Loading...
HomeMy WebLinkAboutExhibit C - SEPA review draft updates to Comprehensive Plan 7-2 Utility Goals &Policies 1 ADOPTION ORDINANCE 8 CAPITAL FACILITIES 2 INTRODUCTION ELEMENT 2-1 The Planning Process 8-1 Introduction 2-6 Profile of Port Townsend 8-1 Planning Context 2-9 Budding Blocks for the Comprehensive 8-2 Challenges and Opportunities Plan 8-4 Capital Facilities Inventory 2-11 Predictions for the Future (Assumptions 8-6 Capital Facilities Goals &Policies for Port Townsend's Comprehensive Plan) 9 ECONOMIC 2-12 Uncertainty of Assumptions (Changes Beyond Anyone's Control) DEVELOPMENT ELEMENT 3 COMMUNITY DIRECTION 9-1 Introduction STATEMENT 9-1 Planning Context 9-2 Challenges &Opportunities 4 LAND USE ELEMENT 9-4 Economic Development Goals &Policies 9-9 An Economic Development Strategy for 4-1 Introduction Port Townsend 4-1 Planning Context 4-3 Challenges &Opportunities 10 CONSISTENCY WITH 4-4 Planning for the Next 20 Years 4-11 Land Use Goals &Policies GMA & COUNTY-WIDE 4-33 Implementation Strategy PLANNING POLICY 10-1 Introduction 5 HOUSING ELEMENT 10-1 Consistency with the 13 GMA Goals 5-1 Introduction 10-6 Consistency with the County-Wide 5-1 Planning Context Planning Policy 5-2 Challenges &Opportunities 5-3 Housing Goals &Policies 11 GLOSSARY OF TERMS 5-10 An Affordable Housing Strategy for Port Townsend 12 ORDINANCE LIST 6 TRANSPORTATION ELEMENT 6-1 Introduction 6-1 Planning Context 6-2 Challenges and Opportunities 6-3 Transportation Goals &Policies 6-25 Transportation Improvements 7 UTILITIES ELEMENT 7-1 Introduction 7-1 Challenges and Opportunities Comprehensive Plan 2016 Table of Contents Figure 6-1 Functional Classification of Existing Streets........................................................................6-8 Figure 6-2 Walkway System Inventory.....................................................................................................6-13 Figure 6-3 Bikeway System Inventory......................................................................................................6-14 Figure 6-4 Public Transportation...............................................................................................................6-17 Table 2-1 City of Port Townsend,Jefferson County&Washington State Age Distribution of Population..................................................................................................................................2-8 Table 4-1 Population&Employment Projections................................................................................4-4 Table 4-2 The Land Use Map—Acreage Within Each Land Use Designation................................4-11 Table5-1 ??..................................................................................................................................................5-5 Table 5-2 Number of Dwelling Units for Each Housing Type (2015)..............................................5-6 Table6-1 Roadway Inventory...................................................................................................................6-5 Table 6-2 Washington State Ferry Ridership Statistics by Quarter....................................................6-18 Table 6-3 Transportation Implementation Program.............................................................................6-26 Table 8-1 Water and Wastewater Level of Service Standards.............................................................8-7 Table 8-2 Transportation Level of Service Standards...........................................................................8-8 Table 8-3 Public Facility Level of Service Standards............................................................................8-8 Comprehensive Plan 2016 Table of Contents Adoption Ordinance Ordinance No.2539 AN ORDINANCE OF THE CITY OF PORT TOWNSEND,WASHINGTON,ADOPTING THE CITY OF PORT TOWNSEND COMPREHENSIVE PLAN AS REQUIRED BY THE GROWTH MANAGEMENT ACT OF 1990,AS AMENDED,(CHAPTER 36.70A RCW);ADOPTING AND INCORPORATING BY REFERENCE THE PORT TOWNSEND URBAN WATERFRONT AND GATEWAY DEVELOPMENT PLANS AS SUBAREA PLANS;READOPTING AND INCORPORATING BY REFERENCE THE 1991 COMPREHENSIVE PARKS AND RECREATION PLAN;REQUIRING THE PREPARATION OF DEVELOPMENT REGULATIONS AND A NEW OFFICIAL ZONING MAP TO IMPLEMENT THE PLAN;AND,ESTABLISHING AN EFFECTIVE DATE. The City Council of the City of Port Townsend finds as follows: 1. After review and recommendation from the Port Townsend Planning Commission,the City's current comprehensive plan was adopted by the City Council in 1981 (the "1981 Plan")as the official public document intended to guide the physical development and conserve the resources of the City. 2. The Washington State Legislature adopted the Washington State Management Act of 1990 and amendments thereto. Chapter 36.70A.RCW,(the "Act"),requiring selected counties and cities to prepare comprehensive plans consistent with the provisions of the Act. 3. Under the Act,the City of Port Townsend is charged with the responsibility of preparing a new comprehensive plan to facilitate the orderly and coordinated growth and development of the City(Chapter 36.70A.040 RCW). 4. As required under the Act(Chapter 36.70A.210 RCW),and to ensure coordination and consistency between the comprehensive plans of Jefferson County and the City of Port Townsend,the City participated in the preparation and adoption of the County-Wide Planning Policy for Jefferson County(City Resolution No.92-112 and County Resolution No. 128-92,both dated December 21, 1992). 5. Throughout the City's planning process,the County-Wide Planning Policy for Jefferson County has been used as a policy guide for the development of the City of Port Townsend Comprehensive Plan. 6. Following adoption of the County-Wide Planning Policy for Jefferson County,the City implemented a thorough planning and public involvement process to guide development of the new Comprehensive Plan in conformance with the Act,and to repeal and replace the 1981 Plan. 7. As set forth in the findings below,the citizen involvement process employed in the planning process exceeds the public participation requirements set forth in the Act(Chapter 36.70A.140 RCW). 8. In May of 1993,the Port Townsend City Council sponsored the PT 2020:Getting Together proj ect to provide an opportunity for citizens to express their concerns about the future of the City. 9. The PT 2020: Getting Together process involved over 1,400 hours of citizen discussion between March and May, 1993,and included more than 600 citizen responses to a questionnaire that sought information about the concerns and values of Port Townsend residents. 10. The product of the PT 2020 project was a report entitled, "PT 2020:Getting Together-Final Report of Coffee Hour Process and Results" (the "PT 2020 Report"). 11. On June 21, 1993,the City Council accepted the PT 2020 Report as a guide to be used in the City's future planning efforts(Resolution No.93-73). 12. After timely public notice,the City Council held two public workshops on March 16 and 23, 1994,to develop a"Community Direction Statement"to guide the development of the new Comprehensive Plan. 13. Derived from the results of the PT 2020 Report,the Community Direction Statement was adopted by the City Council on May 2, 1994,as a vision statement for the comprehensive planning process(Resolution No.94-65). Comprehensive Plan Update 2016 Page 1-1 Adoption Ordinance 14. Throughout the planning process,the City Council.Planning Commission,citizen workgroups,and staff have referred to the Community Direction Statement to ensure that the basic values it embodies are reflected in the new Comprehensive Plan. 15. In May of 1994,Port Townsend Mayor John Clise appointed Councilpersons,Planning Commissioners and Port Townsend citizens to five Citizen Workgroups charged with the responsibility of developing goals,policies,and implementing strategies for the Draft Comprehensive Plan.A sixth workgroup,known as the "String and Glue" Committee,was also formed to help coordinate the efforts of the citizen workgroups and to prepare meeting minutes for the other citizen workgroups. 16. Between May of 1994 and December 1995,the workgroups held a total of more than 50 public meetings as they gathered information,identified key issues,and prepared the Draft Plan elements for community review. 17. Citizen workgroup meeting tunes and places were listed in the weekly "Meetings,Meetings,Meetings"flyer posted at City Hall,and were provided to the Port Townsend-Jefferson County Leader. 18. On January 10, 1996,the Draft Port Townsend Comprehensive Plan and Environmental Impact Statement was released for public and agency review(see Exhibit"A" attached hereto). 19. The Draft Plan represented an integrated State Environmental Policy Act(SEPA)and Growth Management Act(GMA)document,and was formatted and prepared to fulfill the requirements of both the Act and SEPA(Chapter 43.21 C RCW). 20. On January 30, 1996,and after timely public notice,the SEPA Responsible Official(Building and Community Development Director,Dave Robison)conducted a public hearing to accept public testimony on the Draft Environmental Impact Statement(DEIS)portion of the integrated Draft Plan and DEIS document. 21. In February, 1996,and after timely public notice,the Port Townsend City Council and Planning Commission conducted four televised community workshops to review the major policy recommendations of the Draft Plan,and to answer questions from interested citizens.These workshops were held on February 7, 14,21,and 28, 1996. 22. In March and April of 1996,and after timely public notice,the Port Townsend Planning Commission held a series of eight public hearings to accept public testimony on the specific recommendations contained in the Draft Plan. These hearings were held on March 7, 14,21,and 28,and April 4, 11. 18,and 25, 1996. 23. Following the conclusion of the Planning Commission public hearings on April 25, 1996,and after timely public notice,the Planning Commission held a series of seven closed record meetings to deliberate upon the testimony received,and prepare findings,conclusions,and recommendations for the advice of the City Council.These meetings were held on May 4, 8, 15, 16,22,23,and 29, 1996. 24. On June 3rd, 1996,the Planning Commission transmitted the Draft Port Townsend Comprehensive Plan and a list of final recommended amendments to the City Council,together with a unanimous recommendation for adoption {see Exhibit"B" attached hereto). 25. Between June 4 and 18, 1996,and after timely public notice,the City Council held a series of four public workshops to review the specific recommendations contained in the Planning Commission's report,and to preliminarily direct further revisions to the Draft Plan.These workshops were held on June 4, 11, 12,and 18, 1996. 26. On June 19 and 20, 1996,and after timely public notice,the City Council held two additional televised public hearings to accept final public testimony on the Draft Port Townsend Comprehensive Plan. 27. Between June 24 and July 10, 1996,and after timely public notice,the City Council held a series of six special public meetings to deliberate upon the testimony received and to direct final lines-in and lines-out to the goals, policies,and implementing strategies of the Plan,and to direct final changes to the Land Use Map.These special meetings were held on June 24 and 25,and July 2, 8,9,and 10, 1996. 28. On July 3, 1996,a Final Environmental Impact Statement(FEIS)was issued for the Port Townsend Comprehensive Plan as required under SEPA(Chapter 43.21C RCW) {see Exhibit"C" attached hereto). Comprehensive Plan Update 2016 Page 1-2 Adoption Ordinance 29. Throughout the comprehensive planning process,workshops,meetings and hearings have been advertised through a wide variety of media,including direct mailings to City Utility customers and individuals on the City's Comprehensive Plan Mailing List,legal ads and display ads in the Port Townsend-Jefferson County Leader,and announcements broadcast on Port Townsend cable television station(Channel 8). 30. In addition to advertisements for meetings,workshops and hearings,the City has widely disseminated information regarding important issues for community discussion,and key recommendations contained in the Draft Port Townsend Comprehensive Plan.Examples of these public information efforts are detailed in findings 431 through 435,below. 31. In November, 1995,the Port Townsend-Jefferson County Leader ran an insert entitled"Planning Port Townsend,"which provided information on the planning process and the three conceptual plan alternatives under consideration(i.e.,Alternative 41 -Residential Community; Alternative 42 -Neighborhood Community(Focussed Growth); and Alternative 43 -Urban Community(Concentrated Economic Growth)).This insert also contained an informal preference questionnaire regarding the conceptual plan alternatives; more than 100 responses to this questionnaire were returned to City Hall,and the results were tabulated and reviewed by-the citizen workgroups. 32. In August, 1995,the City prepared a 25 minute video describing major issues addressed by the Draft Plan and encouraged residents to become involved in the planning process.This video was broadcast a total of 30 times on local Cable Channel 8,and was available for free rental at local video stores. City Hall,and the Port Townsend Library. 33. Over the course of the planning process,five articles written by the Mayor and City Councilmembers have been published in the Port Townsend-Jefferson County Leader describing the planning process,important issues for community discussion,and how to become involved in the process.Articles published by the Leader include: a. "Please Join Us in Planning Port Townsend"by Councilmember Dan Harpole in November, 1994; b. "The Port Townsend Comprehensive Plan: 'Our Legacy for the Future"'by then Mayor John Clise in May, 1995; C. "The Land Use Chapter-The'Heart'of the City's Draft Comprehensive Plan"by Councilmember Bill Davidson in February, 1996; d. "Port Townsend's Draft Comprehensive Plan:Promoting More Affordable Housing&'Family-Wage'Jobs" by Mayor Julie McCulloch and Councilmember Diane Perry-Thompson in February, 1996; and e. "Port Townsend's Draft Comprehensive Plan:Providing Public Facilities&Services Within Our Financial Resources"by Councilmember Ted Shoulberg and Mayor Julie McCulloch in February, 1996. 34. Prior to the Planning Commission's public hearings beginning in March, 1996,Draft Port Townsend Comprehensive Plan display boards were set up at key locations throughout town,including: City Hall;the Port Townsend Library; Safeway;the Port Townsend Food Co-Op; and Stock Market Foods.These displays were comprised of the draft Land Use Map,the Community Direction Statement,text highlighting important policy issues for community discussion and major recommendations of the Draft Plan,and text describing how to participate in the process. 35. To promote community involvement in the development of the Plan,the Mayor,City Councilmembers and staff visited local service clubs(i.e.,Chamber of Commerce,Rotary,Lions,and Soroptimists)on ten occasions between the summer of 1995 and spring of 1996.These presentations highlighted key issues for community discussion,the major policy recommendations of the Comprehensive Plan Workgroups,and encouraged citizen involvement in the planning process. 36. As more fully described in finding 437,below,the Port Townsend Comprehensive Plan meets the requirements of the Act,including,but not limited to,the required elements concerning Land Use,Housing,Transportation,Capital Facilities and Utilities,and in addition,the optional element of Economic Development as allowed by the Act. 37. The Port Townsend Comprehensive Plan contains goals,policies,implementing strategies and a land use map intended to establish the character,quality and pattern of the future physical development of the City.The Plan Comprehensive Plan Update 2016 Page 1-3 Adoption Ordinance specifies the amount and location of land for various land uses,and the density and intensity of development allowed.Important direction provided by the Plan includes: a. The designation of five new "mixed use centers"intended to serve as focal points for new or emerging neighborhoods and to help promote pedestrian friendly areas with small scale neighborhood shopping and services(i.e.,the new C-I/MU and C-II/MU designations); b. The designation of significant additional land for commercial and manufacturing development,in order to help provide the retail,service,and employment opportunities needed by the community(i.e.,including the new C-I/MU,C-II/MU,C-II(H),NI/C,M-II(A),and M-II(B)designations); C. The designation of significant additional land for moderate and higher density multi-family development in order to encourage more diverse and affordable housing types(i.e.,the new R-III and R-IV designations); d. A policy which directs that manufactured(i.e.,HUD Code)homes be allowed in all single-family residential districts outside the National Register Historic District,provided that such homes meet the standards of the State Energy Code,or its equivalent; e. A policy which directs that duplexes,triplexes,and fourplexes be allowed in all single-family residential districts(i.e.,R-I and R-II designations)consistent with the underlying density requirements of such districts; f Policies intended to promote the creation of a City-wide system of interconnected open spaces and trails; g. Policies intended to provide more opportunities and support for pedestrians,bicyclists,and transit riders, while at the same time allowing the construction of narrower streets to provide newer neighborhoods with a continuity found in older sections of the City; h. A Capital Facilities and Utilities Element which establishes level of service standards and concurrency requirements,lists capital improvements„details construction and funding schedules for capital projects over the next six years,and provides a clear policy framework for providing adequate urban public facilities and services to address current needs and new growth and development; and i. An optional Economic Development Element which includes a strategy which seeks to maximize Port Townsend's potential for future economic growth in a manner consistent with community and environmental values. 38. The Port Townsend Comprehensive Plan provides clear policy direction for the preparation of new development regulations and a new official zoning map;however the City's new development regulations and new official zoning map will not be consistent with,and implement,the Comprehensive Plan upon adoption of this ordinance. 39. The Port Townsend Comprehensive Plan has been prepared in conformance with the goals and requirements of the Act,and is externally consistent with and compatible with the 13 state-wide planning goals contained in the Act (Chapter 36.70A.020 RCW). 40. The Port Townsend Comprehensive Plan has also been prepared with the direction provided by the County-Wide Planning Policy for Jefferson County,and is in conformance with the relevant policies contained therein,including:, a. Policy 41 -Policy to Implement RCW 36.70A.110-Urban Growth Areas; b. Policy 42-Policy on the Promotion of Contiguous and Orderly Development and the Provision of Urban Services to such Development; C. Policy 43 -Policy on Joint County and City Planning within Urban Growth Areas; d. Policy 44-Policy on the Siting of Essential Public Facilities of a County or State-Wide Significance; e. Policy 45 -Policy on County-Wide Transportation Facilities and Strategies; Comprehensive Plan Update 2016 Page 1-4 Adoption Ordinance f Policy 46-Policy on the Provision of Affordable Housing; g. Policy 47 -Policy on County-Wide Economic Development and Employment; and h. Policy 49-Policy on Fiscal Impact Analysis. 41. Based upon the foregoing findings,the City Council finds that adoption of the 1996 Port Townsend Comprehensive Plan will promote the public health,safety and general welfare of the citizens of Port Townsend and should be approved as the official land use classification and guidance document for the City. NOW,THEREFORE,the City Council of the City of Port Townsend in regular session assembled does hereby ordain as follows: Section 1:Adoption.The 1996 Port Townsend Comprehensive Plan,as recommended by the Planning Commission and thereafter revised by the City Council,included as Exhibits"A"through"G" attached hereto,is approved in its entirety as the official land use classification and development guidance document for the City of Port Townsend. Section 2:Filing.The 1996 Port Townsend Comprehensive Plan as approved shall be filed with the City Clerk and shall be available for public inspection upon the effective date of this ordinance. Section 3:Transmittal to DOTED.The City Clerk shall transmit a copy of the 1996 Port Townsend Comprehensive Plan as approved to the State Department of Community Trade and Economic Development(DOTED)within 10 days of final adoption this ordinance,and to other offices and agencies as may be required by law. Section 4:Preparation of Final Revised Comprehensive Plan Copies. Copies of a Final Revised Port Townsend Comprehensive Plan,incorporating the changes to the goals,policies,implementing strategies and Land Use Map approved by the City Council(i.e.,integrating Exhibits "A"through"D" attached hereto into one coherent document for public use),shall be prepared by Port Townsend Building and Community Development Department staff and available for public inspection within 30 days of final adoption of this ordinance. Section 5:Effect on 1981 Plan.Upon the effective date of this ordinance,the 1981 Plan and land use map shall be superseded by the 1996 Port Townsend Comprehensive Plan as approved,PROVIDED however,that if the 1996 Comprehensive Plan is at any time hereafter declared in its entirety to be invalid or of no effect,the 1981 Comprehensive Plan shall spring into effect. Section 6:Effect on Subarea Plans. a. Upon the effective date of this ordinance,the Port Townsend Urban Waterfront Plan and the Port Townsend Gateway Development Plan shall be incorporated by reference and adopted within the 1996 Port Townsend Comprehensive Plan as subarea plans(see Exhibits "E" and"F" attached hereto); b. Upon the effective date of this ordinance,the Port Townsend Comprehensive Parks and Recreation Plan shall be incorporated by reference and readopted under the 1996 Port Townsend Comprehensive Plan as a functional plan(see Exhibit"G" attached hereto); C. In the event of an inconsistency between the policies of the Port Townsend Urban Waterfront Plan,the Gateway Development Plan or the Port Townsend Comprehensive Parks and Recreation Plan and the Port Townsend Comprehensive Plan,the policies of the Port Townsend Comprehensive Plan shall prevail. Section 7:Preparation of Development Regulations and Official Zoning Map.The Director of the Port Townsend Building and Community Development Department,together with the Planning Commission,are directed to begin preparation of new development regulations and a new official zoning map in order to timely comply with,and implement,the 1996 Port Townsend Comprehensive Plan. Section 8:Urban Growth Area.The incorporated limits of the City of Port Townsend shall serve as the limit of the Port Townsend Urban Growth Area until such time as a final unincorporated urban growth area boundary is mutually agreed to by Jefferson County and the City of Port Townsend,and approved by the Joint Growth Management Committee,the Jefferson County Board of Commissioners,and the Port Townsend City Council. Comprehensive Plan Update 2016 Page 1-5 Adoption Ordinance Section 9: Severability.In the event any one or more of the provisions of this ordinance shall for any reason be held to be invalid,such invalidity shall not affect or invalidate any other provision of this ordinance,but this ordinance shall be construed and enforced as if such invalid provision,had not been contained therein;PROVIDED,that any provision which shall for any reason be held by reason of its extent to be invalid shall be deeded to be in effect to the extent permitted by law. Section 10:Effective Date.This ordinance shall be in full force and effect five(5)days following publication of the attached summary,which is hereby approved. Read for the first,second and third times and passed by the City Council of the City of Port Townsend,Washington,at a regular meeting thereof,held this fifteenth day of July, 1996. By Julie McCulloch,Mayor ATTEST: Pamela Kolacy,City Clerk Approved as to form: Timothy 1.McMahan/City Attorney First reading:July 15, 1996 Passage:July 15, 1996 Second reading:July 15, 1996 Publication:July 17, 1996 Third reading:July 15, 1996 Effective:July 22, 1996 Transmitted to the State:July 30, 1996 Ordinance No.:2539 [NOTE: Originals of Exhibits "A" through "F" are on file with a copy of this ordinance in the City Clerk's Office.] Summary of Ordinance No.2539 On July 15, 1996,the Port Townsend City Council passed Ordinance No.2539,adopting the Port Townsend Comprehensive Plan as required by the Washington State Growth Management Act of 1990,as amended(Chapter 36.70A RCW),and establishing an effective date of July 22, 1996.The Port Townsend Comprehensive Plan contains goals,policies,implementing strategies and a land use map intended to establish the character,quality and pattern of the future physical development of the City.The Plan specifies the amount and location of land for various land uses, and the density and intensity of development allowed. Important direction provided by the Plan includes: 1. The designation of five new "mixed use centers"intended to serve as focal points for new or emerging neighborhoods and to help promote pedestrian friendly areas with small scale neighborhood shopping and services (i.e.,the new C-I/MU and C-II/MU designations); 2. The designation of significant additional land for commercial and manufacturing development,in order to help provide the retail,service,and employment opportunities needed by the community(i.e.,including the new C-I/MU, C-II/MU, C-II(H),M/C,M-II(A),and M-II(B)designations); 3. The designation of significant additional land for moderate and higher density multi-family development in order to encourage more diverse and affordable housing types(i.e.,the new R-III and R-IV designations); 4. A policy which directs that manufactured(i.e.,HUD Code)homes be allowed in all single-family residential districts outside the National Register Historic District,provided that such homes meet the standards of the State Energy Code,or its equivalent; 5. A policy which directs that duplexes,triplexes,and fourplexes be allowed in all single-family residential districts(i.e.,R-I and R-n designations)consistent with the underlying density requirements of such districts; 6. Policies intended to promote the creation of a City-wide system of interconnected open spaces and trails; Comprehensive Plan Update 2016 Page 1-6 Adoption Ordinance 7. Policies intended to provide more opportunities and support for pedestrians,bicyclists,and transit riders,while at the same time allowing the construction of narrower streets to provide newer neighborhoods with a continuity found in older sections of the City; 8. A Capital Facilities and Utilities Element which establishes level of service standards and concurrency requirements,lists capital improvements,details construction and funding schedules for capital projects over the next six years,and provides a clear policy framework for providing adequate urban public facilities and services to address current needs and new growth and development; and 9. An optional Economic Development Element which includes a strategy which seeks to maximize Port Townsend's potential for future economic growth in a manner consistent with community and environmental values. Ordinance No.2539 directs that the 1996 Port Townsend Comprehensive Plan shall supersede the 1981 Port Townsend Comprehensive Plan as the official land use classification and guidance document for the City of Port Townsend.The ordinance further instructs the Director of the Port Townsend Building and Community Development Department,together with the Planning Commission,to begin preparation of development regulations and an official zoning map to implement the 1996 Comprehensive Plan.A complete copy of Ordinance No.2539 may be obtained without charge at the City Clerk's Office at City Hall,540 Water Street,Port Townsend,Washington,98368. Comprehensive Plan Update 2016 Page 1-7 Introduction I lei r l(0 r 1�� � �"YY �������1�����(�1����11��111�1��Jjfl�f��JJI)//{IIIPo+�YiPiD141J,�liYGGrlllrm r,mry��w arm din 7 r�!Nr ��r ri/7 ........... r .0 r d m ��i wr ri r r9a�IlY l rc ,„�„r r - ,,; �� rr y � i PRA 4WA'RSeR TrT�ATT�(1T�P T�`f'T(1�T �� r�T��are �ra �greaTl Comment[7S1]: HK-S This section has been"updated to reflect existing conditions and Welcome to the Cite of Port Townsend's Comprehensive Plan.This 20-year plan articulates the communitl-'s current planning process" vision and reflects community values.The coals and policies included in this Plan provide a basis for the Cites land use regulations and it is intended to guide future decision-making.It also addresses anticipated population and employment growth,and how facilities and services will be maintained or improved to accommodate expected growth. THE PLANNING PROCESS Why Plan? All of us make financial plans,travel plans,and work plans that reflect personal goals and objectives.Cities plan for the same reasons each of us make plans as individuals -plans help us to organize our time and to work toward our goals in a step-by-step fashion that saves time,money and effort.Planning simply makes good sense. City planning is very similar to personal planning,but it involves more factors,a lot more money,and is intended to serve the best interests of the community rather than the individual. In response to the requirements of the Growth ililanagement Act(AVIA),the City adopted a AVIA-compliant Comprehensive Plan in 1996. Numerous refinements were made in subsequent annual updates and durino�the 2008 mid cycle assessment This 2016 update responds to the GNIA requirement for periodic review.It also conforms to Countywide Plannino Policies. , , 6 � , "04) (4-effi 6,460 r-esidenfs in 4984, , The tirew Plan is intended to reflect the goals and values of todal1s residents.Port Townsend is our legacy for the future.Prior generations set the basic growth patterns and handed down to us a city rich in histor5y,architecture,and natural beauty.This ftew Comprehensive Plan allows a new generation to define its contribution to Port Townsend.As such,the Plan is a statement of confidence,optimism and belief in ourselves,a statement that our community can change without losing its essential character. The tee-Comprehensive Plan attempts to clearly state the communiWs vision for its future,and how to get there from here.There are manly difficult questions that the Plan seeks to answer: • What areas are best for development,and what areas should be preserved in their natural state? • Where should we locate new housing,industry,commerce and public facilities? • How can we encourage"infill" development in neighborhoods while also maintaining the iflie,,, s ffe f fieifi„. '-character that makes them livable and unique? • How can we encourage"mixed use" commercial and residential development in certain key locations? • How should we desion and lay-out new streets? • What strategies should we use to increase the"walkabilit5y" of our town? Comprehensive Plan 2016 Introduction 2-1 i PHA 4WA41SeR TrT�yT�(1T�P T�`f'T(1�T • How can we most effectively" Httl' fhe C'`,-work to develop an interconnected system of parks,open spaces,and trails? • What can we do to ensure a strong local economy? • How can we help to make housing more affordable to Port Townsend residents? • How will we pay for all this? In sum,how can we manage growth to maintain and achieve the kind of community we want?The ftee� Comprehensive Plan attempts to answer these questions. What is the Comprehensive Plan? Required by the Washington State Growth Management Act(GMA) of 1990,the Comprehensive Plan consists of a Land Use Map designating the desired use of lands for various activities,and goals and policies to guide government and private decision-makers in determining how Port Townsend will grow,look,and operate in the future.The Plan reflects the results of citizen involvement,technical analysis,and the judgement of the Port Townsend Ciry Council. The Plan anticipates change and provides specific guidance for growth and development in the City over the next 20 gears by defining: • How much population and job growth is antician ted and where it should be located; • What type of transportation improvements,utilities,and public facilities must be provided to serve our future population and employment; • Where people will live and what type of housing they will need;and • How to pay for the utilities and public facilities needed to carry out the communiWs vision. Who Created the Comprehensive Plan? (A Summary of Public Involvement Efforts) Public participation ism vital to the success of Port Townsend's Comprehensive Planning process.The City has codified a public participation process in the municipal code;and,for major updates,the Cite has elected to expand on the traditional workshops,hearings. and opportunities for written comment. For example, Ordinance 2539 ado tine the 1996 Comprehensive Plan documents over 1,400 hours of citizen discussion and more than 600 citizen responses to a questionnaire as part of the PT 2020 Coffee Hour. As part of the 2016 Periodic Update,the Cite held a town meeting.conducted an online survey,and launched"Soeakt'p Port Townsend" an online discussion forum F4 e4eedback from the public enabled the Planning Commission and City Council to reach decisions on key policy issues for the 1996 Plan,subsequent u�dat Lfi_AT4ftft and implementing programs,as well as for the 2016 Periodic Update. A�okiiiteered to host eaffell I- -Fl—04-DI D materials to interested hosts.Be Comprehensive Plan 2016 Introduction 2-2 i PRA 