Loading...
HomeMy WebLinkAboutBLD97-055City of Port Townsend 540 Water Street Port Townsend, WA 96168 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: FAIRGROUNDS Parcel No: iD1344004 Project: JEFFERSON COUNTY COURTHOUSE PO BOX 1220 Issued: 7/9/97 Lot: Block: PERMIT # BLD97-00055 WNE JEFFERSON COUNTY COURTHOUSE PO 69X 1220 -rrcwt~ I ut~cKir I iu Public: Re-construction of shelter for barbeque pit. City Contact: JLZ Construction TypelOcc UselOcc Load Type of work: NEW ConsWction Occupancy Type or use: PUB Type 7: 5N Group 1: - B Load 1: 35 Census Category: 318 Type 2: Group 2: Load 2: Estimated Value: $5,370.24 Type 3: Group 3: Load 3: Zoning: PUB Type 4: Group 4: Load 4: -- SI Code: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector FOOTINGS Insp-See Special Conditions FRAMING ,r- ~ f ~- Insp-See Special Conditions FINAL Final-Building Final-Fire Dept. Sign-Off --- _ , ,- SPECIAL CONDITIONS /RESTRICTIONS 1 . FOOTINGS: F~cisting slab requires alternative anchoring per engineering; two alternatives: 1/2" x 3" wedge anchors ~ 2' 6" o.c. or 1!2" x 2 3/4 bolts embedded 2" min., ~ 2' 6" o.c. max. FRAMING: Double tube with 1"web sealer, frame spacing at 5' o.c., requires 2 - 5/8" diameter bolts @ each joint per engineering. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 or 2 City of Port Townsend ~"" ~nsendWA 99368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: FAIRGROUNDS Issued: 719/97 Parcel No: 101344004 Lot: 11, Block: Project: PERMIT #~ BLD97-00055 GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2