HomeMy WebLinkAbout9208-10C= T Y O F PORT TOWN S END
BUILDER'S PERMIT & INSPECTION RECORD
(See Instructions on Attached Sheet)
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385-2294 FOR INSPECTION
Permit Number 9208-10 Issued 8-19-92 Treas. No.
Job Address 2380 Seaview Drive Zoning R-7 A Type V-N Occupancy R3/Ml
Nature of Work Build new house Use of Building(s) we ing
o'~Ter Bernie & Marv Pranger Contractor 5taph
**DRAINAGE: Conditions attached**
**Permit issued contingent upon City receiving signed/notarized Hold Harmless Agreement**
''r 1,,-~
1. GROUNDWORK: Plumbing - Inspector ~ Date '' F •/
~,~~.
2. POOTINGS/SLABS: Setbacks~• Forns= Reinforcement ~ Slab ~~/~ _'~~ ~ ~~
Inspector +.- Date
3. FOUNDATION WALL: Fors` Reinforcement_~ Weather Proofing-
~•
Inspector ~ Date `~ C/ z
'., ; i
4. PLOOR FRAMING: Beams- Joists- Bridging-- Inspector r Date'' -" `(
`~
5. PLOIN3ING: Drains ~ Vents- Traps- Clean-outs- Water Supply ''_` ~~ Gas Supply ~ ?)
Inspector ~_- Date ''-" :' `( ~
6. MECHANICAL: Furnace- Exhaust- Heat Ducts- Inspector Date
7. FRAMING: Walls ! Ceiling- Roof vents Inspector I~--~~ Date ~~ -~~: '`~ ~-
8. INSULATION:. Floor ` Wall Ceiling- Baffles
+' 1
~` ~` ~(i`' ~ `~ ~ ~' ~ ''~ Inspector Date
9. DRYWALL NAILING: Walls G' Ceilinq~~ Inspector~'r-f~ Date ' - -
~t,
10. DRAINAGE: Conditions attached t ti r` Inspector ~.- ? Date ~~'
11. FINAL INSPECTION: Building Plumb. Mech/heating Smoke Det._ House No.
~ -, a
Inspector If~~ Date %"?~~ '~ ' ~ I ~`~
C a 1 1 4 8 hours before you d i g
for ut 3 1 i ty line locate s
1- 8 0 0- 4 2 4- 5 5 5 5