4WA4rS r, TN 1N4RWTD TC`f'T0N iii,�,Jing reeres firellgkeilt towir,regal:444g tile Present R144 filtilre 4"reet"en of tile 94y.Appfemiroately 6PP GA.,�@lrs ---mated and expressed the"r- to4ie &c ;ithe Ciity's future plaralAilg efforts. In May ef 1994,tile Mayer appeinted Plan ell@ for @Roil ef tileb &N,elep geals,pei"Gies and strategies for tile Pfaft 121— -Fl—rl"f-r, 'I's 444 'IQ 1t ffeG@SS to G-61+4444 workshops as they gathered information,identified key issues,prepared draft Plan elernents and-,--A-11 fledbaok OR After release of the Draft Plan,the City Couneil and Plaroming GOO addressed lay tile Plair.:Hwse 4!N49FO14 9144 April Of 1996,tile POA:�WA'RS@144 pla-Mil—GO-3-111 11-111 Dj— tile plaroring geraraiss"en plijbi"O lwafiRgs Jin late April,tile Plaroring geraraissson 14@44 a senies Of puring tile first two week of june, 1996,the City Couneil lield four Imblie --trngs to revew4lie- effie Plaroring geraraissien and te ident,4�,potential a4ditionai okanges te tile Praft Plan.In late final ok llg@s t„the text ara 114--y--Pj—Tile„ Mailiog List,leo ads Rod display ads fil tile Port TOWHSefid-jeffefSffli GERifity Leader,Rod efforts rzr•,are ,steddvel o-,A- ill tile City ,,,7 > stores, Hall, Plan display Ybeaf&W@F@ Set lip at key 1069t"ORS 41FOligl4eilt twAsr, 94y Hafl�tile Port of tile Draft Plan,and text cleseribing how to partietipate"n tile proeess. (comprehensive Plan 2016 Introduction 2-3 i PRA 4WA'RSeR TrT�ATT�(1T�P T�`f'T(1�T Citizen"nvolvenlent ��""�i���� Comment[JS2]: What's in this Plan? HK-this is from the 1996 process. The Adopting At its core,the Plan contains four fundamental concepts�, -that are highlighted below. ordinances capture the public participation process. Maintaining Our Small Town Character To streamline the Comprehensive Plan,it The overriding objective of the Plan is to maintain and enhance Port Townsend's special character and small does not seem necessary town atmosphere.As our communiry grows,the veru character that attracted residents here in the first place is to repeat it. threatened.The Plan contains two veru important areas of policy direction designed to preserve our communiWs essential character while planning for inevitable growth and development. First,the Plan encourages the development of"mixed use centers" surrounded by strong and diverse neighborhoods,similar to the area surrounding the uptown intersection of Lawrence and Tyler Streets today. These centers are intended to serve as focal points for new or emerging neighborhoods and to help promote pedestrian friendly areas with small scale neighborhood shopping and services. Second,the Plan includes policies w4k4�t-that would lead to the creation of a City-wide interconnected system of open spaces and hails.These green spaces would help to protect the small town atmosphere of Port Townsend while providing other benefits,including stormwater control and linking key wildlife areas. Achieving a Better Balance Between Jobs & Housing Another major objective of the Plan is to help address the"jobs/housing imbalance."There are many more people living in Port Townsend than there are good jobs.Because good jobs are hard to find,many Port Townsend residents pay more than they can really afford for housing.The Plan seeks to remedy this imbalance in two important ways. First,the Plan contains an economic development strategy that is designed to encourage businesses which provide"family wage"jobs-jobs that pay good money,so that we and our children can afford to live and work in Port Townsend.It seeks to balance economic vitality with environmental protection and preservation of our small town atmosphere. Second,the Plan contains an affordable housing strategy which provides more land for higher density development,allows more creative housing types,and increases the housing choices available to City residents. Taken together,the affordable housing and economic development strategies should help to make housing more affordable for Port Townsend residents in the decades to come. Accommodating Port Townsend's Share of County-Wide Growth One of the purposes of the GMA is to limit sprawling urban density development in rural and resource lands. To accomplish this goal,the GMA makes clear that a substantial amount of new growth should be planned and provided for within cities and urban growth areas (UGAs)— ; .h -e of gr-ewfh,and to do it in a compact,urban manner.By mutual agreement,and based upon recent demographic data,Jefferson County and the City have determined that Port Townsend's share of Counry-wide growth will be approximately 2 711 4--48-5,people during the period between 20160 and 2036-224.This would increase the City's total population from 9,454 to a total population of 12,165 by 2036 8,'44:n 2nnn fe-44,,'-219 b-f e�-effr-2024. [Jefferson Count,-I2 eso .No. 38 15-2 �_ (Pebf ttiti=y-7 -20050ctober 26,2015]._ Comment[7S3]: M-1 Comprehensive Plan 2016 Introduction 2-4 i PRA 4WA'RSeR N.1N4RWDUGT40N Providing Public Facilities &Services Within the City's Financial Resources r , This Comprehensive Plan is designed to balance the need for additional public facilities and services with the Cies ability,to pall for them.Prior to 1996 tst,Plans often contained a"wish list" of capital projects with no demonstrated ability,to fund the necessary improvements.This Comprehensive Plan sets measurable standards for public facilities and services (i.e.,level of service standards),states what specific capital projects will be constructed,and identifies the sources of revenue_that will be used to fund the necessary,improvements. Policies concerning"concurrencyl' are also a key component of the Plan.Concurrency,is the concept of providing certain facilities and services at or before the time of approval of new development projects.The Plan requires that adequate water,sewer,stormwater,and transportation facilities be provided concurrent with i"- new development-e*ft4Ye-ftpptote4. How Will the Plan Be Implemented? Adopting the Comprehensive Plan is the Cies first important step towards realizing the community's vision. The overall vision will only be achieved as wkeft the Plan is implemented over time.A number of tools are used toimplement the Comprehensive Plan.The Zoning;Code contains a set of regulations to direct land use and desion as new development or redevelopment occurs.Growth's also directed in compliance with the Cites land use and community charactergoals through careful planning for the location and sizing of capital facilities. Policies related to the arts,recreation or human services suort programs related to cultural recreational or social needs. Capital facilities enhancements such as decorative.,;tree rlighting c, arry out policies on community character. Programs such as "safe routes to school"and neighborhood enhancement grantshelp implement policies on neighborhood character or safety"e~~ T~se~a' Iimplementation efforts consist of short-term and long-term actions. Some of the short-term actions include revising the Cies municipal code(e.g.,zoning and subdivision ordinances)to conform to the land use designations and policies of the Plan.Long-term actions include preparation of functional plans (e.g.,Stormwater Functional Plan, , Geffipfehenst-eeTransportation Functional Plan,etc.) and neighborhood or subarea plans (e.�.. Howard Street Corridor Subarea Plan).Functional and subarea plans do not require amendment of the Comprehensive Plan;provided,that theT:4"fte4&-&�implements and areis consistent with the goals and policies of the Comprehensive Plan. Comprehensive Plan 2016 Introduction 2-5 PRA 4WA'RSeR4 Devc0opment and Implementation of a Comprehensive P Pan community D&I On Growth SUIle (Ounlywide Regional PrefmilcV5 Community Man nt Growth Pb nning Plans AC t GO%S Man ent Policies and IT Rvqwrernents Rogdations RNIONS, Plan Development MEN UP 1 1 JOOOT ................................. ............... Comprehensive Plan Plan Implementation —J.................... ent Subarea Wy roctional 01her Pe9uiaticrrus PrOgMims @menting Plans Fadfity hprovements Emill I I "a'i"'l ....................... Comprehensive Plan 2016 Introduction 2-6 i PHA 4WA41SeR TrT�yT�(1T�P T�`f'T(1�T �The Comprehensive Plan is a living document While the Comprehensive Plan is designed to provide a vision for the development of our Cit4,it must also be responsive to changes due to orowt� hand the community's desires. t-�;`The City will monitor,evaluate,and amend the Plan as conditions change, and develop a capital investment program that allocates resources to projects that will spur development in the direction envisioned in the Plan. _ Comment[7S4]: PROFILE OF PORT TOWNSEND HKUpdate"Profile of Part Townsend" Port Townsend Yesterday Long before the advent of zoning or planning enabling legislation,much of Port Townsend's basic land use pattern was established.During the Victorian era of the late 19th century over 14,470 small city lots were platted,typified by the 50'by 100'parcel.In 1935,Washington passed the State Planning Enabling Act,giving authority to cities to establish planning programs. During the two decades that followed the Second World War,the pace of development decreased and empty stores and homes symbolized the military's departure from Fort Worden.As the size of the City dwindled,there seemed little need to plan for the future growth of the City. During the late 1950s,Port Townsend defied news and national magazine reports of its future as a ghost town. In 1958,the community succeeded in attracting a state owned juvenile diagnostic and treatment center to Port Townsend.In an effort to ensure the protection of the City's historical legacy,and to improve the economic fortunes of the community,the City Council appointed the Port Townsend Planning Commission in 1962. Charged with the responsibility to make ongoing,policy-oriented recommendations regarding the overall development of the City,the Commission produced the first City of Port Townsend Comprehensive Plan in 1968.This Plan was implemented in 1971 with the passage of the first Port Townsend Comprehensive Zoning Ordinance.The heart of this implementing ordinance continues to guide Port Townsend's growth and development today. During the 1970s,two notable state laws affected land use regulation in Port Townsend:the Shoreline Management Act(SMA) and the State Environmental Policy Act(SEPA).Aside from the CiWs efforts to implement these two important pieces of legislation,only minimal revisions were made to Port Townsend's zoning code during this period. In 1979,a thorough review of the Comprehensive Plan was undertaken by the Planning Commission with assistance from the Jefferson County Planning Department.Although this updated Plan(adopted in 1981) made substantial alterations to the 1968 Plan,the basic land use patterns remained unchanged.By 1987,with development pressures from the greater Puget Sound area reaching out to touch the edges of Port Townsend, the City recognized the need to establish a Planning Department and hire its first part-time planner.During the late 1980s, City leaders initiated two important planning processes that focused attention on developing goals and policies to guide development from Port Townsend's highway entrance to its historic waterfront area. These efforts culminated in the adoption of two important components of today's planning policy framework: the Port Townsend Urban Waterfront Plan;and the Port Townsend Gateway Development Plan.These policy documents set the stage for complying with the GMA mandate to prepare a new Comprehensive Plan in 1996. Although there have been some refinements to the 1996 Comprehensive Plan,the Communiti-Vision and fundamental concepts remain relevant and intact This 2016 Periodic Update is not an overhaul of the existing Comprehensive Plan 2016 Introduction 2-7 i PRA 4WA'RSeR H.1N4RWDUC44ON plan and regulations;rather,this update will reflect new public input,changes in state law,and new population and emploi-ment growth forecasts. Port Townsend Today Who Lives in Port Townsend? Population There were an estimated 9_454Z,499people living within Port Townsend as of 2016449-6-.-i-rhe ffi f he'-'-,--:"' �" Over the next twenti rears.Port Townsend's current population is expected to increase by 2,711 to a total population of 12,165 b,-2036.This pro'ection anticipates that the Citv's population will grow ata compound annual growth rate of 1.27%over the course of the planning eriod 2016-2036). Education Out of 7 398 persons aged 25 years or older in Port Townsend in 2013.95.8%had high school diplomas. Another 42.4%had a bachelor's decree or oraduate decree. These figures are above the State of��ashinoton averages. The State percentage of persons 25 years or older with a high school diploma was 90.0%,and 31.9% had a bachelor's degree or higher. Over the period between 1990 and 2013,Port Townsend's copulation has not onh drown older but more educated. z_ 0 000, 0 Age The median age in Port Townsend is 53.9 gears,a full sixteen gears higher than the median age for the entire State(37 .3),and fractionally�hicher than the median age for Jefferson County as a whole (453.0).For the C.itG:erftnftr-eft,447017.6% of the population is under the age of 199,while X24.6%is 65 or older.Table II-1 compares the age distribution of the State,C__�_C.o�ntG:•and Citi-. Household Income The median household income for Port Townsend in 2015 was$_41100-34_—,36.Port Townsend's residents have slightly lower income levels than those of Jefferson County as a whole($44.700-3-7-,�).In comparison with the State,however,the City's income level is considerably lower(i.e.,lower than the state median 558,900) ft er-ftyes 451,776'.= t v 0 1 Tefferson County Resolution 38-15 Source:2010 US Census. 3 Source: Claritas cited in the Howard Street Corridor Economic Feasibility Studerer anuary 30 2015 E.D.Hovee&Company.LLC and Spinnaker Strategies Comprehensive Plan 2016 Introduction 2-8 i PRA 4WA'RSeR H.1N4RWTD1TC44ON Approximately 17.1% of Port Townsend's population lives on incomes below the federal poverty level, sh�nificantiy higher than the statewide percentage of 13.4%. I2 oughly 10.7%of Port Townsend's families live below the poverty level,which again,is higher than the statewide percentage of 9.0% M . oreover,nearly. one duarter 23.6%) of families with children (18 and under)live on incomes below the federal poverty level,a full 62.0%higher than the statewide percentage(14.6%). In contrast to the number of families with children living below the federal povert level,approximately one-cuarter(23.6%) of Port Townsend households earnings more than 575,000 per year.4 Census blocks in the western portion of the Cite,south of Hastings.Avenue,and the Castle Hill area west of Sheridan Avenue,aooear to be the most economically disadvantaged,with the highest percentages of children in grade school and middle school in households earning below the federal poverty line. - Table 2-1 Cite of Port Townsend.Jefferson Count, &Washington State Age Distr bution of Population= Agears State Jefferson County Port Townsend Under 198 22",-Z26.3% 16.5% 447617.6% 204-9-24 47-F�-6®9% 4 3.7% -F)A3.88% 25-44 X827.3% X16.9% z�817.4% 45-64 a---'L921% =5366.8% 3 36.7% 65&Over 12.3% 26.3% 24.6% l..s"mployrrr ent Who Works in Port 7"owrrsend& What Do 7"heY Do? Port Townsend Paper Companlr- IvM2 just outside the Citl limits,and marine trades continue to be a major source of nongovernmental emrlo�ment in Jefferson Count. g2 Among the major governmental employers in the Curare Jefferson General Hospital-(46� ,Jefferson County e> �'and the Port Townsend School District#50 _ .The City of Port Townsend employs approximately 100 444-people(including seasonal workers). 4.2, a Source:2010 US Census ttFee�r W r 4 �''.�stxs� Comprehensive Plan 2016 Introduction 2-9 i PRA 4WA'RSeR TrT�ATT�(1T�P T�`r'T(1�T Occupations that are well represented with Port Townsend residents,as compared with the entire state,include persons emplo;ed in the following sectors: Arts. entertainment,sports; Community and social services Food preparation and serving; Health practitioners,techs,and support workers; Life,oh)-sical and socials, iNlanagement positions,office and administrative support; Sales;and Personal care and service. Bv comparison,Cit)-residents(but not those in the County)tend to be underrepresented in occupations such as farming/fishing/forestr)-, con struction/extraction,and production. Both Cit)-and Count)-residents are also underrepresented in other industrial related occupations such as bu lding�rounds maintenance.maintenance repair,transportation, and moving. This occupational mix is consistent with an overall lower average wag structure as is further detailed in the Economic Development Element.—L, BUILDING BLOCKS FOR THE COMPREHENSIVE PLAN Port Townsend Urban Waterfront Plan In recognition of the need for improved municipal guidance and control in the urban waterfront planning area, the Waterfront Plan was adopted by the City Council in December of 1990.The Waterfront Plan was a detailed plan for the Urban Waterfront area that addressed: • Uses of public and private properties; • Height and bulk of structures; • Housing and transient accommodations; • Open space; • Pedestrian and vehicular circulation throughout the planning area; • Physical and visual connections throughout the planning area; 6 Source: Washington State Employment Security Department(ESD),cited in Howard Street Corridor Economic Feosib(I(t Stud anuary 30 2015 E.D.Hovee&Company LLC and Spinnaker Strateeies Comprehensive Plan 2016 Introduction 2-10 i PRA 4WA41SeR TrT�ATT�(1T�P T�`f'T(1�T • Physical and visual connections to the rest of the waterfront and from the bluff above;and • New urban design guidelines and regulations. The Waterfront Plan was among the first steps in the Cies attempts to revise and update its Comprehensive Plan.Urban design guidelines and regulations originating in the Waterfront Plan were later codified in Chapter 17.30 Hi toric Overlay District-Desin Review of the PTMC. In 2007,the City adopted an updated Shoreline Master Program.To improve efficiency,the master program incorporated relevant policies,regulations,and design recommendations from the Waterfront Plan and the stand alone Waterfront Plan was retired. , Port Townsend Critical Areas Ordinance (CAO) (formerly the Environmentally Sensitive Areas Ordinance) 01 ria]hv ado ted in 1992�0rdinance 2319) as an interim ordinance the Cites Critical Areas Ordinance, t C`� (Chapter 19.05 Port Townsend Municipal Code) identifies and regulates to protect"critical areas" as required by the GMA.Port Townsend's CAO�''S�regulates development in order to avoid adverse impacts when possible,to reduce adverse impacts when avoidance is not feasible,and to compensate for adverse impacts.Port Townsend's CAO4- defines and establishes standards for the protection of five types of areas: • Aquifer Recharge Areas; • Fish and Wildlife Habitat Conservation Areas; • Frequently Flooded Areas and Critical Drainage Corridors; • Geologically Hazardous Areas;and • Wetlands. In 2005,the City amended the CAO to incorporate best available science consistent with amendments to the G tile. Port Townsend Gateway Development Plan Adopted by the City Council in August of 1993,Gateway represented the culmination of over three gears of active citizen involvement. Gateway expands upon an earlier"concept plan"adopted in May of 1988.The Plan identifies specific transportation improvements for capital development and establishes development guidelines for the Sims Way/S.R.20 corridor from the Port Townsend City Emits to the Washington State Ferry Terminal. These guidelines are"performance-oriented"rather than"prescriptive"and address issues regarding the look, feel and function of the Gateway Corridor.The Gateway Plan incorporates three primary goals into a comprehensive transportation redevelopment strategy: • Traffic Safety; • Streetscape Improvements and Aesthetics;and • Economic Vitality. Comprehensive Plan 2016 Introduction 2-11 i PRA 4WA41SeR N.1N4RWDlJG440N The County-Wide Planning Policy for Jefferson County In Jefferson Counter,the first step in coordinated planning efforts called for by the GMA occurred in December 1992 with the adoption of the CWPP.The CWPP addresses eight subject areas,and is intended to be used as a guiding framework for subsequent development and adoption of comprehensive plans.The CWPP specifically deals with the following: • The designation of urban growth areas (UGAs) (CWPP#1); • Promotion of contiguous and orderly development and the provision of services to such development(CWPP#2); • Joint City and Counter planning within urban growth areas (CWPP#3); • The siting of essential public facilities of a counter or state-wide significance(CWPP#4); • Counry-wide transportation facilities and strategies (CWPP#5); • The need for affordable housing for all economic segments of the population(CWPP#6); • Counry-wide economic development and employment(CWPP#7);and • Analysis of fiscal impact(s) (CWPP#8). Port Townsend 2020: Getting Together (PT 2020) In May of 1993,Port Townsend sponsored the PT 2020 project to seek new and more comfortable ways for citizens to express their feelings,hopes,and concerns about the future of the City.Approximately 600 citizens participated in 80"coffee hours" and school sponsored events to provide the information that ultimately was incorporated within the report.The results of this public involvement effort were summarized and later used as the basis for preparing the Community Direction Statement in Chapter€-7-III of this Plan. Similarities of the "Building Blocks" Each of the five "building blocks" described above provided direction for the development of Port Townsend's Comprehensive Plan.Concepts commonly found within these documents include: • Maintaining a sense of community and small town atmosphere: • Preserving and maintaining Port Townsend's special places; • Encouraging economic diversity, • Providing affordable housing for all citizens; • Protecting the environment;and • Greater citizen involvement in the development of planning policies and regulations. PREDICTIONS FOR THE FUTURE (ASSUMPTIONS FOR PORT TOWNSEND'S COMPREHENSIVE PLAN) Commence/add : HK-7"revise/add The following basic assumptions about Port Townsend's future formed the basis for this Comprehensive Plan. Assumptions(per Pc assessment and 9/18/14 • meeting)population The assumptions influenced the development of each of the Comprehensive Plan elements. growth,economic outlook" Comprehensive Plan 2016 Introduction 2-12 i PRA 4WA'RSeR TrT�ATT�(1T�P T�`f'T(1�T • Port Townsend will continue to be the retailing,service,government,medical,and transportation center for eastern Jefferson County.Diversification of the local economy will cause the City to reevaluate its historic land use patterns,and zone more land for commercial or manufacturing uses and encourage housing fvpes suitable for working families. Shoreline areas that are necessary for the continued vitality of the marine trade industries will continue to be protected and reserved for such uses. • Port Townsend will remain the principal city of Jefferson County'and as the population of the area continues to grow and age,the City's role as the activity center for governmental,professional, and medical and social services within the County will grow. Given the trend toward an aoino population,the City will need to take a more active role in reahzin an appropriate jobs/housing balanceto suoport a community diverse in acre and income • Port Townsend and the surrounding portions of unincorporated Jefferson County will remain an attractive place to live,and population growth will continue to increase rimarily as a result of in-migration. Whole. • Port Townsend's citizens will remain active in the affairs of City government and planning,and will demand that growth and development be responsive to the desires of the community,with an emphasis on maintaining Port Townsend's special places and high quality of life rather than encouraging growth for growth's sake. • As areas within Port Townsend become more densely developed,the demand for public services and amenities will also grow,requiring local government to plan for and provide the services and facilities necessary to serve the growth in a sustainable manner— • Like other local governments,a7 Port Townsend will be forced to rely even more heavily on local sources of revenue as state and federal funding of community services and capital improvements becomes increasingly difficult,to obtain.As a result,the City will hrtave to reexamine traditional land use patterns in order to make the most effective use of its capital facilities investments. • The majority of Port Townsend's new residential development will occur in previously platted areas. • As the area recovers from the 2008 recession,there will be significant commercial redevelopment activity along the Highway 20 corridor and in Port Townsend's Commercial Historic District. • As vacant and developable land becomes more scarce and population continues to grow,the cost of housing is projel cted--•�'��nr�to rise at a faster rate than personal income.Balancin2 the demand for seasonal homes and tourist accommodations with the need for affordable permanent housino willcontinue to be a challen g.®This will force the City to reexamine traditional housing and residential development patterns. • Although improvements will be made and greater emphasis will be placed upon public transportation and pedestrian and bicycle travel,the private automobile will continue to be a significant form of transportation for the majority of Port Townsend and Jefferson County residents. Port Townsend must consider revisions to its traditional land use patterns and development regulations to promote greater use of pedestrian and bicycle routes and its public transportation investment Comprehensive Plan 2016 Introduction 2-13 i PRA 4WA41SeR TrT�ATT�(1T�P T�`f'T(1�T • Concerns about water quality and wildlife preservation,as well as other environmental issues, will continue to generate changes to state and federal laws,which will also impact local land use planning requirements and development regulations. • Port Townsend's economy will expand,tourism will remain important to the local economy,and the marine trades will increase in economic importance.The Port of Port Townsend will also focus more attention on promoting marine trades and providing the necessary improvements to sustain these uses. • Port Townsend will experience growth in citizen interest in the arts and cultural activities as the population increases.This growth will result in increased attendance at local art,cultural, ed-t�4educational and recreational events,and create a demand for new and improved facilities. • An increasingly dense population will create greater demand for recreation facilities and open space,and Port Townsend will need to specifically identify recreational and open space needs. • Port Townsend will continue to provide municipal public services (e.g.,water and wastewater)to the residents of the City and water service to certain portions of unincorporated Jefferson County,as they become designated UGAs or are included within areas to be served by the City through the City's Comprehensive Water System Plan. UNCERTAINTY OF ASSUMPTIONS (CHANGES BEYOND ANYONE'S CONTROL) All comprehensive plans are based upon a set of assumptions about Mends and events that are likely to occur. However,we cannot predict the future,we can only adopt growth strategies based upon our best understanding of likely growth trends and the consequences of implementing a particular strategy. Unforeseen events can affect the amount,rate, composition,and location of future job growth, demand for housing,vehicle trip generation,and land development.For example,the decision of a major employer to move into or out of Port Townsend could significantly affect Port Townsend's Plan.Construction of a major business park,a decision regarding the future viability of the Port Townsend Paper Mill, changes in lifestyles,shifts in the global economy enerow shortages natural disasters and technological advancements are events beyond the control of the City that could alter the assumptions used in the comprehensive planning process. Global scale environmental degradation and climate chancre all point to possible large scale changes in the coming decades.The potential for sea level rise of several feet over the next 100 tears,increased severity of storms with hioher force winds and heavieility° declining snowpack,lower summer river flows,higher winter flows and increased river temperatures)all create uncertainties for the future. How these changes will impact as in future decades at the local level is unclear. Further innovations in how people work,such as internet-based jobs or the Growth of a sharing economy,and how people live,such as community co-housing;and smaller houses,will also present challenoe� s to past assum tions. Comment[7S6]: HK Comprehensive Plan 2016 Introduction 2-14 i PHA 4WA'RSeR H.1N4RWDUC440N Unforeseen events and changes to growth treads will cause Port Townsend and other jurisdictions to periodically reevaluate their comprehensive plans.Plan amendments are anticipated to occur regularly over the life of this Comprehensive Plan. 1 Intercensal and Postcensal Estimates of the Total Resident Population by Year for the State,Counties,Cities, the Unincorporated Areas,and Incorporated Areas: 1968 to 2002 (Washington State Office of Financial Management,February 2003). Comprehensive Plan 2016 Introduction 2-15 f r i r / rl it J/l ✓y r / H / Community Direction Statement r / ORR �� rr i,`'%/ t l%✓/�i���% ��� lllii rh,j✓��i 6/� '/l✓ �i a, i o,i,", P45"N" ✓ J u ;. � `I l rr £re'M .... r i r ✓ ' �o�� it �� ii✓rr r�� �� i�aai�� ✓k r � �✓r � �� l' � //rani 1//rr� % �✓iy� �1 �r�r��(7��°�tiV�y� I ,,, ��r4,Tv��h„� ✓/ ri�i rro✓i 1 �r� �!)