HomeMy WebLinkAboutRainier Street & 20th Street WTF Offsite UtilitiesCONFORMED DRAWINGS
C o n t r a c t D r a w i n g s F o r
Water Treatment Facility
Site Work and Off-Site Utilities
Port Townsend, WA
August 2015
HDR Project No.
224954
City Project No.
6161
VICINITY MAP
LOCATION MAP
I N D EX O F D R A W I N G S
GENERAL:
1 00G-01 COVER SHEET
2 00G-02 GENERAL SYMBOLS AND LEGEND
3 00G-03 KEY PLAN
4 00G-04 SURVEY CONTROL PLAN
5 00G-05 CONSTRUCTION SEQUENCING REQUIREMENTS
WATER TREATMENT FACILITY AND 5MG RESERVOIR SITE:
6 00C-01 OVERALL SITE PLAN AND STAGING
7 00C-02 GRADING PLAN 1
8 00C-03 GRADING PLAN 2
9 00C-04 5MG AND WTF TESC PLAN
10 00C-05 SITE GRADING SECTIONS WTF
11 00C-06 SITE GRADING SECTIONS RESERVOIR AND BOOSTER PUMP STATION
12 00C-07 MISC SECTIONS AT WTF AND 5 MG RESERVOIR SITE
13 00C-08 STORMWATER PIPING, BIO-SWALE AND DITCH PROFILES
14 00C-09 STORMWATER EXISTING CONTROL STRUCTURE MODIFICATIONS
15 09C-10 WATER PIPE PLAN AND PROFILE STA 38+20 TO 43+00
16 09C-11 WATER PIPE PLAN AND PROFILE STA 43+00 TO 47+00
OFFSITE UTILITIES:
17 09C-12 WATER PIPE PLAN AND PROFILE STA 47+00 TO 52+00
18 09C-13 WATER PIPE PLAN AND PROFILE STA 52+00 TO 57+00
19 09C-14 WATER PIPE PLAN AND PROFILE STA 57+00 TO 63+00
20 09C-15 WATER PIPE PLAN AND PROFILE STA 63+00 TO 68+00
21 09C-20 SANITARY SEWER PLAN AND PROFILE STA 7+00 TO 12+00
22 09C-21 SANITARY SEWER PLAN AND PROFILE STA 12+00 TO 16+00
23 09C-22 SANITARY SEWER PLAN AND PROFILE STA 16+00 TO 21+00
24 09C-23 SANITARY SEWER PLAN AND PROFILE STA 21+00 TO 26+00
25 09C-24 SANITARY SEWER PLAN AND PROFILE STA 26+00 TO 31+00
26 09C-25 SANITARY SEWER PLAN AND PROFILE STA 31+00 TO 36+20
27 09C-30 20th STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 1
28 09C-31 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 2
29 09C-32 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 3
30 09C-33 20TH STREET TRAIL BAKER ST TO SE CORNER OF SITE SECTIONS AND PROFILES
31 09C-33A 20TH STREET TRAIL HOWARD ST TO ST. HELENS ST SECTIONS AND PROFILES
32 09C-34 TYPICAL TRAIL SECTIONS
33 09C-35 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD SECTIONS PHASE 2
OFFSITE UTILITIES (CONT):
34 09C-40 DUCT BANK PLANS 1
35 09C-41 DUCT BANK PLANS 2
36 09C-42 DUCT BANK PLANS 3
37 09C-43 DUCT BANK PLANS 4
38 09C-44 DUCT BANK PLANS 5
