HomeMy WebLinkAbout9404-08..mss"" ~
C S T Y O F PORT T OWN S END
BUILDER'S PERMIT & INSPECTION RECORD
(See Instructions on Attached Sheetj
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385- 2294 FOR INSPECTION
***SEE NOTI CE TO LOCAL ENFORCEMENT AGENCY AT FINAL IN PLAN SET***
Pewit Number 9404-08 Issued 4/25/94 Treas. No.
Job Addzess 573 Redwood Zoning P1 Type V-N Occupancf ~~
Nature of 'rbrk Modular Home & Garage Use of Buiidinq(s) Dwelling
timer Rose
& John Cal dwel 1 _
Contractor Glen River
aNESi ENERGY CDDE* **Boundary Line .Adjustment, & Street Vacation to be recorded with County
Auditor before placement of modular home"
i. GaoUNDwowt: ?ltu~,*R~tblic Works Requirements*** IrspeeLOr Data
2. FCOTINGSrSLABS: Setbacts !~-For~s~/ Eeinforcexnt !~ Siab,
~.-+9 ~ / ~ ~ ~ 'r / ' qY~ nsa c:or ~ W Date~~j'
3. FOUNDATION 'BALL: fora ~ Beinforcexnt L ~teather Proofine_ G
Vents v Cravl Acess //
InSneCtOr_ ~ u~ DaL2 '~'~ `j'+,
~. FLODB F3UQNG:: Girders- Saists_ Bridging- Shield Under Posts- Positive Past/Girder Connect-
Girder/Concrete-1/2"i Treated Mood to Concrete- Anchor Bolts rjAashers_
• Inspector Date
5. PLID®ING: Drains- Vents- Traps- Clean-Doss- Nater Supply- Gas Sanoly_
Inspector Date
6. MECHANICAL: Furnace- Exhaust Eeat Ducts- Inspector Date
i. FEAMII~: lialls_ Ceilinq_ &oof Vents ~iindovs_ Air Seal
In 'loll Pepetrations_ Chimney Straps- Inspector ]ate
E. INSULATION: Floor ;tall Ceiling Baff:es
Inspector -Date
9. DBYNALL NAILING: Nalls_ Ceilinq_
Inspector Date
10. DRAINAGE: Attached Plan Approved InsneCor__~ W Date
ll. FINAL INSPECTION: Building Plumb. Mech/heating Smoke Det. House Ho.
Barrier: Insulation Certificate- Inspector pate
-..,,, poly _V. B. Paint -Kraft Paper
(certificate requieed) LPG (Fire Department) Date
CaIL1 48 riours before you dig
for utility line locates
1- 8 0 0- 4 2 4- 5 5 5 5