HomeMy WebLinkAbout9503-10CITY OF PORT TOWNSEND
BUILDER'S PERMIT & INSPECTION RECORD
machinery and eouinment, shall be Cmited to 7 a.m. to 6 a.m.. Monday - Fiidav
and vrohr7~ited on weekends and national hofrdavs
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number 9503-10 Issued 05J02195 Treas. No. Receipt Date
Job Address 686 Lake Street Zoning P.T.B.P. PUD Type V-N Occupancy B-2
Nature of Work Construct New Commercial Use of Building(s) Office
Owner S & B Land Comoanv Contractor Staof Construction
»• bIRT & DEBRIS CAUSED BY CONSTRUCTION SHALL BE SWEPT FROM PAVED SURFACES
. ON A DAILY BASIS. CONSTRUCTION AREAS SHALL BE WATERED TO SUPPRESS DUST
~ See Attached Fire Dept. Memo dated 04/26/95 for Fire Dept. Requirements
Approved/Date
CONCRETE ~~~ ~~~ ~~~'~ ~ ~~
•Setbacks per PUD
~,~~~. s/zs~~J~~ ~~,~
•Footing§
•Foundation Wall 18" on east, 6" others; ~~~ j ~~j~
engineered connections
PLUMBING
•Groundwork
^Rough-In (WAC 51 .20 compliance)
•
-Page 1 of 2-
S & B Land Company H9503-10
Port Townsend Business Park, Lot 54
May 2, 1995
MECHANICAL R.~~' ~J6t: '~!Z`ECQ~ ~ ~-+
^Mechanical Equipment -Nameplate info to
comply with approved plans
^Pipe & Ducts -Proper sealing (tape seams
long. & vert.1 & Insulation (R-81
•Heat Source Equipment and Controls - T-
zones {2), Deadband {5°1, 7-day
programmable heat pumps w/ operating
instructions w/ area served noted
^Hot water heater -Pipe Insulation (R-31
^Fresh Air Reqmts -Certify w/ testing per
WSVIAQ
FRAMING '~vt~- ~ Z Z' ~ ~ `z•
^General
^Shear Wall Panels (w/ hold dawns, anchors pk- ~ji~~gS'.g
a
panel nailing) .
`
^Steel straps fSkytight, covered entry porch
& 4 x 8 headers)
^Air Seal
^Glazing L50 or less, SHGC .45 or less)
^Doors 1.60 or less)
INSULATION ~,,,,,, /~ ~` ~ ~/l0 j~~l~ ~ Z~~~~
^Foundation Wall 1R-10 ext. to top of
~ ~~a"~~ ; „ ~ gyp- ~~2~ ~ `~~
,~„^,'y"~~y Lfla.Gbo'
^Walls (R-191 ~
^RooflCeiling IR-30 all roofs)
^Vapor Barrier (Paint)
,~,
i
•
-Page 2 of 2-
S & B Land Company t/9503-10
Por[ Townsend Business Park, Lot 54
May 2, 1995
SHEETROCK/NAILING
^Walls -General
1-hour wall (north
^Ceiling \~~~
•Soffit/Eave/Roof - 1-hour (north side w/in
10' of property line) ~~' `
(_~i~~ t `'-;ii3
-- t''`. 71 L ~ ~ !~
~,/t.-^„ /"~ ~~ ~, ~~~ ~~
~ ~
~' ` '
LIGHTING & MOTORS
^Lighting: Equipment & Controls (exterior
lighting shut-off)
FINAL
^PUD Requirements
^Electrical (L & I)
•Public Works Dept.
•Fire Dept. (including signage designating
smoking/non-smoking areas per RCW
70.160)
•Bldg. Dept.
g/ ~ 't;~(~ Jy l
~ c/
- Landscaping I
- Parking
- Barrier-free Accessibility
~~**Access and Utility Improvements ('including completion of Enfield Green trail) to
be Completed by June 3Q 19953r~s
» CONSTRUCTION SITE SHALL BE PROVIDED WITH RECYCLING & TRASH CONTAINERS,
SNOW FENCING AND/OR CONSTRUCTION DUMPSTERS
» IT IS UNLAWFUL TO OCCUPY A BUILDING PRIOR TO OBTAINING A CERTIFICATE OF
OCCUPANCY OR FINAL INSPECTION APPROVAL
-Page 3 of 3-