� � � ^��� y a r�rraurim��u,. ; "The future of Port Townsend depends on the actions and plans of its citizens today. It is important, therefore,to understand what Port Townsend citizens want their city to be like in 20 years and beyond,what they want to preserve, and what they want to change." (from Port Townsend 2020: Getting Together,Final Report) Port Townsend is our legacy for the future. Each generation makes its contribution.This Comprehensive Plan is today's attempt to define and refine our legacy to Port Townsend. Our dream of how Port Townsend should be and could be for generations to come is presented in this Plan. Such a plan is a statement of confidence,optimism and belief in ourselves, a statement that our community can change without losing its essential character. This Direction Statement sets forth the framework for carrying out this planning effort. In the future,the Direction Statement will be referred to when the Plan is interpreted or amended to ensure that the basic values it embodies are not lost.The Direction Statement is in the present tense,as if we were speaking of Port Townsend today. While our vision is to protect most characteristics of today's town,the vision should be read as describing the community we wish Port Townsend to become in the next 20 years. We envision Port Townsend as easternJefferson County's economic and cultural center, Port Townsend is the County seat,and the center of eastern Jefferson County's economy and employment. A diversity of commercial and industrial activities flourish and provide meaningful employment opportunities for residents.The area accommodates a strong retail center catering to residents and tourists alike.Tourism is integrated into the local economy,while at the same time,the affordability of housing,goods and services is maintained for residents, and the livability of the community endures. Cottage based industries and low impact light manufacturing have a strong presence in the community. An important concentration of incubator industries is also found here.The urban waterfront along Port Townsend Bay is anchored at either end by marinas and port areas devoted to the City's marine-related commerce and industry. These areas are essential to the character of Port Townsend as a working waterfront town. A regional center of culture and learning. Port Townsend provides its citizens with quality elementary and secondary instruction, as well as career training and college education needed for success and personal enrichment.The City offers world class arts and entertainment and continually celebrates its cultural and historical assets by hosting many exciting festivals and events.Anywhere in town,we are only a convenient bike ride or walk from work,classes,dining,entertainment and home.This closeness reinforces the tie between Port Townsend's economy, culture and a large residential community People live here because they enjoy being in the midst of the natural beauty and cultural amenities of Port Townsend. a community with a sense of history and place, Founded in 1851,the City harbors a National Historic District and a wealth of superb Victorian era homes recognized on the National Historic Register.These historic buildings provide a magnificent backdrop and preserve a tangible link to Port Townsend's vanished dreams of being the preeminent city of the Puget Sound region. Structures and places of historical importance are surrounded by new compatible development. Following the Highway 20/Sims Way Corridor,a procession of distinctive buildings have been added to Port Townsend's architectural heritage. Port Townsend is a vital and active place that retains a small town atmosphere and a strong sense of community. In its retail districts, sidewalks are lined with busy shops that cater to residents as well as visitors. Historic commercial buildings,long established residential areas,and parks,town squares and streets lined with trees give the City an atmosphere of relaxed permanence. Parks,gateways and walkways are rich with historical monuments and public art. Buses,trails and bikeways provide useful transportation options for workers, shoppers and visitors and dependence upon the automobile is diminished. Comprehensive Plan 2016 Community Direction Statement 1 3-1 The City is pedestrian oriented,and neighbors greet one another as they walk by for work,play or exercise.The City's tree-lined walks,trails and streets provide shade and habitat and reinforce Port Townsend's network of green spaces. Open spaces offering an opportunity for rest,views,contemplation and enjoyment of the natural environment are found throughout the City.These public spaces are free of litter,well maintained and richly planted with flora that blends with the native vegetation. a place that prizes its natural setting, The natural setting of this "Key City" of the Peninsula is accentuated with buildings and green spaces that combine with the lower Olympics,the Cascades and marine vistas to create a dramatic backdrop for an attractive and memorable place. By ferry,the City is the gateway to the Olympic Peninsula's natural wonders. The air is fresh and the adjacent waters of Port Townsend Bay,Admiralty Inlet and the Strait of Juan de Fuca are clean,full of marine life,and easily accessible. The downtown waterfront is an attraction that offers cultural, educational and social opportunities that reinforce the City's natural setting. The Waterwalk provides people a pedestrian path along the shore of Port Townsend Bay,tying the City's shoreline together from the Olympic Discovery Trail to Fort Worden State Park and North Beach.The walk connects the waterfront with a larger network of trails that lead to surrounding districts and residential neighborhoods.This loop also unites an extensive system of parks and open spaces,including many environmentally sensitive areas that provide significant wildlife habitat The City's urban wildlife corridors provide vital links between critical wetland habitats,drainage corridors and other protected areas.These corridors connect with a larger network of wildlife movement routes that extend beyond the City and into the County,ultimately leading to the Olympic National Forest and Park. a great place to live, A wide choice of housing types and prices is available for a diversity of lifestyles and incomes. Residential development is centered in distinct neighborhoods that are safe, secure, and have identities and characters of their own. Opportunities for socializing,recreation, quiet and solitude are all close at hand,as are facilities and events that enrich the body,mind and spirit. a town that cares, Social and health services are available and provide dignified care to dependent residents.The community offers training and support for those able to become more independent Port Townsend's elderly and special needs populations are appreciated for making valuable contributions to the life of the community and are afforded convenient access to transportation and other human services. Volunteerism remains essential to the fabric of the community. Citizen volunteers enrich the community by donating their time and services to a wide variety of community organizations, artistic and cultural endeavors, environmental protection and enhancement efforts,and efforts that aid disadvantaged segments of the population. The youth of Port Townsend are recognized as an important part of the community.The City cultivates opportunities for the youth of our town to play, socialize,find entertainment,work,and be involved in extra-curricular experiences. where we work together. The public and private sectors work together pursuing the continued strength and growth of Port Townsend's economy, diverse employment base,and cultural and educational opportunities. City government is open and accessible.It provides leadership in promoting and implementing public policy. Government is willing and able to respond quickly,creatively, and efficiently to provide innovative ways of meeting the challenges facing the community. City and County governments cooperate to solve common problems. The private sector Comprehensive Plan 2016 Community Direction Statement 1 3-2 participates in the success of government by actively helping in decision-making and adding its talents to help solve community problems. Regulations,laws and policies are enforced with equity and justice.Development is orderly and predictable.The inhabitants of Port Townsend feel,and are,safe.The City's residents respect the opinions,as well as the cultural and ethnic diversity of their fellow citizens.While discussion of civic issues remains robust,residents communicate with one another and elected officials in a considerate manner. Business supports the cultural and educational life of Port Townsend. Government encourages business,civic and neighborhood organizations to participate in decision-making and in helping it honestly evaluate its successes and failures. Above all,our hope for the future becomes the City's promise to maintain and enhance Port Townsend's special character and small town atmosphere! Comprehensive Plan 2016 Community Direction Statement 1 3-3 Land Use Element IIIIIIIIIIIIIIIIIII M � y oa - �/i ' a " ViblubxrX��yxl�,�'y�il��ry `I7 Ntl � w SIC �k Wq"Tse i-' INTRODUCTION The Land L1se policies contained in this element,alone with the Land Use Nlao (Figure LL-*1),identify the intensity of development and density recommended for each area of the cite.The Land Use Element is designed to help Port Townsend achieve its vision of maintaining or improving the communitti's character, environment,emplo ment base, and aualit; of life while accommodatingorolec? ted orowt� h and improving community resilience and adaptability to chanoino circumstances. General patterns of land use in Port Townsend e te,`2 ' - " Beare influenced significantly bar the City's development history.This land use element builds upon the City's history while looking to its future. It acknowledges that Port Townsend's "special places"include its historical structures and natural features,and that there is community support to protect these resources from incompatible development. g 6 , D 4994,on' ftbonf 0 g Comment[JS1]:see Population Forecasts below Future land use planning in Port Townsend is guided by the goal that all uses -residential,commercial, manufacturing,open space,and public facilities -be carefully planned to maintain or enhance the Cies small town atmosphere.A balance of land uses is sought in this element to provide more opportunities for residents of Port Townsend to find meaningful employment and affordable housing,while retaining and protecting the environment and unique character of the community. Mang aspects of this element will look familiar to City residents.Where a call is made for change,it is to enhance Port Townsend's small town atmosphere and carry out the desires of residents,as described in the Communit5r Direction Statement(see Chapter III of this Plan). PLANNING CONTEXT Growth Management Act Requirements The Washington State Growth Management Act(GMA)requires cities to prepare a land use element and land use map.- Toorether,this element and the land use mao e< ei-will guide future land uses for the next 20 gears.The GMA requires that the land use element of the comprehensive plan address the following topics: o= Agricultural Lands o Timber Lands Comprehensive Plan 2016 Land Use Element 4-1 Land Use Element ❑= Residential Areas ❑ Commercial Areas ❑= Manufacturing Areas ❑ Public Utilities ❑= Open Space ❑ Recreation o= Public Facilities ❑ Essential Public Facilities (regional) o= Population Densities ❑ Building Intensities o= Future Population Growth ❑ Urban Growth Areas (UGAs) ❑= Flooding,Stormwater and Water Quality Wherever possible,the land use element should consider utilizing urban plannin approaches that promote physical activity. Comment[JS2]: HK-improves consistency with RCW36.70A.070 Each of these topics is addressed by the Land Use Elementgoals and policies,and the Land Use Map.fes_ Countmide Planning Policies Port Townsend Urban Growth Area (UGA) Under the GMA, "urban growth"is defined as growth that makes intensive use of land for the location of buildings,structures,and impermeable surfaces.The Act makes it clear that urban growth must occur only within designated urban growth areas (UGAs),and that counties,rather than cities,are responsible for designating UGA boundaries. The Cit, of Port Townsend Urban Growth Area UGA) contains approximately 4,460 acres. The UGA boundary is coterminous with the incorporated cite limits.The City of Port Townsend is one of two UGAs in east Jefferson County,along with the recently established Port Hadlock rondale UGA.The Glen Cove area, Comment[JS3]:HK lying near to the ciWs corporate limits,has been designated as a limited area of more intensive rural development,or"LAMIRD"by Jefferson County The City will periodically inventory and assess its available supply of residential,mixed-use,commercial and industrial lands to determine whether additional land supply is needed. If it is determined that additional land is needed to accommodate projected growth,the city should seek to rezone land within the existing city limits before identifying areas outside the city limits for expansion of the city's UGA and potential annexation. In conformance with the county-wide planning policies for Jefferson County,the city and the county should continue to coordinate planning efforts. . , , , {fnttfff�,6-2003+. Comprehensive Plan 2016 Land Use Element 4-2 Land Use Element r n TTnn i��n� Comment[JS4]: (HK-Moved to land use map below) " n The Port Townsend PlanningArea Comment[JSS]: 0-15. Consider revising The"planning area"includes all of the lands within the present City limits,and portions of the Glen Cove narrative and Figure to ard area that have the potential to be included within the City's UGA,as discussed above.In 1996 the Cir reflect bA street � � Corridorr SubAxea Plan. whas divided into 11 conte tual subareas,as indicated on Figure IV-1 on page IV-4.The adoption and incorporation of subarea plans into the Comprehensive Plan adds greater detail, �uidance and predictabilit, to future development Subarea plans include plans for neighborhoods corridors Urban Reserve areas special districts and ioint plannin areas The City has already prepared several subarea plans,such as the Urban Waterfront Plan (incorporated into the 2007 Shoreline Master Program update),Gateway Development Plan, and the Draft Point Hudson Master Plan.A subarea plan is envisioned for the Howard Street Corridor. The subareas used in the preparation of this Plan build upon those previously established. 2 , Shoreline Master Program In November 1972,the people of the State of Washington enacted the Shoreline Management Act(RCW 90.58).The primary purpose of the Act is to provide for the management and protection of the state's shoreline resources by planning for reasonable and appropriate uses.The law provides a two-tier planning and regulatory program by the state and local government.By law,the City is responsible for preparation of a "Master Program"in accordance with the policies and requirements of the Act and the State Shoreline Guidelines (WAC 173-26).The city must also develop a permit system in accordance with the requirements of the Act. In 2007,the City Is updated Shoreline Master Program (SMP),prepared in accordance with the Shoreline Guidelines,was adopted by the state.The Cies SMP is a stand-alone document with an adoption by reference to the Cies Critical Areas Ordinance(Ordinance 2899) and surface water management manual. Pursuant to RCW 36.70A.480,the goals and policies and Environment Designations Map of a shoreline master program shall be considered an element of the cies comprehensive plan.All other portions of the shoreline master program,including use regulations,shall be considered a part of the cies development regulations. , Comment[JS6]:F=1@11lent Gonta-," tile TF, instead,this diseuss-ioll-4-s- xl� Comment[JS7]:xl� Comment[JSS]:HK -The Tri Area is now Big& Little Ouilcene Watershed Conq,PUD Jefferson Comprehensive Plan 2016 Land Use Element 4-3 Land Use Element Within the US Forest Service's USPS planning and management jurisdiction are the Cite of Port Townsend's Big Ouilcene River and Little Quilcene River municipal watersheds.These areas are located aooroximateh-20 miles from the Cit-,in the Ohmpic National Forest within fefferson and Clallam Counties. The watersheds total 58.4 square miles,with almost half the area designated as Wilderness.While manaoed b- the USES for the primary resource management objective of maintaining higl�ualit, water for domestic use, commercial timber harvesting and public recreation are permitted activities within the watershed.This area is not intended for development and is not discussed further in this element. Planning issues and manaoe� ment policies for the watershed are addressed in the"Cooperative Watershed Protection Program for the Big and Little Ouilcene iNlunidgal Watershed" and the"Memorandum of Understanding Between the Cit-of Port Townsend and U.S. Department of Agriculture Forest Service O11-mpic National Forest"QIOU-6-93-9-02- 13 . Comment[7S9]:HK CHALLENGES &_ OPPORTUNITIES The PT 2020 survey conducted in the spring and summer of 1993 and town meetings conducted as art of the 2008 mid c-c1e assessment�ndicate4 that the people of Port Townsend feel that the best characteristics of Comment[JS10]: the City include: HK OL, Small Town Atmosphere o' Natural Beauty ❑" Safety and Security ❑2 Arts&Cultural Events o& Special Places o& Diverse People o& Accessible Waterfront o& Historical Legacy o& Walkable Town ❑& Commitment to Community o& Open Government The challenge of this element is to preserve or enhance these essential characteristics of Port Townsend while planning to accommodate the growth that is likely to occur within the next 20 gears. Duringthe public articipation process for the 2016 GNIA Periodic update,five basic ke)-issues were identified: 44e� land, is-sttes r,- ,,.:r -Per-f 4'ewrsend:i„a,,d I. � � Comment[JSll]: Per the PC Assessment —Communitti-resilienc-in a changinor world,including adaptation to climate change,the need to transition from fossil fuels to more sustainable energy sources,shifts towards more local support systems,changin0 economies and the nature of work, chancres in the demooraph-of our community towards older residents, and changes in housing atp terns. 1. —The lack of available and affordable housing in our communit-that is mak no it difficult for-ouno families,working eople and people of limited means to find acceptable housing,in our community as prices of homes and rentals escalate. Comprehensive Plan 2016 Land Use Element 4-4 Land Use Element 2. —Economic vitality for our community that will provide a diversiti of lobs,a healthy environment for small businesses,and educational oo oortunities,within a small town,historic,and maritime industr- based community. 3. —Transportation options that are multi modal,safe,and interconnected, and the need toreare for shifts away from an automobile-based transportation system. 4. —Components of communit-livin that enhance our auafit;of life-darks and recreation, community diversity and environmental cjuality. How call the City enswe the proteetion of tile citlality and citlantity of groilridwaterV zt@ri fiat.-a rxs��he 6. Commercial retail an JaiisAiesses r 9. ncrrtt � "essentialtile b0lrlldfff��be 106ffted? 12. 7. How should the City address wildliAl-and hml—f�f n be ieeated'.) 5. P. pfateetilig tile Gity!"l-11+11-'11 Comprehensive Plan 2016 Land L1se Element 4-5 Land Use Element PLANNING FOR THE NEXT 20 YEARS Introduction Port Townsend and the eastern Quimper Peninsula will likely receive a large share of Jefferson County's population growth over the next 20 gears.This Comprehensive Plan,and the Land Use Map contained within this element will shape how future growth will affect the City of Port Townsend.The Land Use Map will establish the appropriate locations for specific land uses,and the density and intensity of future development. Population & EMDIovrnent Projections Under the GMA,all cities and counties must allow development densities sufficient to accommodate the next twentv;ears of pro ecl ted population and emplo_Lment�,rowth. Comment[JS12]: HK-improve consistency with RCW36.70A.110 in , t A2 QM 299 in 2000 61 — Z— J 11 11-1 , 0 o g_—, 9,694, 7 7 7 7 fflleefffed0 1 , b ecw e 2444 .na 2424._Over the next twenty years,Port Townsend's current population estimated at 9,454 for 2016)is expected to increase by 2,711 to a total population of 12,165 bi 2036.This projection anticipates that the Cies population will grow at a compound annual growth rate of 1.279-'Z% over the course of the planning period 2016-2036.This updated forecast and allocation anticipates a sionslower growth rate than was projected under the City's initial GMA Comprehensive Plan in 1996.In fact,the updated allocation anticipates ft .g , . Port Townsend's 2036 population:r f e ,fff-2 willbe 1 711 less than was projected for the year 2016 under the original GMA Plan, PlannIln�PerIlod County Resolution No. Total Population for Compound annual Ending-Year Growth Rate 1996-2016 96-046 13 876 2.56% 2016-20136 38-15 12165 1.27% r.. _--fh Rafe 4446-244-4- 46-444 6 cr -Accordingly,the updated forecast and allocation suggests that no expansion to the Port Townsend UGA is currently necessary,and neither is there a need for municipal infrastructure expansions not anticipated under the 1996 Plan. . nQ'7n c i1-1111----.-,1111 In44C, Comment[JS13]: M-1 Comprehensive Plan 2016 Land Use Element 4-6 Land Use Element Note that the protected population growth mai not accurately represent changes in population trends due to currently unknown factors. Therefore,annual population estimates from the Office of Financial iNlanagement 01"1Vl should be reviewed,and if the rate is substantialli higher than antici ap ted, pooul� anon projections should be revisited and the plan revised accardin�l Comment �°-z 1 The Cite retained a consultant to review employment forecasts and to assess the feasibility of the Howard Street Corridor specifically(E.D. Hovee:2015). The City and treater Jefferson County experienced significant losses as a result of the Great Recession. During the period 2006-13,the County experienced a net loss of 1 340jobs or an employment decline of 15%). As the area begins to recover from the Recession..job growth is projected to be somewhat more rapid in the first five;ears with continued economic recovery,then somewhat slower thereafter. In the State of Washington 10-year employment forecasts are prepared for economic regions rather than on a county-specific level.Jefferson County is included within the 3 county Olympic Consortium that also includes Clallam and Kitsap Counties.The most recent forecast(Nlay 2014)indicates a projected net gain for the three counties of 13,400 jobs from 2012-22.This equates to an annual average job growth rate of 1.1% oo er;ear.Assumin2iefferson Count)maintains a 7%share, about 940 added in-county Wbs could be expected within this 10 year period.If this need is extrapolated forward over a longer term 20-year time horizon (at compound Growth rated,the total land need for high wage jobs for Jefferson County would come in at about 55 acres over 20)-ears at a minimum. The City envisions development of the Howard Street Corridor will provide approximately 82.5 acres of full served employment land including shovel regdy industrial acreage with the potential to create 1,465 jobs (representing 12.8% of the current count)wide labor force). The development of the Howard Street Corridor is part of a strate2N to address as)-et unrecovered job loss from the Recession and match anticipated countywide population growth both currently and over the next 20 years. See Jefferson County Resolution No.---')-F� f38-15 LAND USE MAP The Land Use Nlap represents the general future land use patterns which are desired for the Citi of Port Townsend within the 20 year 12tarining period.The map is the City's "blueprint" for action and o ,p,hicall�- depicts where various land uses should be located.The goals and policies found within this chapter support and implement the land usemap.The Land Use Map and accompanying goals,policies and implementation steps should be used to evaluate future land use proposals.They are intended to guide both public and private actions.Although the Land Use Map is not a zoning map,it is sufficiently detailed to provide clear direction for amendments to the zoning map.This section describes the land use designations (see below) to be used in implementing the Land Use Map (see the map pocket at the back of this Plan).The proposed map Formatted: Font: is based on a number of factors including Not Italio . • —The Community Direction Statement(i.e.,Chapter III of this Plan): • —Physical and social/economic characteristics of the area; • —Existing development patterns; • —Existing zoning Comprehensive Plan 2016 Land Use Element 4-7 Land Use Element • —Ownership patterns; • —The condition of existing structures; • —Several existing documents which provide guidance for future development,including o Urban Waterfront Plan(incorporated into the 2007 Shoreline Master Program update); o Gateway Development Plan(i.e.,Gateway); 0 :4nr��ft ft"48�-�,`'�-�Critical Areas Ordinance(i.e.,ICAO Ordinance); Comment[JS15]: HK o Jefferson 2000 Strategic Plan; o County-Wide Planning Policy for Jefferson County,and o Port Townsend 2020;Getting Together(i.e.,PT 2020). The Land Use Map indicates the type of future development desired for Port Townsend while allowing flexibility for previously approved development.It is important to keep in mind that this Plan addresses a a-4- twentG:year time period.The changes that result from the implementation of this plan will take place slowly and incrementally over time. . Land Use Map Designations The following categories and land use designations have been used in developing the Land Use Map,and are described more fully below: Residential 1,Yesonations: Low Density: I2-I (SF) p to 4 d.u.per acre(i.e..10,000 s.f. minimum lot size) iNledium Density I2-II (SF) up to 8 d.u.per acre(i.e., 5,000 s.f. minimum lot size) High DensityI2-N(NLF') a minimum of 15 units and a maximum of 24 units per 40,000 s.f. area r . T,...,..: . . p M1 �rrc- Formatted:Tab stops: 1.5",Left ^' Formatted:Tab stops: 1.5",Left T..a:._ T,... ..: . . Formatted:Tab stops: 1.5",Left N:gi, Bens`,_-! Comment[JS16]: HK improve consistency Ord.2967 Formatted:Tab stops: 1.5",Left rn „ y 7 991,1 t Formatted: Normal, Space After: Opt, 444ed Use e,4g4 G#e4-Mixed Use Designations Tab stops: 1.5",Left Neighborhood Serving illixed Use Center C-I/�tiIU with moderate density multi-famih residential Formatted: Space After: 3 pt Community-Serving Mixed Use Center C-IIZNIU with high density multi-family residential ------------------------- Comprehensive Plan 2016 Land Use Element 4-8 Land Use Element Mi,-.ed r, r - Formatted: No re ffi .ttnt_ c,..._.. �. i,-.ed r,,e C–_enfer- r r7 i\rr, ffidhigh � Spacing � g � Formatted: No Spacing Commercial 1,esitgnations: Neighborhood Commercial: C-I General Commercial: C-II Hospital Commercial: C-II(H) Historic Commercial: C-III lWar°ine Related and lWrzngfiwtur°ing 1,esitc nations: Mixed Light Manufacturing and Commercial: M/C Light Manufacturing: M-I Marine-Related Uses: M-IIA(Boat Haven) Marine-Related Uses: M-IIB (Point Hudson) Heavy Manufacturing: M-III rnra nre. 282c K 9.2 n Park&0)pen Space 1,esitc nations: Existing Park&Open Space P/OS Potential Park&Open Space(overlay)® P/OS(A) —Mixed Public/Infrastructure/Open Space _P/OS(B) Other 1,esitc nations: —Public/Infrastructure P-I Planned[brit Development(f:[JD,)1,esitc nations: Residential R-PUD —Mixed Use MU-PUD —Commercial/Manufacturing CM-PUD A Description o thy^[,and Ilse 1,esitc nations Comment[7517]: This section provides a brief description of the land use designations which are listed above and shown on d the deons are P P � descriptions are the Land Use Map. � n modified,we will need to make corresponding amendments to Title 17. w 7:�__�..L[1-1:_11 L.�1._.,, Table IV-1�on page V-15 shows the existing and proposed acreage in each of the Comment[7518]: different land use designations.The zoning ordinance will provide more detailed direction regarding the HK14 development of these areas,consistent with the policies of the overall plan. Comprehensive Plan 2016 Land Use Element 4-9 Land Use Element Residential 1,Yesitc nations R-I -Low Density Single-Family:This designation accommodates single-family residences (including duplexes,triplexes,and fourplexes) at a density of up to 4 dwelling units per acre(i.e., 10,000 square foot minimum lot size,or approximately 4 dwelling units within one block of platted land).This land use designation has been applied only within drainage basins 4a and 4b in the northwestern portion of the City, because of stormwater-related development constraints.The designation accommodates single-family development at densities that maintain and promote the"small town" character of Port Townsend,while ensuring that the environmental quality(particularly as it relates to stormwater control) of the area is not adversely impacted.Higher densities could be permitted in these areas through approval of a Planned Unit Development(R-PUD) overlay designation.The designation also provides for a wide range of agricultural uses. R-II -Medium Density Single-Family:This designation accommodates single-family dwellings (including duplexes,triplexes and fourplexes) at a density of up to 8 units per acre(i.e.,5,000 square foot minimum lot size,or approximately 8 dwelling units within one block of platted land).The R-II designation corresponds closely to those areas of town that are currently platted to 8 lots a block,include few development limitations, and which are in proximity to existing pubic facilities and services. Selected forms of agriculture are also allowed. 2 R-III-Medium Density Multi-Family:The R-III designation accommodates smaller scale multi-family structures (e.g.,5-12 dwellings per structure) at a minimum density of 10 units per 40,000 square feet and a maximum density of 16 units per 40,000 square feet of land area.Although multi-family development is encouraged in these areas,single-family residences continue to be an allowed use where the parcel and/or contiguous ownership is less than 12,000 square feet in size. . R-IV-High Density Multi-Family:This designation accommodates larger scale multi-family structures i a (e.g., 10-24 dwellings per structure) at a density of not less than 15 units� ����per 40,000 square feet of land area,or more than 4H-,224_ nits y&,& per 40,000 square feet of land area.A minimum density has Comment[JS19]: been specified for this designation in order to discourage use of this land for subordinate,lower density, HK Consistent with Ord. single-family development. �, 296 IWixed Use 1,Yesitc nations This designation provides for a compatible mix of single-family,multi-family housing and neighborhood commercial businesses and services,with an emphasis on promoting multi-story structures with commercial uses on the ground floor and multi-family housing on upper floors.This designation will promote development of a mix of uses over time,like those found in the Downtown and Uptown Districts of the City today.Specific requirements for the mix of uses and residential densities 4o-H4-,ehave een established in Comment[7S20]: the revised zoning code. HK C-I/MU -Neighborhood Serving Mixed Use Center:This designation provides for a compatible mix of small scale commercial uses and medium density multi-family housing in multi-story building.Under this designation,commercial uses are located mainly on the ground floor of multi-story structures,with residential units above.Over time this designation should promote neighborhood identity,by providing a range of commercial retail and service opportunities within walking distance,reducing reliance upon the automobile. This designation has been applied to three locations in the Cir the southwest comer of the intersection of 49th Street and Jackman;the Hastings and Howard Street intersection;and the San Juan and F Street intersection. Comprehensive Plan 2016 Land Use Element 4 10 Land Use Element C-II MU - n:.-. ��General Commercial Mixed Use Center:While very similar to the 1 / ._______.___, � /�Comment[LB21]: 1 neighborhood mixed use designation described above,this designation accommodates a broader range of As recommended at the 211/11 PC meetrng. commercial uses and higher residential densities than the C-I/MU designation described above.Thine_ desi,dation accommodates a wide range of commercial uses_ ` Comment[LB22]: �-arrd as well as residential densities that approach those found in the R-N designation.The GII/MU The PC recommended at the 211 meeting to designation has been applied to areas that are closer to the Cies existing east/west commercial corridor(i.e., make the commercial portions of both the east and west sides of Discovery Road from 7th Street to 12th Street;and the east side uses within the GII/Ilffi zone the same as those uz of Kearny Street from Je€€c errFrankliti o Garfield Street).Like the C-I/MU designation,the C-II/MU —\, the C-11 zone. district is intended to promote more focused and transit or pedestrian oriented development patterns. Comment[LB23]: 0-16. In order to be Commercial DesXd nations consistent with the recommendations of the C-I -Neighborhood Commercial:This designation is exclusively a neighborhood commercial district, Hovee Economic Study. providing convenience shopping for a limited residential area(i.e.,within a one-half mile radius). Comment[3S24]: Distinguished from the C-I/MU designation described above,only residential uses that are subordinate and HK Consistent with Ord. accessory to the primary commercial use are permitted within this district.The designation allows for the 2670 retailing of neighborhood commodities and the provision of neighborhood professional and personal services. Specific permitted and conditional uses should be defined in the zoning code.The C-I designation has been applied to � t the southwest comer of the intersection of Kearnev and 19th Streets, 111111T�� h al Comment[JS25]: HK Consistent with Ord. C-II -General Commercial:This designation has been applied to commercial areas outside neighborhood 2967 and mixed use areas.This designation accommodates a wide range of general commercial uses.-s4�=e*- Comment[JS26]: C: I,.e-' Uses located within this designation include retail businesses,professional HK Consistentwi h ord. offices,hotels,restaurants,and personal services shops.Upper-story residential units are permitted outright. Comment[JS27]: LB Howard Street? This designation has been applied to more areas of the City than any other commercial designation,and 2 occurs in various locations along Sims Warr and Water Street,and in the triangular area bounded bar S.R. 20 to Comment[LB26]: O 16. In order to be the south,Howard Street to the east,and Discoverer Road to the northwest. consistent with the recommendations of the ' Hovee Economic Study. C-II(H) -Hospital Commercial:This designation accommodates medical clinics,offices,pharmacies, nursing homes,and other medical related uses in areas close to major medical facilities.This designation has been applied to areas near Jefferson General Hospital between Sims Warr and 11th Street,and to the I-ah Tai Care Center on the west side of Kearney Street.Accessory or supporting uses,a florist's shop for example, are also allowed. Specific permitted and conditional uses have been detailed in fet4t;T the zoning code. Comment �HK 1 C-III-Historic Commercial:This designation is intended to accommodate the mix of uses that have occurred over time in the City's Downtown and Uptown historic districts.The designation makes provision for general retail uses on the ground floor of structures,and promotes a mix of uses on the upper floors of historic buildings,including residences,artist and craft studios,and professional offices.Uses within the Commercial Historic District that also lie within the jurisdiction of the Shoreline Master Program (i.e.,within 200 feet of the shoreline) are subject to the policies and standards of both documents.The Shoreline Master Program is incorporated into this Plan bar reference. . � , lW ar°ine Related and lWczngfiwtur°ing 1,Yesitc nations M/C-Mixed Light Manufacturing and Commercial:This district accommodates small scale manufacturing businesses along with associated and subordinate on-site retailing.The purpose of this designation is to provide for manufacturing and commercial enterprises which do not fit neatly under either Comprehensive Plan 2016 Land Use Element 4 11 Land Use Element the light manufacturing or commercial label . ., ., Manufacturing to commercial floor area ratios are necessary within this designation to ensure that certain uses do not dominate at the expense of others.The M/C designation has been applied to areas south of Sims Warr,and west of Thomas Street. . _ , M-I-Light Manufacturing:The M-I designation provides for light manufacturing,processing,fabrication and assembler of products and materials,warehousing and storage,and transportation facilities.The designation is appropriate for light manufacturing uses similar to those allowed within ftro-p�' the Port Townsend Business Park.No areas of town are currently proposed to receive this designation.