HomeMy WebLinkAboutBLD97-058City of Port Townsend 540 Water Street
Part Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1500 VAN NESS
Parcel No: 948313402
Project:
-CONTRACTOR/OWNE
PORT TOWNSEND SCHOOL DIST #50
450 FIR ST
PORT TOWNSEND, WA 98368
Issued: 5116/97
~~ZN('T ~ BLD97-00058 ~
PORT TOWNSEND SCHOOL DIST #50
450 FIR ST
PORT TOWNSEND, WA 98368
PROJECT DESCRIPTIO
Addition of 135.5 sq ft deck to existing building.
City Contact: Construction TypelOcc UselOcc Load
Type of work: ADD Construction Occupancy
Type of use: PUa Type 1: Group 1: Load 1:
Census Category: Type 2: Group 2: Load 2:
Estimated Value: $2,055.58
Type 3: Group 3: Load 3:
Zoning: P-I
Type 4: Group 4: Load 4:
SI Code:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector
FOOTINGS
-Porch Bay Piers
FRAMING
/c
~' ~
FINAL-Deck
Insp-See Special Conditions ~{. ~, 2, ~~ ~ '
SPECIAL CONDITIONS /RESTRICTIONS
1 . All inspection may be done at Final Inspection if work to be inspected remains visible.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend 540 Water Street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1500 VAN NESS Issued: 5116197
Parcel No: 948313402 k:
Project: ~~l~l~( BLD97-00058
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2