39 09C-45 POWER AND TELECOMMUNICATION VAULTS LAYOUT
TRAFFIC CONTROL:
40 09C-47 ROAD CLOSURE AND DETOUR
41 09C-48 ONE LANE TWO WAY RANIER STREET
ESC & RESTORATION PLANS:
42 09C-50 OFFSITE UTILITIES ESC & RESTORATION PLANS 1
43 09C-51 OFFSITE UTILITIES ESC & RESTORATION PLANS 2
44 09C-52 OFFSITE UTILITIES ESC & RESTORATION PLANS 3
45 09C-53 OFFSITE UTILITIES ESC & RESTORATION PLANS 4
46 09C-54 OFFSITE UTILITIES ESC & RESTORATION PLANS 5
47 09C-55 OFFSITE UTILITIES ESC & RESTORATION PLANS 6
48 09C-56 OFFSITE UTILITIES ESC & RESTORATION PLANS 7
49 09C-60 20th STREET IMPROVEMENT PLAN AND SECTIONS
50 09C-61 20th STREET IMPROVEMENT TESC AND RESTORATION PLAN
51 09C-62 20th STREET IMPROVEMENT PROFILE AND SECTIONS
DETAILS:
52 09C-70 TYPICAL TRENCH SECTIONS AND SURFACE RESTORATION DETAILS
53 09C-71 TESC DETAILS 1
54 09C-72 TESC DETAILS 2
55 09C-73 ROADWAY DETAILS
56 09C-74 WATER APPURTENANCE DETAILS 1
57 09C-75 WATER APPURTENANCE DETAILS 2
58 09C-76 SEWER DETAILS
59 09C-77 STORMWATER DETAILS 1
60 09C-78 STORMWATER DETAILS 2
61 09C-79 STORMWATER DETAILS 3
62 09C-80 CATHODIC PROTECTION DETAILS
63 09C-81 BOLLARD DETAILS
HVF
X
20
WTL WTL
WTL
100 YEAR
75.8
SANITARY SEWER MANHOLE
SANITARY SEWER PIPELINE
CATCH BASIN
CULVERT
STORM DRAIN PIPELINE
175+00
WATER PIPE CENTERLINE
WATER PIPE SINGLE LINE
WATER PIPE DOUBLE LINE
ISOLATION VALVE
TRENCH PLUGS
BLIND FLANGE
CATCH BASIN INSERT
A
IRR
SD
UGF
UGTV
OHE
OHF
OHT
OHTV
MONUMENT
MONUMENT IN CASE
REBAR & CAP
SCRIBED "X"
PK NAIL
METAL SIGN POST
WOOD SIGN POST
SANITARY SEWER MANHOLE
STORM DRAIN MANHOLE
CATCH BASIN
WATER METER
GAS VALVE
TRAFFIC JUNCTION BOX
TRAFFIC SIGNAL POLE
W/ LUMINAIRE
LUMINAIRE (SINGLE
FIXTURE)
LUMINAIRE (SINGLE
FIXTURE)
W/CONDUITS TO
UNDERGROUND
ELECTRICAL JUNCTION
BOX
POWER METER
TELECOMMUNICATION
JUNCTION BOX
CABLE TV JUNCTION BOX
JUNCTION BOX
TELECOMMUNICATION RISER
UTILITY POLE
UTILITY POLE W/CONDUITS
TO UNDERGROUND
GUY ANCHOR
GUY POLE
X
XXX
GENERAL
PLAN AND PROFILE
ESC AND RESTORATION
TRAFFIC CONTROL
SPECIAL CROSSINGS
00
01
02
03
04
REPRESENTATIVE
LOCATION OF DETAIL
X
-
DETAIL NUMBER
DETAIL
SCALE: 3" = 1'-0"
ELEVATION
SCALE: 3" = 1'-0"
X
ELEVATION LETTER
DETAIL MARKER
XX
* DRAWING WHERE
ELEVATION IS LOCATED
SINGLE ELEVATION OR PHOTO MARKER
* IF PLAN AND SECTION, OR DETAIL CALL-OUT AND
NUMBER IS REPLACED BY A LINE (-).