{034:-•Pd-e— M-IIA(Boat Haven) -Marine-Related Uses:This designation accommodates a variety of uses including marina,recreational boating,manufacturing,assembler,haul out and repair.The M-IIA designation has been applied primarily to Port owned lands at the Boat Haven.Zoning;provisions should T e'H)f— � &5adistinguish between the larger scale marine-related uses at the Boat Haven and smaller scale marine-related uses allowed at Point Hudson.Uses within this district that also lie Comment[JS30]: within the jurisdiction of the Shoreline Master Program (i.e.,within 200 feet of the shoreline) are subject to HK the policies and standards of both the zoning code and the Master Program. M-IIB (Point Hudson) -Marine-Related Manufacturing: Similar to the M-IIA district,this designation accommodates a variety of marine-related uses at a scale appropriate to Point Hudson.Like the M-IIA designation,the zoning code should continue to detail a specific range,scale and intensity of marine-related uses allowed within this�Estrict� sAdaptive reuse of the Comment[JS31]: original Point Hudson Station buildings should be encouraged.Uses within this district that also lie within the HK jurisdiction of the Shoreline Master Program (i.e.,within 200 feet of the shoreline) are subject to the policies and standards of both the zoning code and the Master Program. ._, M-III -Heavy Manufacturing:The M-III designation accommodates heavy industrial activities including processing,fabrication,assembling of products or materials,and bulk storage.This designation has not been applied to any areas within the current City limits.An example includes the Glen Cove LAMIRD.f0fd—NTee Park and Open Space 1,Yesitc nations P/OS-Existing Park&Open Space:This category includes existing City-,County-,and State-owned parks,recreation areas,and City-owned lands which provide valuable natural and open space functions.fOf44 P/OS(A) -Potential Park and Open Space (overlay):This category includes areas that may have the potential to be included within a comprehensive and interconnected s�rstem of open spaces and trails.The P/OS(A) overlay appears in areas that could be valuable if maintained as open spaces,such as wooded areas, drainage corridors,and scenic vistas.These areas could accommodate multiple functions including:lower density residential development;stormwater management:wildlife habitat;and passive recreation.Three primary approaches are being considered in the development of this network: outright purchase of key properties;incentives for landowners to cluster new development in areas outside, or on the margins,of open space areas;and reductions in allowable density. P/OS(B)-Mixed Public/Infrastructure/Open Space:This designation is applied to lands used to provide public utilities,facilities and services which also provide valuable natural and open space functions. Uses include stormwater detention facilities and wastewater treatment facilities. Comprehensive Plan 2016 Land Use Element 4 12 Land Use Element Alternative parcel-specific zoning-In certain circumstances,specifically identified City-owned parcels currently under P/OS(B) designation may receive an alternative,nonpublic zoning designation.This alternative designation shall be inactive and secondary and shall not become applicable until such time as the City ownership of the parcel is terminated and/or the City determines that the anticipated land use no longer is applicable to the public purpose of the public zoning designation. . Other 1,Yesitc nations P-I -Public/Infrastructure:The purpose of this designation is to identify lands used to provide public utilities,facilities,and services.Allowable uses include schools,libraries,public utilities,and government buildings. Alternative parcel-specific zoning-In certain circumstances,specifically identified City-owned parcels currently under P-I designation may receive an alternative,nonpublic zoning designation.This alternative designation shall be inactive and secondary and shall not become applicable until such time as the City ownership of the parcel is terminated and/or the City determines that the anticipated land use no longer is applicable to the public purpose of the public zoning designation. . Planned[brit Development(P11D)1,Yesitc nations Higher densities and more creative site design and development may be allowed through a Planned Unit Development(PUD) approval.PUDs are special overlay designations which are not shown on the land use map because approval is discretionary,based upon a showing that more flexible"performance standards" are satisfied.The permitted density should take into account the site's natural constraints,the character and density of surrounding areas,and proximity to arterials,transit service,employment and shopping areas,and planned amenities. R-PUD -Residential:This designation provides for a compatible mix of single and multi-family housing and a neighborhood center.The designation can be applied only within areas zoned for residential use(i.e.,R- I,R-II,R-III and R-IV).The R-PUD designation promotes clustering and the development of innovative self-sustaining residential communities offering a wide variety of compatible housing types and densities, neighborhood businesses,recreational uses,open space,hails and other amenities that are seldom achieved through traditional zoning approvals.4'his designfffien. b-f.e Ga,-:r 4 nn3. Specific requirements for the siting and relationship of the various land uses,dwelling types,and densities in these developments should continue to be detailed 4-e- in the zoningComment[JS32]: ordinance, consistent with the applicable policies of this Plan.The zoning ordinance should provide sufficient H flexibility to allow the dwelling types and densities to vary in response to market conditions,while maintaining the integrity of the project.The actual mix and arrangement of uses should be established through a binding site plan. MU-PUD -Mixed Use:Like the mixed use designations described above,this category provides for a compatible mix of commercial and multi-family residential uses.This overlay designation applies only in areas zoned for mixed use development(i.e.,C-I/MU and C-II/MU),and allows mixed use developments to be treated differently and more flexibly than allowed under ordinary zoning standards.Standards for mixed use PUDs should allow variety in terms of the composition of the mixed use centers,depending upon location, access,character of surrounding neighborhoods,local desires,and market opportunities.Like the residential PUD designation,residential densities should be determined on a case-bar-case basis,factoring considerations which include:proximity to arterials;availability of transit service;and proximity to planned amenities (e.g., park and recreation facilities). CM-PUD -Commercial/Manufacturing:This overlay designation applies only in areas zoned for commercial or manufacturing development(i.e.,C-I,C-II,C-III,M/C,M-I,M-IIA,M-IIB and M-111).The Comprehensive Plan 2016 Land Use Element 4 13 Land Use Element designation allows business and industrial park developments to vary from the prescriptive standards of the zoning code.The designation is intended to promote innovative and well designed commercial and light manufacturing developments which are supportive of the Cies economic development strategy. Standards for this type of PUD should allow variety in terms of the mixture of commercial and manufacturing uses— NI-, 1010 c 2 2 rr nnn2\1 Comment[JS33]: Iance-Howard Street revisions? Comment[7S34]: If the district descriptions do not address density- Table TV4-21: The Land Use 1Vlap—Acreace Within Each Land Use Desicrnation* than we may need to keep tbis table to provide TABLE lAr-4!EA, PEP USES,PENSEP4ES the bookends for zoning. BUILDING HEIGHTS" r �Xp"SES ALLOWED n RMAA_'Ai PE-NISI,c, irL9Qn n A!PEPS44:(Dv BT-_!h9!-NG HEIGHTS rz r-Or������ � { ee} - 0 es 1 €etrr�eieees I III 4a r, n P- r r�y-r.. a��.r� _ - y --_ - t, -}k3,k�U4)-trate-YeeE -feet r.._.__a,✓ - - - - _i- rvrraricrcrra Fv?r`�rfi✓vc _ _ __ car" �rriv kAl,=i'lf ti—sI 1 f��rcxxcr-rr�✓cra�rrccv - i____�±__r .. 4T x� �oc�cscc y �rrtrrdr"rrrdcics Fv?r`�rfi✓vc _i - _ Comprehensive Plan 2016 Land Use Element 4 14 Land Use Element TABLE jAr-4!EA, PEP USES,PENSEP4ES BUILDING HEIGHTS* PE LOT GQA,ER—� --- --4 9111__ 4,e 200- - T a rf`rrUra`rc'a --- ��'1T.�m�=1���-�..^-_t•'_ __ tiT crn-nxc-cccirrcc 1 Tcmc" .rcr� - 1 __�±_—r .. 3T cac�v'ir'r'rEE7r�'arn.+c� tiT P4 crrracnC)rrUi-r'i`c�r�Tor'ii-ii2� T-T)T6D Comprehensive Plan 2016 Land L1se Element 4 15 Land Use Element TABLE jAr-4!EA, PEP USES,PENSEP4ES BUILDING HEIGHTS* r}z � c��r��ih-c LOT T GQAA,ER—€ {€eetj Y - r Comment[7535]: HK14 14 1-2:4'u6 -N4A-P " R! ,(4 Formatted: Space 3x44,Ai r AG N r ND r,S) After: 0 pt,Line spacing: single Land Land Use Area in acres Designation ,Less Platted Rights of Way and Formatted: Font: Marinas Bold R-I 566 R-II 1,516 R-III 169 R-IV 22 R-PUD n/a C-I/MU 15 C-II/MU 15 MU-PUD 0 C-I 1 C-II 106 C-II(H) 11 C-III 26 CM-PUD 28 M/C 62 M-I** 0 M-II(A) Boat Haven 44 M-II(B)Point Hudson 17 M-III** 0 P/OS 608 P/OS(A)*** n/a P/OS(B) 86 P-I 149 Total 3,442 Comprehensive Plan 2016 Land Use Element 4 16 Land Use Element * Totals include lands within the Port Townsend City limits only. ** These land use designations could be applied to portions of the Glen Cove area,if a FUGA larger than the Port Townsend City limits is designated. *** This designation is intended only to depict,at a conceptual level,areas that could be valuable if maintained as open spaces. Considerable work must be completed before the boundaries of this conceptual overlay district can be detailed,and before specific steps can be undertaken to implement the concept. Consequently,acreage totals are of marginal usefulness at this point in�Mm Comment �FIK 1 v v v LAND USE GOALS & POLICIES The following goals,policies and implementation steps have their foundation in the PT 2020 Report,the Community Direction Statement contained in Chapter III of this Plan,and input from stakeholders and interested citizens participating in the 1996 uodate and subseduent amendments thereto (includingenhanced outreach efforts during the 2008 mid-ci cle assessment and the 2016 periodic a date . +k-c- .`r.. , 1) kV � ���� 11, irection for establishing land Comment use patterns,densities,and design standards that: HK • —Carry out the Community Direction Statement; • —Reduce sprawl and the costs associated with providing public infrastructure; • —Maintain or improve the character and livability of established neighborhoods; • —Provide for a variety of transportation alternatives; ®—Provide people with opportunities to live close to work; Encourao,e hi sical activity Comment[JS38]: HK-improve • DeveloQ a sustainable balanced and resilient communit . consistency withRCWs6.70A.070(1) • —Reflect the land's physical capability to support development; Comment[JS39]: 0-2 Wording comes • Protect natural resource lands and environmentallysensitive areas; from PC Assessment • —Provide a variety of housing opportunities and types to accommodate different lifestyles and incomes; • —Create desirable and distinctive neighborhoods based on their cultural and natural characteristics; and • —Provide for a comprehensive and interconnected system of parks,open spaces and trails. Comprehensive Plan 2016 Land Use Element 4 17 Land Use Element Overall Land Use Goal:To accommodate the Cies expected population growth in a sustainable manner that maintains or improves the community's character,environment,employment base,and quality of life and responds to anticipated climate change, impacts. Land Use Map Goal 1:To guide development within Port Townsend,ensuring that the Comprehensive Plan is implemented in a manner which is coordinated and consistent with all applicable City plans and codes. Policy 1.1: —Use the Land Use Map as a guide for future rezones and other land use decisions. Policv 1.2: Use the goals,policies and implementation steps of this element to determine appropriate zoning designations for areas near the boundaries between different land use designations on the Land Use Map. Policy 1.3: ®Ensure that all land use decisions and approvals made by the City Council and its appointed commissions,boards or committees are consistent with the Land Use Element and the Land Use Map. Policy 1.4: ®Review and revise as necessary the existing zoning code,zoning map,and other development regulations to ensure consistency with this Plan. Policy 1.5: _Process all rezone applications together,no more often than once each year. PolicSr 1.6: _Beginning in 2016,44,and at least once ever5r eicrhtc�(;�8)gears afterwards,conduct a thorough review of this Plan to ensure that it fuller conforms with the requirements of the GMA,as required under RCW 36.70A.�130. Comment[JS40]: M(12) Policy 1.7: _Focus growth in areas with the capacitor to absorb development with the least cost in terms of providing public utilities,transportation and park facilities,where adverse environmental impacts can be avoided or mitigated,and where development will reduce sprawl and promote attractive,vital and distinctive neighborhoods. ; 240;}- Natural Resource Lands & Environmentally Sensitive Areas Goal 2:To protect,sustain and manage Port Townsend's natural resource lands and environmentally sensitive areas for present and future generations. Policy 2.1: _Continue to use,and revise as necessary,the Environmentally Sensitive Areas Chapter of the Port Townsend Municipal Code(PTMC)to require protection and/or enhancement of environmentally sensitive areas within new developments. Policy 2.2: Use"best available science"when reviewing and revising the tsCritical 4reaschapter of the PTMC to ensure that the functions and values of Comment[JS41]: Scritical ureas are adequately protected,and give special HK consideration to measures needed to preserve salmon fisheries. Recognize that scientific knowledge and information is rapidly developing.in natural resource areas affected bpi climate�chanoe. Comment[JS42]: 0-2 Policy 2.3: _Protect natural resource lands,archaeological properties,and .n"i fenffi nfff 7,_ critical-areas through public and private initiatives,such as: open space tax incentives; cluster development;PUDs;transfer or purchase of development rights;public land acquisition;dedication of City owned tracts and street rights of way;conservation Comprehensive Plan 2016 Land Use Element 4 18 Land Use Element easements;landowner compacts;soliciting donations of land;downzoning;limiting the amount of lot coverage;and best management practices in development. 2.3.1 —Work with the Counter Assessor and Jefferson Land Trust to educate property owners about tax reduction programs and conservation easement options available for preserving natural resource lands and environmentally sensitive areas. 2.3.2 Consider opportunities for climate chance mitigation and adaptation oti natural resource lands and critical areas. Comment[JS43]: 0-2 Policy 2.4: _Continue to encourage agricultural uses in the least developed portions of town by allowing certain agricultural uses outright in low density residential areas.Specify allowable agricultural uses in revisions to the zoning code. 2.4.1 --Consider the need to adopt and implement a right to farm ordinance in order to protect agricultural uses in certain residential zones. Policy 2.5: ®Recognize that there are no timber lands of long-term commercial significance located within the City. Unless protected by environmentally sensitive area or open space and timber designations, timber harvesting should be allowed upon completion of State Environmental Policy Act(i.e.,SEPA)review subject to associated conditions. Policy 2.6: _Petition the Department of Natural Resources for lead agency status on all Forest Practice Applications (FPA) as timberlands within the City are"likely to convert" because of Port Townsend's status as an urban growth area(UG ** Comment[JS44]: May need to update- Policv 2.7: _Require performance bonds for reclamation activities prior to a permit approval for mineral City adopted Chapter 19.06 Tree Conservation resource extraction sites. Ord and assumed lead for Class IV FPAs. Policy 2.8: _Respect the rights of private property owners while protecting and preventing the degradation of environmentally sensitive areas. [r-d.No. 282[ �.�, �T r, � Innn2M Comment[JS45]: M-11 City Attorney has Open Spaces & Trails reviewed andound no frevisions necessary. Goal 3:To develop a comprehensive open space and hails plan and implementation program which protects the natural environment and significant cultural resources,provides passive recreation opportunities,is integrated with the nonmotorized component of the Transportation Element,and is designed to link neighborhoods with parks,significant open spaces,schools,shoreline access areas,mixed use centers and employment centers. Policy 3.1: _Acquire and develop public open space and trails within the financial capabilities and level of service standards of the Capital Facilities Element. Policy 3.2: _Develop and implement nonregulatory and regulatory means for acquiring and developing the open space and trails network. 3.2.1 --During development review,encourage applicants to dedicate land for future open space and trails. 3.2.2 _Amend the zoning and subdivision codes to provide incentives for open space including,but not limited to clustered developments and planned unit developments (PUDs). Comprehensive Plan 2016 Land Use Element 4 19 Land Use Element 3.2.3 _Acquire land for open spaces and trails through municipal or state programs,such as stormwater management and wildlife/wetland protection. 3.2.4 -Apply for grants from public agencies and private foundations to acquire land for open spaces and trails. 3.2.5 -Work with nonprofit groups,such as the Jefferson Land Trust,to obtain conservation easements and create incentives for open space and trails system development. 3.2.6 _Use property tax deferral programs to promote the retention of valuable open space land in an undeveloped state(i.e.,the Open Space Taxation Act,Chapter 84.34 RCW). 3.2.7 -Explore other techniques for acquisition and development of the open space and trails network(e.g.,T�` e�ef el, {4 }Recreation and Conservation Office(RCO�funding utility bill donations,a community or regional bond issue,�etc.). Comment[JS46]: HK Search and replace Policy 3.3: ®Locate trails in areas that are important to preserve as open spaces, such as wooded areas, IAds now Rco drainage corridors,shorelines, scenic vistas,and others.Locate trails along drainage corridors (RCW79A25) when possible to do so without degrading the environmental functions and values of the area. Policy 3.4: _Designate and retain wetlands,drainage corridors and other areas that provide essential habitat for priority plant or wildlife species as passive open space. Sites which the City should consider acquiring include,but are not limited to: a. *r—Winona Wetlands; b. 4—Howard Street Wetlands and Drainage Corridor; c. 50th Street Wetlands and Drainage Corridor;and d. Hastings/25th Street Wetlands and Drainage Corridor. Policy 3.5: _Where possible,accommodate multiple functions within the open space and trails system, including stormwater management;viewpoints;protection of cultural resources;wildlife habitat;and passive recreation. Policy 3.6: _Coordinate with Jefferson County to identify and designate open space corridors and trails within and between urban growth areas,as required under the GMA. 3.6.1 --Integrate the open space and trails network with the Pfe�'_Olympic Discover-�'ail. Comment[JS47]: HK 3.6.2 -Support the expansion es+ ' �'���of a Quimper Peninsula wildlife and open space corridor consistent with the Quimper Wildlife Corridor iNlanac ement Comment[JS48]: HK Policy 3.7: _Identify existing unopened rights of way,utility corridors and drainage corridors for use in developing the trails system.Design trails in a manner which allows the corridors to function as urban wildlife corridors. Policv 3.8: Preserve and enhance shoreline access areas consistent with the CiWs Shoreline Master 11 Program. . _2 , , Comprehensive Plan 2016 Land Use Element 4-20 Land Use Element Policy 3.9: _Design the trails system to link neighborhoods with parks,significant open spaces,schools, cultural resources,shoreline access areas,mixed use centers and employment centers. Abutting or nearby larger scale developments should be encouraged to provide trail connectors to the larger trails and open space network. Policy 3.10: Design trails to be accessible to people with disabilities as much as the natural characteristics (e.g.,topography) of the region will allow. Policy 3.11: Develop a coordinated sign program which provides a user friendly guide to the location of hails. Policy 3.12: Consider trail linkages in the development of new government facilities,including new parks and open spaces. Policy 3.13: Prohibit the use of off-road vehicles on public trails designated in the St3ftee a il� Non-iNtotorized Transportation'Plan. Comment[7S49]: —1 HK 1 Policy 3.14: Develop and adopt standards regarding trail uses that minimize conflicts between different types of trail users (e.g.,pedestrians,bicyclists,and equestrians). Policy 3.15: Provide adequate funding for open space and trails network operation and maintenance. Parks & Recreation ® Facilities & Prograrns Goal 4:To develop park and recreation facilities,programs and opportunities which are responsive to the needs and interests of Port Townsend residents. Policv 4.1: Continue to addresses the communiWs needs for active and passive recreation opportunities through Comment[JS50]: implementation of the-Parks._Recreation&Open Space Plan. HK Acknowledge adoption of Parks,Rec, 4.1.1 _Provide recreation programs that are comprehensive,enriching,and affordable for OS Plan? all citizens. 4.1.2 _Provide a wide range of athletic facilities such as:tennis courts;baseball and softball fields;gymnasiums;swimming pools;multi-purpose fields for soccer and general outdoor play,volleyball courts;and a golf course. 4.1.3 _Provide a wide range of passive recreation opportunities within the parks system (e.g.,nature walks,picnic areas,bird-watching,observation areas). Policy 4.2: _Acquire and develop public park and recreational lands to serve the future population of the City. Policy 4.3: _Pursue a variety of options for park and recreation facility acquisition and development. 4.3.1 _During development review,encourage developers to dedicate land for future park and recreation facilities. 4.3.2 _Apply for grants from public agencies and private foundations to acquire land and develop the City's park and recreation facilities. 4.3.3fe"ising -' 4N pProvide incentives that encourage developers to provide neighborhood parks Comprehensive Plan 2016 Land L1se Element 4-21 Land Use Element which serve the residents of new developments (e.g.,density bonuses,mitigation land banking,creative right-of-war�se�. Comment[JS51]: HK 4.3.4 e _ fhe Provide incentives that encourage developers in commercial districts to provide pocket parks,plazas, courtyards,arcades,atriums,pedestrian corridors,and through block corridorsJ. Comment[JS52]: Policy 4.4: _Locate,design,construct and manage park and recreation facilities to be compatible with HK natural features (e.g.,soils,geology,topographer,and shoreline resources) and cultural resources. 4.4.1 -Preserve natural features which are conducive to park and recreation functions. 4.4.2 _Incorporate habitat considerations in the design and development of new park and recreation facilities. 4.4.3 _Encourage the use of native plants which attract wildlife. 4.4.4 _Incorporate significant cultural resources in the design and development of new park and recreation facilities,and provide interpretive opportunities where appropriate. Policy 4.5: _Design and manage park and recreation facilities to maximize environmental protection and provide interpretive opportunities for ecological systems and features,and cultural resources. Ple, 4.5.1: --Extend maximum environmental protection in perpetuity for the exclusive open space,wildlife habitat,and passive outdoor recreation functions within Kah Tai Lagoon Nature Park.Within those areas depicted on the 6(� Boundary Map (RCO Project# 81-043,LCWF 53-00486, executed by the City on July 3,2013 and the State Recreation and Conservation Office on June 19,2013),Kah Tai Lagoon Nature Park shall be designed and managed in accordance with the legal obligations assumed under the 1981 Federal Land and Water Conservation Fund Acquisition Grant,and any grant amendments.As stated on the 6(f)Boundary Map: "All land within the boundary of the park is dedicated in perpetuity to public outdoor recreation."The contract obligations include the following(Project# 81-043A, Amendment Number 2): —"The purpose of the grant was to expand the City's ownership and control around+e- he lagoon and develop a municipal passive use park. The lagoon is a natural area associated with marsh,wetlands,and grasslands and provides nesting,feeding,and breeding habitat for birds,ducks and other wildlife. The area should be set aside for preservation of natural resources and open space to serve wildlife habitat and compatible passive recreation uses." The 6(� Boundary Map,depicting the property subject to the LWCF protections, the project contract,and other key documents,are recorded at Jefferson County Auditor File No. 585012(July 18,2014). Policy 4.6: _Design park and recreation facilities to accommodate a citizenry diverse in age,interests, income levels and abilities. Comprehensive Plan 2016 Land L1se Element 4-22 Land Use Element Policy-4.7: _Where adverse impacts could occur,screen and buffer park and recreation facilities to protect adjacent or nearby-private properties. Policy-4.8: ®Consider acquiring inholdings and adjacent parcels that would increase the long-term integrity-and viability-of the CiWs park and recreational lands. Policy-4.9: ®Broaden the use of school buildings and grounds as places for public use after school and on evenings. 4.9.1 _Increase cooperative management with the Port Townsend School District through joint use agreements. 4.9.2 Joint use agreements should seek to renovate,schedule,and manage facilities for greater public use and enjoyment. Policy-4.10: Support,encourage,and provide technical assistance to neighborhood associations seeking to acquire or develop property-for neighborhood parks,recreation,and open space. Policy-4.11: Develop working relationships with other entities that have a shared foal of improving- recreational m rovingrecreational ooportunities in Tefferson Counter � which will serve Port Townsend�esidentsl. Comment[JS53]: l 0-21 1 Policy-4.12: Assure that maintenance and operation costs are considered in the development of City-park and recreation facilities.Ensure that City-park and recreation facilities incorporate design and construction features that minimize long-term operation and maintenance costs (e.g.,design park restrooms to include energy-efficient light fixtures and skylights). Policy-4.13: —Set City--wide standards for park and recreational facility-maintenance,and the unit costs to achieve those standards. { to tr i,2403}}- Parks & Recreation -Administration & Operations Goal 5:Provide the support and leadership to respond effectively-to the community-'s evolving priorities and needs.Respond and be accessible to the community-by creating new policies,procedures and technologies to meet the diverse current and future needs. Policy-5.1: _Deliver measurable economic benefit to the community-by providing or supporting programs,special events and facilities. Policy-5.2: _Incorporate sustainable standards and best management practices into planning and design of new parks and rehabilitation of existing facilities. Policy-5.3: _Deep clean and well-maintained parks and facilities,retaining a high level of appearance of landscaped sites. Policy-5.4: ®Identify-,preserve and interpret Port Townsend's heritage,traditions,historic,environmental and cultural features. Policy-5.5: _Master Plan major parks and facilities through a public input process to modernize and update sites. Policy-5.6: _Develop staff growth through educational classes, certification and gaining.{F3 A��e--15- Comprehensive Plan 2016 Land L1se Element 4-23 Land Use Element Parks r ti®n ®Budget & Funding Goal 6: Strive to adequately fund ongoing parks and recreation programming and maintenance through proactive well-planned budgeting practices,the pursuit of partnerships and the securing of grants. Policy 6.1: _Prepare and anticipate for future staffing needs that may arise due to budget and other financial circumstances. Policy 6.2: _Establish an ongoing six-gear Capital Improvement Plan(CIP) for parks and recreation facilities. Policy 6.3: _Pursue local,regional,State and Federal grant sources for park maintenance and development. Policy 6.4: ®Develop new and additional partnership/volunteer stewardship programs utilizing local service clubs and organizations. Policv 6.5: ®Investigate establishing a set of impact and/or mitigation fees that fairly contribute to the construction and upgrading of parks. ._, Water Quality & Management Goal 7:To manage surface,ground,storm,waste,and coastal waters to ensure that water resources are protected and preserved. Policy 7.1: _Manage stormwater quantity in a war that approximates the natural hydrologic characteristics of the area while ensuring that all stormwater receives adequate treatment before discharge or infiltration.The quality of stormwater discharged from stormwater treatment facilities,such as ponds,drainage corridors,wetlands,salt water, etc. should be as close to the water quality present before human encroachments as possible. Policy 7.2: ®Ensure that public and private development projects are reviewed and conditioned in a manner consistent with the City's Stormwater Master Plan and the Stormwater Management Manual for the Puget Sound Region. 7.2.1 Continue to implement the Stormwater Management Manual for the Puget Sound Region as a guide for reviewing developments and requiring the use of best management practices for land clearing,runoff affecting water quality,erosion and sedimentation. Comment[JS54]: HK City has adopted Policy 7.3: _Pursue strategies intended to reduce stormwater runoff to levels not likely to cause flooding, SWAM significant erosion to natural drainage ways,or significant degradation of water quality. 7.3.1 _Integrate impervious surface reductions into development regulations. 7.3.2 _Encourage alternative modes of transportation that reduce the need for streets and parking. 7.3.3 _Develop standards for narrower residential streets,with reduced,but adequate, parking opportunities. 7.3.4 _Encourage the use of pavers and other pervious surfaces for low use areas such as overflow parking and emergency access roads. Comprehensive Plan 2016 Land L1se Element 4-24 Land Use Element 7.3.5 _Encourage cooperative parking such as joint(i.e.,combined),shared and coordinated parking. 7.3.6 _Encourage underground or under-the-building parking in higher density areas. 7.3.7 -Develop flexible parking regulations related that limit the amount of impervious surface,while still providing for parking needs. 7.3.8 _Encourage cluster development that minimizes impervious surfaces. Policy 7.4: _Encourage the use of a natural drainage systems approach to control stormwater from new developments.Where feasible,new developments should capitalize on natural drainage features to hold and heat stormwater and pollutants before they are carried down slope or before they enter wetlands or other bodies of water. Policy 7.5: _Apply existing regulations,including Anpendix J of the International 'H `he �'� - Building Code(i.e.,clearing and grading provisions) and the Critical Areas Ordinance(Chapter 19.05 PTMC) to maintain and enhance the quality of Port Townsend's water resources.Strictly enforce regulations regarding clearing, grading,dumping,discharging,and draining;flood and erosion control;and environmentally sensitive areas,including�etlands�. Comment[JS5 HK Policy 7.6: _Encourage property owners to use native and/or drought tolerant plants to decrease water usage as well as provide habitats for wildlife. Preserve existing native vegetation to the greatest extent feasible to protect water quality and prevent erosion and sedimentation. Policy 7.7: _Continue to work with specific neighborhoods to review drainage problems and update stormwater ordinances and program capital improvements to provide adequate drainage for the land uses planned in this element. Policy 7.8: ®Coordinate with Washington State University Cooperative Extension Service to discourage the use of herbicides and pesticides. Policy 7.9: ®Require development to be of a type and density that does not significantly degrade or deplete groundwater which is,or may in the future,be used as a public water supply source. 7.9.1 _Continue to regulate to protect critical aquifer recharge areas through the Environmentally Sensitive AJCBS Ordinance(Chapter 19.05 PTMC). Policy 7.10: —Structure Port Townsend's water planning and management procedures and programs to minimize the consumption of water and to improve the conservation habits of residents. Air Quality Management Climate Miti ati®n & AdaptationComment[JS56]: 0-2 Recognizing city's , ,� commitment to both reducing GHG and Goal 8:To preserve the quality of Port Townsend's air as one of its unique physical resources and achieve a adaptation planning community-wide standard of cutting greenhouse gas emissions to levels 80 percent lower than 1990 levels by 2050. Policy 8.1: —Cooperate with local,State and Federal air pollution control agencies which set energy policy and emissions standards and regulate activities that emit air pollutants/greenhouse gas emissions. Comprehensive Plan 2016 Land Use Element 4-25 Land Use Element 8.1.1: Endorse State and Federal actions that are required to make local actions both effective and affordable. Policy 8.2: ®Support efforts to monitor or enforce reduced wood stove emissions to prevent air pollution. Policy 8.3: ®Examine the feasibility of adopting and enforcing a local air pollution monitoring and control ordinance. 8.3.1: Local regulation should adopt or incorporate by reference local or regional air quality standards. 8.3.2: Examine the feasibility of requiring all new wood and pellet stoves to meet the emissions standards for gas and oil stoves. 