HomeMy WebLinkAbout9505-12CITY OF PORT TOWNSEND
BUILDER'S PERMIT & INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
CALL 385-2294 FOR INSPECTION
Permit Number 9505-12 Issued 6/21195 Treasurer's Number
Job Address 4606 Mastnolia Zoning R1-A Type V-N
Nature of Work New House with Garaoe
Owner Robert & Donna Fitzoatrick
Receipt Date
Occupancy R-3 / M-1
Use of Building{s) Sinole Familv Dwellino
Contractor owner-builder
" Inspection Required on tatera[ Restraint Detail Prior to Cover
1. GROUNDWORK: Plumbing Inspector Date
~OOTINGS/SLAB: Forms Reinforcement__~ Slab t!
Setbacks
/
UFER r/ Inspector Date
3. FOUNDATION WALL: Forms i~ Reinforcement_~ Weather Proofing ~ Vents
Crawl Access Inspector ~~ ~. Date ! > ~' (~7
4. FLOOR FRAMING: Girders ~~ Joists ~~ Bridging ~/ Shield under Posts t~
Positive Post/Girder Connect (~ Girder/Concrete - 1 /2"_,L~
Treated Wood to Concrete~~ Anchor Bolts w/ Washers
Inspector Date /-~~ ~f~
5. PLUMBING: ts Traps / Clean-Outs '~
Drains:~~ Ven
/
Water Supply J Gas Suppty ~ Hose Bibs iAt. Vac. Break.)
0
Inspector ~ Date *~ ~'~ ~~ ~
l
•~/
;~
/
6. MECHANICAL: App.
Furnace Exhaust
Heat Ducts s
Solid Fue
~
Date r ~i"-~r.~
Inspector ~~
Call 48 hours before you dig for utility line locates.
1-800-424-5555 -Peso t of ~-
Robert & Donna Fitzpatrick
Building Permit q 9505-12
Tune 21, 1995
7. FRAMING: Walls Ceiling Roof Vents Windows
Air Seal In-Wall Penetrations
Fresh Air Inta ke (WIN PTS) Chimney Straps
Inspector Date
8.
INSULATION:
Floor(R-191
f Wall(R-19) `~ Ceiling(R-301 /
v' B
affles
"
~
Inspectors ~l
1
d
Date 1~ ~ ~~ ~ f y
9. DRYWALL NAILING: *~'~ Walls ~ Ceiling // Inspector ~~ Date ~- ~~ g~+
%'
10. DRAINAGE: Inspector Date
71. FINAL INSPECTION: Building / Plumbin /Mechanical/H ting /
Smoke Detectors House Number
Vapor Barrier(PAINT)~/~pG(Fire Department) /
Insulation Certificate / Inspector Date
r~ If Public Works and/or Fire Department improvements were required as a condition of vour
Qermit Qlease call the Public Works Deoarttnent at 385-7212 and ask them to sign off on your
project Qrior to calling the Building Deoariment for a final inspection It is unlawful to occupy a
building before a final inspection or certificate of occupancy is obtained.
****All building permits expire if no progress has been made within six months, or if no
inspections have been made by the Building Deparirnent within one year. Call for at least one
inspection per year to keep your building permit active. ****
-Page 2 of 2-