Loading...
HomeMy WebLinkAbout062216 WSDOT - Post-docket Adw MWWashington) State Olympic Region Department of Transportation 5720 Capitol Boulevard,Tumwater P.O.Box 47440 Olympia,WA 98504.7440 360-357-26001 FAX:360-357-2601 TTY'.1-800-633-6388 www.wsdot,wa.gov June 21, 2016 Ms, Judy Surber Planning Manager City of Port Townsend 250 Madison Street, Suite 3 Port Townsend, WA 98368 RE: City of Port Townsend Comprehensive Plan Proposed Update#22334 j Dear Ms. Surber: Thank you for allowing the Olympic Region of the Washington State Department of Transportation (WSDOT) the opportunity to review and comment on the proposed amendments to the Comprehensive Plan. We recognize the investment of time and energy that this document represents, and we appreciate the opportunity to review the plan. The comments below are provided for your consideration as the City completes its update. The Growth Management Act requires an inventory of state-owned transportation facilities within the City's jurisdictional boundaries per RCW 36.70A.070 (6)(a)(ii). The traffic forecasts for SR 20 must be for at least 10 years to provide information on the location, timing, and capacity needs of future growth. Most comprehensive plans typically use a 20-year forecast and show existing year LOS results and future horizon year LOS results that are compared against the WSDOT Urban LOS D standard in a table (LOS results are also typically shown on maps), Page 6-33, Policy 8.3 mentions "The city should encourage a LOS standard of a one- boat wait on weekdays and a two-boat wait on weekends." Suggest adding this sentence, "The Washington State Ferries has established a Level 2 LOS Standard (75% full sailings in January and May, 85% full sailings in August) for the Port Townsend/Coupeville Ferry." The 2015 Freight and Goods Transportation Inventory results could be mentioned in the Transportation Element. SR 20 within the City of Port Townsend is designated T-3 truck route with 3,050,000 annual tonnage and 810 annual daily truck volumes (9.4% trucks). PC-30 Ms. Surber June 21, 2016 Page 2 The 2015 annual tonnage; average annual daily truck volumes, and truck percentages can be found in the following website link: k htt www.wsdot.wa. ovNR rdonl res F42539OD-AB5B-44BF-8F21- 92BADECC7545/0/2015FGTSStateRouteTlthroughTS.pdf i Again we thank you for the opportunity to review and comment on the proposed comprehensive plan update. if you have any questions related to this letter please contact Nazmul Alam of my office at(360) 704-3207. Sincerely, l Dennis L, Engel, P.E. Transportation Planning Manager DE:y1 YL cc: Ike Nwankwo, Commerce Anne Fritzel, Commerce Debbie Clemen, PRTPO . i i i PC-30