HomeMy WebLinkAboutBLD97-029City of Port Townsend
Building and Community Development
Issued: 3/25197
Lot: _
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1100 JACKMAN ST
Parcel No: 948303608
Project:
KEVIN BOWEN
1110 JACKMAN
PORT TOWNSNED, WA 98368
-PROJECT DESCRIPTIO
Add 224 Sq. Ft. storage shed attached to existing residence.
City Contact: RS Construction TypelOcc UselOcc Load
Type of work: ADD Construction Occupancy
Type of use: SF Type 1: 5N Group is U-1 Load 1: f
Census Category: 328 Type 2: Group 2: Load 2:
Estimated Value: $4,144.00 Type 3: Group 3: Load 3:
Zoning: Rt
TfPe 4: Group 4: Load 4:
SI Code:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
~-Inspection Date Inspector
FOUNDATION ~ Z3'97 ~S
Insp-See Special Conditions
FLOOR FRAMING
Insp-See Special Conditions f,
FRAMING
.Insp-See Special Conditions 3
FINAL
Insp-See Special Conditions
SPECIAL CONDITIONS /RESTRICTIONS
1 . FOUNDATION: Pier block per engineered plans.
FLOOR FRAMING: Inspection may be done at Framing Inspection.
Call 48 hours before you dig for utility line locates
1-800-424-5555
540 Water Street
Port Townsend, WA 98968
BLD97-00029
KEVIN BOWEN
1110 JACKMAN
PORT TOWNSNED, WA 98368
Page 1 of 2
City of Port Townsend 540 Water Street
Port Townsend, WA 98968
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1100 JACKMAN ST Issued: 3125!97
Parcel No: 948303608 Lot: lock:
Project: ~("(~ BLD97-00029.
SPECIAL CONDITIONS i RESTRICTIONS
3. FRAMING: See engineered details on approved plans.
4. FINAL: All inspections may be done at Final Inspection if areas to be inspected are accessible.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspeetions are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2