HomeMy WebLinkAbout9312-09CST Y O F P ORT TOWN S E N D
BUILDER'S PERMIT & INSPECTION RECORD
(See Instructions on Attached Sheet)
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385-2294 FOR INSPECTION
Permit Number 9312-04 Issued 12/14/93 Treas. No.
Job Address 540 plater Street _ Zoning P-1 Type Occupancy
Nature of Hack Install handrail Use of Building(s) City Hall
Amer City of Port Townsend Contractor ~taizefield Co.
*NEH ENERGY CODE*
1. C~OUNDWORR: Plumbing Inspector Date
2. FCOTINGSrSL,IBS: Setbacks- Forms- Reinforcement- Slab_
Date
3. FOUNDATION :TALL: Forms- Reinforcement- Heather Proofina_
Vents- Cravl Acess_ Inspector Date
3. FLOOR FRAMING:: Girders- Joists- Bridging- Shield Under Posts- Positive Post/Girder Connect-
Girder/Concrete-1/z"_ Treated 'Rood to Concrete- Mchor Bolts ~/Hashers
Inspector Date
5. PLU1®1NG: Drains- Vents- Traps- Clean-outs- 'later Supply- Gas Supply_
Date
6. 1D:C9AlIICAL: Furnace- Exhaust- Beat Ducts- Inspector Date
i. FRAMING: Halls- Ceilinq- Roof Vemts Hindovs_ Air Seal
In Hall Penetrations` Chi~ey Straps- Inspector-
Date
8. INSULATION: Floor _ hall Ceilinq- Baffles_
9. DRYHALL NAILING: Halls- Ceilinq_
10. DRAINAGE:
Inspector -Date
Inspector Date
Inspector
Date
11. FINAL INSPECTIOtI: Building Plumb. Mech/heating Smake Det. Rouse No.
~r Barrier: Insulation Certificate- Inspector Date
ml poly _V. B. Paint -Kraft Paper
(ceeifieete inquired) LPG (Fire Department) Dete
Ca 1 1 4 8 h our s be f o r e you d i g
for u-ti 1 ity 1 ina 1gca~tes
1- 8 0 0- 4 Z 4- 5 5 5 5