DETAIL ARE SHOWN ON SAME DRAWING, DRAWING
GENERAL NOTES
B-101
TP-101
CIVIL SYMBOLOGY EXISTING CIVIL SYMBOLOGY
GATE POST
MAIL BOX
CONIFEROUS TREE
DECIDUOUS TREE
TEST HOLE (WITH FIELD IDENTIFIER)
YARD LIGHT OR LUMINAIRE
W/NO MAST
GRATE INLET
CORRUGATED POLYETHYLYNE PIPE
REINFORCED CONCRETE PIPE
CAST IRON PIPE
CORRUGATED METAL PIPE
DUCTILE IRON PIPE
WATER MANHOLE
WATER VALVE
FIRE HYDRANT
GENERAL
CIVIL
ELECTRICAL
G
C
E
1
5255
20
MHHW
WTL WTL
WTL
EOP
CB
OHW
POWER VAULT
ASPHALT OVERLAY
CONCRETE
GRAVEL, DRAIN ROCK OR
AGGREGATE BASE
SANDBAG REVETMENT
CRUSHED GRAVEL SURFACING
DEMOLITION
RIPARIAN
SALT WATER EDGE
WET NATIVE SEED MIX
LOW GROW SEED MIX/
LAWN SEED MIX
UPLAND UPLAND SEED MIX
EROSION CONTROL BLANKET
OR MATT
CP
##
21
21
CONSTRUCTION NOTES
1. VERIFY THE LOCATIONS, ELEVATIONS, DIAMETERS, MATERIALS, AND OTHER PARAMETERS OF EXISTING FACILITIES TO WHICH NEW FACILITIES CONNECT BEFORE
BEGINNING ANY WORK.
2. LOCATION OF UNDERGROUND UTILITIES (UGT) IS APPROXIMATE. VERIFY UGT LINE LOCATION BEFORE TRENCHING.
3.VERIFY INVERT ELEVATION OF EXISTING UTILITIES BY POTHOLING A MINIMUM OF 200 FEET AHEAD OF WATERLINE INSTALLATION.
4.PROTECT ALL EXISTING UTILITIES, SERVICE CONNECTIONS AND ALL SURFACE IMPROVEMENTS. CONTRACTOR SHALL REPAIR ALL SERVICE CONNECTIONS WHETHER
SHOWN ON THESE PLANS OR NOT.
5. PROTECT ALL EXISTING UTILITIES AND SURFACE IMPROVEMENTS. CONTRACTORS SHALL COORDINATE WITH PROPERTY OWNERS DURING CONSTRUCTION TO AVOID
DAMAGING EXISTING FACILITIES. CONTRACTOR SHALL BE RESPONSIBLE TO IDENTIFY AND LOCATE ALL EXISTING UTILITIES ON PRIVATE PROPERTY.
6. CONSTRUCTION ACTIVITIES SHALL NOT EXTEND BEYOND THE CONSTRUCTION LIMITS SHOWN IN THE PLANS WITHOUT PRIOR APPROVAL OF THE ENGINEER.
7. REFER TO EROSION AND SEDIMENTATION CONTROL DRAWINGS FOR PROTECTION AND RESTORATION REQUIREMENTS.
8. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING, MAINTAINING AND REMOVING TEMPORARY ACCESS ROADS AND RESTORATION OF CONSTRUCTION AREAS TO
PRE-CONSTRUCTION CONDITION OR BETTER.
9. EXCESS TRENCH MATERIALS MUST BE HAULED OFF SITE. NO SPOILS SHALL BE SPREAD IN WETLANDS OR WETLAND BUFFERS. NO MATERIALS SHALL BE STOCKPILED
IN WETLANDS OR WETLAND BUFFERS.
10.TURBID WATER GENERATED FROM CONSTRUCTION ACTIVITIES, INCLUDING TURBID DEWATERING WATER, SHALL NOT BE DISCHARGED DIRECTLY TO ANY SURFACE
WATER. TEMPORARY SEDIMENT PONDS OR PORTABLE TANKS SHALL BE USED AS NECESSARY TO ALLOW THE TURBID WATER TO SETTLE BEFORE DISCHARGE.
DEWATERED GROUNDWATER CAN BE TREATED USING PORTABLE TANKS ONSITE OR TREATED AND DISPOSED OFFSITE, PER APPLICABLE RULES AND GUIDELINES OF
THE DEPARTMENT OF ECOLOGY NPDES PERMIT.
