Loading...
HomeMy WebLinkAboutBLD97-072City of Port Townsend 540 Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME • Call 385-2294 For Inspection Site Address: PORT14 ND CPORT OF PORT TOW Issued: 615!97 Parcel No: 1013001 L ock~ Project: ~EeHIT BLD97-OOJ72 -CONTRACTOR/OWNE WATERWORKS INC. 2123 EAST BAKERVIEW ROAD BELLINGHAM, WA PORT OF PORT TOWNSEND PO BOX 1180 PORT TOWNSEND, WA 983680980 -rrcv~c~, t uca~,rvr i wrv Commercial -Boat Wash Building at Port of Port Townsend. City Contact: Construction TypelOcc UselOcc Load Type of work: NEW ConsWdion Occupancy Type of use: COM Type 1: SN Group 1: S-2 Load L Census Category: Type 2: Group 2 Load 2: Estimated Value: $30,837.00 Type 3: Group 3: Load 3: Zoning: M-IIA Type 4: Group 4: Load 4: SI Code: • SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector Inspection Date Inspector ( SLAB ~~ (,'(L,>;pgt-1. ~, LIGHTING -Forms FINAL ! -Monolithic Slab/Fdn Final-House Number -Reinforcement Final-Building LASTJ-~1-~.Tiu1 PLUMBING g ? ~ Final-Plumbing -Rough-In (D-V-T & Cln Outs) Final-Fire Dept. Sign-Off ' -Water Supply Final -Electrical (L&I) MECHANICAL ~ Insp-See Special Conditions # 1 -Source Specific Fan FRAMING ~ sp-See Special Conditions # 2 l ~lnsp-See Special Conditions ~ 3 Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 1 of 2 City of Port Townsend P rtVTownsend,tWA 96368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: PORT14 ND CPORT OF PORT TOW Parcel No: 1013001 Project: SPECIAL CONDITIONS /RESTRICTIONS 1 . MECHANICAL: Building is unheated. 2. FRAMING: Engineered metal building. Issued: 6/5/97 Lo ck: {~Eef'1 tT ~ BLD97-00072 FRAMING: Special Inspection required per UBC Section 1701.5.6 for bolt tightening requirements. GENERAL CONDITIONS t. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 n U • Page 2 of 2