HomeMy WebLinkAbout9412-20CITY OF PORT TOWNSE]VD ~~ =~ ,~,~<''~
BUILDER'S PERMIT & INSPECTION RECORD ~ l -- ~~~
~.
~.~ti.
Permit Number
Job Address
CALL 385-2294 FOR INSPECTION
941 2-20 Issued 1 ~~ 0/95 Treasurer's Number
1629 Jefferson Zoning R-1 Type V-N
Occupancy R3
Nature of Work Replace Foundation Use of Buildingls) Residential
Owner Jane Souzon Contractor Townsend Builders
***Future Construction to Comply with Foundation Design***
1. GROUNDWORK: Plumbing _ Inspector Date
_ ~;
~~ ,-
2. FOOTINGS/SLAB: Setbacks~~t~ ~~S" FOfmS<-r -v,~.Reinforcement;T~h3s•Slab
,,
UFER~lT'/L~. Inspector~i%:%!~' ~~%. Date
3. FOUNDATION W LL: Forms Reinforcementt~ Weather Proofing Vents
``~~ ~
/'~!i~,u, , ? Crawl Access Inspector T.?~ v - Date ~/~;
4. FLOOR FRAMING: Girders Joists Bridging Shield under Posts
Positive Post/Girder Connect Girder/Concrete - 1 /2"
Treated Wood to Concrete Anchor Bolts w/ Washers
5. PLUMBING:
6. MECHANICAL:
Drains: Vents Traps_ Clean-Outs
Date
Water Supply_ Gas Supply Hose Bibs IAt. Vac. Break.)
Inspector
Date
Furnace Exhaust Heat Ducts Solid Fuel App.
Inspector
7. FRAMING:
Date
Walls Ceiling Roof Vents Windows
Air Seal
Chimney Straps
In-Wall Penetrations Fresh Air Intake( 1
Inspector
Date
8. INSULATION: Floor{ I Wall( ) Ceiling{ ) Baffles
Inspector Date
Call 48 hours before you dig for utility line locates
1-800-424-5555 -PBga, of z-
Inspector
Name of Permit Holder
Building Permit !6
Date
9. DRYWALL NAILING: Walls Ceiling Inspector Date
10. DRAINAGE: Inspector Date
t t , FINAL INSPECTION; Building ~-~ Plumbing 'f Mechanical/Heating
Smoke Detectors ~ House Number ~
Vapor Barrier) ~ LPGIFire Department) ~~
Insulation Certificate Inspector Date~'Y~
~' ~f' Publfc Works and/or Fire Depamnent improvements were required as a condition of vnur
Derntit please caU the Public Works Deeamnent at 385 9212 and ask them to sign o(f on vnur
nrpjgct orior to calling the Buildiae Detrartment for a final injection Do not occupy a bw7ding
before a fora) inspection or ce~f' rcate of occupancy is obtained.
***;All building permits expire {l' no pmgress has been made within six months, or j f no
inspections have been made by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active. ****
-Papa 2 ~ -