HomeMy WebLinkAboutBLD97-017Port Townsend, WA 98368
City of Port Townsend 6'°W~`ef$t'°°`
a
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
• THIS CARD 8~ APPROVED PLANS MUSj~Bg II ONSTRUCTION SITE AT INSPECTION
Site Address: 1504 CL
Parcel No: 984602302
Project:
LITTLE 8< LITTLE
3535 MCNEILL ST
PORT TOWNSEND, WA 98368
`` /
~~Q~~ ~ :rl'~
~~` ~a
r
;~~ r~~, t~°I
Inspection
~-, _ ,_
~l Issueq: 3131/97 ..<-~_. .- ; ~-,; ~. .
1 Lot: Block: ; :~ , , ~ ,
~R~IT ~ BLD97-00017
J LEVY
1284 7TH ST
Residential -New single family dwelling (2000 sq ft} with Carports, porch, deck, unfinished basement, unfinished shop.
City Canted: JLZ Construction Type/Oec Use/(kc Load
Type of work: NEW Constmctlon Occupancy
Type o/use: SF Type 1: SN Group 1: R-3 Load 1: 7
Census Category: 101 Type 2: Group 2: U-1 Load 2:
Estimated Value: 5150,000.00
Type 3: Group 3: Load 3:
Zoning: R1
SI Code: Type 4: Group 4: Load 4:
,, -;:; SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
~: ~ •~~r ~ ~;- ~~- ~ E' ~ _.~ REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
Insp-See Special Conditions ~~ -LIFER
TEMP EROSION & SDM'T CON FOUNDATION
Insp-See Special Conditions ~a, Insp-See Special Condttions ~(~
GROUNDWORK PLUMBING -Stem Wall
Insp-See Special Conditions ~; -Forms
FOOTINGS -Reinforcement
Insp-See Special Conditions ~Y -Anchor Botts
Insp-See Special Conditions ~ -Vents
-Setbacks -Crawl Access
-Footings -Lat. Restraint Holdawn Hdwr
-Forms SLAB
-Reinforcement Insp-See Special Conditions ~$'
Tor Footing -Setbacks
Call 48 hours before you dig for utility line locates j
1-800-424-5555
Page 1 of 3
City of Port Townsend 540 Wateratreet
Port Townsend, W 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD ~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME •
Call 385-2294 For Inspection
Site Address: 1504 CLALLAM Issued: 3/31/97
Parcel No: 984802302 Lot: Block:
Prole«: pFR11AIT # BLD97-00017
Inspection Date Inspector Inspection Date Inspector
-Lat. Restraint Holdown Hdwr -Attic Venting
FLOOR FRAMING -Window U Value
Insp-See Special Conditions ~g -Window Safety Glazing
-Joists -Air Seal
-Bridging -Door U Value
-Positive Connection -Fire Blocking
-Treated Wood to Concrete INSULATION
-Anchor Bolts & Washers -Slab (R10)
-FDN Vents -Floor (R-30)
PLUMBING -Wall (R-19)
Insp-See Special Conditions ~j'q -Ceiling (R-38)
-Rough-In (D-V-T & Cln Outs) -Baffles
-Water Supply VAPOR BARRIER
-Hose Bibs (bckflw pro. regd) -Paint
MECHANICAL -Crawl Space - 8 Mil Poly
-Furnace DRYWALL NAILING
-Remote Manifolded Fresh Air -Walls
-Source Specific Fan -Ceiling
-Vents -Garage/House Occ. Separation
-Water Heater ~ DRAINAGE
FRAMING -Engineered Plan
Insp-See Special Conditions ~fp FINAL
Insp•See Special Conditions Final-House Number
-Walls Final-Building
-Seismic Anchors Final-Plumbing
-Ceiling Final-Insulation Certificate
-Roof Final-Vapor Barrier Cert.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 or 3
City of Port Townsend ~wa~se drWA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
S THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1504 CLALLAM Issued: 3/31/97
Parcel No: 984602302 Lot: Block:
Project: PE~IUIIT # BLD97-00017
Inspection Date Inspector
Final-Smoke Detectors
Final-Public Works Sign-Off
SPECIAL CONDITIONS /RESTRICTIONS
1 . Per Shoreline Exemption LUP97-00011 no further expansions to or additions seaward of this
permitted development are allowed without review under the Shoreline Master Program.
2. TESC: See engineered plan.
3. GROUNDWORK PLUMBING: Unfinished basement with slab foundation shows future
bathroom.
4. FOOTINGS: See engineered plans for resteel, anchor bolts, etc.
FOOTINGS: Front setback variance allows ten-foot front setback. Rear setback is per
shoreline exemption i.e., 100 feet from edge of bluff or the average setback of adjacent
existing dwellings within 300 on either side, whichever is less.
6. FOUNDATION: See engineered plans.
7. SLAB: See engineered plans for holddown locations, etc.
8. FLOOR FRAMING: BCIs proposed for floor framing.
9. PLUMBING: If water pressure exceeds 80# pressure reduction valve required.
1D. FRAMING: Joists, beams and stringers, posts and timbers, speed as #1 per engineered plans.
11 . FRAMING: See engineered plans for shear wall schedule.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspection5 are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 at 3
•