GENERAL SYMBOLOGY
X
XXX
X
XXX
X
XXX
FIRST CUT
ARROW INDICATES
SCALE: 1/4" = 1'-0"
PLAN
SECTION
SCALE: 3/8" = 1'-0"
SECTION LETTER
PLAN NORTH
DIRECTION OF
SECTION VIEW IS* DRAWING WHERE
FLAG INDICATES DIRECTION
OF SECTION CUT
SECTION LETTER
* DRAWING WHERE
SECTION VIEW IS LOCATED
DETAIL NUMBER
* DRAWING WHERE
DETAIL IS LOCATED
SECTION CUT MARKER
WATER PIPE STATIONING
AND TICKS
TRAFFIC
STRUCTURAL
CATHODIC PROTECTION
T
S
CP
DETAILS
CATHODIC PROTECTION
DECOMMISSIONING
WATER SERVICE LINES
05
06
07
08
DRAWING DISCIPLINE ABBREVIATIONS
(1ST DIGIT)
DRAWING SERIES DESIGNATIONS
(1ST TWO DIGITS)
IDENTIFICATION SYMBOLOGY
ARROW
INDICATES
POINT OF
VIEW
ELEVATION IDENTIFICATION LETTER
* DRAWING WHERE POINT OF
VIEW MARKER CAN BE FOUND
GENERAL NOTES
1.ALL WORK AND MATERIAL SHALL CONFORM TO THE PROJECT
SPECIFICATIONS AND THE STANDARDS AND SPECIFICATIONS
OF THE CITY OF PORT TOWNSEND. A SET OF APPROVED
PLANS AND SPECIFICATIONS SHALL BE KEPT ON SITE AT ALL
TIMES DURING CONSTRUCTION.
2.THE CONTRACTOR SHALL ARRANGE AND ATTEND A
PRE-CONSTRUCTION CONFERENCE PRIOR TO THE START OF
CONSTRUCTION.
3.THE LOCATION, TYPE, NUMBER, SIZE, AND MATERIAL OF ALL
EXISTING UTILITIES SHOWN ON THESE PLANS IS
APPROXIMATE AND SHOULD NOT BE CONSIDERED
COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING
UTILITIES THAT MAY AFFECT OR ALTER THE IMPLEMENTATION
OF THIS PROJECT BY POTHOLING, VISUAL INSPECTION,
COORDINATION WITH EXISTING UTILITY COMPANIES, OR
OTHER MEANS AS APPROPRIATE. THE CONTRACTOR SHALL
CALL (1-800-424-5555) AND ARRANGE FOR FIELD LOCATION OF
THE EXISTING FACILITIES PRIOR TO CONSTRUCTION, AND
THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS
FOR PROTECTION OF EXISTING UTILITIES DURING
CONSTRUCTION. RESPONSIBILITY FOR UNDERGROUND
FACILITIES OR UTILITIES IS GOVERNED BY THE PROVISIONS
OF CHAPTER 19.122 REVISED CODE OF WASHINGTON.
4.OVERHEAD ELECTRICAL POWER, TELEPHONE, CABLE TV, AND
OTHER OVERHEAD LINES ARE GENERALLY NOT SHOWN. THE
LINES THAT ARE SHOWN ARE LOCATED BY POINT-TO-POINT,
POLE OR TOWER TO POLE OR TOWER. DETERMINE THE
EXTENT OF HAZARDS OR IMPACTS ON CONSTRUCTION
ACTIVITIES CREATED BY OVERHEAD OR UNDERGROUND
ELECTRICAL POWER, TELEPHONE, CABLE TV, AND OTHER
LINES IN ALL AREAS, AND FOLLOW PROCEDURES DURING
CONSTRUCTION AS REQUIRED BY LAW AND REGULATIONS.
PRIOR TO CONSTRUCTION, MEET WITH UTILITY OWNERS TO
DETERMINE THE EXTENT OF HAZARDS AND TAKE WHATEVER
PRECAUTIONS AND REMEDIAL MEASURES THAT MAY BE
REQUIRED TO PROTECT PERSONS AND PROPERTY AND TO
AVOID DISRUPTION OF SERVICE.
5.MAINTAIN CONVEYANCE OF STORM DRAINAGE AND SEWAGE
FLOWS DURING THE CONSTRUCTION AND DURING THE
REPLACEMENT, MODIFICATION OR RESTORATION OF
EXISTING FACILITIES.
6.SMALL HORIZONTAL AND VERTICAL ANGLE POINTS SHOWN
ON THE PLAN AND PROFILE ARE FOR ALIGNMENT ONLY. FOR
DEFLECTIONS LESS THAN 5 DEGREES, IT IS NOT INTENDED
TO CUT THE PIPE TO PROVIDE DEFLECTION AT THAT EXACT
LOCATION. PIPE DRAINS AND AIR VALVE LOCATIONS SHALL
BE ADJUSTED TO THE HIGH AND LOW POINT RESPECTIVELY.
