occupancy
Type of use: COM Type 1: SN Group 1: S-2 Load L
Census Category: Type 2: Group 2 Load 2:
Estimated Value: $30,837.00
Type 3:
Group 3: Load 3:
Zoning: M-IIA
Type 4: Group 4: Load 4:
SI Code:
• SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
( SLAB ~~ (,'(L,>;pgt-1. ~, LIGHTING
-Forms FINAL
! -Monolithic Slab/Fdn Final-House Number
-Reinforcement Final-Building LASTJ-~1-~.Tiu1
PLUMBING g ? ~ Final-Plumbing
-Rough-In (D-V-T & Cln Outs) Final-Fire Dept. Sign-Off '
-Water Supply Final -Electrical (L&I)
MECHANICAL
~ Insp-See Special Conditions # 1
-Source Specific Fan
FRAMING
~ sp-See Special Conditions # 2
l ~lnsp-See Special Conditions ~ 3
Call 48 hours before you dig for utility line locates
• 1-800-424-5555
Page 1 of 2
City of Port Townsend P rtVTownsend,tWA 96368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: PORT14 ND CPORT OF PORT TOW
Parcel No: 1013001
Project:
SPECIAL CONDITIONS /RESTRICTIONS
1 . MECHANICAL: Building is unheated.
2. FRAMING: Engineered metal building.
Issued: 6/5/97
Lo ck:
{~Eef'1 tT ~ BLD97-00072
FRAMING: Special Inspection required per UBC Section 1701.5.6 for bolt tightening
requirements.
GENERAL CONDITIONS
t. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
n
U
•
Page 2 of 2