HomeMy WebLinkAboutBLD97-0594 ~ ~ City of Port Townsend
Building and Community Development
540 Water Street
Port Townsend, WA 96366
BUILDER'S PERMIT AND INSPECTION RECORD
r wT ~GIGN'f C/^TIl11~
Call 385-2294 Fob Nh~ection
~(~I~
Site Address: 3RD 8r ALDE R ~~ l~ Issued: 5!29197
Parcel No: 974700501
~~~
Project: I;L~) ~f t p Lo ~ lock:
(~~ ~~I~'Il~ ~- BLD97-00059
~f~ ~
-CONTRACTOR/OWNE
J
FLAGARD BUILDERS INC. \
STEVE TUCKER
PO 80X 2328 1935 LANDES
MT. VERNON, WA 98273 PORT TOWNSEND, WA 98368
-PROJECT DESCRIPTIO
Commercial -New auto repair shop
Owners: Steve & Cathy Tucker
Cily Contact: Construction TypelOcc UselOcc Load
Type of work: NEW Construction Occupancy
Type of use: COM Type 1: SN Group 1: S-3 Load 1: 13
Census Category: Type 2; Group 2: 8 Load 2: 12
Estimated Value: $140,000.00 Tye 3: Group 3: Load 3:
I Zoning: M1C Type 4: Group 4: Load 4;
SI Code:
SPECIAL CONDITIONSIRESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
TEMP EROSION & SDMT CON F ~'-~ : ~. -Reinforcement ,~ 7 '' ~. ~,(
Insp-See Special Conditions ~ ( /~
-Anchor Bolts ~
FOOTINGS `"~, ~~ '"'l~ ,~,~ ~, SLAB i
Insp-See Special Conditions ~7j I
-Setbacks
-Slab/Radiant ~ - F
-Footings
!-Forms ~ -Insulation '(~-I p (( ~ ~ G
-Reinforcement
PLUMBING n ~ ~~
-Rough-In (D-V-T Cln Outs)
-Interior Footing l g b ~
y
-Water Supp /6
7
-LIFER
FOUNDATION -Gas Supply !
Insp-See Special Conditions ~ Z '~ Hose Bibs (bckflw pro. regd) f (I
tem Wall , , , ~ ~ -Pipe Insulation `
~ ~-- i -Pressure Reduction Valve
r01TTIS ~
,
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page t of 3
City of Port Townsend Water Street
Port Townund, WA 98363
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 3RD ~ ALDER Issued: 5/29~s7
Parcel No: 974700501 lock:
Project: ~~'~-f BLD97-00059
Inspection Date Inspector Inspection Date Inspector
-Water Heater -Roof (R-21) 2 S ~ ~`'
MECHANICAL -Baffles
-Boiler VAPOR BARRIER
-Exhaust Insp-See Special Conditions .}~ 7
-Combustion Air DRYWALL NAILING
esh r Yflk (3WVG. In!(•5 -Walls ~ 23 ~i
-Source Specific Fan ~ DRAINAGE
-Heat Source Equip. & Controls -Engineered Plan
-Efficiency ~ ~
0 PARKING
FRAMING
Ilnsp-See Special Conditions ~ (,~ LANDSCAPING
LIGHTING
,
Insp-See Special Conditions ~ Fj MOTORS
Insp-See Special Conditions # (~ FINAL
-Walls Final-House Number
-Lateral Restraint Panel Final-Building ~~~- lA1SP'>:
-Roof Final-Plumbing
-Attic Venting Final-Insulation Certificate
-Window U Value Final-Vapor Barrier Cert.
-Window Safety Glazing Final-Public Works Sign-Off
-Air Seal Final-Barrier Free Access
-Door U Value Final-Fire Dept. Sign-Off
-Rafter/Truss Pos. Conn. -Smoking/Non Area Signage
'-Firestopping(~pfTy~P c.,pFD-r~ -Fire Extinguishers
-Weather Resistive Barrier
INSULATION
-Slab (R70) C~~ 5t,gp~ I NSPF
-Wall (R-it) ~IGi
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
City of Port Townsend Port ownsendtWA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 3RD & ALDER
Parcel No: 974700501
Project:
SPECIAL CONDITIONS /RESTRICTIONS
Issued: 5/29/97
Lot loc4~
I~NI"j BLD97-00059
1 . TEMP EROSION CONTROL: See approved plan for required site erosion control. Inspection
required for silt fencing, drainage swales, etc., PRIOR to any construction.
2. FOUNDATION WALL: See approved Structural Calculations for placement of anchor bolts for
corner holdowns.
3. SLAB: Groundwork plumbing test PRIOR to cover for drain and waste piping and radiant heat
piping in slab.
4. FRAMING: Street and Utility Development Permit will be approved and paid for by the
applicant PRIOR to the Framing Inspection.
5. FRAMING: Engineer of Record to inspect and certify via letter to Building Department
correctness of all engineered framing details PRIOR to Framing Inspection.
6. FRAMING: Draft stops in soffit every 60 lineal feet.
7, VAPOR BARRIER: Vapor Barrier required in wall and roof system, to be installed on the warm
side of the respective assemblies. Approved vapor retarders are: Kraft faced insulation, 4 mil
poly or approved vapor barrier paint. Alternates may be used if approved by Building
Department.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
~. ~..
City of Port Townsend ,
LPG Aoolication & Certificate Of Final Inspection
Installer:
Nu'v LmWM Plltlv
Permittee:_.~-~- ~k~
o~. ~rl
~. s~
Mechanical Permit No.
Building Permit No.
Installation Type: ^ New ^ Container Change ^ O[her.
Inspection Data.
1. Historical District Determination:
2. U.B.C. Use Classification:
3. Elements: ^ Container(s) ^ Piping ^ app&ance(s) ^
4. Container Size/Type:
5. Container Serial No.:
6. Container Mfr. Date:
7. Other tank(s) Type, Size, SB:
8. PipingSize/Type(s): 3/4!rl3z
9. Test Pressure,Type: R!!= ~' ~lD~
10. Appliance Mfr.(s)/Model/SN(s): }t/~"/L ~r fir: ~,~. //I/
11. Appliance Location(s):
Scfiematic
12. Listing(s): fd~T ~^~-
13. Miscellaneous:
Inspection Items Pass Fail NIA
Container(s) ^ ^ ^
Piping CiY ^ ^
Regulator(s) ^ ^ ^
Apurtenances ^ ^ ^
Setbacks ^ ^ ^
Appliance(s) ^ ^ ^
Other ^ ^
PP
9Rnroval To Render Service:
^ Approved
^ Conditional Approval:
^ Not a roved
ispected Bv:
Comment /Code Reference
Date: O! /~ /~ ~
Time: //.~~Zy
Office Stamp
MechaNcal Fee (20D8): S18.00
State Code Fee (2D05): SQ•50
Port Townsend Fire Department -LPG Form V6.0 - 12!17/97
>,~ ~,~,.