HomeMy WebLinkAbout9201-10C S T Y O F PORT TO WNS EN D
BUILDER`S PERMIT & INSPECTION RECORD
(See Instructions on Attached Sheet)
Penit Number 9201-10 Issued 1 /15/92 Treas. Ho.
Job Address 1145 Water Street Zoning C111 Type 5-N Occupancy -
Nature of work r'~mmprc;al Remodel Ose of Buiidingfs) Restaurant
Amer parr. Tnwncanri Playa Lmtd. PartnersCpntzactor Island Construction and Dev., Inc. a
- ~ --- _ ,
*NE4i ENERG'I CODE*
1. Gr".OUNDI~RR: Plumbing Inspector <- ~ Date
CALL 385-2294 FOR INSPECTION
S. f00TIHGS/SilBS: Setbacks- Forms- Reinforcement- Siab_
Inspector Date
1. FOUNDATION :TALL: Fons_
`Dents
Reinforcement, +kattrer Proofina_
CrdGl ACess_ i~LSDeCtor Dale
a. ~.AOR FRAlIING:. Girders- Joists- Bridaina_ Shield Under Posts- positive Post; Girder Connect-
Girder:COn~ete-1/2"_ Treated Mood `_o Con~ete_ Anchor Bolts r/pashers_
LDSnector ~~
5. PLU!lBIHG: Drains_L
~ .;r iY"l.ir
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
'ISDeCtor r
o. HEC&1NICAL: E'urnace_ Exhaust- Heat Ducs_ Inspector Date
Hv~acNrr>~ kr~'~ sus c~~unl(~-A~ ~S ~{-z~-yz_
r. FRAlQHG: ~talls_'~ Ceiilnq Roai vents `aindovs_
In Udall Pemetratioas_ Chimney Straps- Inspector `~~~ Date `/ l
3. INSULATION: floor _ gall Ceilina_ Baffles-
Inspector Date
9. DBYtiALL NAILING:. f~alls_ Ceiling-
10. DRAINAGE:
_~ 11. FINAL INSPECTION:
Inspector Date
Inspector Date
Building Plumb. Heck/heating Smoke Det. House Na.
Inspector
gents= Traps _ Clean-outs /_ +ater Supply_
,, ,
Gas Supply
Date
C a 1 1 4 8 hours before you d i g
for u~ i 1 i t y l i n e l o c a t e s
1- 8 0 0- 4 2 4- 5 5 5 5
CS'I'Y OF PORT TOWNS END
BUILDER'S PERMIT & INSPECTION RECORD
i ~ (See Instructions on Attached Sheet)
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385-2294 FOR INSPECTION
Perait Number 9201-10A Issued 2/26/92 Treas. No.
Tob Address ~ 145 Water Zoning C111 Type 5-P~ occupancf A-3
Nature of WorX Commercial remodel a en umOse of Building(s)
G•rner Port Townsend Plaza L~mite Contractor Island Construction an eve opment, Inc
PartnersMp,
*NEW ENERG'f CODE*
1. GROUNDWORK: Plumbing
Insperot Date
2. FOOTINGS/SL.4A5: Setbac!rs_ Forss_ Reiniorcexnt_ Slab_
Inspector Date
3. FOUNDATION :TALL: Far~s_ Reinforcexnt_ We=_ther Proofina~
Vents- Ctarl Acess
LnSpeCtpZ Ddt2
-~ 4. FL00R FRAMING:: Girders- doists_ Bridai~_ Shield Under Posts- positive post/Girder Connect_
. Girder;Conctete-1/2"_ Treated Mood to Con~ete_ Anchor Bolts r/Washers
Inspector Date
5. PLUMBING: Drains- Vents- Traps- Cleanrouts_, :later Supply! ~ Gas Sunply_
~'. L j jo r (l r i'T
_ Inspector t ~ ~~ Date . '- `~
6. NE($AMICAL: Yurnace_ Exhaust- Heat Dues _ Inspector Date
-r. FRAMING: Walls, Ceiling Roof Vents Windovs_
Im Wall Penetrations- Chimney Straps- Inspector Date
8. INSULATION: Floor , Wall _ Ceiling-, Baffles-
9. DRYWALL NAILING: Walls- Ceiling_____
Inspector Date
Inspector Date
10. DBAIHAGE: Inspector Date
~'l~ fI~t>G t~sPECTZQN' Buildin4 Plumb. xecb/heating Spoke Cet. Bause Ha.
Inspe! ~.or Date
Ca11 4 $ hours before You d.io3
l i n e l o c a t e s
~_.~ „t_i1itY _,r