Loading...
HomeMy WebLinkAboutBLD97-029City of Port Townsend Building and Community Development Issued: 3/25197 Lot: _ BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1100 JACKMAN ST Parcel No: 948303608 Project: KEVIN BOWEN 1110 JACKMAN PORT TOWNSNED, WA 98368 -PROJECT DESCRIPTIO Add 224 Sq. Ft. storage shed attached to existing residence. City Contact: RS Construction TypelOcc UselOcc Load Type of work: ADD Construction Occupancy Type of use: SF Type 1: 5N Group is U-1 Load 1: f Census Category: 328 Type 2: Group 2: Load 2: Estimated Value: $4,144.00 Type 3: Group 3: Load 3: Zoning: Rt TfPe 4: Group 4: Load 4: SI Code: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS ~-Inspection Date Inspector FOUNDATION ~ Z3'97 ~S Insp-See Special Conditions FLOOR FRAMING Insp-See Special Conditions f, FRAMING .Insp-See Special Conditions 3 FINAL Insp-See Special Conditions SPECIAL CONDITIONS /RESTRICTIONS 1 . FOUNDATION: Pier block per engineered plans. FLOOR FRAMING: Inspection may be done at Framing Inspection. Call 48 hours before you dig for utility line locates 1-800-424-5555 540 Water Street Port Townsend, WA 98968 BLD97-00029 KEVIN BOWEN 1110 JACKMAN PORT TOWNSNED, WA 98368 Page 1 of 2 City of Port Townsend 540 Water Street Port Townsend, WA 98968 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1100 JACKMAN ST Issued: 3125!97 Parcel No: 948303608 Lot: lock: Project: ~("(~ BLD97-00029. SPECIAL CONDITIONS i RESTRICTIONS 3. FRAMING: See engineered details on approved plans. 4. FINAL: All inspections may be done at Final Inspection if areas to be inspected are accessible. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspeetions are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2