7.ELEVATIONS SHOWN ON THE PLAN AND PROFILE DRAWINGS
ARE CENTERLINE OF PIPE ELEVATIONS UNLESS OTHERWISE
NOTED. STATIONS AND ELEVATIONS AT VERTICAL BENDS ARE
AT PIPE CENTERLINE UNLESS OTHERWISE NOTED.
8.PIPELINE SLOPES SHOWN ON THE PLAN AND PROFILE
SHEETS ARE APPROXIMATE. IN CASE OF A DISCREPANCY
BETWEEN THE SLOPE AND THE STATION/ELEVATION
CALLOUTS, THE STATION/ELEVATION CALLOUTS SHALL
CONTROL.
9.CONSTRUCT PIPE ON UNIFORM SLOPE BETWEEN INDICATED
ELEVATION POINTS.
10.HORIZONTAL DIMENSIONS ON PLAN AND PROFILE SHEETS TO
PIPELINES, MANHOLES, AND OTHER FACILITIES, ARE TO THE
CENTERLINES OF THOSE FACILITIES UNLESS SPECIFICALLY
NOTED OTHERWISE.
11.CLEARING LIMIT IS SAME AS ROAD RIGHT-OF-WAY OR
TEMPORARY EASEMENT LINE WITHIN PRIVATE PROPERTY,
UNLESS INDICATED OTHERWISE.
12.CONSTRUCTION LIMITS ARE SHOWN ON THE PLAN, PROFILE,
ESC PLAN, AND RESTORATION DRAWINGS. WHERE
CONSTRUCTION LIMITS ARE REDUCED TO AN AREA LESS
THAN THE FULL EASEMENT WIDTH, THESE LIMITS ARE
DEFINED ON THE ESC PLANS AND SHALL ALSO APPLY TO ALL
CONSTRUCTION SHOWN ON THE PLAN AND PROFILE
DRAWINGS.
13.ACCESS FOR PRIVATE PROPERTY OWNERS SHALL BE
PROVIDED AT ALL TIMES. TEMPORARY CLOSURES OF
BUSINESS OR RESIDENTIAL ACCESS SHALL BE COORDINATED
WITH PROPERTY OWNERS A MINIMUM OF 14 DAYS IN
ADVANCE OF THE WORK.
14.CONTRACTOR SHALL SALVAGE AND REINSTALL OR REPLACE
ALL EXISTING LANDSCAPING, IRRIGATION AND SLOPE
DRAINAGE SYSTEMS REMOVED OR DAMAGED DURING
CONSTRUCTION, UNLESS DIRECTED OTHERWISE.
15.SLOPE FINISH GRADES BETWEEN SPOT ELEVATIONS SHOWN.
IF FINISH GRADE LINE IS NOT SHOWN, RESTORE SURFACE TO
ORIGINAL GRADE ELEVATION.
16.PROPERTY CORNERS, SECTION CORNERS, RIGHT-OF-WAY
MARKERS AND SURVEY CONTROL MONUMENTS WITHIN OR
ADJACENT TO THE PROJECT SHALL BE PROTECTED DURING
CONSTRUCTION. THE CONTRACTOR SHALL OBSERVE THE
MONUMENT LOCATIONS PRIOR TO CONSTRUCTION AND
NOTIFY THE OWNER OF WHICH MONUMENTS MAY BE
DISTURBED BY CONSTRUCTION ACTIVITIES. THE
CONTRACTOR WILL ESTABLISH REFERENCES FOR THE
MONUMENTS WHICH MAY BE DISTURBED DURING
CONSTRUCTION AND REPLACE THOSE MONUMENTS AFTER
CONSTRUCTION. THE CONTRACTOR SHALL PROTECT THE
REFERENCES UNTIL THE MONUMENTS HAVE BEEN
REESTABLISHED BY THE CONTRACTOR.
