HomeMy WebLinkAbout9203-22C= T Y O F PORT TOWN S E N D
~' BUILDER'S PERMIT & INSPECTION RECORD
(See Instructions on Attached Sheet)
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385-2294 FOR INSPECTION
Permit Number 9203-22 Issued 3/18/92 Treas. No.
Job Address 3080 San Juan Zoning R-1 Type ~-N Occupancy R-3
Nature of work new construction Use of Building(s) residence
oFner Paul Harder Contractor Owner
1. GROUNDWORK: Plumbing Inspector Date
2. FOOTINGS; SLABS: Setbacks- Forms '~ Reinforcement / Slab
Inspector ti ~ ' Date~_ :"1 `~ f ~
3. FOUNDATION WALL: Forms- Reinforcement- Weather Proofing-
Inspector Date
~. FLOOR FRAMING: Beams- Joists Bridging- Inspector ~ \ Date " ~-~ ~{ `?
ti
5. PLUMBING: Drains tients_ Traps- Clean-outs Water Supply " Gas Supply' ?~
_" j _., ;;
Inspector ~ ~ Date
6. MECHANICAL: Furnace Exhaust Heat Ducts
Date
7. FRAMING: Wa11sT Ceiling Roof - Gents - Inspector Date ~`-
_.~ ~~4:.i.. 1. (~'&; .. ~..
l- '
8. INSULATION: Floor `~~" Wall Ceiling- Baffles -
Inspector ~ Date
9. DRYWALL NAILING: Walls= Ceiling'- Inspector 7 ~ Date''
10. DRAINAGE:
Date
11. FINAL INSPECTION: Buildinq~_ Plumb. Mech,`heatinq Smoke Det. House No.
.,
~ :,~ Inspector r Date ~~=
tiw
t~
~~ .
C a 1 1 4 8 hour s be for a y ou d i g
f o r ut i 1 i t y 1 i n a 1 o c a t a S
1- 8 0 0- 4 2 4- 5 5 5 5