Loading...
HomeMy WebLinkAbout9406-18W atetman & Katz Birilding 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD9406-18R-1 Issued: 11/03/03. Parcel Number: 957-311-305 Job Address: 536 Cass Street Zoning: RR=II Type: VV=N Occupancy: R-3 Total Occupant Load: No Chance Nature of Work: Revision #1: Component performance calculations for Washin¢ton State Ener2y Code Compliance in residential remodel Owner: John & Phyllis Marckworth Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 See Original Permit 9406-18 for other permits REQUIRED INSPECTIONS APPROVF,D/i)ATF, FRAMING - - - - - - - See attached calculations for Door and Window U-Factors INSULATION See attached calculations for Ceiling, Floor and Wall U-Factors FINAL .See original inspection record Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pmmt # BLD9406-I BR-1 .N , AT. ONDITIONC 1. Contractors working on this project are required to Gave a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11 3 85-2 2 94. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. SoIIs exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require fnspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required after inspection report corrections are completed. 6. The Bullding Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one yeah Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rn for to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 CSTY OF PORT TOWNS END ~~~~II~~ ~~' i'. l BUILDER'S PERMIT & INSPECTION RECORD j~,~' (See Instructions on Attached Sheet) ' Z/-~ THIS CARD MUST BE POSTED AT CONSTRUCTION SITE ~ ~~~ ~ ~ ~ ~~~ , CALL 385-2294 FOR. INSPECTION ~~ ~.~• ~~r~~~D~-- Permit Number 9406-18 Issued 6/24/94 Treas. Ho ~~ • ) 12~~~~' ~~~ Job Address 536 Cass Street Zoning R-1 Type V-N Occupancy R-3 Nature of Stork RPSj(~Qntial Additj.~ Dse of Building{s) finale family dxellina Diner John & Phy I s Ma-rc c~xo`rth -Contractor Same as newer *NeW ENeRGY coDe* 1. GROUNDWORK: Plumbing- InSpeCt~L Date 2. FOOTINGS/SLABS: Setbacks ^' Forns_ Reinforcement i Slabs , UFER h~;~~t" _ ~^ ___ _ Inspector ~'-- ~' Date ~~ !`~-`%~,~ 3. FOUNDATION WALL: Foss ~~ Reinforcement Weather Proofinq~~~ Vents / Czavl ~Acess 4 ~ ~~r. ~~ Date ~ "~~'~~ 4. FLOOR FBAMING:: Girders Joists Bridging Shield Dnder ts~ positive Post/Girds/r Connect Girder/Concrete-1/2"~~ Treated Wood to Concrete Anchor Botts r/Washers / / ~ ~ ~ Inspector ~~ Date~~ ' I ~PLDlDIIHG: Drains [/vents~L Props ~ Clean-outs !/'later Supply ~./ Gas S ly OSE BIBB At. Vac. Bre/ak) Inspector Date 6. NEfS1YNICAL: Furnace- Exhaust V Heat Ducts- Inspector Date ~. FRAMING: +ia1Ls~~Ceilinq~8oof1t Vents~j Wfndovs1~ pu ~~ ~~/Qq In Wall Penetrations L/ mey Stra d inspector•_.,,_ DatE~~~~`~` 8. INSDLATION: Floor ~~ Wall ~ Cefi/linq~6 Baffles / ,LJI![iulp/N~ ~~~ ~ ~C C~yL*I~+~1 Inspector~,~ Date1!~7~'_Z_9 9. DRYWALL HAILING: Walls Ceiling / ( Inspector ~' ~ Date Zd 10. DRAINAGE: N/A Inspector Date 11. FINAL INSPECTION: Building Pluib. Nech/heating Smoke Det. House Ho. Barrier: Insulation Certificate- Inspector Date poly _V. B. Paint -Kraft Paper (certisute rcq~;r«q LPG (Fire Department) Date CaY1 48 hours before you dig for ~uti 1 ity Z ine locates 1- 8 0 0- 4 2 4- 5 5 5 5