Loading...
HomeMy WebLinkAboutG St. Beech to Cherry Waterline ExtensionDriveway e. C ,WftllqNNW== CHAIN LINK FENCE (exist) FH (Exist) W -7 > > rain e Dh ew > Hot Top (Top by City. Ctr Dig) D iveway(oxjst) J Stop Sign 6 Gate Valve PP Existing culve 8, R/W w ew Top for ADUf,antra or to verify location V Existing 1" GaIv (spaghetti) Block 2 BKore ohy igging or installatioi TPPpP o, MB pp C7670. Beech St. PP 90 Degree BendgoDegreeBendg W Concretew/ Concrete thrust blockblockLNew of Cherry Street Provide new 11" top for 1000 G St. G" STREET 0 LEGEND UJ Also, to be used for flushing & somplinq) W WATER LINE SID- STORM DRAIN LINE Athrustbl=k PVC Li6" PVC Line SS SANITARY SEWER LINE Droin>e dij> (eAt) > > > LOT LINE / R/W New 1" Tap for 1000 To be used for flushing Sampli ig) Exist r, Exist gro nd on enterlinndoncenterfina. W JC W W New 6' PVC Water Main 0_00 Approx. 275LF HEDGE Temporary Bench Mark (TBM) 466.52 :.' GENTERYNE C 0+30 V — • I 0+80 1+30 -1 9 IffO. CENTERLINE S 46.30: S015.4 Ss 54 .07 SSExistingMaintenanceHole k5!21 45.66 Assumed Elevation 40 Ft 49 0-50 provision or conditions and requirements. UJ MHSSSa s Q Sw SSA 146 4. The contractor shall be fully responsible for the location and T, RR continuous tracing tape installed 12"-18" under the final ground,, surface. The miarker tape shall be 4" wide minimun plastic Z Exist )6" AC Line FH (Exist) W -7 > > rain e Dh ew > Hot Top (Top by City. Ctr Dig) D iveway(oxjst) J Stop Sign 6 Gate Valve PP Existing culve 8, R/W w ew Top for ADUf,antra or to verify location V Existing 1" GaIv (spaghetti) Block 2 BKore ohy igging or installatioi 47.22 4" AC Existing culvert C— ce (exist) Gate Valve (exist) 4-.— Hot Top (Tap by City, Ctr Dig) 4" Gate Valve 4 x 6 increa s Location — M. . Df4 t from other to CB (exist) Edge of Asphalt U1 W LU a w IZ Ld o, Existing CB(NW Corner) C7670. Beech St. ADU of Cherry Street Cn 48 0 LEGEND UJ W WATER LINE SID- STORM DRAIN LINE SS SANITARY SEWER LINE 1) /r T UNDERGOUND TELEPHONE LOT LINE / R/W New 1" Tap for 1000 To be used for flushing Sampli ig) Exist r, Exist gro nd on enterlinndoncenterfina. JC ASPHALT TREE (AS NOTED) HEDGE MH MAINTENANCE HOLE 45.66 SPOT ELEVATION Generals Conditions 1. A preconstruction meeting shall be held with the city prior S New Valve' Box 46 L provision or conditions and requirements. UJ 146 4. The contractor shall be fully responsible for the location and UJ 5. All non—ferrous pipe and services shall be installed with continuous tracing tape installed 12"-18" under the final ground,, surface. The miarker tape shall be 4" wide minimun plastic Existing 1 Concr.te coded for the utility to be marked and which can be detected by a standard metal detector. The tape wire shall be furnished and installed by the contractor. 6. The contractor shall have a copy. of the approved plans and permits at the construction site at all times. 7. All disturbed areas shall receive temporary and permanent erosion control in the form of vegetation establishment such as grass seedings. C ross Cul ert Monday to Friday, unless otherwise approved in writing. 44- U) 42 Blo k 1 i ---------------------------------- W NewA.1 PVC Main 47.22 4" AC Existing culvert C— ce (exist) Gate Valve (exist) 4-.— Hot Top (Tap by City, Ctr Dig) 4" Gate Valve 4 x 6 increa s Location — M. . Df4 t from other to CB (exist) Edge of Asphalt U1 W LU L 8" RCP (existing sewer main) A-f Scale 1 20' ry Existing CB(NW Corner) of Cherry Street t 48 New Valve Box,! LEGEND W WATER LINE SID- STORM DRAIN LINE SS SANITARY SEWER LINE 1) /r T UNDERGOUND TELEPHONE LOT LINE / R/W New 1" Tap for 1000 To be used for flushing Sampli ig) Exist r, Exist gro nd on enterlinndoncenterfina. ASPHALT TREE (AS NOTED) HEDGE MH MAINTENANCE HOLE 45.66 SPOT ELEVATION Generals Conditions 1. A preconstruction meeting shall be held with the city prior New Valve' Box 46 L provision or conditions and requirements. 146 4. The contractor shall be fully responsible for the location and existing underground utilities by calling 1-800-424-5555. 5. All non—ferrous pipe and services shall be installed with continuous tracing tape installed 12"-18" under the final ground,, surface. The miarker tape shall be 4" wide minimun plastic Existing 1 Concr.te coded for the utility to be marked and which can be detected by a standard metal detector. The tape wire shall be furnished and installed by the contractor. 6. The contractor shall have a copy. of the approved plans and permits at the construction site at all times. 7. All disturbed areas shall receive temporary and permanent erosion control in the form of vegetation establishment such as grass seedings. C ross Cul ert Monday to Friday, unless otherwise approved in writing. 44- 42 i ---------------------------------- NewA.1 PVC Main 40 40 0-30 0+00 0+30 0+80 1+00 1+30 2+00 2+30 2+60 PROFILE "G" STREET. Scale: Hor: 1" 20' Vert : 1" 2' APPROVEI r2jz) 0 t VORT L 8" RCP (existing sewer main) A-f IY 4 Z, W M M ry r. t r LEGEND W WATER LINE SID- STORM DRAIN LINE SS SANITARY SEWER LINE 1) /r T UNDERGOUND TELEPHONE LOT LINE / R/W X X FENCE LINE PP POWER POLE M TELEPHONE PEDISTAL CONCRETE WATER VALVE 0(.FH FIRE HYQRANT ASPHALT TREE (AS NOTED) HEDGE MH MAINTENANCE HOLE 45.66 SPOT ELEVATION Generals Conditions 1. A preconstruction meeting shall be held with the city prior to any construction. 2. All workmanship and materials shall be in accordance with the City of Port Townsend Standards, the current edition of the State of Washington Standard Specifications for Road, Bridge and Municipal Construction, and any project specific special provision or conditions and requirements. 3. Temporary erosion control measures are required and shall comply with the storm water code, Chapter 5 of these Standards and WSDOT/APWA Specification 1-07.15 4. The contractor shall be fully responsible for the location and protection of all existing utilities. The contractor shall verify all existing underground utilities by calling 1-800-424-5555. 5. All non—ferrous pipe and services shall be installed with continuous tracing tape installed 12"-18" under the final ground,, surface. The miarker tape shall be 4" wide minimun plastic non—biodegradedable, metal core or backing marked and colored,'-'- coded for the utility to be marked and which can be detected by a standard metal detector. The tape wire shall be furnished and installed by the contractor. 6. The contractor shall have a copy. of the approved plans and permits at the construction site at all times. 7. All disturbed areas shall receive temporary and permanent erosion control in the form of vegetation establishment such as grass seedings. 8. Construction work shall be restricted to 7:00 AM to 5:00 PM Monday to Friday, unless otherwise approved in writing. IY 4 Z, W M M