HomeMy WebLinkAbout9203-33CST Y O F P ORT T O WN S EN D
BUILDER'S PERMIT 6 INSPECTION RECORD
(See Instructions on Attached Sheet)
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385-2294 FOR INSPECTION
Permit Number 9203-33 Issued 3/31 /92 Treas. No.
Joh Address .5300 Kuhn Street 2oningRlA & P1 gvpe Occupancl
Mature of aor!cBuild wastewater Treatment Use of Buiidinq(sj Wastewater Treatment Plant
Amer City of Port Townsend Plant Contractor IMCO General Construction Operations
*NEW ENERGY CDDE*
1. Gr",CUND(+CRK: P!umbino
Inspector Date
2. FCDTINGSrSLA&S: Setba~YS_ For~s_ Reinforcexat_ Siabi
Inspector Date
1. FOUNDATION 'MALL: Forzs_ Reinrorcexnt_ eeether Praofinc_
Vane- Crawl Acess
IASpeCtoZ Ddt2
t. FLCOR FRAHIHG:: Girders- Jaists_ Bridging- Shield Under Posts- positi~re Post; Girder Connect~
GirderiCon¢ete-1/2"_ Treated hood to Concrete- Anchor Bolts 'r/dashers
Inspector Date
5. PLDHBING: Drains- Vents- Trans- Clean-outs- dater Supply- Gas Supply-
Inspector Date
b. NECHAIRCAL: Furnace- Exhaust- Heat Ducts- Inspector Date
i. FRAIIIHG: galls- Ceilinq_ Roof Veers ~iindous_
In Stall Penetrations, Chimney Straps- Insaector Date
8. INSULATION: Floor _ Stall Ceilinq- Bafiles_
9. DRYBALL HAILING: 4lalls_ Ceilinq_
Inspector -Date
Inspector Date
10. DRAINAGE: Inspector Date
11. FINAL INSPECTION: Building ~ P1umb. r~i Nech/heating t~ Smoke Cet.
~~ House No i
. '-~
Inspector ~ -,~ , Date
C a 1 1 4 8 hour s
for utility be f o r e y o u d i g
Line locates
1. - 8 0 0- 4 Z 4- 5 5 5 5