Loading...
HomeMy WebLinkAboutBLD97-058City of Port Townsend 540 Water Street Part Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1500 VAN NESS Parcel No: 948313402 Project: -CONTRACTOR/OWNE PORT TOWNSEND SCHOOL DIST #50 450 FIR ST PORT TOWNSEND, WA 98368 Issued: 5116/97 ~~ZN('T ~ BLD97-00058 ~ PORT TOWNSEND SCHOOL DIST #50 450 FIR ST PORT TOWNSEND, WA 98368 PROJECT DESCRIPTIO Addition of 135.5 sq ft deck to existing building. City Contact: Construction TypelOcc UselOcc Load Type of work: ADD Construction Occupancy Type of use: PUa Type 1: Group 1: Load 1: Census Category: Type 2: Group 2: Load 2: Estimated Value: $2,055.58 Type 3: Group 3: Load 3: Zoning: P-I Type 4: Group 4: Load 4: SI Code: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector FOOTINGS -Porch Bay Piers FRAMING /c ~' ~ FINAL-Deck Insp-See Special Conditions ~{. ~, 2, ~~ ~ ' SPECIAL CONDITIONS /RESTRICTIONS 1 . All inspection may be done at Final Inspection if work to be inspected remains visible. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend 540 Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1500 VAN NESS Issued: 5116197 Parcel No: 948313402 k: Project: ~~l~l~( BLD97-00058 GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2