Loading...
HomeMy WebLinkAboutBLD97-005-~ ~ City of Port Townsend PoAyTownsend,WA88.168 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 505 GARFIELD Parcel No: 988800805 Project: -CONTRACTOR/OWNE DISCOVERY BAY CONSTRUCTION P. O. BOX 1410 PORT TOWNSEND, WA 98368 Issued: 4!23/97 Lot: ~T # THOMAS CHAMBERS 1212 GARFIELD Residential new single-family residence (1793 sq ft), garage (342 sq ft), and deck (32 sq ft) Block: BLD97-00005 Cily Contact: JLZ Conatrudion TyprJOcc UselOcc Load Type ofvrork: NEW ConstruMion Occupancy Type of use: SF Type 1: 5N Group 1: R3 Load 1: 6 Census Category. 101 Type 2: Group 2: U-7 Load 2: 2 Estlmaled Value: SZW,OUn.00 Type 3: Group 3: Load 3: Zoning: Rt SI Code: Type 4: Group 4: Load 4: ~ SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE ~\ REQUIRED INSPECTIONS Inspection Date Inspector Inspection Date Inspector Insp-See Special Conditions FLOOR FRAMING ~~G. 7 ~S GROUNDWORK PLUMBING G~' ~2 7 t/s Insp-See Special Conditions Insp-See Special Conditions PLUMBING SLAB x.' pk, ~ , Insp-See Special Conditions 7, 2~ ~ ~CJ -Setbacks Insp-See Special Conditions , •ZZ.9~ ~5 -Forms -Rough-In (D-V-T 8 Cln Outs) -Monolithic SIaWFdn -Water Supply -SlablRadiant -Hose Bibs (bckflw pro. regd) -Reinforcement -Water Heater gyp. ~ S -Interior Footing -18" A.F.F. -Insulation MECHANICAL , ~ ~7 ~ S -Anchor Bolts -Furnace ~ - / ~~ f ~R ~7, 5 -Combustion Air Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 City of Por~t'Townsend 648 Water Shoat ` Port Townsend, WA 96368 ~ 1 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 505 GARFIELD Issued: 4/23/97 Parcel No: 988800805 Lot: Block: Pr°'e°t: hFRMIT ## BLD97-00005 Inspection Date Inspector Inspection Date Insp for -Whole House Fan -Garage/House Occ. Separation ' -Source Specific Fan -Enclosed Space Under Stairs j ""~ -Environmental Air Exhaust FINAL FRAMING ~ Final-House Number Insp-See Special Conditions , Z(-G~ Final-Building Insp-See Special Conditions Final-Plumbing -Walls final-Mechanical/Heating -Alternate Braced Wall Panel ~~ Final-Insulation Certificate 'p ( S -Ceiling Final-Vapor Barrier Cert. -Roof Final-Smoke Detectors -Window U Value Final-Public Works Sign-Off -Air Seal Final-LPG (Fire Dept.) -Fresh Air Intake (Wall Ports) -DoorUValue -Ai '(~tz~k-- y'va"~~V ~" -Fire Blocking y 5 ~I ~ -Weather Resistive Barrier INSULATION ,L1.y, -Wall (R-19) -Ceiling (R-30) -Baffles ~° ` VAPOR BARRIER 0, r( ~ ~ JS ~iSU,rb a -Paint 9f~ (L~~V~.- ~ ~ P DRYWALL NAILING ~ (, ~QCJ ~ '~~th ~ ~W GQ~~b ~ ~ ~? Insp-See Special Conditions ~ ~~ 0~ ~ %e"" -Walls -Ceiling -Interior Braced Wall Panels Call 48 hours before you dig for utility line locates 1-800-424-5555 A w l s~ Page 2 of 3 City of Port Townsend 640 Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 505 GARFIELD Issued: 4/23/97 Parcel No: 988800805 Lot: Block: Protect: PERMIT ## BLD97-00005 SPECIAL CONDITIONS /RESTRICTIONS 1 . PUBLIC WORKS: 8' parking strip on Garfield Street originally required as a condition of this permit is deleted as a condition for development of this property due to recent adoption of the new engineering design standards. Waiver of this requirement is conditional upon applicant's agreement that parking on the existing paved travel way is not permitted. If applicant chooses to develop on-street parking at a later date, submittal and approval of a Minor Activities Permit is required. 2. PLUMBING: Radiant floor heating in slab. 3. FLOOR FRAMING: Floor framing inspection may be done at same time as framing inspection. 4. PLUMBING: If water pressure exceeds 80#, pressure reduction valve required. 5. PLUMBING: Hydronic baseboards provide second floor heat. FRAMING: See pages S1 and S2 of plans for location of plywood sheathed braced wall panels 7. FRAMING: Blocking required at horizontal joints for GWB interior braced wall lines. 8. DRYWALL NAILING: Inspection required for GWB interior braced wall panels. See pages S1 and S2 for panel locations. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. ReinspeGions are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 T i