Loading...
HomeMy WebLinkAboutBLD97-034City of Port Townsend Port o,~sena,twA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8r APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1013 EDDY ST Parcel No: 987002007 Project: MALCOLM R KITTRIDGE 1013 EDDY ST Issued: 3/29/97 Lot: Block: PERMIT ## BLD97-00034 WNE MALCOLM R KITTRIDGE 1013 EDDY ST PORT TOWN A 98368 Residential -Enclosure of existing porch for a sun room (140 sq ft) City Contact: JLZ Type of work: ALT Type of use: SF Census Category: 434 Estimated Value: 52,000.00 Zoning: R1 SI Cade: Construction TypelOee UselOce Load CaisWC~on Occupancy Type t: SN Group is R-3 Load t: Type 2: Group 2: Load 2: Type 3: Type 4: Group 3: Load 3: Group 4: Load 4: SPECIAL CONDITIONSIRESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector Inspection Date Inspe or FOOTINGS :!,~~_ ~~ ~;;,- ~~~,., -Seismic Anchors -Footings INSULATION -Reinforcement Insp-See Special Conditions -#„Z FOUNDATION ~, -y7 / X -Floor (R-19) ~. ~- Insp-See Special Conditions ¢#/ -Wall (R-19) -Stem Wall VAPOR BARRIER -Reinforcement Insp-See Special Conditions ~~ -Vents -Crawl Space - 6 Mil Poly FLOOR FRAMING . / C/• l ~/ ~j DRYWALL NAILING ~ .2?, 97 l~ -Treated Woad to Concrete -Walls G~Nb, FRAMING ~ FINAL Insp-See Special Conditions Final-Building / 0 i 7 ~ ~j, ~Ils Final-Smoke Det. Througout Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend 640 Water Street Port Townsend, WA 98766 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1013 EDDY ST Issued: 3!29197 Parcel No: 987002007 Lot: Block: Project: PERMIT # BLD97-00034 SPECIAL CONDITIONS 1 RESTRICTIONS 1 . FOUNDATION: Seismic Anchors required; see plans for locations. 2. INSULATION: Insulation not required for unheated space. As oftentimes unheated space is eventually converted to heated space and as applicant proposes to insulate walls and floors, applicant may request that the Building Department inspect the insulation to verify compliance with building and energy code standards. 3. VAPOR BARRIER: Not required for unheated space. However, walls and floors separating heated space from unheated space require the installation of a vapor retarder, faced batt insulation must be face stapled. If sun room space may be converted to heated space in the future, applicant may choose to install vapor retarders and have them inspected by the Building Department. 4. FRAMING: Air seal and window u-value compliance not required for unheated space. However, as applicant proposes to install insulated windows and, as unheated space is often converted to heated space, applicant may choose to call the Building Department for inspection. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspedions are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4, All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2