HomeMy WebLinkAbout9503-04
CITY OF PORT TOWNSEND
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
CALL 385-2294 FOR INSPECTION
Permit Number 9503-04 Issued 03/20/95 Treasurer's Number
Job Address 1629 Jefferson Street Zoning R-1 Type V-N Occupancy R-3
Nature of Work Residential Remodel Use of Buildingls) Sinole-family Dwelling
Owner Jane Souzon Contractor Townsend Builders
1. FLOOR FRAMING: Girders Joists Bridging Shield under Posts
Positive Post/Girder Connect Girder/Concrete - 1/2"
•
2. PLUMBING:
~ ~
3. MECHANICAL:
4. FRAMING:
5. INSULATION:
Inspector
~~ ,
~ ~~"~`-
i, , ~ ~ .
/i .
~u` n
e ~'~ r
Date
Drains: !!~ Vents Traps Clean-Outs 4/
Water Supply ;,~ Gas Supply Hose Bibs (At. Vac. Break.) I/
//Inspector / Date
Furnace Exhaust! Heat Ducts / Solid Fuel App.
Inspector ~~ -irk ~ Date ~ ~JS- ~ `'
Walls L ~eiling_~~ Roof_~ Vents_ % Windows r~
Air Seal_ ~ Fresh Air Intake (Make-up air through furnace)__
Chimney Straps;' Inspector /j. o. Date =~/tdh'~r:.
,~ -
Floor(R-19) WaIIIR-13&R-21)) ~~ Ceiling(R-301
Baffles ~ j ~ k'. p;t r~_
~f i!`
Inspector
6. DRYWALL NAILING:
Treated Wood to Concrete Anchor Bolts w/ Washers
BUILDER'S PERMIT & INSPECTION RECORD
Date
Walls / Ceilin ~' ~'~~~'
g Inspector_ ~>-/° Dated ~ ~~(~~
Call 48 hours before you dig for utility line locates
1-800-424-5555 -Page, of 2-
•
Jane Souwn
Building Permit tf9503-04
March 2Q 1995
7. DRAINAGE: ~~+ Approved Inspector Date
~ ~ ~ ~
8. FINAL INSPECTION: Building Plumbing Mechanical/Heating
Smoke Detectors ~, House Number/
Vapor BarrierlPaint) ~ LPG(Fire Department) ~,
~` = ~//
Insulation Certificate / Inspector Date~ly~'
~ If Public Works and/or Fire Department improvements were required as a condition o,[your
• permit. please call the Public Works Department at 385-7212 and ask them to sign off on your
project prior to calling the Building Department for a final inspection. It is unlawful to occupy a
building before a final inspection or certificate of occupancy is obtained.
*sssAll building permits expire if no progress has been made within six months, or if no
inspections have been made by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active. ****
-Page 2 of 2-
•