8.3.3: If adopted,ensure that local air pollution control ordinances clearly delineate review and enforcement authority and responsibility. t Comment[JS57]: HK Air quality is the Policy 8.4: _Minimize air pollution and greenhouse gas emissions by implementing a broad range of purview of the Olympic Region Clean Air voluntary measures as recommended bar the Jefferson County/City of Port Townsend Agency(ORCAA) Climate Action Plan,jointly adopted by the County and City on November 14,2011,on ORCAA is a regional including energy conservation and promoting the use of alternative modes of transportation. agency serving Clallam, Grays Harbor,Jefferson, Mason,Pacific,and MCI-8.5:2- Enhance existing plans and regulations that reduce dependence otifossil fuels (e.o�.,promote 'Thurston counties. appropriate land use patterns,densities,and parking�recluirements� ORCAA monitors, adopts regulations; Poli8.6-5�: Pursue citizen education efforts designed to increase awareness of climate e and d its provides for the g uniform administration associated challenges and encourage citizens to conserve energy and reduce air pollution and enforcement of emissions,especially automobile and wood smoke emissions. regulations:administers the requirements and purposes of chapter 8.6 .1: Encourage the use of the City compost facility as a practical alternative to 70.94 RCw,as yard burning. amended,and the Federal Clean Air Act. Policy 8.7,(�: —Regularly assess progress and program needs,identifying opportunities and obstacles for Comment[JS58]: meeting adopted greenhouse gas emission targets. 0-2 8.76.1: Conduct periodic greenhouse gas emissions inventories using all available and emerging tools (e.g.,ICLEI's CAPPA software). Consider other indicators of success such as miles of bike lanes,transit ridership,increased fuel efficiency,and number of households actively participating in composting and recycling programs. 8.76.2: -Apply an adaptive management approach which accounts for results of monitoring,changing conditions,new information and technological advancements. Policy 8.8�: —Assess the risks (e.g.,increased incidence of drought,flooding,and sea level rise) and potential impacts on both City government operations and on the larger community due to climate change. Comment[JS59]: HK-Climate Change t......... ,.L. .1.. Preparedness Plan(2015) provides general risk assessment. O-2 Comprehensive Plan 2016 Land L1se Element 4-26 Land Use Element 8.8,;.1: Consider projected climate chati cre.imp acts and adaptation stratecies when investing in public projects,updating disaster preparedness plans,land use plans and regulations. c :7: : a m r 1 Comment[7S60]: 0-2/HK. Climate 8.8-7.2: Change Preparedness Plan(2015)provided a hiek > ' n vulnerability assessment. Consider the assessment of risk and potential responses–both in terms of mitigation and adaptation–associated with climate chano Comment[JS61]: 0-2/HK. Climate Change Preparedness Plan(2015)provided a Policy 8.-99: —Explore amendments to the development regulations that more closely align with Climate vulnerability assessment. Action Plan strategies using the following hierarchical approach: • Conservation/Efficiency measures • Voluntary/Incentive based interventions • Regulatory controls. , "tine 4 Residential Lands Goal 9:To accommodate the population growth objectives for the City of Port Townsend and to further the objectives of the Housing Element of this Plan. Policy 9.1: _Assure a wide range of housing opportunities throughout the entire community,while preserving and creating distinct residential neighborhoods. Policy 9.2: _Locate medium and high density housing in areas of the community most suitable for such uses,based on consideration of environmentally sensitive areas,the availability of existing services,public utilities and facilities,and transportation facilities. Policy 9.3: _Allow manufactured homes (which meet the HUD Code) on single-family lots in all residential zones,provided that they comply with the requirements of the Washington State Energy Code for single-family homes,or its equivalent,and further provided that the manufactured homes meet applicable age and design standards established in the zoning code.The intent of this policy is to recognize manufactured housing as a legitimate housing choice for Port Townsend residents. Policy 9.4: _Require that medium and high density housing developments be served with sheets of sufficient capacity to lessen neighborhood traffic congestion. Policy 9.5: _Ensure that implementing regulations allow experimentation in newer forms of residential development where clustering,density bonuses and other incentives help to achieve affordable housing and open space goals. Policy 9.6: _a. Develop performance standards to ensure that home occupations maintain or enhance the character of existing residential neighborhoods;and b. Consider establishing a conditional use permit(CUP)requirement for other commercial uses not permitted outright under the Home Occupation Code that might be made Comprehensive Plan 2016 Land Use Element 4-27 Land Use Element compatible with the primary use and character of residential neighborhoods through the CUP review and approval process. . 2 Policv 9.7: ®Encourage accessory dwelling units (ADUs) and other innovative techniques for providing affordable housing. Policy 9.8: As funding becomes available,develop neighborhood parks in higher density locations where the need is greatest. Policy 9.9: _Encourage higher density residential development in areas where the existing development patterns or terrain are conducive to walking,bicycling,and frequent transit service. Policy 9.10: Encourage well designed infill development through density bonuses and by allowing innovative lot configurations. Policy 9.11: —Establish maximum housing densities for residential districts,and minimum densities for the highest density multi-family residential district.Establish a variety of densities for residential areas to accommodate a variety of lifestyles and income levels. Policy 9.12: Disperse multi-family housing and special needs housing throughout the City rather than in isolated developments.Facilitate the development of this housing by designating and zoning smaller multi-family residential districts in manor locations.Encourage building design and landscaping that will help this housing blend into or improve the neighborhood. Policy 9.13: _Accommodate higher density residential uses in well designed mixed use centers to promote Formatted: Font: more efficient land use,support transportation facilities,and ensure compatibility with Garamond, 11 pt surrounding neighborhoods. Policv 9.14: Discourage the conversion of residential areas to nonresidential uses.Prevent the encroachment of commercial uses into residential zones,except for: a. A limited amount of small scale,compatible commercial uses within neighborhood commercial districts that are located within walking distance of all homes in a neighborhood,which serve and enhance the neighborhoods where they are located, and are spaced at least one-half mile from any existing commercial district; b. A limited amount of small scale commercial uses in mixed use districts,when developed in conjunction with new housing units;and c. Home occupations within residential districts,provided the use is consistent with the primary residential use,and compatible with the surrounding neighborhood. Policy 9.15: Promote increased densities and alternative housing hypes in all residential neighborhoods through design standards that:reinforce the character of single-family residential districts; and assure multi-family developments integrate with and enhance the neighborhoods in which they are permitted. Policy 9.16: Ensure that each neighborhood is provided with adequate open space,natural buffers,and public recreational facilities. , ; Commercial Lands Goal 10:To provided adequate commercial land to conveniently serve community needs while maintaining Port Townsend's small town atmosphere. Comprehensive Plan 2016 Land Use Element 4-28 Land Use Element Policy 10.1: Provide appropriately sized and located commercial areas to reduce retail leakage,reduce vehicle trips out of town,enhance the tax base,and improve the livability-of the community. Policy 10.2: Encourage appropriately located neighborhood-oriented commercial development of a type and scale intended to serve nearby residents. Policy 10.3: Encourage new commercial areas to locate along the street edge of arterials with shared access and parking towards the back or side of the lot. Provide convenient pedestrian access to and between businesses to increase the businesses overall sales potential. Policy 10.4: Where possible,allow the Gateway-Commercial Corridor to be increased in depth to enable development of integrated commercial projects which depart from commercial strip development.Prohibit the expansion of such areas where it would significantly diminish the livability-or viability of an adjoining neighborhood. Policy 10.5: —Identif)-opportunities for infill or redevelopment in commercial areas.Work with the development community-to identif)-and construct streetscape or infrastructure improvements (e.g.,wider sidewalks,landscaping,benches) needed to achieve commercial or mixed use development in appropriate locations. Policy 10.6: Require safe,direct,and convenient pedestrian access to commercial and public building entrances from sidewalks and parking lots. Policy 10.7: Reduce vehicle/pedestrian conflicts and disruptions in traffic flow. Consider adopting access and circulation requirements that restrict or prohibit drive through and drive in facilities in certain locations. 10.7.1 --Encourage public and private development proposals to enhance the street-side environment to maximize safety-and comfort for pedestrians,bicyclists,and transit users. Comment[JS62]: Policy l O.8: —Identif)-an area suitable for a technical training school or college campusi. HK --ZjrComment[JS63]: HK(13)City acquired the parcel in 2008 aefe t (Resolution 08-083) Updated and moved to Economic Development 10.8.1-2 —Ensure that decisions regarding capital improvements (e.g.,motorized and v Element Pois 2.3.4 nonmotorized transportation improvements) factor consideration of the potential Comment[LB64]: 0-15 and as campus site. recommended by the PC at their 211 meeting. Policy 10.9: Encourao�e the development and build out of the 4 .fes �Howard Street/Discover)- Comment[JS65]. Road Corridor as a mixed emploi-ment work district comprised of commercial,lieht Docket Item#15 Based industrial and service uses,with median and hioher densit-residential along the _eri herd of on the Economic Feasibility Study(Hovee: the work district. , 2015)consider revisions Prepare a�,., ���„ y to Land Use Policy 10.9 a subarea plan for i�a development of the area. to reflect the`working The subarea plan should�ddress�: vision statement"for the Howard Street corridor. a. The size and location of proposed land uses; consider contracting with a land use consultant to formulate a b. Targeted commercial light industrial and service uses and potential.employment consulsubaretant t to numbers; implement the recommendations of the Economic Feasibility Study. Comprehensive Plan 2016 Land L1se Element 4-29 Land Use Element C. Proposed street improvements,including right-of-war acquisition and nonmotorized facilities; d. The location of open space and buffers; e. Identification of public improvements and costs needed to facilitate the planned development;and f. Design guidelines which clearly describe the development characteristics desired. Policy 10.10: As depicted on the Land Use Map,require a 50 to 100 foot open space buffer along Sims Warr(i.e.,S.R. 20) from the City limits to Howard Sheet,and Discovery Road from the City limits to 7th Sheet,to preserve the forest corridor,and to provide a visual buffer between the roadway and new residential,commercial,and manufacturing development 10.10.1—Limit access through the forest corridor buffer to platted street rights-of-war. 10.10.2—Ensure that utilities to serve new development along the forest corridor are placed underground. 10.10.3—Preserve existing trees and vegetation along the forest corridor to the maximum extent possible. 10.10.4—Require the planting of native species when necessary to enhance the buffer,and the replanting of native species to replace trees and vegetation removed during development. 10.10.5—Coordinate with Jefferson County to extend the open space buffer from the City limits south along S.R. 20 to Old Fort Townsend Road. . Manufacturing Lands Goal 11:To provide opportunities for manufacturing development and diversification of the local economy in a manner which efficiently uses community attributes and natural resources,and has minimal impacts on the environment. Policy 11.1: Work with the Economic Development Council,Jefferson County,and the Port of Port Townsend to determine the area's projected manufacturing land use needs and each entiws role in satisfying those needs. Cooperate with these entities to develop a coordinated strategy for manufacturing development in the area. Policy 11.2: —New land needed to accommodate light manufacturing uses should have the following characteristics: a. A location near an arterial with good highway access and transit service; b. Adequate existing or planned utility capacity to serve proposed light manufacturing uses; c. Few environmental constraints,such as critical aquifer recharge areas,wetlands, steep slopes,etc.; Comprehensive Plan 2016 Land Use Element 4 30 Land Use Element d. Sufficient size to accommodate the proposed manufacturing uses and any needed buffers;and e. Compatible surrounding land uses. Policy 11.3: Preserve existing manufacturing areas for light manufacturing uses. 11.3.1--Limit nonmanufacturing uses in manufacturing districts to those uses that complement or support manufacturing development,except for those support services which meet the needs of the area's work force. Support services could include associated offices,restaurants,day care facilities,recreational facilities,and other similar uses. 11.3.2 Allow wholesale uses but limit retail sales uses. Policy 11.4: Review,and if necessary,revise development regulations to ensure that manufacturing development will be designed,built,landscaped,and operated in a manner which maintains the value and desirability of surrounding lands. Policy 11.5: Require that manufacturing uses provide pre-treatment of effluent discharges to the wastewater system in compliance with discharge standards. Consider the use of differential wastewater utility charges,based upon the impact of the land use. Policy 11.6: Encourage master plans for new manufacturing areas.Master plans should specify the types of uses targeted,overall building and site design,operations and management,and necessary improvements including: open space;stormwater facilities;landscaping;and traffic circulation and control. Policy 11.7: —If additional land is needed to accommodate manufacturing uses or provide capacitor for projected manufacturing growth in Port Townsend the City should seek to rezone land within the existing city limits before identifying areas outside the city limits for expansion of the cies UGA and potential annexation. Policy 11.8: —Coordinate with Jefferson Counter to extend the open space buffer from the City limits south along S.R.20 to Old Fort Townsend Road. Port Related Uses Policy 11.9: Work closely with the Port of Port Townsend to provide for the development of the Boat Haven and Point Hudson properties in a war that ensures the viability of long-term marine uses,the vitality of the area for port-related uses,and compatibility with surrounding areas. Policy 11.10: —Where regulated by the Port Townsend Shorelines Master Program,new water-oriented port-related manufacturing and commercial uses should take priority over non-water oriented uses.Allow limited non-water oriented uses,when incorporated into development which also contains water-dependent or water-related uses,at specified areas of the Boat Haven and Point Hudson,or to facilitate reuse of the Port office building,as further defined in the Shoreline Master Program.Allow a limited range of non-water oriented uses at Point Hudson as a means of promoting"adaptive reuse" of the original Point Hudson Station buildings. . Comprehensive Plan 2016 Land Use Element 4 31 Land Use Element Pefiev 44.44. lvlara(4 t.,(44.No.294¢ c i (n r ;l 16,hnnqh[ Comment[JS66]: Mixed Use Centers HK Goal 12:To encourage the creation of mixed use centers that combine commercial and residential land uses, providing an opportunity to develop areas in Port Townsend which are transit oriented and pedestrian friendly,and offering opportunities for affordable housing,convenience shopping and quality design. Policy 12.1: —Establish a neighborhood-serving mixed use designation which provides for a compatible mix of small scale commercial uses and medium density multi-family housing in multi-story buildings. 12.1.1--Locate neighborhood-serving mixed use centers around the intersection of arterials,or the intersection of an arterial and a collector,to give them visibility,a central location,and enable them to serve as the neighborhood focal point. 12.1.2 _z–Separate neighborhood-serving mixed use centers by at least one-half mile(street distance) or as necessary to provide them with economic viability. 12.1.3 --Limit commercial uses in neighborhood-serving mixed use centers to businesses that primarily cater to neighborhood residents,such as small grocery stores and personal and professional services. 12.1.4 --Encourage nonmotorized access in neighborhood-serving mixed use centers. 12.1.5 --Ensure that neighborhood-serving mixed use centers are of sufficient size to promote an appropriate mix of residential and commercial uses. 12.1.6 --Accommodate moderate density multi-family development within neighborhood- serving mixed use centers. Policy 12.2: —Establish a communit5r-serving mixed use center designation to be applied to areas which are in proximity to the CitS�s existing east/west commercial and transportation corridor(e.g., both sides of Discovery Road from 7th Street to 12th Street;and the east side of Kearney Street from Garfield to Franklin Street). 12.2.1 --Accommodate a wide range of general commercial uses which serve a local or City-wide market in structures within community-serving mixed use centers. 12.2.2 --Discourage auto-oriented commercial drive through uses in community-serving mixed use centers. 12.2.3 --Accommodate high density multi-family development in community-serving mixed use centers. Policy 12.3: —Establish a mixed use PUD overlay designation to allow discrete areas to be treated differently and more flexibly than allowed under ordinary zoning standards. 12.3.1 --Apply the mixed use PUD overlay designations to parcels within designated neighborhood and community-serving mixed use centers. (Note:PUDs which are primarily residential,but which allow for limited on site commercial development (e.g., "Rosewind") should be addressed as residential,rather than"mixed use" PUDs which allow greater intensity and diversity in terms of use). Comprehensive Plan 2016 Land Use Element 4 32 Land Use Element 12.3.2 —Standards for PUDs should allow variety in terms of size and composition of the mixed use centers,depending upon location,access,the character of surrounding neighborhoods,local desires,and market opportunities. 12.3.3 --Allow residential densities to be determined on a case-bar-case basis,factoring considerations which include:proximity to arterials;availability of transit service; and proximity to planned amenities (e.g.,park and recreation facilities). Policy 12.4: Ensure that zoning standards encourage the development and construction of mixed use centers. Policy 12.5: Ensure that residential and commercial uses are located close to each other within the mixed use centers. 12.5.1 --Craft implementing regulations that provide the flexibility to mix uses in either a vertical or horizontal arrangement. 12.5.2 --Permit temporary residential use of the ground floor,provided that it is constructed with a ceiling height that can accommodate commercial uses once the mixed use center matures. Policy 12.6: Require that buildings in mixed use centers be at least two stories in height,unless approved otherwise through the PUD process. Policy 12.7: —Establish maximum lot coverage limits above the first floors of buildings to prevent the development of bulky buildings which overwhelm their surroundings. Policy 12.8: —Establish commercial street frontage minimums and minimum floor area standards for mixed use centers.Craft implementing regulations that allow applicants to comply with either commercial street frontage or minimum floor area standards,whichever best suits the proposed development. Policy 12.9: Promote a variety of retail spaces in terms of size,location and configuration in order to create economically viable opportunities for small tenants. 12.9.1 --Craft implementing regulations that encourage developers to provide leasable spaces which will be desired by a wide variety of small businesses. 12.9.2 --Consider requiring commercial spaces to be at least 15,but not more than 75 feet deep (unless a project has a specific large tenant). 12.9.3 --Devise standards to ensure that commercial spaces can be divided into relatively small increments for multiple tenants (e.g.,the ground floor level of buildings should have bags or modules which allow for tenant spaces -each with its own entrance). Policv 12.10: Accommodate a variety of around-floor commercial uses throuooh implementation of R-T—R �'_-, minimum clear ceiling height standards which allow greater ceiling heights gs sl Comment[JS67]: HK. Implemented by Polic�r 12.11: _Develop implementing standards that encourage common wall construction within mixed ora 2982(2008). Codified in Table use centers. 17.18.030 Comprehensive Plan 2016 Land Use Element 4 33 Land Use Element Policy 12.12: _Establish flexible usable open space standards for mixed use centers. 12.12.1--Consider exempting projects which are located within one-quarter mile of a park. 12.12.2--Consider including balconies and roof decks in calculating available open space within mixed use centers. Policy 12.13: Implement design guidelines for mixed use center development that establish essential principles which benefit prospective tenants as well as surrounding�eighborhoodsj. Comment[JS68]: HK Standards have been 12.13.1—Ensure that design guidelines deal specifically with first floor development in adopted. See Chapter 17.44 PTMC mixed use structures,in order to accomplish the objectives of design quality and viable commercial exposure. 12.13.2—Consider establishing guidelines for awnings and canopies to help protect pedestrians from the weather. 12.13.3—Consider establishing guidelines for large windows and kick plates. 12.13.4—Consider establishing guidelines to enhance ground level expression. 12.13.5—Consider establishing guidelines which encourage the provision of pedestrian friendly signage within mixed use centers. 12.13.6—Consider establishing guidelines which allow small scale businesses to extend part wall into the sidewalk(e.g.,with elements like chairs and small tables,umbrellas, flower pots,etc.). Essential Public Facilities Goal 13:To ensure that essential public facilities will be allowed in locations appropriate for the services provided and the people served,while assuring compatibility with the surrounding development and the natural features of the surrounding land,water and vegetation. Policy 13.1: Conform with Counry-Wide Planning Policy#4(i.e., "Policy on the Siting of Essential Public Facilities of a County or State-Wide Significance"). Policy 13.2: Locate essential public facilities adjacent to or in proximity to appropriate essential infrastructure(e.g.,arterials). Policy 13.3: Require public or private developers of essential public facilities to complete appropriate infrastructure improvements necessary to support the development such as: construction of streets; signage;walkways;street lights;bus shelters,benches;parking;and utility lines. Policy 13.4: Design,locate and buffer essential public facilities in a manner which protects the character of the surrounding neighborhood(i.e.,through fencing,landscaping,etc.). Policy 13.5: Require an analysis establishing the need for such facilities,including an inventory of the current capacity and location of equivalent facilities. Policy 13.6: Evaluate the public costs and benefits of all essential public facilities,including forecasted operation and maintenance expenses. Comprehensive Plan 2016 Land L1se Element 4 34 Land Use Element Public Facilities & Utilities Goal 14:To ensure that adequate public services,facilities and publicly owned utilities are available to existing and proposed development. Policy 14.1: Ensure that development is in conformance with the water and wastewater comprehensive master plans. Policy 14.2: —Implement the Cit,�s En�ineerinc Desip�n Standards infrastructure tiering strategy Prioritize the provision of capital facilities,services and utilities within the urban growth Miers. Comment[JS69]: HK-See the Policy 14.3: Ensure that all existing and new development within the Port Townsend Urban Growth Engineering Design Standards for the City's Area(UGA)is supplied with adequate wastewater collection and treatment facilities. infrastructure tiering strategy Policy 14.4: Consider allowing the use of alternative,technologicafly sophisticated individual waste treatment systems. Policy 14.5: Discourage the establishment of individual private wells,except for agricultural irrigation purposes.Provide potable drinking water only through the City's water utility. Policy 14.6: Locate public facilities which are intended to serve the entire community in areas conveniently accessible to City residents (e.g.,community parks,schools,government offices). 14.6.1--To the extent feasible,locate City agencies and departments in the downtown area. 14.6.2 --Locate critical facilities including emergency services (i.e.,police and fire) away from seismic hazard areas as identified under the Port Townsend Environmentallv Sensitive Areas Ordinance(i.e.,Chapter 19.05 PTMC). Policy 14.7: Design,locate and buffer all public facilities in a manner which protects or enhances the character of the surrounding neighborhood(i.e.,through fencing,landscaping,etc.). Citizen Participation & Coordination Goal 15:To establish and maintain City decision processes that include the informed,active participation of all those affected. Policy 15.1: Encourage and support the creation of neighborhood organizations and other groups throughout the City,in order to help citizens effectively participate in City decision processes. Policy 15.2: Provide information to organizations and the general public to enable effective participation, such as information about the structure of City government and decision processes. Policy 15.3: When appropriate,use City publications,bulk mail,direct mail,the broadcast and print media,and other opportunities to inform affected parties about: a. Current or proposed City programs or decisions that may affect them;and b. Opportunities to participate in City decision processes. Comprehensive Plan 2016 Land Use Element 4 35 Land Use Element Policy 15.4: Amend the Comprehensive Plan annually to incorporate the updated Capital Facilities & Utilities Element. Policy 15.5:4-'-.� Ensure thatthe process for amendino the eComprehensive Plan and development regulations encourages earn and continuous public participation and ensures coordination between communities and urisdictionsI Comment[JS70]: M(10)Improves 15.5.1 Establish Comprehensive Plan review procedures for periodic consistency with RCW36.70A.020(11)and updates,annual amendments, and emergence amendments consistent with WAC 365-19600(3) I2 C«'36.?0A.13 . Comment[JS71]: M(10)Improves 15.5.2: Consider all proposals to amend the Comprehensive Plan consistency with concurrent1 so the cumulative effect of the variousrrooposals can be ascertained RCW36.70A.130. This policy provides further (except as otherwise p12rovided by CW36.70A.130). basis for existing t procedures set forth in � - PTMC 20.04 Comment[JS72]: M(10)Existing policy seems inconsistent with 15.5.3 Utilze a variery of encouraging RCW36.70a130(2)(a)(iv)a broad spectrum of public and PTMC20.04.03oA7, viewpoints,wherever reasonable,to oversee major revisions to the general elements "The amendment of the capital facilities element of the Comprehensive lan. of the comprehensive plan that occurs 15.4-25.4 -Encourage,where appropriate,that proposed amendments to the Plan eonerrentlywith the which affect the unincorporated lands adjacent to the CitSr s Urban Growth Area adoption or amendment of the city's budget."is (UGA) are subject to separate public hearings before the Jefferson County and Port excepted from the annual Townsend planning commissions. amendment process. h g Proposed revisions improve consistency with 15. 5.5 Ensure that the process for amending the Comprehensive P1.lan results in RCW36.70A.130(2)(a) decisions that maintain in consistency and cconform with the applicable and(b) provisions of the County-Wide Planning PolicY4 � �`� '���' � Comment[JS73]: M(10)Improves ` n n consistency with RCW36.70A.130 Policy 15.6 : _Ensure that the interlocal planning efforts of Port Townsend,Jefferson County,and other Comment[JS74]: jurisdictions are coordinated to manage issues and areas of mutual interest �Mlo Permit Processing Goal 16:To ensure responsive and efficient permit processing. Policy 16.1: Balance the need to process permits in a timely fashion,while at the same time ensuring that regulations intended to protect and enhance the natural environment are regularly revised and systematically enforced. Policy 16.2: Assure that regulations that implement this Plan include provisions which ensure that development applications are processed in a timely,fair,and predictable manner. Policy16.3: Maintain Comment[JS75]:a centralized permit process which allows an HK chapter 20.01.030 applicant to apply for all needed approvals at once and for the simultaneous processing of all offers optional Consolidated Permit aspects of project approval. Consider establishing a master use keimit�.. Processing Policv 16.4: Adhere to adopted-4 +permit processing deadlines so that applicants will be able to plan Comment[JS76]: HK chapter 20.01 Land with greater certainty. Development Administrative Procedures Comprehensive Plan 2016 Land Use Element 4 36 Land Use Element Policy 16.5: Design a permit processing system that coordinates the efforts of overlapping jurisdictions (i.e.,federal,state,local)in order to avoid duplicative reviews and unnecessary time delays. Policy 16.6: Continue to refine the Cites Permit data management system and ensure that is coordinated with other City departments and Jefferson County(i.e.,Jefferson County Assessor's�Officeb. Comment[JS77]: Policy 16.7: Continue to administer �implementing regulations which respect the legal rights of �H private property owners,and which provide just compensation or permit requirement waivers ff�-in instances where the application of the regulation would result in a legally defined"taking" of private property. Comment[JS78]: HKPolicy 16.8: Consider providing a"fast track"permit review process whereby an applicant may choose to � pay a higher rate for priority processing through outside contractual consulting services. Historic & Cultural Resources Goal 17:To preserve historic and cultural resources to retain our connection to the past,enhance community values,and leave a historical legacy for future generations. Policy 17.1: —Use the expertise of the Historic Preservation Committee(HPC)in matters that relate to the preservation of Port Townsend's heritage and strategies to retain a sense of the past as the City grows and changes. Continue to use the HPC for all mandatory design reviews of developments within the, fff ,r„l ReIIL fe f Aisf fi-Dlsf " Citi,as specified in Chapter Comment[JSHK 79]: 17.30 Hi toric Overlay Di trict Design Review PTMC. [Ord.No.2945,§ 1.12, (April 16,20(7)]. Policy 17.2: Encourage the retention of significant historic and cultural resources which foster community identity and pride. 17.2.1 --Promote the revitalization of older housing stock,preservation of neighborhood patterns,and the marking of important sites. 17.2.2 --Develop incentives that promote the adaptive reuse and preservation of historic buildings (e.g.,use of the upper floors of downtown historic buildings).Ensure that incentives provide reductions in regulatory requirements such as parking,in exchange for desired public benefits. 17.2.3 —Work with downtown property owners to seek grant funding to rehabilitate and seismically retrofit historically significant structures. 17.2.4 --Promote commercial historic district revitalization strategies that recognize and capitalize on the historic traditions of Port Townsend. 17.2.5 --Apply both the International Existinor�Building Code� no the Special Comment[JS80]: Valuation for Historic Properties program to historic structures within the National HK Register Historic District. Policy 17.3: Coordinate with the Port Townsend Historic Preservation Committee and the Jefferson County Historical Society to seek funding to revise and update the CiWs historic survey and enhance interpretive opportunities. 