17.SECURE ALL PERMITS NOT OBTAINED BY THE OWNER PRIOR
TO CONSTRUCTION. THESE INCLUDE BUT ARE NOT LIMITED
TO THE FOLLOWING: TRANSPORTATION, BURNING,
TEMPORARY CONSTRUCTION OF FIELD OFFICES,
PREPARATION OF STAGING AREAS OUTSIDE OF ROW OR
SIMILAR.
18.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
MEANS, METHODS, AND SEQUENCES OF CONSTRUCTION AND
FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
19.CONNECTIONS TO EXISTING SYSTEM SHALL BE MADE
ONLY AFTER NEW WATERMAIN HAS PASSED PRESSURE
AND PURITY TEST. FINAL CONNECTION PIPING AND
FITTINGS SHALL BE SWABBED CLEAN.
20.CONTRACTOR SHALL GIVE CUSTOMERS MINIMUM 1 DAY
WRITTEN NOTICE PRIOR TO TRANSFER OF SERVICES TO
NEW MAIN. ADDITIONALLY, CONTRACTOR SHALL NOTIFY
CUSTOMERS 30 MINUTES MINIMUM PRIOR TO
TRANSFERRING THEIR SERVICES TO THE NEW MAIN.
21.CONTRACTOR REQUIRED TO PROVIDE A COMPETENT
PERSON(S) TRAINED TO IDENTIFY EXISTING OR
PREDICTABLE HAZARDS RELATED TO TRENCH SAFETY,
SOIL CONDITIONS, AND SHORING REQUIREMENTS. IN
ACCORDANCE WITH WAC 296-155 PART N,
REPRESENTATIVES OF THE CITY SHALL NOT BE
REQUIRED TO PERFORM THE ROLE OF COMPETENT
PERSON FOR THIS PROJECT. NO WORKERS SHALL ENTER
A TRENCH OR OTHER EXCAVATION FOUR FEET OR MORE
IN DEPTH WITHOUT TRENCH SAFETY SYSTEM IN PLACE.
22.CONTRACTOR IS RESPONSIBLE FOR ALL SIGNAGE AND
NOTIFICATION NECESSARY FOR THE EXECUTION
OFCONSTRUCTION RELATED ACTIVITIES.
23.THIS IS A STANDARD DRAWING SHOWING COMMON
SYMBOLOGY. ALL SYMBOLS ARE NOT NECESSARILY USED
ON THIS PROJECT.
24.SCREENING OR SHADING OF WORK IS USED TO INDICATE
EXISTING COMPONENTS OR TO DE-EMPHASIZE
PROPOSED IMPROVEMENTS TO HIGHLIGHT SELECTED
TRADE WORK. REFER TO CONTEXT OF EACH DRAWING
FOR USAGE.
SCHEDULE CONSTRAINTS
AND SEQUENCING
1
2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0G-02
GENERAL SYMBOLS AND LEGEND
26300G-02.dwg
M. BLANCHETTE
B. SHAHA
K. GOSS
R. CARPENTER
224954
08/12/2015CONFORMED DRAWINGS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0G-03
KEY PLAN
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
WATER
TREATMENT
FACILITY
0G-04
SURVEY CONTROL PLAN
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0G-05
CONSTRUCTION SEQUENCING REQUIREMENTS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0C-01
OVERALL SITE PLAN AND STAGING
0C-02
GRADING PLAN 1
1
A
B
C
2 3 4 5 6 7 8
D
ISSUEDATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0C-03
GRADING PLAN 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUEDATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0C-04
5MG AND WTF TESC PLAN
0C-05
SITE GRADING SECTIONS
WTF
1
A
B
C
2 3 4 5 6 7 8
D
ISSUEDATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0C-06
SITE GRADING SECTIONS
RESERVOIR AND
BOOSTER PUMP STATION
0C-07
MISC SECTIONS AT WTF AND
5 MG RESERVOIR SITE
1
A
B
C
2 3 4 5 6 7 8
D
ISSUEDATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0C-08
STORMWATER PIPING, BIO-SWALE
AND DITCH PROFILES
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
0C-09
STORMWATER
EXISTING CONTROL STRUCTURE
MODIFICATIONS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-10
WATER PIPE PLAN AND PROFILE
STA 38+20 TO 43+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-11
WATER PIPE PLAN AND PROFILE
STA 43+00 TO 47+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-12
WATER PIPE PLAN AND PROFILE
STA 47+00 TO 52+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-13
WATER PIPE PLAN AND PROFILE
STA 52+00 TO 57+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-14
WATER PIPE PLAN AND PROFILE
STA 57+00 TO 63+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-15
WATER PIPE PLAN AND PROFILE
STA 63+00 TO 68+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-20
SANITARY SEWER PLAN AND PROFILE
STA 7+00 TO 12+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-21
SANITARY SEWER PLAN AND PROFILE
STA 12+00 TO 16+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-22
SANITARY SEWER PLAN AND PROFILE
STA 16+00 TO 21+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-23
