Permit Number: BLD92O5-04 R-) Issued: lOt . 99 Parcel Number: 948303105
Job Address: 1071 Landes Ct. Zoning :R=II Type: V/NR Occupancy: R-3/U-1
Total Occupant Load: <10 Nature of Work: Revise deck and covered porch.
Owner: Callahan, Earnev Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
REQUIRED INSPECTIONS APPROVED/DATE
•
Footings
1'6" X 10" square poured concrete- w/ 2 # 2 re-
steel EW.
Framing
Double 2"X12" @ the S.E. corner
Truss to rafter connection w/ 5/8" bolt
Final
House Numbers
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pmnit q BLD4305-04R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection ofadjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection. report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within-one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates •
I-800-424-5555
Page 2 of 2
~ C S T Y O F PORT T O WN S EN D
BUILDER'S PERMIT & INSPECTION RECORD
(See Instructions on Attached Sheet)
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385-2294 FOR INSPECTION
Permit Humber Callahan. Ernie Issued 5/6/92 Treas. No.
Jab Address 1071 Landes Court Zoning R-1 Type 5-N Occupancl R-3
Nature of Work R~~ i 1 ~I paw hnme Dse of Buiidinq(sj Dwel 1 i na
o'me7 Farn ACt Callahan, 7r. Contractor Same a s Owner
*NEW ENERG'1 CODE*
1. GROUNDWORK: Plumbing
Inspector Date
2. FOOTINGS/SL.ABS: Setbacts ~~ Forms ~" Reinforcement L~ Slab_
Inspector~- 1•[~`'t.--' Date ~ -~ - ~'~
r,;~Cl i`
3. FOONDATION MALL: Forayer Reinforcement- Weather Praafinq~~ ~-
Yents_ Cravl Acess_ Insnect~ ~. ~' Date "' , ~ ~( c
4. fI00R FBANING:. Girders- Joists- Bridging Shield Under Posts- Positive PostJGirder Connect
Girder/Concrete-1/2"_ Treated Wood to Concrete- anchor Bolts v/Washers-
Inspector Date
5. PLDlR3IHG: Drains- Yents_ Traps- Clean-outs ' Water Supply- Gas Supply-+;F__
' ' : ,' ,
n i v(: ~ j Inspector `- , Date ~ ~ -• r ~,
,~,
4" '6. NECBAffiCAL: Furnace- Erhaust_ Heat Ducts- Inspector Date
i. FBANING: Walls- Ceiling ~ Roof Veers ~ Windovs_
C.,.
In Wall Pepetrations_ Chimmey Straps- Inspector J~. ~ Date ~ ' `" F._ % ,/.
a. INSDLATION: Floor ' Wall _' Ceiling` Baffles
4.
Inspector I ^ ~~ Date ~ ^ ~ !'
9. DRYWALL HAILING: Walls- Ceiling- Inspector Date
r ,. ~;iik l , ~ `~ ,
~~ .~:, ~~~ ' ~~g/~ ~ / Inspector /S
10. DRAINAGE: Required; attached ~ Date3 i 19~
FINAL INSPECTION: Buildinq_/ Plumb. Nech/heating Smoke Det. L~~ House No. v
****FIRE HYDRANT AT 10th AND HILL STREETS****Inspector ~ i Date
e ~ ~ ~r
C a 1 1 4 8 hours before you d i g
~E'o r utility line locate s
1- 8 0 0- 4 Z 4- 5 5 5 5