17.3.1 --Continue to research,identify and inventory Port Townsend's historic structures and sites. Comprehensive Plan 2016 Land Use Element 4 37 Land Use Element 17.3.2 --Integrate an inventory of Port Townsend's historic sites and structures into the City's permit database for ease of recognition in permitting. Policy 17.4: Continue to refine and implement the 's P historic preservation guidelines in the zoning ordinance to govern the demolition of historic structures and walls more than 50 gears old.Ensure that the guidelines include a map and inventory which identifies all significant historic structures in Port�ownsen4. Comment[JS81]: HK-PTMC 17.30 Policv 17.5: Continue to refine and implement historic preservation guidelines in the zoning Historic Preservation ordinance to govern the conservation and preservation of historic�nuralsj. Code Comment[JS82]: 17.5.1 —Ensure that the guidelines include a photographic inventory which identifies all HK-PTMC 17.30 Historic Preservation significant historic murals in Port Townsend. Code 17.5.2 --Consider establishing guidelines that prohibit the repainting,removal or alteration of historic murals,except for instances where the structural integrity of the building is at stake or where new development would obscure an historic mural. Policy 17.6: Develop and implement an historic preservation element in a future amendment to this Comprehensive Plan. Port Townsend Urban Growth Area (UGA) Note:In conformance with the GMA(RCW 36.70A.130(3)) and the Counter-Wide Planning Policy for Jefferson County,the Counter and City will review,at least once every ten(10)gears,its designated UGA.In conjunction with Jefferson County's review of its UGAs (i.e.,both incorporated and unincorporated),the City will review the densities permitted within the Port Townsend UGA,the densities permitted within its boundaries,and the extent to which the urban growth occurring within the County has located within the City and its UGA.If necessary,the plans of the County and City will be revised to accommodate the urban growth projected to occur for the succeeding twenty-gear period.The recently revised and updated Joint Population Forecast and Allocation predicts that the ciWs population will reach 12.165 44,-_'-_2-9 by the gear 20364,1 711-54Z less than was projected under the original 1996 Port Townsend Comprehensive Plan for the gear 2016 (i.e., 13,876).Accordingly,no expansion of the Cies UGA is needed to accommodate the urban growth allocated to Port Townsend through the gear O036-24.At the time of this writing the city limits Comment[JS83]: of Port Townsend constitute the cies UGA boundary,and the city does not support extending the UGA to �Mi encompass unincorporated lands adjacent to Port Townsend nor does it support a stand alone Glen Cove UGA. Goal 18:To promote the logical and efficient build-out and redevelopment of lands within the city,served with adequate urban public facilities and services.In planning growth over a 20-gear period,the city should focus on developing lands within the existing city limits before seeking to expand the cies UGA into adjacent unincorporated areas. Policy 18.1: Support light industrial and accessory commercial zoning in the Glen Cove LAMIRD. 18.1.1--Participate and support county sub-area planning efforts in the Glen Cove LAMIRD. 18.1.2 --Encourage the establishment of zoning designations within the Glen Cove LAMIRD to support diversified manufacturing(e.g.,small scale"clean"industry) and accessory commercial uses. Comprehensive Plan 2016 Land Use Element 4 38 Land Use Element Policy 18.2: Support the County in limiting new residential and incompatible commercial uses within the unincorporated portion of the Glen Cove LAMIRD. Policy 18.3: —The City has acquired the PUD's public water system serving the Glen Cove area.The City should manage the Glen Cove water system to promote industrial and accessory commercial uses in the Glen Cove LAMIRD and the City should discourage inappropriate urban-type development in designated rural areas. Policy 18.4: Work with Jefferson Counter and the Jefferson Land Trust to designate open space and trail connections through the unincorporated portions of Jefferson County(i.e.,consistent with Chapter 36.70A.160 RCW). 18.4.1 Coordinate with Jefferson County to extend a 50 to 100 foot open space buffer along S.R. 20 from the Ciry Emits to Old Fort Townsend Road. Shoreline Management Goals & Policies Goal 19:To encourage uses,densities and development patterns that are consistent with the Shoreline Management Act and the Port Townsend Shoreline Master Program (SMP). Policy 19.1: Reserve appropriate shoreline areas for water-oriented uses.Allow non-water oriented uses in limited circumstances. Policy 19.2: Manage City shorelines of statewide significance according to the order of preferences for use established in the Shoreline Management Act(i.e.,RCW 90.58.020) -uses that: a. Recognize and protect the state-wide over local interests; b. Preserve the natural character of the shoreline; c. Result in long-term over short-term benefit; d. Protect the resources and ecology of the shoreline; e. Increase public access to publicly owned areas of the shorelines; f. Increase recreational opportunities for the public in the shoreline; g. Provide for any other element as defined in RCW 90.58.100 deemed appropriate or necessary. Policy 19.3: Protect and enhance shoreline visual and physical access consistent with the Shoreline Management Act and Public Trust Doctrine principles. Policy 19.4: Protect the quality and quantity of surface and ground water in shoreline areas and adjacent lands by minimizing land clearing,soil disturbance and nonpoint runoff affecting water quality,erosion and sedimentation,through the use and implementation of the DOE Stormwater Management Manual for Western Washington. Policy 19.5£1: —Recognize that the goals and policies of the City's SMP are considered part of this Comprehensive Plan,and that the shoreline use and development regulations of the SMP are Comprehensive Plan 2016 Land Use Element 4 39 Land Use Element considered part of the Cies development regulations. . Comment[JS84]: IMPLEMENTATION ST HK Successful implementation of the concepts,goals,and policies of the Land Use Plan will require monitoring and adaptive management. Itis anticipated that the City's regulations,procedures,programs,and capital investments will require periodic updates-.The following steps should be undertaken to implement when revising the Land Use Element: 1. 4—Check for internal consistence between the�' `� Comprehensive Plan,zoning districts and the zoning map(i.e.Title 17 PTMC). S Comment[JS85]: HK 2. 27-12 eview and revise as needed the standards contained in the Zoning and Subdivision Codes-.43to ensure implementation of the Comprehensive Plan goals and policies. e-t-c �, Comment[JS86]: HK 3. �—Develop design guidelines.Develop and modify existing cGriteria and standards w.,,�• d-e-�to address the compatibility of new commercial,manufacturing and multi-family development,to protect neighborhood character,and to create more pedestrian friendly Oevelopmen4 Comment[JS87]: HK 4. Develop in accordance with established urban growth tiers. Growth tiers or urban service areas which aree consistent with the County-wide Planning Policy for Jefferson County have been designated and will need to be updated overtime. These tiers�help to direct the timing and location of new development and public facilities and services within Port Townsend's Final Urban Growth�re�. Comment[JS88]: HK 5. -_`�—Invest in public improvements.The public improvements suggested by this land use plan(e.g.,an interconnected system of open spaces and trails;street development and repair;and an expanded wastewater treatment facility)will facilitate and complement private development. 6. —Develop new,preview and modify existing Subarea Plans. Consider developingnewer subarea plans as a means of implementln� the Comprehensive Plan goals and policies. Existing plans,such as the Gateway Development Plan, should be reviewed and revised to ensure consistency with this Comprehensive Plan. [()r-d. Ne. 294", 4.4;, '°p"' 4Ihnn�hi Comment[JS89]: HK 77. �—Periodically review and revise z'c ._ `�land use permitting process.The Cies land use permitting process must be periodical1v reviewed and modified to ensure consistency with the GMA and state regulatory reform efforts,and to allow development permits to be processed in a timely, fair,and predictable�nannerj. Comment[JS90]: HK �-8.-8 Pursue funding to implement the croak and policies of this chapter consistent with est Comment[JS91]: practices. 0-2.PC 2/25/16 Comprehensive Plan 2016 Land Use Element 4-40 Style Definition: Heading 3: Underline, Font color:Auto, Line spacing: Multiple MMMMMOM 1.08 li Housing Element r � 9 ° �mfr i c I i INTRODUCTION rtft! g ILI" I'll This housing element has been developed to address the housing needs of the City of Port Townsend.It represents the communiWs housing policy plan for the next 20 gears.The purpose of this housing element is to create a frameworkpte-T�, i i s to address existing problems and provide direction for a long term housing strategy.The Community Direction Statement contained in Chapter III of this Plan declares: —"A wide choice of housing types and prices is available for a diversit; of lifestles and incomes. Residential development is centered in distinct neighborhoods that are safe secure and have identities and characters of their own. C)t�portunities for socialzing,recreation.quiet and solitude are all close at hand, as are facilities and events that enrich the bode mind ands irit." Comment[7S1]: HK-moved. the two This element is closely linked to other elements in the Comprehensive Plan. For example,the Land Use introductions have been Element defines the intent and location of residential land use designations and densities within the Cite. melded. Housing a ffordabilite is tied to the availabilite of infrastructure (Capital Facilities &Utilities Element),and to family wage obs Economic Element(.Access to goods and services is especially critical for families with limited incomes and mobility(Transportation Element). A full understanding of Port Townsend's housinor policies and plans should include coordination and consistence with these other elements of the Comprehensive Plan. Brief discussions of housing inventory and needs are provided in this Element,but the full atialesis of the 2015 Inventors and Needs Assessment found in endix*should be consulted for information rec aired be the Comment[SG2]: G1VIA. The discussion of housing characteristics provides necessary base-line data.This information,along I moved this to make it a little more clear that the with the demo2raphic characteristics of the community including ate.income(see Chapter II.Introduction of Assessment is fully Appendix*1, and household tape adds to the understandincr o� f the populations'housingneeds. incorporated as part of this element. Comment[7S3]: HK-5-Update section to reflect CWPP and Ten Year Plan to End This Housing Element has been prepared in conformance with the followino�sty, ate regional,and local plans, Homelessness. Improve pollcleS and guldelineS: internal-consistency. Growth Management Act Requirements Among the 13 planning goals contained within the GNIA, one pertains specifically to the housing element: "Encourage the availability of affordable housing to all economic segments of the population of this state, promote a variety of residential densities and housing types,and encourage preservation of existing housing stock:" (RCW 36.70A.020(4)). The GMA requires that the housing element recognize the vitality of established residential neighborhoods and identifies four features that must be included within the housing element: • An inventory and analysis of existing and projected housing�eedsll; Comment[7S4]: HK Update footnote to reference 2015 Housing Inventory Comprehensive Plan 2016 Housing Element � 5-1 PRA 4WA'RSeR4 V.14PUSIN6 cLLEME 4 • A statement of the goals,policies and objectives for the preservation,improvement and development of housing; • Identification of sufficient land for housing,including,but not limited to,government-assisted housing,housing for low income families manufactured housing multi-family housing,and group homes and foster care facilities;and • Adequate provisions for existing and projected housing needs of all economic segments of the community. (RCW 36.70A.070(2)). Other sections of the GMA recommend the use of innovative planning techniques that are directly related to housing,including density bonuses,cluster housing,planned unit developments (PVDs),and the transfer of development rights (RCW 36.70A.090).These and other nontraditional techniques are reflected in the goals, policies and implementation strategies of this element. vv Afford b b b ` - 0 g' , 0 }j Comment[7SS]:HK -CPP is now correct. g; , F11111111 . The herts' 1116 1 .�., 4'he Port b . g. b "". Ynenpfeftf ,eHffi County-wide Planning Polio for Jefferson County(CWPP) specificalli Pohci #6. While this pohcirequires the Citi to plan for its fair share of special needs,low income and moderate income housin- i- t also Comprehensive Plan 2016 Housing Element � 5-2 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 acknowledo,es that housing development is market striven and"will be addressed throurzvgte sectorbrogrg�ns and sects; local government should not gssuffle a direct rale in the ou'neashib or gdministrgtion o�bublic assisted housing;rgthea; this should be left to brzvgte nonbrofit or quasi- Ivblic entities." Per the CWPP the housing elements are required to provide a housingstrateo; which examines existing oticies and regulations to identifi opportunities to encourage the provision of affordable housing ndin Homelessness In efferson County WA:A Ten Year Plan by Oh-CAP and efferson Shelter to HousinoComment[SG6]: Parffiership. Did the City formally adopt this?If not,can we just reference when/how The ten-dear Plan lays out a framework to end homelessness inefferson Count, by using cleartrateoies and the County adopted it? timelines. The original concept of a ten-year plan to enAlso,if it's a 10-yeas plan,d homelessness came from the National Alliance to didn't it expire last year? End Homelessness;the federal Der artment of Housing and Urban Development accepted the coal in 2001, (4/5Is emailedolyCAp) and by 2005 all Washington counties were required to have such aplan in glace in order to be eligible for certain funding for homeless services. �� ' Comment[7S7]:I�x �PW f011WA"'Rg goals,p0i"O"@S, s4ategy 14RA,e 44@4: tile 140�lsllg goal 44i@ GMA,41- -condensed and moved to intro above u y t5 .. y, 7 t7,- h.,.7„ H4 HH l 1,P;1-4. u tile giil4ilar to tile 1996 No@&Assessil4ent,tile 2PP;gelis,44g Aetion Plan eenellf&d t4at- ],7,71@; tile ' ,,7 Comprehensive Plan 2016 Housing Element � 5-3 PHA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 CHALLENGES & OPPORTUNITIES. As further documented in Appendix*.2015 HousinoNeeds Inventorg,over the two decades since adoption of the Citv's current Comprehensive Plan in 1996,significant chanes have occurred both nationally and locally that will affect housing needs for Port Townsend residents over the next 20 years.Demo�phic and economic factors affecting housing demand include slower than Previously amiciair ted ror)ulation growth;shrinking household size;continued aping of the Population;more siti2le-Person households;weak emIplooyment not yet recovered to pre recession levels,and high dependence of residents on non-wage sources of income. One of the most pressing and complex challenoes� facing the City is to address appropriate housino�neer ds for all economic segments of the community-. A lack of available and affordable housing makes it difficult for;oung families working�.peoPle and people of limited means to find acceptable housing in our community as prices of homes and rentals escalate. Employers are losing staff to more affordable communities and finding it difficult to recruit new hires due to the high cost of housino4Artists boat builders,.firefiohters musicians educators seniors single parents,and the corner barista are among the people who are strucrAinc to find affordable places to live.These are the ver-people who make our communit,-vibrant and diverse. Housing challenges include: ®A lack of affordable housing available to households with incomes below 120%of the Area Median Income VII . 1. 2. A shortage of higher density and affordable rentals with demand exceeding;supply for both market rate and affordable units. —A rising demand for seasonal homes and short-term accommodations results in fewer homes available for permanent residents. 3. 4. A lack of local,family wage jobs. Currentlyjobs are disproportionatehv skewed toward lower waore service-sector occupations. 5. ---'� Government-assisted units at risk of turning market rate as existing contracts expire(e.o USDA/IIUD contracts). 6. Existincrhousing stock is at risk of falling into disrepair as homeowners with limited incomes struoole to maintain their homes. 7. Increased demand for emerorenci transitional and permanent housing units to serve the City's special needs populations;and 8. New construction which is inconsistent with projected demand in terms of number,pr ce ®and typ e. New housing development patterns and housinptypes present an opportunity to encourage a housing mix that more effectively serve the full ranoe of housing needs. Comprehensive Plan 2016 Housing Element � 5-4 PHA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 The goals,policies,and implementation strategy of this element seek to address the housing challeti�es identified by these key findings,and guide future housing development in Port Townsend. [Ord. Nam"� �- HOUSING POLICIES Housing Supply gfhr Y ftna sP e Aft Port Townsend has nearly double the residentialhv zoned land needed to accommodate the projected 2036 population of 12,165 residents. However,the inventory ffllee&6eft of vacant land does not appear to include 43e adequate sites with readihv available infrastructure(water,sewer,roads) to meet the projected needs for sinole famih- and hither density housiticr Over the longg term,it is anticipated that the rate of housing construction will need to rick up itiorder to meet pro'el cted population orowth due to the continued decline of averaoe household size and the increase in seasonal units as a proportion of the total housing inventory. As of 2015 Port Townsend has over 5 300 housino units. .lhouoh the City does not construct own or manaoe housing.the Cite does work in partnership with housirip roviders and service providers. An estimated 693 units a proximately 13%of the totall target low and moderate income households with some form of financial assistance. Rentals are reported at near 100%occupanc;. Anticipating demand(i.e..population forecasts are not an exact science and ma oni� ficantly im acn ted by various factorsee..o., climate change and economic boom/bust . Trends will need to be monitored periodicall;. Goal 1:To provide an adequate suppler of housing for residents of all income groups,including sufficient housing affordable to low and moderate income groups. Policy 1.1: —Provide sufficient,suitably-zoned vacant land for development of all housing types to accommodate the future needs for each type of housing,including single-family,multi-family and manufactured homes. Policy 1.2: Comment[JSS]:rix 1, - -the reference to 105 was prior to the 1996 land use e f 6A fef hT-he f denst- -est „r,: 7 Encourage the integration of multi-family housing map which upzoned developments in locations which aree compatible with existing neighborhoods. significant areas to multi-family residential Policy 1.3: _Rezone areas near public facilities and services,commercial services,arterials and jobs for higher density residential use. Comprehensive Plan 2016 Housing Element � 5-5 PHA 4WA41SeR4 V.HOUSIN6 cLLEME 4 Housing Affordability An estimated 52%of Port Townsend renters and 39% of homeowners are housing cost-burdened(i.e..pa;ink more than 30 percent of their income for housings,a virtual doublingfQ the proportion of cost-burdened households since 1990. Port Townsend household incomes have lagged well behind those of all Washington residents relative to housingvalues.This affordability gap has worsened since 2000.From 2000 to 2015,median household incomes drooped substantially relative to median home values for both Port Townsend and Washington state. However,the decline is steeper iiiPort Townsend(nearly 10%,versus 5%statewide) and, unlike statewide incomes which have regained some lost ground since 2010 Port Townsend incomes have continued to slio. Goal 2:To promote the provision of affordable housing throughout all geographic and economic segments of the community. Policy 2.1: —Encourage the provision of affordable housing by designating more land area for higher density housing. Policy 2.2: —Evaluate existing land use regulations and identify measures to increase the variety of affordable housing types throughout Port Townsend.Examples of potential e&4e revisions include: smaller single-family lot sizes;more liberal allowance of single-family attached dwellings (i.e.,duplexes,triplexes and fourplexes);increase multi-famihv density,zero lot line development,conversion of lamer homes to multi-famihv units; -smaller homes and micro- nits. �� ' a___ 7r:� ._�: o r,rT Comment[JS9]: Per 2/25 PC,the term 2.2.1 --Offer incentives to developers and home builders who provide housing for low and "tiny home'was replaced with smaller homes. moderate income households,such as:density bonuses;waivers for impact fees and system development charges (SDCs);and prioritypermit processing procedures. Comment[JS10]: 0-26 ADU's have been 2.2.2 --In order to provide lower cost housing,consider permitting affordable housing implemented. To some extent the City has "demonstration projects"in which development standards may be negotiated without implemented smaller lot sacrificing public health and safetysizes and liberal allowance of sf attached dwellings- however,more liberal ® Policy 2.3: Work in partnership among various levels of government and with other public and private applications could be agencies to address housing needs that transcend jurisdictional boundaries. Consider all considered(e.g.,allow duplex on a 5,000 square available local,County,State,and Federal funding opportunities and private resources in the foot lot). Revisions development of affordable housing and participate in region-wide coordination of affordable expand on he variety of potential housing types. housing related plans and programs. Some of the revisions would require Polido 2.4: Periodically Comprehensive Plan r a date an inventory of surplus public lands that may amenments. be suitable to nonprofit housing providers for affordable housing.Consider affordable Comment[JS11]: housing needs and opportunities associated with inventoried surplus public lands before HK The City has disposing of them. prepared and maintains an inventory of City owned properties which Policy 2.5: —Provide utility rate assistance to low income populations. maybe suitable for affordable housing.(City Polir :2.6Consider,in cooperation with housing partners,alternative organizational Structures that Resolutions 09-035, � — P g P may g 5 10-024,11-018,and improve our ability to meet affordable housing goals;for example,creation of a housing 15-018). consortium,public development authority(PDA) or a regional housing trust. Policy 2.7: —Monitor and assess the effectiveness of the goals,policies and implementation steps of this element through the Planning Commission. . Comprehensive Plan 2016 Housing Element � 5-6 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 Housin condition Comment[JS12]: HK Updated inventory Ase of a house is a factor in the duahty of housing and how much housino costs to maintain. Lender normal information. source: American Community c rcumstances,a new residential unit can be expected to have an effective useful life of 40-50 years before it survey becomes functionally obsolete. The useful lifespan can be expanded indefinitely with continued maintenance and reinvestment. In Port Townsend,anoroximately 26%of the existing housing stock was built before 1960, making;it over fif -years old. Although the Citv is known for its historic homes,much of the housing stock is more recent with roughly 40%built in 1990 or later. Home values are rising;aorain,back to about pre-recession levels.The median value of homes has increased from lust over 5110,000 in 1990 to over 5291.000 in 2015. Year Structure Built Estimated Number of Units Percent of Total Housin.e-Units Built 2010 -2014 75 1.5% 2000-2009 1046 20.5% 1990-1999 989 19.4% 1980-1989 726 14.2% 1970-1979 576 11.3% 1960-1969 351 6.9% 1950-1959 195 3.8% 1940-1949 186 3.6% 1939 or earlier 186 3.6% DATA SOt CE:L.S. Census Bureau 2014 American Communitv Survev 5-Year Estimates Goal 3:To conserve and improve the Cies existing housing stock. Policy 3.1: _Assist in the reduction of utility costs by increasing access to weatherization services. Comment[JS13]: HK-currently the 3.1.1 Facilitate the expansion of existing weatherization activities. "Peninsula"Housing Authority 3.1.2 —Assist housinproviders Comment[JS14]: HK 3.1.2 and 3.2.1 in the development of a minor h7LHg , suggest we either 1)Keep funded through State administered block grant funds,or the Stce it general: "housing providers"or 2)list Program. Community Action Council,Peninsula ® Housing Authority, Policy 3.2: Assist homeowners with housing in poor or fair condition in gaining ar Habitat for Humanity or repair or renovation of their homes. 3)combination thereof housing providers(e.g., 3.2.1 _—Support efforts of olycAP,PHA,Habitat) ���� _etin,�:r housitip_providers to obtain Housing Preservation Grant Program Comment[SG15]: I'd vote for being more funding for the repair and rehabilitation of dwellings for low income renters and general to allow greater owners. flexibility. Comprehensive Plan 2016 Housing Element � 5-7 PRA 4WA'RSeR4 V.140 rcIP46 ELLEN4✓N4 3.2.2 _®Identif-neighborhoods and areas of the City most in need of rehabilitation assistance and infrastructure improvements.To the extent possible,coordinate public investments in capital infrastructure with rehabilitation efforts. Housing Types From 2008-2014.the overwhelming;mai orit)of new development was comer sed of single-famil-units more than 200 units or 83%of all new housing).The remaining 17%of added housing stock consisted of 23 accessory-dwelhn2 units ADLJs),three duplex and 16 apartment units. The Housing Needs Inventorv- identified a shortfall in multi-famih housing. Following is a table from the inventon which provides a comparison with statewide numbers. Table 5-2: Number of Dwelling Units for Each Housing;Tvne(2015) Port Townsend Jefferson County Washington State Type of Housing Port No units ereent units ereent units ereent Spacing,Centered Single-family 4 006 75.2% 13 583 73.7% 2,028.402 66.7% ( Formatted Table Du lex 203 3.8% 331 1.8% 79.428 2.6% Formatted: No Spacing,Centered 3 Alex/4-plex 161 3.0% 322 1.7% 113 262 3.7% "' Formatted: No Multi-famil,\L45+units 737 13.8% 1,126 6.1% 5984-2 19.7% Spacing,Centered Mobile Homes 164 3.1% 2,607 14.1% 214-01 7.0% Other(boat.KV,van. etc.) 55 1.0% 473 2.6% U93 0.2% Formatted: No Spacing Total (all unitsl 5.326 100.0% 18.442 100.0% 3.039.620 100.0% "' Formatted: No Spacing Fort Townsend Jefferson County Washington State Formatted: Normal, Type of Housing (units) (percent) (units) (percent) (units) (percent) Left Single-family 4,006 75.2% 13,583 73.7% 2,028,402 66.7% Duplex 203 3.8% 331 1.8% 79,428 2.6% 3-plex/4-plex 161 3.0% 322 1.7% 113,262 3.7% Multi-family(5+units) 737 13.8% 1,126 6.1% 598,423 19.7% Mobile Homes 164 3.1% 2,607 14.1% 214,012 7.0% ,Other(boat,RV,van,etc.) 55 1.0% 473 2.6% 6,093 0.2% Total all units 5 326 100.0 0 18 442 100.0 0 3 039 620 100.0 0 Source:The Nielsen Company. Goal 4:To promote a variety of housing choices to meet the needs of Port Townsend residents and to preserve and encourage socio-economic diversity. Policy 4.1: _Encourage the integration of a mix of housing types,densities and costs suitable for a population diverse in age,income,household composition and individual needs. Comprehensive Plan 2016 Housing Element � 5-8 PRA 4W.,RSeR.7 D„Wo 11/12 V.14PUSIN6 cLLEME 4 4.1.1 --Allow attached single-family dwelling units (i.e.,duplexes,triplexes and fourplexes) in all single-family residential zones, ; ,i.- Comment[JS16]: 0-26. At the 2/25 a. z-Etisure new construction does not exceed the base density meeting-PC generally agreed that the City requ rementS Of the Zone. should consider allowing some flexibility re:"base fib. Consider amending the development regulations to allow density requirements" conversion of existino larger homes to exceed the base density requirements. 4.1.2 _ Affind fhe r rg��A11ow manufactured homes 1(:- j on single-family lots in all residential zones,if they meet the HUD standards, and -comply with the requirements of the Washington State Energy Code for single-family homes,or its equivalent,and pfe-A.c+ �14e- c �' if thee:meet applicable age and design standards established in the zoning code.It is not the intent of this plan to promote the development of traditional mobile home parks.Instead,the intent is to recognize manufactured housing as a legitimate housing choice,which should be made available to Port Townsend�esidents. Comment[JS17]: HK-code was revised J 4.1.3 --Promote 42ert"4 accessory dwelling units (ADUs) for long-term rentals in all residential zones,providing zoning code requirements are satisfie Comment[JS18]: HK-they are permitted Policv 4.2: _Encourage innovation and variety in housing design and site development and support unique as rentals(i.e,not transient and sustainable community housing projects such as: co-housing;planned unit developments accommodations);n the (PUDs);"grow"home and cottage home developments;and cluster developments which offer R,c 1 and R-III zoning an alternative to the CiWs prevailing grid pattern. 4.2.1 --Encourage clustering and small lot PUDs in order to retain open space and promote the construction of affordably priced attached single-family houses. 4.2.2 --Offer density bonuses to builders who provide low-income housing in market rate developments.Link the amount of bonuses to the level of affordability(i.e.,the lower the cost or rental rate per unit,the greater the bonus). Grant density bonuses only in instances where all of the following conditions are satisfied: a. The developer agrees to sell or rent the units to qualifying residents(i.e., low income and very low income households); b. 4—The developer ensures the continued affordability of the units for a minimum of 40 gears;and c. The units are of an innovative design and compatible with existing neighborhood character. 4.2.3 --Develop and implement standards which encourage innovative housing design while ensuring compatibility with existing neighborhoods (e.g.,standards for zero lot line development;and design standards for multi-family and attached single-family developments). Comprehensive Plan 2016 Housing Element � 5-9 PRA 4WA'RSeR4 V.14OUSIN6 cLLEME 4 Policy 4.3: _Encourage multi-family development in mixed use areas which accommodate both residential and commercial uses,and in areas adjacent to commercial and manufacturing zones. 4.3.1 --Include within the comprehensive land use plan and zoning code mixed use zones to encourage a co-mingling of residential and commercial uses in certain,select areas. 4.3.2 --Encourage adaptive reuse of the upper floors of historic buildings in the downtown for permanent housing and artist studios live/work situations. Policv 4.4: _Allow group homes in all residential zones in the community.Implement-'--c4 zoning standards which ensure that the size of a group home(i.e.,number of residents and staf�is compatible with zoned densities and available transportation and servicesl. Comment[JS19]: HK Code includes size Policy 4.5: _Promote home ownership by encouraging alternatives to conventional detached single-family standards housing,such as: condominiums;smaller homes attached single-family units;townhouses; and"grow"and cottage homes. [Ord. No. 2Q98 `tll7 [ InnnGh, Comment[7S20]: 0-26 Low Income & Special Needs Populations Special needs housing populations includes those who are not able to live independently in traditional housing as well as those who may not have an income sufficient to obtain housino without assistance. —The 2015 Housinr�Needs Inventor�-(A endix*)inventoried group Quarters,financially assisted housiricr and emercrencv/transitional housing as for homeless individuals and families.An important function of emereenc and transitional housino is to assist in addressino homelessness. Recent trends indicate a decline in the overall number of homeless but an increase in homeless children and families As of December.201.5-ari.estimated 693 housino units in Port Townsend tareet low and moderate income individuals and families with some form of financial assistance(i.e.,over 13%of all housinr�in Port Townsend). Compared with the entire state,it aopears that the proportion of housing,that is financially assisted in Jefferson Count)ma)be above averaoe however—+e�the oroportion of units available and affordable to low income residents is below averaoe.? Goal 5:To identif-locations for and facilitate the development of housing opportunities for low income and special needs populations. Policy 5.1: _Coordinate with -, , singg 7s ,-, tieftp±e€r-housing providers,and other public and private housing interests to increase the supply of housing for low income and special needs populations within Port Townsend. The Washington S� tate Department of F'indinos� indicate that statewide about 5%of all housing is subsidized,which would aopear to be below the Port Townsend ratio. Another method for comparing different geogWhic areas in the state is presented as a Quantification of affordable and available housing units for every 100 households.Statewide 51 units are affordable and available for evert-100 households earning 50% or less of AiNIL In comparison,there are only 32 units for ever-100 households at 50%or less of AiNII inJefferson,Clallam and Kitsap Counties,33 units in Mason County,and 38 units in GraFs Harbor County Comprehensive Plan 2016 Housing Element 5-10 PHA 4WA41SeR4 V.HOUSIN6 cLLEME 4 5.1.1 --Coordinate with Jefferson Counter to develop a"fair share"distribution of low income and special needs housing and to encourage the future distribution of such housing throughout appropriate areas of the County. 5.1.2 --Assist social service organizations in their efforts to seek funds for training,and construction and operation of emergency,transitional and permanent housing. 5.1.3 _Adopt a memorandum of understanding establishing a formal relationship and supporting the mission of theS� , public housing authorities. 