SANITARY SEWER PLAN AND PROFILE
STA 21+00 TO 26+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-24
SANITARY SEWER PLAN AND PROFILE
STA 26+00 TO 31+00
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-25
SANITARY SEWER PLAN AND PROFILE
STA 31+00 TO 36+20
9C-30
20th STREET TRAIL AND
TEMPORARY HAUL ROAD PLAN 1
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-31
RANIER STREET TRAIL AND
TEMPORARY HAUL ROAD PLAN 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-32
RANIER STREET TRAIL AND
TEMPORARY HAUL ROAD PLAN 3
9C-33
20TH STREET TRAIL
BAKER ST TO SE CORNER OF SITE
SECTIONS AND PROFILES
1
A
B
C
2 3 4 5 6 7 8
D
ISSUEDATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-33A
20TH STREET TRAIL
HOWARD ST TO ST. HELENS ST
SECTIONS AND PROFILES
1
A
B
C
2 3 4 5 6 7 8
D
ISSUEDATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-34
TYPICAL TRAIL SECTIONS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-35
RANIER STREET TRAIL AND
TEMPORARY HAUL ROAD SECTIONS
PHASE 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-40
DUCT BANK PLANS 1
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-41
DUCT BANK PLANS 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-42
DUCT BANK PLANS 3
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-43
DUCT BANK PLANS 4
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-44
DUCT BANK PLANS 5
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-45
POWER AND TELECOMMUNICATION
VAULTS LAYOUT
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
9C-47
ROAD CLOSURE AND
DETOUR
1
A
B
C
2 3 4 5 6 7 8
D
ISSUEDATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-48
ONE LANE TWO WAY
RANIER STREET
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-50
OFFSITE UTILITIES
ESC & RESTORATION PLANS 1
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-51
OFFSITE UTILITIES
ESC & RESTORATION PLANS 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-52
OFFSITE UTILITIES
ESC & RESTORATION PLANS 3
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-53
OFFSITE UTILITIES
ESC & RESTORATION PLANS 4
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-54
OFFSITE UTILITIES
ESC & RESTORATION PLANS 5
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-55
OFFSITE UTILITIES
ESC & RESTORATION PLANS 6
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-56
OFFSITE UTILITIES
ESC & RESTORATION PLANS 7
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-60
20th STREET IMPROVEMENT
PLAN AND SECTIONS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-61
20th STREET IMPROVEMENT
TESC AND RESTORATION PLAN
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-62
20th STREET IMPROVEMENT
PROFILE AND SECTIONS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-70
TYPICAL TRENCH SECTIONS AND
SURFACE RESTORATION DETAILS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-71
TESC DETAILS 1
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-72
TESC DETAILS 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-73
ROADWAY DETAILS
S
5 S
6
S2
S7
S8 S9
S1
S
3
S
4
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-74
WATER APPURTENANCE DETAILS 1
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-75
WATER APPURTENANCE DETAILS 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-76
SEWER DETAILS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-77
STORMWATER DETAILS 1
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-78
STORMWATER DETAILS 2
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-79
STORMWATER DETAILS 3
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-80
CATHODIC PROTECTION DETAILS
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATEDESCRIPTION
PROJECT MANAGER:
PROJECT NUMBER:
FILENAME
SCALE
SHEET:Of01"2"
DESIGNED BY:
CHECKED BY:
August 12, 2015
CAD:
City of Port Townsend
WATER TREATMENT FACILITY
SITE WORK & OFF-SITE
UTILITIES
CONFORMED DRAWINGS
9C-81
TRAIL BOLLARD DETAILS
June 26, 2015