HomeMy WebLinkAboutBLD97-018City of Port Townsend ~wa~ss~ WA983~
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
• THIS CARD 8< APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 990 UST
Parcel No: 985205804
Project:
-CONTRACTOR/OWNE
DORIS H THURSTON
990 U STREET
PORT TOWNSEND, WA 983683400
Issued: 2/13/97
Lot: Block:
BLD97-00018
OWNE
DORIS H THURSTON
990 U STREET
PORT TOWNSEND, WA 983883400
r nv~~~. ~
Construction of a tool shed (216 sgft)
City Contact:
Type of work: NEW Construction
Type of use: Type 1: SN
Census Category: Type 2:
Estimated Value: 56,000.00 Type 3:
Zoning:
Type 4:
1 SI Code:
Construction TypelOCC UselOcc Load
Occupancy
Group 7: U-7 Load 1:
Group 2: Load 2'.
Group 3: Loatl 3:
Group 4: Loatl 4:
2
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector Inspection ! Date Inspector'
FOOTINGS ~ -Roof
Ilnsp-See Special Conditions ~ -Window Safety Glazing
I-Setbacks -RaftedTruss Pos. Conn.
-Reinforcement FINAL •Z -~ ~/
-LIFER ', Insp-See Special Conditions 2, j
FLOOR FRAMING
-Girders I
r
~-Joists
!-Shield Under Posts
'-Positive Connection
-Girder to Hal1~ DowN
-Treated Wood to Concrete ~
~MING
Call 48 hours before you dig Tor utmty une locates
1-800-424-5555
Page 1 of 2
City of Port Townsend ~eWn"S"`°'
Port Townsend, WA 98398
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD _
THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME .
Call 385-2294 For Inspection
Site Address: 990 UST Issued: 2N 3/97
Parcel No: 985205804 Lot: Block:
Project: BLD97-00018
SPECIAL CONDITIONS /RESTRICTIONS
1 . Footing: See approved plan for hold down schedule. Inspection required at Floor Framing
inspection. '
2. Final: Possible to do Final inspection at Framing inspection.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
peen made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2