Loading...
HomeMy WebLinkAboutBLD97-040City of Port Townsend a rtwownse dtwassass Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 834 SHERIDAN AVE Parcel No: 948319202 Project: -CONTRACTOR/OWNE JEFFERSON CO PUBL HOSP DIST #2 9TH 8 SHERIDAN PORT TOWNSEND, WA 98368 Issued: 417197 -00040 JEFFERSON CO PUBL HOSP DIST #2 9TH &SHERIDAN PORT TOWNSEND, WA 98368 rrwa~~, i vwviw , iv~~ Commercial -Remodel: Switch reception space with gift shop space, new walls and T-bar ceiling; new T-bar ceiling in lower level storeroom. City Contact: Construction TypelOcc UselOcc Load Type of vrork ALT Construction Occupancy Type of use: PUB Type 1: Group t: Load 1: Census Category: Type 2: Group 2: Load 2: Estimated Value: $10,000.00 Type 3: Group 3: Load 3: Zoning: PUB SI Code: Type 4: Group 4: Load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector Inspection Date Inspector DEMOLITION Final-Mechanical/Heating Insp-See Special Conditions ~ Y Final-Barrier Free Access MECHANICAL ,ZL ~ Final-Fire Dept. Sign-Off -Heat Ducts -Smoking/Non Area Signage -Duct Insulation -Fire Extinguishers FRAMING Final -Electrical (L&I) ~L I-Walls RYWALL NAILING ' ° ~ ~. y;~/9~; -Walls ' T-BAR GRID CEILING . ~ z • ~S LIGHTING ~lZ'97 / .Insp-See Special Conditions ~ 2 ~` Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend PST wnsendtWA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 834 SHERIDAN AVE Parcel No: 948319202 Project: Issued: 4J7197 ock: t~t~~icT ~ BLD97-0004 SPECIAL CONDITIONS /RESTRICTIONS 1 . DEMOLITION: By previous permit. 2. LIGHTING: See attached lighting budget. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2