BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 505 GARFIELD
Parcel No: 988800805
Project:
-CONTRACTOR/OWNE
DISCOVERY BAY CONSTRUCTION
P. O. BOX 1410
PORT TOWNSEND, WA 98368
Issued: 4!23/97
Lot:
~T #
THOMAS CHAMBERS
1212 GARFIELD
Residential new single-family residence (1793 sq ft), garage (342 sq ft), and deck (32 sq ft)
Block:
BLD97-00005
Cily Contact: JLZ Conatrudion TyprJOcc UselOcc Load
Type ofvrork: NEW ConstruMion Occupancy
Type of use: SF Type 1: 5N Group 1: R3 Load 1: 6
Census Category. 101 Type 2: Group 2: U-7 Load 2: 2
Estlmaled Value: SZW,OUn.00
Type 3: Group 3: Load 3:
Zoning: Rt
SI Code: Type 4: Group 4: Load 4:
~ SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
~\ REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
Insp-See Special Conditions FLOOR FRAMING ~~G. 7 ~S
GROUNDWORK PLUMBING G~' ~2 7 t/s Insp-See Special Conditions
Insp-See Special Conditions PLUMBING
SLAB x.' pk, ~ , Insp-See Special Conditions 7, 2~ ~ ~CJ
-Setbacks Insp-See Special Conditions , •ZZ.9~ ~5
-Forms -Rough-In (D-V-T 8 Cln Outs)
-Monolithic SIaWFdn -Water Supply
-SlablRadiant -Hose Bibs (bckflw pro. regd)
-Reinforcement -Water Heater gyp. ~ S
-Interior Footing -18" A.F.F.
-Insulation MECHANICAL , ~ ~7 ~ S
-Anchor Bolts -Furnace ~ - / ~~ f
~R ~7, 5 -Combustion Air
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
City of Por~t'Townsend 648 Water Shoat `
Port Townsend, WA 96368 ~ 1
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 505 GARFIELD Issued: 4/23/97
Parcel No: 988800805 Lot: Block:
Pr°'e°t: hFRMIT ## BLD97-00005
Inspection Date Inspector Inspection Date Insp for
-Whole House Fan -Garage/House Occ. Separation '
-Source Specific Fan -Enclosed Space Under Stairs j ""~
-Environmental Air Exhaust FINAL
FRAMING ~ Final-House Number
Insp-See Special Conditions , Z(-G~ Final-Building
Insp-See Special Conditions Final-Plumbing
-Walls final-Mechanical/Heating
-Alternate Braced Wall Panel ~~ Final-Insulation Certificate 'p ( S
-Ceiling Final-Vapor Barrier Cert.
-Roof Final-Smoke Detectors
-Window U Value Final-Public Works Sign-Off
-Air Seal Final-LPG (Fire Dept.)
-Fresh Air Intake (Wall Ports)
-DoorUValue -Ai '(~tz~k-- y'va"~~V ~"
-Fire Blocking y 5 ~I ~
-Weather Resistive Barrier
INSULATION ,L1.y,
-Wall (R-19)
-Ceiling (R-30)
-Baffles ~°
`
VAPOR BARRIER 0, r( ~ ~ JS ~iSU,rb
a
-Paint 9f~
(L~~V~.-
~
~
P
DRYWALL NAILING ~ (, ~QCJ ~
'~~th
~
~W
GQ~~b
~
~ ~?
Insp-See Special Conditions ~
~~
0~
~ %e""
-Walls
-Ceiling
-Interior Braced Wall Panels
Call 48 hours before you dig for utility line locates
1-800-424-5555
A
w
l
s~
Page 2 of 3
City of Port Townsend 640 Water Street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 505 GARFIELD Issued: 4/23/97
Parcel No: 988800805 Lot: Block:
Protect: PERMIT ## BLD97-00005
SPECIAL CONDITIONS /RESTRICTIONS
1 . PUBLIC WORKS: 8' parking strip on Garfield Street originally required as a condition of this
permit is deleted as a condition for development of this property due to recent adoption of the
new engineering design standards. Waiver of this requirement is conditional upon applicant's
agreement that parking on the existing paved travel way is not permitted. If applicant chooses
to develop on-street parking at a later date, submittal and approval of a Minor Activities Permit
is required.
2. PLUMBING: Radiant floor heating in slab.
3. FLOOR FRAMING: Floor framing inspection may be done at same time as framing
inspection.
4. PLUMBING: If water pressure exceeds 80#, pressure reduction valve required.
5. PLUMBING: Hydronic baseboards provide second floor heat.
FRAMING: See pages S1 and S2 of plans for location of plywood sheathed braced wall panels
7. FRAMING: Blocking required at horizontal joints for GWB interior braced wall lines.
8. DRYWALL NAILING: Inspection required for GWB interior braced wall panels. See pages S1
and S2 for panel locations.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. ReinspeGions are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3 T