HomeMy WebLinkAbout9311-07C 2 T Y O F PORT TO WN S EN D
BUILDER'S PERMIT 6 INSPECTION RECORD
(See Instructions on Attached Sheet)
• THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CALL 385-2294 FOR INSPECTION
Pewit Number 9311-07 Issued 11/10/93 Treas. No.
Job Address 2387 3rd Street Zaninq C_11 1~jpe Occapanc~f
Nature of Wor!c Fdn_ Commercial bldg. Dse of 8ui!dingjsj Future warehouse
omen Bi 11 Schwi 1 ke Contractor Pearce PPnI ncul a Rui 1 derc
*NEW ENE$G'{ CODE* ****FOUndat'f On Only****
1. G"r,DUHD4iDRK: P!umbinc
_nsre~or Date
::. FCDTIRGSiSLA85: Setbacss ~~ Forms v'~Beinforcement~ S!ab~ ~PIJ/6
Inspector t~~ Dated
3. FOUNDATION 'BALL: Fora- Reinforceeent_ Seather Prooiina_
dents- Crayl Aces
- InSDEC:OI - DdL2
~. FLOOH FBAHING:: Girders- Joists- Bridaipq_ Shield Under Pasts- Positive Past/Girder Copnect_
GirderlComcrete-i/2"_ Treated 'rood to Con~ete- Anchor Bolts ~/4lashers_
• Inspector Date .
5. PLUMING: Drains- Pents_ TraDS_ Clean-outs- ;cater Supply- Gas Supply_
6. HECSANICAL: Furnace Exhaust Heat Ducts
i, FRAHING: halls, Ceiling Roof `Dents ;iindovs- Air Seal
In Ball Penetrations- Chimmey Straps- Inspe
a. INSULATION: Floor _ .tall _ Ceilinq- Baffles_
9. DHYSiALL HAILING: italls_ Ceilinq_
10. DRAINAGE:
Date
Date
Date
Inspector Date
Inspector Date
Insaector
Date
12. FINAL INSPECTION: Building Plumb. Hech(heatinq Smoke Det. House No.
~por Barriar: Insulation Certificate- Inspector Date
_ mil poly _V. B. Paint -Kraft Paper ;
~~~ ~
Ca 1 1 4 8 riour s before you d i g
for ~u-ti 1 icy Z ine locates
1- 8 0 0- 4 2 4- 5 5 5 5