5.1.4 --Cooperate with other jurisdictions in the region to co-apply for special needs housing funds. Policy 5.2: _Encourage the development of new,innovative and high quality,rent-assisted housing by aggressively pursuing grant funds. State funds,donations from private individuals and organizations,public revenue sources and other available financing. Policv 5.3: _Integrate special needs and low income housing developments throughout the community. Policy 5.4: _Consistent with state and federal law,regulate residential structures occupied by persons with handicaps the same as residential structures occupied by a family or other unrelated persons. Policy 5.5: _Consistent with state and federal law,regulate residential structures occupied by group care for children the same as similar residential structures occupied by families or other unrelated persons. . 2 Jobs/Housing Balance Port Townsend and Jefferson Countv were affected more severel,-than most of the rest of the state during the 2008 recession,but clear signs of economic recovery are now finallyparent.Looking forward,even more robust employment growth will be necessary-to support ftftt ff fe,,ra fee increased home ownership,stable rental stock and im roved housing affordability Comment[SG21]: Do we want to focus on ownership,or go broader to say"increased home Goal 6:To promote a greater balance between housing and employment opportunities. ownership,stable rental stock,and improved Policy 6.1: _Recognize that an adequate suppler of affordable housing is directly linked to economic housing affordability" development. Policy 6.2: _In response to demand and need,change certain land use designations from residential to mixed use,commercial or manufacturing to expand Port Townsend's tax and employment base. Policy 6.3: _Implement the Economic Development Element of this Plan in order to provide"family wage"jobs in Port Townsend. Policy 6.4: _Coordinate with Jefferson County to provide a regional economic development strategy which integrates "fair share" housing suppler policies with economic growth. Comprehensive Plan 2016 Housing Element 5-11 PHA 4WA41SeR4 V.HOUSIN6 cLLEME 4 Phasing of Housing Growth Housing affordability is heavily dependent upon available infrastructure including streets,sewer,and water.The Cite has adopted an infrastructure tierinors� tratecr to prioritize the provision of capital facilities,services and utilities within three urban growth tiers. Go4 7:To encourage higher density residential development within the City limits with gradual phasing Comment[JS22]: outward from the urban core. Although there is more than enough vacant ® residentially zoned land to Policv 7.1: Attempt to locate higher density residential designations m areas of the CitSr that have the accommodate forecast infrastructure and services to support high density housing.In areas designated for higher population and housing growth over the next 20 density residential development that are not presently served with public facilities and utilities, years,itis likely that there is not enough phase the provision of infrastructure in a manner consistent with policy 2.5 of the Capital immediately buildable(or Facilities&Utilities Element of this Comprehensive Plan. shovel ready)lana served with infrastructure. Policy 7.2: _Reference the Transportation Element of this Plan and consider transportation impacts when making decisions affecting the location and density of housing. Policy 7.3: _Reference the Capital Facilities and Utilities Element of this Plan and consider the impact of housing decisions on capital improvements planning. Permit Processing/Regulatory Reform Goal 8:To facilitate predictable and timely permit processing. g t � Cede iComment[7S23]: HK TTQf- TUC Comment[7S24]: HK Policv 8.12: _Revise and consolidate regulations and permitting processes to foster predictability and Comment[LB25]: remove uncertainty for builders and lenders. The city does not have the ability to"relax"any of requirements within uq Policv 8.2-3: When revising the Port Townsend Municipal Code(PTHC) to implement this Plan,identif- the rthe re and eliminate unnecessarily expensive or difficult development standards (e.g.,review,and consider revisions to residential street,parkin stormwater,and utilit5r�equirements�. Comment[JS26]: 0-25 Policy 8.34: —In reviewing and revising the Port Townsend Municipal Code to implement this Plan,balance the need to promote housing affordability with the need to require development-related improvements that adequately protect public health and safety while reducing long-term operations and maintenance costs to the City. Policv 8 v4­5�-: dEncourage lenders to make financing available for innovative/sustainable housing(e.g., housing in upper stories of historic buildings,co-housing projects,accessory dwelling units (ADUs),and"grow"and cottage�Omen. Comment[7S27]: 0-2 Policy 8.56: Consider revisions to the development regulations that will promote use of new technologies which help conserve resources and minimize the generation of greenhouse gas emissions: 8.561: Encouracre the development of distributed generation of electricity through renewable sources. Comprehensive Plan 2016 Housing Element 5-12 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 8.54.2: Encouraore enerc v efficiency in both new and existino houses and the development of"zero net energy"housing _&,F,5.3: Encourage on-site water conservation technolob_(eL.o.,rain barrels, low-water use a fiances. Comment[JS28]: 0-2 HOUSQTD I A (® T XA/ I I LDTOWNSEND Introduction g .. �g �� .An affordable housing strategy is needed to preserve the character of our community._ Itr+e-pt6,+Prior to the 1996 plan,City government has played a limited role in encouraging the provision of affordable housing.For the most part,affordable housing has been provided by builders and developers seeking to capitalize on local market conditions.The City's past involvement in fostering the availability of affordable housing was confined to zoning very limited areas of town for higher density multi-family development. Like this earlier approach,the original 1996 strategy,detailed below,addressed the suppler of multi-family zoned land.Additionally,the City's approach sought to clearly articulate a course of action which would provide real incentives for developers and builders to produce the type of housing needed in the community.44& 6 The 2006-7 Port Townsend/Jefferson Counter Housing Action Plan includes forty-two housing strategies.These strategies range from creation of an oversight network to economic development,infrastructure development and financial incentives.Innovative development projects (Community Land Trust and Tierra Contenta models)and rehabilitation of existing housing stock are key strategies,given that,ultimately,our success will be measured bar the actual number of affordable housing units on the ground. The Strategy® - ;. Comprehensive Plan 2016 Housing Element 5-13 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 . - The City should undertake the following actions to implement the Housing Element goals and policies: 1. Keep Housing in the conversation Actively involve our partners and our community in a dialog on housing issues. Build understanding and support for affordable housing in the community bypublicizinp successful housin�4.projects and programs. 2. Periodicallv audit and adjust the zoning code,design standards, and fee schedules to accommodate a variety of housirigj es,with a focus on affordable,special needs,and sustainable housing,while ensuring compatibilit, with existing neighborhoods. Examples of code refinements to consider include: Allowance for ADU owners to rent the ADU and main residence Common-wall construction Reduced and more flexible parking requirements More flexibility in housing ri-pes permitted(as for smaller homes,micro-apartments,and zero-lot line development Increase in the maximum number of units allowed in a multi-family structure to more than the 24-un1t current maximum (after review with potential owner/development interests) Re-evaluation of other development standards that could be modified to reduce development costs while maintainingpublic health and safety(as with road standards Addressing means by which the Citv might cost-effectively reduce the expense of meetinc infrastructure funding reduirements from residential builders as might occur, for example,with community stormwater management systems 3. Provide sufficient land supolly with adequate infrastructure for affordable housing development. Take steps to re-designate land as needed for higher density including affordable housincr prioritizing sites currently or readily served by infrastructure,in areas that are walkable and accessible to transit. Prioritize infrastructure investments in areas ripe for economic development and hick density residential development. Comprehensive Plan 2016 Housing Element 5-14 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 Prepare subarea Mans in high 42riority areas Commit to im roving financial suQQort with a focus on sustainable fundingmechanisms and Comment[SG29]: Organizational structures. Do we think this is consistent with the CPP's statement that local 4_ government will not be a direct provider?Would it IdentifG s ecif c housing needs,such as p eventing displacement of mobile homes or housincthe. be more consistent to say "Commit to working with local service' dusm-workforce(e.g.,artists,retail,marine trades housing providers to help them secure sustainable Invite local experts in the housincr indusm-and social services(e.g.,Communir .Action Council, - funding?" Housing.Authoriti to help set pr o Cities,recommend actions and obtain brant funds. Identifi-potential 0000rtunifies and resources,such as surplus public propert Emphasizecoordination with the County and opportunifies for public/private partnerships. Pursue the potential to create and fund a community/housincr land trust-either for Port Townsend or for wideroeo�raQhic area involving multiple jurisdictions. En e lenders and developers to assess and cultivate participation in identi ing realistic options to secure mortoaoe and related investment in the full range of resident housing finance needs. F'undinr,mechanisms also could include identification of sources that allocatepublic costs more equitably between residents and non-residents and mitigate housinc r cirig;availability and affordal)14 for local residents. 5. Promote incentives for low and moderate income housing;development Offer density bonuses for units 2uaratiteed to remain affordable Offer impact fee exemptions to reduce costs for units guaranteed to remain affordable(S rateoti Consider reduced Parking requirements for housing rest.cted to low income seniors and special needs residents L.Strateoy#2) Consider ex eta dited permit�rocessiti for oublicl, funded low income housino.Strateov#7). ®ililaintain reasonable land use and utility fees . Comment[SG30]: We don't impose impact 6. Evaluate the cumulative impact of fees and off-site mitigations itirelation to the final price of the fees housing. I2 ecommend reducing or exempting fees for low income housing guaranteed to remain affordable for the long term. Comprehensive Plan 2016 Housing Element 5-15 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 7. Facilitate predictable and timelpermitprocessing.Improvements should include consolidated applications,administrative decision-making author ty, automated permit tracking,and timelines for permit review. 8. Encourage the development of affordable housing"demonstration projects"in which flexible, innovative development standards mai-be used without sacrificing public health and safety-.- Look for ways to revise permit requirements to reduce development costs without compromising environmental anal t or adequate public review. —Assess the need to conduct a residential buildable lands inventory. —While GNLr1 does not require Port Townsend to update its residential BLI�at this time,a local update is Comment[SG31]: maG:provide valuable data to inform next stens.Although there annears to be more than enough vacant Will it ever be a requirement for us?If so, residentially zoned land to accommodate forecast population and housing growth over the next 20 can we point that out as years,it is likely that there is not enough immediateli buildable(or shovel-ready)land served with M option to wait until it's required? infrastructure. 9. Lack of shovel-ready sites is particularliproblematic for higher density single and multi-famill development at locations proximate to multi-modal transportation and close to the urban core. iMatching the caoacit, of the truly buildable land supply to specific categories of owner and rental demand by income/price level is pivotal to determine whether,where,and how much land should be desiornated for higher density and more affordable housing ®Actively encourage public-private partnerships for affordable housing. —Actively seek diverse private sector participation together with public and non-profit partners in reviewing and modifying zoning and associated reorulatory standards to better facilitate affordable housing development(see Strateg; #21. Identify existing oroperties providing affordable,financially assisted housing that are at risk of transitioning to market rate rentals and potentially displacing existing residents. Activelv surport initiatives to improve local resident emploi ment and wage opportunities. 10. -Consider more explicit linkages of seasonal to affordable permanent housing and/or limitations on transient accommodations. —Prioritize initiatives for low income,homeless and special needs populations. —1 his_would include,for example,providing step-bi-step implementation of the 10-d ear plan for ending homelessness in Jefferson County-including the plan's housing first approach.There is continuing opportunity to work with the rangeoff providers and supportive organizations currently in place. 11. Due to the onooino challenge of obtaining adequate funding,options for securing added sustainable fundingsources or new innovative partnerships should be considered as opportunities are presented.3f ,_r ra -1- ., -,-� r-��-- Pttriority or allocated funding should be considered for portions of the population that remain most under-housed. —Encourage development of ADL1s as affordable rentals. Comprehensive Plan 2016 Housing Element 5-16 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 12. A first step would be to further assess reasons as to why less than half of existing ADUs are being rented,and determine incentives that might be considered to increase rental use A.secorid.step would be to apph-what is learned about existing,ADUs to encouracre additional new ADL7 construction as year-round rentals prioritized over transient use. Financial and/or regulatory incentives might be considered together with marketino for owners to better understand project costs and long-t� eim benefits of added rental income potential. ®t1ooh Adaptive iManagement-i\ilonitor outcomes,update housing needs and strategies accordin�l;. 13. Demographic and economic conditions will continue to chang�uite possibh in d rections currently unanticipated. Conseduentl,it will be worthwhile to monitor changes in local population growth and housing demand more actively in theears ahead.If the new 2015-forecasts'-p-rove to be substantiall- over or under target over a multi year period,forecast revision is suggested before completion of the 2016-36 planning cycle. g,"g-'nal 4996 4. Provide (Of at d I-F1111—1111FI11L F1111 Gonsidef- � 6. Seek ong ----------------- 11 . �. 4. Pfemete s,g Make dffpkemt"-, in—p—on, �. b b b Comprehensive Plan 2016 Housing Element 5-17 PRA 4WA'RSeR4 V.HOUSIN6 cLLEME 4 Additional stratecies are provided s in the 2006-7 Port Townsend/Jefferson Counter Housing Action Plan: Strategies will need to be prioritized and those requiring regulatory changes vetted through the public process. . The inventory and analysis of existing and projected housing needs is contained in the Draft Port Townsend Comprehensive Plan and Draft Environmental Impact Statement issued on January 10�-,1996.This inventory and analysis served as the foundation for the goals,policies,and implementation steps contained within this Housing Element. 2 This inventory of public land was included within the Draft Port Townsend Comprehensive Plan and Draft Environmental Impact Statement issued on January 10, 1996.A map inventory of publicly owned lands can be found on page VI-21 of that document. Comprehensive Plan 2016 Housing Element 5-18 9 � I i/l„/%r�i' �. ,�r � o,..� i �r�✓ %//��,U�J��rl/ r � ,�..� ,Jai�r�r10r��//I r /�iiii%r/i%llk����l �I� rc 1 / ., 1 /%%i .. II (J /i�///„ oo ;ii 1rr'JJJJI,J JJJJ/rl'((��IIWM7�'d AIMaa//,�„i„ ,,, i,o„ w,Gr^'. NTRODUCTIONL Comment[DPop O,HK3,R2-Proposed The Transportation Element provides o,uidance for the development of the Cite--'s transportation s,-stem to newintro—shortened serve and accommodate the land use plan. This guidance builds unpothe Cites recoil nusing wor ition as an attractive usiding from the current ntro residential community,employment hub,and visitor destination. Or keep the existing intro which is more There is a wide range of transportation needs. iNlati existing streets were built in previous decades,often detailed. with an inadequate base, and requ re maintenance and uorade Current revenue sources are made uaa to to Comment [KC2]: keep no with the needs for maintenance and new facilities. Concerns about transportation have also expanded kItematively,use the to include neighborhood impacts and accommodation for all users. There is also a strong impetus to reduce existing introduction which is slightly longer the environmental impacts of transportation,to create"complete'streets,to reduce reliance on the single but covers the general occupant vehicle and to address resiliency and sustainability of the transportation si stem. transportation needs of the City and helps to The overall vision for Port Townsend's Transportation Element is to provide a safe,integrated,and efficient maintain continuity with multi-modal transportation, stem that is consistent with the Citi's overall vision and that adequately servesn the existing Pla..,,. anticipated growth The Transportation Element sets a framework for understanding"prioritizing,measurinc and creatinga� transportation network to help Port Townsend achieve its vision. The transportation policies and guidance in this element are the foundation for development standards and regulations that im lep ment the Comprehensive Plan;including Port Townsend iNlunicipal Code Eriaineeritia Design Standards • Transportation Functional Plan • Non-motorized Transportation Plan • Six Y-eear Transportation Improvement Program Regional Transportation Collaboration and Planning The goals, olicies and implementation steps outlined in this element will result in a comprehensive transportation s,-stem that will adequately serve antici ail ted Growth;will provide for future mobility for all user groups and modes of travel in and throuch Port Townsend;and will be adaptable to a chano�irig environment ' , ; A ss ; g - �. b Comment[DP3]: covered in opportunities r b challenges or existing conditions rather than b intro higher- b Comment[DP4]: Move this idea to Opportunities and Challenges ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-1 I n n i nq Context Comment[DPS]: HK3, -Suggest this This Transportation Element takes its guidance from state,regional,and local fans,policies and guidelines, new section to replace GMA Requirements including: heading below. This is a broader reference to • The Growth Management Act which directs cities to establish a direct link between transportation contributing policies. and land use planning • The Washinpton Transportation Plan,which establishes and recommends statewide transportation policies and strateoQies • The Peninsula l2 eoional Planning Transportation Oroanization PI2 PT0)l2 egional Transportation Plan which adopts °oats and policies for the four county members (Kitsap,Mason,Clallam, efferson ®County-wide Planning Polic,v for fefferson County which-requires counts-wide coordination on transportation issues,for example,transit and airport facilities.The policy also provides guidance for preparing this Transportation Element.including level of service standards. concurrency,and transportation demand management(TD1yI strategies DI'l- fin The Growth iNilanacrement Act-contains the following specific requirements and overall goals to °guide in establishing the link between land use and transportation: GTAGaa12—P anspa rations Encourage e kyeptmultri�x®dal�a�s�oftadgn systems that are based on r oie� onal priorities and coordinated with county and ciry comprehensive plans. GTA(goal 12—Euhbc fabbtfes and se ces, Ensure Haat those pRhAc hcllitles and sea ces =cessa� to support development shall be adequate to serve the development at the time the development is available for occupancy and use without decreasing current service levels below locally established minimum standards. The GNLr1 also contains specific requirements on what must be included in the transportation element,with which this element complies. �mr��wath Nnasrtiasrn®rv�®rtit l�r9t G7®see eir®rv�®rtir Comment[DP6]- 1 HK3—Delete this .i - entire section. Replace with above Planning Context ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-2 fellweet'ng: s. P a Ro Wfff .. Pre�g on The G g t � � fftethtlies. s. �. Comment[DP7]: HK 3 Delete this section. Replace with new section "opportunities and 4. Whaf sinnAff ds or-peheies, are needed f8 challenges"below. " Change from questions, _ .1- s _ to descriptive. Delete old,outdated,or implemented issues. 4. t __ghe- ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-3 lffipf =c icrr`r: - Comment[DP8]: Completed b b - SCHA Comment[DP9]: LLENGES AND. HK3,-This section I I replaces existing section OPPORTUN "major transportation The City of Port Townsend faces-several challenges as it plans for the next 20 years of growth. Developing issues facing port Townsend"in order to the appropriate transportation network to serve the growing needs of residents and visitors-becomes a update and make more balance between durability,affordability,—livability,walkability and safety while preserving the city's small current. town character. The transportation system must also be resilient and-respond to climate changes and This whole section -;potential rising sea levels, to-evolving technology,and to changing demographics and lifestylesneeds another round of. Funding for edits. street maintenance to address the preservation and upgrade of the existing streets is also a critical need for the Comment[DP10]: Clty -2—res her wording added Street Network The City seeks to ensure that all new transportation infrastructure provides for the mobility of all users with streets that are safe,narrow enough to protect our small town character and appropriate for the adjacent land uses,and within available funding constraints. For local access residential streets Tthe city has adopted"narrow"street standards that reflect the comprehensive plan goals and policies-for new neighborhood sheets. The development,update, and implementation of the street-design standards provides the opportunity to develop safe,walkable streets that create and preserve neighborhood character,accommodate different modes of transportation-, while providing adequate parking and encouraging transit use. Pedestrian and Bicycle Infrastructure Over the last twenty years the City of Port Townsend has added many miles of sidewalks and bike lanes to existing streets. The city's design standards require new development to install sidewalks along all their frontage of arterials,collectors and streets in commercial districts. However,many gaps remain on existing ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-4 arterials and collector sheets. These gaps limit the mobility of pedestrian and bicyclist between key destinations-within the City and regionally. Along with filling in the gaps,additional enhanced crossings for pedestrians are needed,particularly along State Route 20,where traffic volumes are heavy and there are limited protected pedestrian crossing locations. The City's extensive trail network7 enhances connectivity throughout the city. The City can continue to promote,expand,and preserve the trail system by preserving un-opened rights-of-war and reviewing development projects to ensure there are pedestrian and bicycle connectivity to and through-a project and by supporting volunteer efforts to expand and enhance the network. Transit Access and Availability There are continued opportunities for the city to work with Jefferson Transit UTA)-to enhance service to key destinations (such as Fort Worden State Park) and establish better-transit and pedestrian and bicycle connectivity. Since JTA is a rural service provider for the entire county they currently have limited bus routes and route frequency within Port Townsend. -This leaves transit--dependent riders with difficulty, accessing their needs,and it forces manor potential transit users to drive instead. The City can look for opportunities to work with Jefferson Transit to encourage enhanced transit service from Jefferson Transit through investment in transit supportive amenities to help residents,employees and visitors access and use transit. Network Connectivity A gridded street pattern provides a logical and desirable street network. New streets are installed in the City of Port Townsend through development of single family homes on existing platted lots and through subdivisions and-,planned unit developments-. Street design-standards are intended to provide streets that are safe,affordable to construct,long lasting and durable,and are accommodating to all users;in other words to assure that"complete streets"fundamentals are implemented. Parking The City,of Port Townsend is a regional as well as a national destination which puts-a strain on the parking throughout the Downtown and surrounding Uptown residential areas. Most of the buildings downtown do not have private parking areas for employees or visitors and there are very,few public parking areas. On-street parking makes up a large percentage of the parking suppler. Downtown parking is at a premium during certain times-e �a c fke---� . To accommodate the increased pressure-for parking Downtown the City must look for ways to-increase access through other means such as the-Haines Place Transit Center Park and Ride, transit service,and alternate modes of transportation. . Maintenance of Existing Roads Facilities built in preceding decades are reaching the end of their design life and require maintenance and upgrade. Mang existing streets were constructed with an inadequate foundation and are failing. Even those new streets that have been recently constructed require regular maintenance to protect the City's investment. As stewards of the transportation infrastructure the City must maintain these valuable assets. There is a large need to identify,a dedicated revenue source to provide for the maintenance and preservation of the-manor miles of roadways in the City,from arterials to local neighborhood streets. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-5 Regional Growth and Connectivity The City is connected to the regional transportation system through State Highway 20,the ferry system,the transit system,private transportation companies and the Olympic Discovery Trail system.- Due to our geographical location,the City relies on the regional transportation network and must work with other agencies in an integrated approach which brings in manor methods of moving people and goods. T)f Y T(V PiRPL 'r@�—I I _1 L7Y64RUL �U hTCT)f U L TT T7 I\7LLTICI z Comment[DP11]: HK—this section has been deleted in its entirety. The write-up under each heading was moved to be an intro in I- l^ a 4 . r'nM-nr';+t/ related policy section below. Edits to the write ups can be seen under each policy ®r nTyTx�nv pq section.. Lo...,,'f•o.-,,,;„^t1 Peyelop =®==ten ,.FFQn �=s Comment[DP12]: HK—an updated pa-4--t— version of this table will be moved to the implementation section ” ^� ® at end of element Formatted: Left ^rrsl�'arms-u4 ^„rrciccrr�cvorrao ' Formatted: Left Formatted: Left Formatted: Left Formatted: Left b=” ( Formatted: Left yk tr�et sic may P � 14aal n fg Formatted: Left xr:ts., and-trric[4a--coc[r *�,•,,Lcricv_vr••t Fircor"Ii:'^-cs4�4.-�rv411"rva"g"i'i 2..acs--ti-affievoliv a:t,d gill rp^ p " F ^ F Formatted: Left �-crooe2¢ta-2�[cor �rrz iri�ri'r'ocruo-tc2cccvazrs 40Y to F 2 44iis roocsn[� ioocrcrroo •SII ;ao„^,a,^F,,,.,^„^^ .,•,.^ Formatted: Left nn"iicc409i 44 cnasra"2¢�cnm i njri'cir'�v"i 4��1^ors ci3r^.ai Comprehensive Plan 2016 Transportation Element 1 6-6 Formatted: Left J Formatted: Left Formatted: Left ? *a4f�nonrg Formatted: Left Formatted: Left A A..4-,,FC.,,.,,.i.,,,..�,./,,,:i,d nil ' Formatted: Left ..00 s3-C� `r2-�a Fror Formatted: Left �olr.�vrni ^oc�r'� "'i s�'fi'"rc t-cc"r nsic"r'rror rccrrnio�4 i Formatted: Left a oxo��p 3r�frae4rirgcu�rrsor� icc-c�i4�• v7-itc"�4Pr. Formatted: Left 2Dr...o eARQ 7 Cr-rr..'s-a.C,..arise" .�ii� .1 Formatted: Left rrsRrauy-oriuu�o� rsrran�rr 1. brrr Develop'�iw —t, Formatted: Left a�^fir" 440"o�o'rr o—Pe'ia 2.Develop �^ nil b f� s forr ^�o t ~� Formatted: Left an 4r<cc-¢av^ ol,vrrrc4hin44ww*atcrr'�earr aFda- c u �n/c:,,,"xxr�^p r�. Rr*�" �•por"';fir•^omr27�u� 1.L•,��i,..��,..,�n��a.,4;��nr Formatted: Left �®roprno=� r rns�rr�nosstorr j N-Am HA`r'orreo tQ1c`5 kH?3� Sh .>€1'g@. r„o Formatted: Left irosor-Pvoz�rrucrr�-rarar ---------------------------------------------------------------------------------------------------------------------------------------------------- f-ir'^rc�c-4�or��1-rr.`^irrQ"*rc<r�” owPc urccnxtcresrc-rvccccocoss Comprehensive Plan 2016 Transportation Element 1 6-7 Formatted: Left J Formatted: Left RANSPORTATION GOALS & POLICIES �g Q, �er Comment[DP13]: HK3 delete Overall Transportation Goal:To develop a safe,integrated,multi-modal public and private transportation system for the efficient movement of people of all abilities and goods,with cost-effective facilities and minimum environmental impact. Land Use & Transportation The GNLA recognizes the close linkage between land use and transportation. Itis important that transportation facilities be designed not only to meet federal,state and local standards,but also to meet community vision and desires. For manv Deople.the duality of life of the Cit is s dependent on how well the transportation system functions far pedestrians,bicyclists,transit riders and motorists. Ta implement Port Townsend's Comprehensive Plan,streets must not only move People and goods,but must be compatible with and suDDort the Cites preferred land use pattern,enhance the duality of fife of residents,and Prem e � suPPort healthvlifesti-tes. Comment[DP14]: 02,HK3-update narratives;address resiliency,complete Goal 1: Promote a balanced,affordable,reliable,convenient and efficient transportation system which streets,active supports--the Land Use Element and Community,Direction Statement of the Port--Townsend Comprehensive Plan. Policy 1.1: Ensure that transportation system improvements are compatible with adjacent land uses. This_i-.ektdes b b Comment[DP15]: HK3—this is addressed Policv 1.2: Encourage��,,:__„a tt res measures that increase housing near commercial centers and H the atter al street promote multiple-modes of travel. map figure 6-1 and the street classification Policy 1.3: Provide a transportation system tief�rk that enhances neighborhood development and system "-I infill. Comment[DP16]: HK3 implemented Policv 1.4: Seek to locate new community,facilities near transit routes and in areas convenient for easy access by pedestrians and bicyclists. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-8 Policy 1.5: Design streets- af qe-1-.`ee serve a varied land use pattern, Comment[DP17]: which includes higher standards for commercial areas and mixed-use centers,and HK3-LOS stds have reduced standards for 4iftgf-�- �local access streets. been adopted and ace covered in LOS Policy 1.6: Design roads and other transportation facilities to preserve i isting extrees aswPolicies ° cres feasible and to contribute to an attractive visual image that retains our small town Comment[DP18" atmosphere. HK3 update to align with current standards Policy 1.7: W Promote the use of and pracuce alternative modes of transportation;in order to reduced growth--of automobile traffic, Comment[DP19]: 02 — Suggest 2 separate policies and � n t ___ address PT 20/20 I olic5 1.8 Site and design transportation facilities to minimize environmental impacts comments wand cansiderprojected climate change impacts. Comment[DP20]: 02—resiliency and Policy 1.9-9: _' ' illainta n a street-use ermit system for the private use of public street rights-of- climate change war that includes appropriate criteria for uses,termination provisions,and annual fees. Comment[DP 1]: : mh Policy 1.101: � Encourage uses �i r­•ghi a w, a „ t4 ,�an "tele-practices that promote tele- HK3 accoplised commuting" and non-motorized modes of transportation. Comment[DP22]: 02,Hk3-update to be Policy 1.11�!�= Encourage land use and transportation practices that reduce fossil fuel consumption broader to address and 2reenhouse gas emissionsresiliency,vehicle trip reduction goals Comment[DP23]: 02—resiliency,20/20 Interjurisdictional Coordination comments and issues Goal 2:_4" Coordinate the planning,construction,and operation of transportation facilities with the programs of Jefferson County,Washington State Department of Transportation(WSDOT)Highways and Ferries Divisions,the Peninsula Regional Transportation Planning Organization(PRTPO),the Port of Port Townsend,Jefferson Transit,and utility providers,as wellas other aorencies and jurisdictions.{Or-d-Ne /-'7F Policy 2.1: Continue to participate in the PRTPO for funding of regional transportation improvements and forir7 the planning and implementation of the Peninsula Regional Transportation Plan. Policy 2.2: Coordinate with affected agencies to design regional transportation systems to support urban growth within designated urban growth areas (UGAs). • b b b Comment[DP24]: HK 3 delete; Policy 2.3: Establish and maintain a joint City-County program for reviewing and resolving inter- duplication jurisdictional transportation concerns in,or affecting.Port Townsend's UGA.Include representation from ssthe appropriate agencies. Policy 2.4: Review and comment on all major land developments in Jefferson County which may affect the regional transportation system serving the City. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-9 Policy 2.5: Coordinate transportation planning and improvements with the transportation and land use plans of Jefferson County-,and cooperate with the County-and Port of Port Townsend to identify opportunities to maximize benefits with limited financial resources. Policy 2.6: Support the development of regional bicycle transportation corridors that link regional commercial recreationaland employment areas.� �Comment[DP25]: Weyele b 02 resiliency; Comment[DP26]: HK3,HK34—delete Arterial and Collector Street System commentary-covered by design manuals and adopted regional plans Inventory The street system in Port Townsend is classified according to the roadway's purpose,design characteristics and function. The functional classification guides the proramming of roadway improvements. Within the Cite of Port Townsend,the roadway classifications include principal and minor arterials,collectors and local streets and are further defined in the Transportation Functional Plan. Generally,local access streets include all public streets not classified as arterials or collectors. Fa--ure 6-1 shows the Cit,'s roadway functional classifications—Table 6-1 provides an inventor-of the-roadways within the City of Port Townsend by classification and surfac� Table 6-1 I2oadwai Inventor Principal Arterial 3.21 s s s 3.21 3.46% Minor Arterial 3.14 7.01 _ _ 10.14 10.92% Collector 2.53 12.70 - 0.19 15.42 16.60% Local Access 18.35 36.54 0.07 9.14 64.12 69.02% Total Miles 27.23 56.25 0.07 9.34 92.89 100.0% The principal arterial within the Cit, Limits is State Route 20 (SI220)which extends from the Ferre Terminal and continues 2.7 miles west to the Citv Limits. State route R-20 provides a regional connection from the Olympic Peninsula and the 1-5-Corridor via the Port Townsend-Coupeville ferry. 41t iso designated by the State as a Highway of Statewide Significance. Highways of Statewide Significance are facilities that have been soecialh designated by the State of�N'ash noton to ensure linkao es between major communities with n the State and to assist with prioriri:-42lannin2 and the allocation of funding There are five signalized intersections (fourralono.I 20 and one at the eater Street/Tavlor Street intersection)in the Cite. The Cit-\-is responsible for and maintains the traffic signal at Fater and Tavlor Streets. WSDOT is responsible for maintenance and operations on all other traffic signals on SI2 20. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-10 Goals and Policies The arterial street system is the backbone for the movement of goods and people of all abilities around town. It is often a challenge for any single roadway to meet the expectations of all users and modes of travel at any given time. The followinc,.42olicies and priorities address issues related to the street network as a system,the design of individual roadways,traffic flow and roviding for the various modes of travel and users of the system. In the undeveloped Northwest duadrant of the City,new collectors or arterials maybe needed as identified in the Transportation Functional Plan. Issued aii latittafy 40,4996), 9 , b Table V14 aii b b z Comment[DP27]: rp Move to 2 policies suggestsbelow 1-1 b b b , Comment[DP28]: HK—move to arterial Goal 3: Provide a connected eej arterial and collector street networkwhich is streets and edit planned,designed. constructed and operated far safe travel for all users with efficient Comment[DP29]: mobility and access to and within Port Townsend_ HK outdated Policv 3.1: ��Adopt,update and implement street design standards that are T�s� Comment[DP30]: consistent with the adopted Land Use Map and land use obeco fives 02,HK 3-update to reflect standards that ,and which accommodate the needs of all users and modes of travel. have been adopted and to address complete Pofic)-L2-Ne-,, .- The Transportation Functional r „r a f e-1`a4 St e Plan and its regular street and resiliency updates should be used as a guide for development of the future arterial and collector street issues. system:_ Comment[DP31]: 02,HK3—revise to t reflect that standards have been adopted t - Comment[DP32]: 02-addresses complete streets PoIiCV 3.3:2 Undertake; Comment[DP33]: public involvement process and d study that reviews a range of collector/arterial HK3-update to reflect options and recommends future road alignments for the area lying north of Hastings Avenue adopted pians. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-11 and west of San Juan Avenue that, takes into consideration: I&._IPerojected future traffic generation at the end of the 20 year planning horizon as Comment[DP34]: HK3—revise to reflect t rr ___: well as at build-out adopted plans a. Land use and zoning designations as modified by this Comprehensive Plan Comment[DP35]: 4— HK3 Revise to reflect b®The presence of Environmentally Sensitive Areas,including steep slopes,wetlands, the city adopted a and drainage corridors Transportation e Functional Plan(TFP) ' b � b � Comment[DP36]: HK3 Numbering to be —Possible changes in travel behavior,including the use of alternative modes updated +r Comment[DP37]: ft r iv iv HK3 move to LOS ® Comment[DP38]: HK3–LOS standards 333 .14-4: Pending the completion of the process and study outlined in policy 3.34-.-2 and a concurrency above,use Figure 6-+1-�V� � �ns a guide to preserve options for ordinance have been accomplished and possible future road alignments by. adopted. For clarity and to reduce duplication a. Requiring rights-of-way of adequate width as a condition of development approval and potential conflicts, in currently unplatted areas; all LOS and b. Requiring appropriate setbacks along possible future road alignments as a condition concurrency related policies in this section of development approval;and are moved to the end of Limiting driveways and other access points onto possible future road alignments as LOS policy section below and edited there. a condition of development approval_ Comment[DP39]: Note 2020 asks to ct r delete this policy r arguing it may lead to ,e;®Thigher speeds on roadways and opposes small town character r goals. Policy 3.3: Utilities should be placed underground as arterial street improvements are made. Comment[DP40]: HK3,02—revise to Policy 3.4: Provide adequate setbacks for residential uses along arterials to protect adjoining properties allow for more flexible for design options' from noise,dust,and traffic safety impacts.i consistent with existing stds;and flexibility Policy 3.5: (Adopt and update street design standards for arterials and collectors-P L"rovide far safe depending xi adjacent and attractive conditions for bicyclists and pedestrians. land use. Comment[DP41]: � HK—move to rfit r LOS�concmrency b b section 8. Policy 3.6-7: b „ „ Comment[DP42]: HK3–the adopted Manage access onto engineering design arterials and minimize driveways and drivew"width. standards cover the details ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-12 Policy 3.7-9: Design standards for arterial and collector streets should+tt fit the character of the areas and land uses through which they passincludi ,scenic arterial street standards for certain areas of town,_ g., Comment[DP43]: HK3—revise to reflect Policv 3.8-9: Follow the recommendations described in the Port Townsend Gateway Development Plan adopted standards and to fund and construct S124�6 20 improvements. bb ble the Land use and transportation section 1 policies t• Comment[DP44" � i HK3—accomplished. move to end of t r mancingpolicies 9 Comment[DP45]: HK3 update narratives.. This section is from policy direction' - Change to a policy pre :°a e�-Pohcy 3.9-: Ensure new development and redevelopment within the Gatewav Subarea is the following.... consistent with the Gatewav Plan. Comment[DP46]: HK3—accomplished. Policy 3.10: (Develop criteria far public street lighting that prioritizes arterial and collector intersections These are in the TIP. transit sta s and pedestrian crosswalks. Sheet li hts and on-street li hfin should balance Comment[DP47]: aesthetic and safety concerns with economic considerations including operations and 02-this is suggestion maintenance costs. from 20/20. Could then delete 3.12 Policy 3.11: 12 ec a re F_�t on-site lighting to a�a r,. ske 46-h6tig hetik be hooded and shielded so that it is directed to the project site and so that a.feet,:6-1, d,es ffi­paad Jai-,,..t,f ap `,-�s to minimize o�lare Comment[DP48]: onto public streets.- HK3 revise to clarify the purpose of the Policy 3.12: Provide street lights commensurate with the neighborhood and ultimate level of density and Policy based on local,state,federal and utility design guidelines. ed e Comment[DP49]: HK3—duplicates 3.10?? delete? EHis6tit atid r tfsest r Comment[DP50]: HK3,HK 34—delete this level of detail from gtieattr-ar ll r policy.Refer to " b guideline documents Policy 3.134: Street design standards should include Rfi�, the establishment of planting strips with Comment[DP51]: adequate width for appropriate vegetation,including street trees ffiOre ift HK3—says same as3.15 and adopted city as an integral part of street construction or reconstruction. standards. Comment[DP52]: HK3 accomplished. Comprehensive Plan 2016 Transportation Element 1 6-13 Policv 3.14 : Strive to retain and manage appropriate trees and vegetation within city richt of wav and where possible replace street trees lost to disease-, damage or development• b b b b Comment[DP53]: HK3—task accomplished—PTMC 12.04.Proposed policy rewrite better reflects adopted practice. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-14 i ur ®1FUNCTIONAL CLASSIFICATION OF EXISTI STREETS v PORT TOWNSEND r , 12th tMOO 4,1040,444hw ,,s. is i MMMMw Principal Arterial Minior Arterial Collector Local Access ROW(Preservation Corridor Parks. Public Schools ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-15 Comment[DP54]: Include info on figure 6-1,street functional �ocal or Residential Street System!, in TFPton as shown The characteristics of the local access streets and how the) function for motoristsedestrians and bicyclists Comment[DP55]: can impact the duality of life of the residents and the vitality of a neighborhood. HK3-update narratives-the Illy b introductory material was moved from b a a a, "policy direction"and . On local�•~� � --access streets fte��;r�t.,."t . a �pavement edited. widths should be as narrow as passible while still assuring safe maneuverability far cars,bikes.pedestrians utility.vehicles (e g. garbage trucks) and emerovncv vehicles. _' �Llocal access street is-.standards that allow narrower streets will help achieve other City goals,including: 1. Maintaining neighborhood scale and character: 2. Lowering construction and maintenance costs:N• 0---�- —00 U---,a iv 1-6-11 b b 3. Saving vegetation and trees: ftb b 4. Reducing stormwater runoff: b., 5. Encouraging traffic safety g b -116 6. Encouraging better land use: 7. Keeping higher density areas livable: b b cz 6- b Comment[DP56]: Moved from policy 10rMUM Cir direction Comment[DP57]: HK3 accomplished. eft Delete this paragraph effierr ry from policy direction. Local Street standards r 6" b have now been adopted that consider these factors b b IVIIVVIII b b --------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-16 b b Comment[DP58]: HK3-update Goal 4:4� Develop a b ocai street s�stem which accommodates molt 1e modes of narratives. From Policy transportation with design standards that may vary depending upon individual neighborhood Direction-delete for characteristics. this revision; implemented (Policy 4.1: E4,fff rnm-Develo and maintain street- design and construction standards for Comment[DP59]: local access streets for new developmerit-Gi that reflect a reasonable balance 02-20/20 suggestion; between initial expense and long-term operations and maintenance costs,that provide for better reflects complete street concepts accessibility for all users and that sa fehv accommodate:- Comment[DP60]: 02,HK3-Combine policy 4.1 with 4.2 and a. Vie- tormwater management and other utilities; revise to incorporate b®Neighborhood motor vehicle traffic complete street concepts and city design E-c_ -parking; stds gid. Emergency and service vehicles; 47e. Pedestrians; e.f£Bicycles; Mail boxes; g: Garbage and recycling services; h7i. Public transportation access i- Street Lights;and j-k_Street trees. Policy 4.2-3: Develop and maintain desicn standards that Eencourage "narrow streets"to help Comment[DP61]: retain the City's small town atmosphere,to enhance safety--and to minimize the amount of HK3-reword; „_e7 „t eliminate Los reference paved area to reduce construction costs,storm water runoff and heat buildup.�7 _� I'll Local street standards should reflect a balance between safety,efficiency,ftftd-4te maintenance and-€preservino� small town character. Comment[DP62]: HK3,HK34 —an unnecessary policy; Policy 4.3 L7evelap standards and sheet laylocalaccess anresent out dance to Eencourage d residential MUTCD is for signage traffic only on local streets to minimize traffic noise,congestion,and hazards to pedestrians. and striping. all streets (Discourage through access for motorized traffic by traffic calming Viand/or must meet this standard. by",re_--�g-not recluirin certain sections of streets to be opened to motor Comment[DP63]: Vehicles. HK3-A separate policy section was added Policy 4.46: Designate certain viewpoint street ends and,where appropriate,provide signs,benches and below for neighborhood traffic calming safety barriers to encourage public use and to prevent encroachment from neighboring residents. Comment[DP64]: Some 20/20 comments Policy 4.5-7: Allow and designate certain streets for closures(or do not allow some steeets to be opened) incorporated in certain areas so the street grid is broken in an effort to promote more pedestrian friendly Comment[DP65]: b HK3-eliminate this neighborhoods. the hr„„„-,,,-„ „�] TD7,,.-. detail;constrains options ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-17 Policy 4.6,S: (Facilitate active transportation connections by eL-ncoura ig ng_,ethe street system in €e new subdivisions and PUDs to-be desioned and built�on a rectanWI LLgrid or a modified grid pattern.If cul-de-sacs or dead end streets are used,require`' a+ � multi-use paths to connect the dead ends e�+ee+to on-site and off-site pedestrian and bicycle facilities and provide for a sufficient number of thoroughfares (connections to arterials,collectors or feeders)for public transit and emergency access.i Comment[DP66]: HK3,)2—updates to nlrwr�,� ^rim®dras Pedestrian & Bicycle Transportation follow EDS and ger 1A/,n11Ar%rs -tr%A Mr,%irlinra implemented standards; also our existing policy meets a goal of active transportation -per Inyentcry Tacoma Comment[DP67]: Titled"Walking and Approximately 21..p erc eritof Port Town send's streets have sidewalks on at least onBicycling"ore side of the street. There "Pedestrian and bicycle are 31 total miles of sidewalks. Sidewalks are ogenerally available alono,arterials..streets within the historic transportation"in other business district,and in newer subdivisions. Despite the fairly good sidewalk coverage in some areas of the plans; City,many arterials and collectors remain without adeduate sidewalks and,many older residential areas have incomplete sidewalk networks. Bicycle Facilities In contrast to a historical and relatively extensive sidewalk network the Cite--'s bicycle facilities are relatively new. Along with the recent growth of the network,the Cite has received desionatio� n as a Tiicvcle-Friendly Citv at the Bronze level. There are aoproximateh-8 miles of streets with striped,desionated bicycle lanes in Port Townsend. To support biking,there are approximately-ftr 50 public bicycle racks,—predominately located in the downtown historic district.–Fa--ure 6.3 shows the streets which have bicycle lanes and also shows multi-use oaths within the Ciry of Port Townsend. Trails In addition to sidewalks and bicycle lanesthere is an extensive trail network that provides important connections throuohou� t the Cita. There are approximately 34 miles of trails in Port Townsend. 1.4 miles of these trails are multi-use paths which are at least eight feet wide and have an ADA accessible surface. Fa--ure 6.2 includes the trail network. The Larry Scott Memorial Trail is a major regional trail of which 0 6 miles is located within the City. The trail begins at the Port of Port Townsend boat yard and continues 7.3 miles to the south,terminating at illilo Curry Road in the Countv. The Lara-v-Scott Memorial Trail is the eastern most section of the Olvm sic Discovery Trail,which,upon completion,will constitute 130 miles of multi-use trail from Port Townsend to the Pacific Ocean. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-18 Goals and Policies M-dir-ii rlir®rgti n ran til nrn t rim r9 C®®tet®rn ISI®�r9� ( r9 ctr��nr Rir+e®rql c �. i Comment[DP68]: HK3.02—update narratives. This intro was moved from policy Creating a pedestrian-and bicycle friendly city requires a connected network of sidewalks,walkable direction and edited; and language added streets,multi use oathways and bike routes sported by the Cites broad network of trails and public parks• regarding transportation ll �. t choices desired.de-,�elepffienf and ing!is The goals and policies of this Plan make it clear that building a nonmotorized system is a high priority. The City has adopted a Non-Motorized Transportation Plan'�'�'� --' which-seeks to create an integrated network of pedestrian and bicycle r i improvements that provide incentives to walk or bike across town. The Plan, identifies areas where sidewalks and bikeways need to be completed. The Plan also Identifies where. rights-of-war not open to vehicular travel and the trail system s hotild be ideft flea rovide integral components of the "'a~walking and bik tier network. - Ultimately, krreep ,�this network�'�links up with other modes of transportation including transit and ferry service. IiXialking and bic cog Drovide many individual and community benefits from health and safety and mobility to quality of life. People wha cannot or prefer not to drive need safe and efficient transportation choices. It is the intent of the followingpoficies to promote an integrated, safety-oriented pedestrian and bic,c� les system that increases mobility choices.orovides convenient access to schools,businesses,recreation areas and transit and encourages regular Dhvsical activit to enhance health and wellness. Comment[DP69]: 02 and HK#- b improves consistency Wke laries arid pedestr4lri walkways ali a4l arfefi als arid ffiktj ar ealleetaf s.These will he btti4t as riew f eads ff e with rcw 36.70A.070 b fVpIn b areas-�ft b Comment[DP70]: HK3 from policy direction- move to mplrmentation ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-19 Comment[DP71]: HK—covered by other (Goal 5: eCreate a safe and convenient environment for walking and bicycling through the construction goats and policies and maintenance of a connected network of pedestrian and bicycle facilities which are integrated with streets and other transportation facilities.1 Comment[DP72]: Folia5.1: use Transp -Non- rVotorszed02—adding maintenance and Plan and its reo lar updates to--guide the development and installation of pedestrian and connected to address safety;reduce reliance bicyclist improvements and networks.1, on autos.Also per policy Policv 5.2: Adopt and maintain street standards that-Pprovide for safe and convenient pedestrian and 5.23 below bicycle use on all developed public street rights-of-way.consistent with the street Comment[DP73]: classification ^+^^+--4h adept^a stfeef„+^� HK3 accomplished Comment[DP74]: Policy 5.3: Provide pedestrians and bic,clists with a safe convenient and interconnected-system of HK3 update facilities,incentives,and services;that fuller support trip-making connections between Comment[DP75]- residential areas,employment centers,shopping,recreational facilities,points of interest, 02,HK3—update for schools,public transit and other public services within the City.4'he resiliency,complete Develop this system using streets,adopted plans and standards,and measures that include: accomplishments a. Physically separating pedestrians and bicycles from fttir,4 vehiclee't} traffic,-., b. Encouraging separated internal pedestrian circulation systems in new or redeveloping commercial-retail districts; c. Developing policies that address conditions warranting illumination of pedestrian d. Providing�oedestrian facilities that meet ADA reduirements;�' '���� + e. Giving special consideration to pedestrian and bicyclist opportunities in school, park,sports and commercial areas;and f. Expanding and improving the Be��City-wide sidewalk/pathway s-sem tem including on and off-road trails to establish safe integration of bicycle and pedestrian circulation. Policv5.4: (Require s-Safe,convenient walkways and bikeways � in proximity to �Comment[DP76]: HK3 all arterials and collectors f• teincl -r streets near multi-family and commercial development.; Comment[ add 02,HK3,36 add (Policy 5.5: 1 12 ecluire wWalkways,-ftril bikeways and trails sn�d be fec ed-wclause which aligns here appropriate in with state subdivision planned unit development(PUD),subdivision and plat approvals,including safe routes for act children who walk to school.- Comment[DP78]: rn r + : „ +r +. + t,_ 02—change to stronger Policy 5.6: _ N ('provide b safe,convenient walkways statement for resiliency, and crosswalks on streets leading to or near transit stops. carbon reduction Comment 779"HK3;HK 34—covered by current WSDOT design standards. --------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-20 Policy 5.7-9: Encourage employers to rovide�3r3 r7 e€bicycle facilities at employment sites. ��beeess Comment[DP80]: HK3,bicycle access to b fgf transit sites and on transit is covered by policies.5.6 and 6.12) b Vfii Comment[DP81]: HK3—move to Policjv 5.84-4�: - funding/implementatio Ensure that the implementation and maintenance of nonmotorized improvements are n policy section 10 coordinated and consistent in design and construction. b z Comment[DP82]: HK3 This should be related to implementation of the NM Plan,and projects Policy 5.+94: iAilaintain Pfeaa—'safes route to school'—'map to assure that safety and accident identified in the NM Plan and covered under prevention for pedestrian and bicycle travel to school receives the highest consideration.44-,f-- policy 5.1 ��ork with theme School District and private institutions oto-jointly prepare the maps and to implement-efk+eg �� � the design and construction of Comment[DP83]: HK3—move to pedestrian and bicycle facilities in and adjacent to school zones. implementation, shatild funding section 10 Comment[DP84]: b 02,HK3,HK34 WSDOT and other documents dictate what b b r is included in a SRTS g g program—and they can d. Use Tpfap-1-4tte b , change over the years r eed sight b r b' Comment[DP85]: There are state and fed Policy 5.104: Develop educational programs that promote awareness of the"safes route to school."The guidance documents on Police Department and School District should provide"hands-on"training for the safe use what needs to be n a of bikeways and pathways as well as vehicular,bicycle and pedestrian traffic controls such asSR S program stop signs,signals,and crossing guards. b Comment[DP86]: HK3—accomplished- `c. Sfffe.+r-etife ,-L,eall- the Plan is adopted. b.Difeeft-ate Policy 5.1 and other policies cover it now El�`�rb zt�lftl��i 4�t1'r, ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-21 ter.. cn��,.7._ • i. Bffr-fier-s and gf g' ce e. Gesif If-main,; r ehiele (Policy 5.116: Desigonateiti-the classification of bicycle paths,lanes and routes-based on latest des Comment[DP87]: standard manuals (e.o.,WSDOT,AASHTO,NAC'l HK3,HK34- 2ccomplished;details on t type of bikeways ace in NMP. (sim lac to Redmond policy) I b > > b b b b b b b b b b ' b r b' { b Comment[DP88]: HK3. Implemented. - Polic�r 5.12 : -Review all development proposals and street development permit applications for Detailed classification conformance with the Non=-ili-Motorized Transportation plans. system is in NM Pian Preserve 43designated e r sxce sr .connections in the Plan e P eseffe- or and in other guida"ce documents. rovide acceptable alternate locations that maintain connectivity. Ensure that Lew developments s4�provide connections to the apeii spaee atid+r-a4pedestrian and bicycle�system.i Comment[DP89]: HK3-NMP is now Policy 5.13,S: �F-stablish pedestrian and bicycle links between public facilities, adopted. ftnd-commercial and employment centers,neighborhoods,and higher density residential areas. Comment[DP90]: 02 20/20 ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-22 Policy 5.4-414: Designate certain right-of-way corridors for�Ionmotorize -use only.Streets so designated Comment[DP91]: should not be -opened to vehicular traffic and I-'' should be preserved as open substitute pedestrian space,utility easements and ftr part of the-walking and bikino- and bicycle network. Comment[DP92]: 02 while 20/20 Policy 5.15a—(4: Establish deu.,i standards for pedestrian walkway widths,types and materials to recommended instead accommodate varying levels of pedestrian traffic and to ensure that streets are"pedestrian of"active" friendly" transportation,staff depending upon the district in which the use occurs. suggests walking and Policy 5.16 : Coordinate with Jefferson Transit to ensure that park-and-ride facilities are functioning as biking. Also,clarify policy to adopted plans multi-modal stations linked directly to the waIkitio and b1kitio-roi�n �ors���network. and practice Policy 5.17Ensure that C--commercial or mixed use projects provide internal pathway linkages to pedestrian and bicycle networks eflief pfffltys, and to adjacent uses. T'olicy 5 18 b b z - Maintain Comment[DP93]: 02,HK3—propose tlterte 5 2� Nrffifi+ffindesionated bicycle lanes to the same level as the motor vehicle-lanes. } rewording per below and to include b sidewalks;delete references to standards Comment[DP94]: ' Y HK3-Covered by 1. Gass 1 6—Rike Paths); policy 5.16 above pl. Class TT '__O nk_e rhati,�es'; 4l°. rays 444 i_nz. n ..+ r> .m„„+ .a ,„.arm,, a --- = — . d Ti. -Steley 4ki� Comment[DP95]: HK delete; too detailed for comp plan ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-23 Figure6-2 WALKWAY SYSTEM INVENTORY a VII e u 49th 5`$. .�p pp gyp, 111 CP � f¢ u riru a,ur.ung., r,. �� P „ rar. wx oY. ...rm ✓mt ruu PORT 'TOWN5ENC7 � ti` rN ai fn B p � m 01)MZV 41 o� �. � N� �, � ��^��r rr � rte• �, W lk#10 I �i Multi-Use paths Sidewalks r ` Trails ._ . 7- Stairs Enhanced crorssings Parks Public.Schools ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-24 iur ®3 BIKEWAY SYSTEM INVENTORY i PORT TOWNSEND w 1 A' qjo, It ' Ge gam L,M 1 nth t mw'M '" *" wcwMaw �......... iumwo ,�' r- Class I -Bike Path r Glass 11-Bike Lane i ^jmR40 Glass 11-Climbing Lane /V- Glass Ill-Bike route Parks Public Schools ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-25 Traffic Calmind Comment[DP96]: HK3-This section was Previously part of Policy Direction but not all of 1111111-6 11 the direction made it ffiefefisfs. Sffeefs ffke into policies. In addition,traffic calming was adopted in the Engineering design standards following the 1996 Comp Plan so the detail can be eliminated here. Propose updating the narrative per HK3— g` , ld id and as part of that making this a new �,st t -. policy section. w: a Redmond has a separate policy section for traffic calming. .• Rffi.se dcfes-scizlk�s y y .• Ptill,se r-ncr"3d dia—gonal dtt�cftefs N •• PLCttPGG' _tom• RCT 11 11 G "u a h.dest.iff ,.:ae_r.,fn,"bti ` Comment[DP971, u ccresQ rr7icrccszcrn--�crr�.r� HK3 —Rework th s discussion into policies Traffic)conditions on neiLyhborhood streets can affect the livability and cluality of life in the neighborhood. Comment[DP98]: Streets not only serve the needs of motorists,but also provide for social interaction,walkinLy,and bicvclinLy. o;HK3—proposed The application of specific traffic calming strategies to individual streets can increase the safety and new intro to Traffic Calming policies. attractiveness of the street:however.implementation measures must be carefully considered to ensure that Numbering will be the desired effect is achieved. adjusted in the next draft. Goal 6:® Provide safe streets far neinhborhoods. Policv 6.1: Pursue strategies to discourage nonlocal though traffic in residential neighborhoods Policv 6.2: Develop a pros am for neiLyhborhood traffic calming and traffic control based on the fundamentals of education,enforcement and engineerinLy. Aptly a hierarchy of responses based on the severity of the trafficproblem.- Policy 6.3: Maintain standards for traffic calming strategies and evaluate their effectiveness. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-26 PoEcv 6.4: New developments should be designed to allow local traffic movement while discouraging nonlocal thrautrh-traffic. Comment[DP99]- 02,neighborhood Transit Services) Comment[DP100]: HK3—Propose separating transit and ferry policies into two Jefferson Trans tAuthar ty sections Public bus service is provided within the Ceity biJefferson Transit Authority,a public transportation t&ea,gericv.estabtished in 1980. Jefferson Transit's service area covers 259 square miles and provides a variety of public transportation services that include fixed-route,route deviated,vanpool and ride-matching,with both regional and intercit9 bus connections. In 2014,eight fixed-routes including;deviated fixed-routes operated iNlonda v t�gh F'rida fr�rproximately 6:00 a.m. to 8:0Q.-P.m.lall routes operated on Saturday ona slightly reduced schedule. ADA paratransit service Dial-A-Ride)is provided in full compliance with federal ADA paratransit regulations. Jefferson Transit connects passengers to major hubs including ltsap Transit in Poulsbo,Clallam Transit in iVlason Transit in Seauim and Brinnon. Fie-ure 6-5 shows the current transit routes and bus stops within the City of Port Townsend. The goals and policies of this element strive to promote the use of public transit.Since the City is not a provider of transit,it must work closely with Jefferson Transit to help match Emited transit services to the needs of the community. tieft b. b Comment[DP101]: rre Covered under LOS � and TDM sections b h 6 l a ffi ii , b dsektpeg­ffhose areas of town Comment[DP102]: which grow at a relatively low density,single-family residential development pattern,mw4&not justify HK3-update narratives. significant increases in transit service.However,new commercial and multi-family residential development, covered by the policies below and especially public facilities,assisted living facilities,boarding houses,and group homes, ,:b�' elate t-ktiis4 freed, a- warrant increased services and f..a...c...I...i..t.i..e...s.... 1Comment[DP103]: 4e c elt� HK3—These two paragraphs are from Policy direction. Proposed edits shorten and update as an intro to the goal and policies Goal 7k ,encourage regulations, strategies:and prate ams that promote transit ftft"erry-use and link s-t transit to alternative modes. Comment[DP104]: 02-broaden the goal to Policy 74�.1: Encourage zero foot frontage setbacks for commercial uses on streets with bus facilities to address active encourage transit use.Locate parking in the rear or to the sides of buildings. transportation and 2020 comments Policy Zi4.2: Require street level pedestrian uses in buildings in commercial,office,or mixed-use centers with bus routes and nearby bus facilities to stimulate activity and interest. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-27 Policv 7.3: �ork with Jefferson Transit and other agencies to plan and promote frequent and coordinated transit service and facilities in areas of highest demand (e.n. commercial recieatianal,manufacturing areas and high density residential areas). Comment[DP105]: HK3,02—proposed newpolicy. Addresses resiliency,active Policy 7 .43: b Consider refiring transportation,etc. transit serviceable site plans with,pedestrian connections Co�d6 DP106] for new subdivisions,planned unit developments (PUDs),afid eaffi er-_-'r „..a multi-family 6.3 nd 6.10 are housing—and commercial developments all similar Policies Comment[DP107]: r 02broadento address Policy 6 47_5: Use the-Transportation Functional Plan ti and the Jefferson Transit resiliency,20/20. Comprehensive Plan as the basis for establishing future transit routes. Comment IDP108]: HK3 duplicates policy Policv 74.6: Encourage public transit as a preferred mode of visitor travel to and from Downtown and 63 H other major visitor destinations within the City and region,through the use of the Park-and- Ride transit facility. Policy 7,(�.7: Promote the use of the Park-and-Ride facility to serve employees in the Commercial Historic District,Boat Haven District,and other designated activity and employment centers in the City and County in order to intercept trips by single-occupant vehicles,thereby reducing traffic and parking congestion. Policy 67.8: Coordinate transit and ferry schedules to xse encourage the use of the Haines Street Park-and-Ride facility for ferry walk-on passengers and other long-term users._Supt�art regular transit service to Washington State Ferry terminals at Bainbridge and Kingston to facilitate access to Puget Sound urban centers and airports. Comment[DP109]: 02—proposed from 20/20 Policy 67.9: As appropriate,provide needed infrastructure to support public and private transit-oriented development. Policy 67.10: In coordination with Jefferson Transit,establish standards within development regulations that identify when transit-supportive improvements (e.g.,pull outs,shelters,and appropriate pedestrian access to transit facilities)will be required for new commercial,residential,and public facility stops along established or planned transit routes.1,a the b z b b b. b b ua4 to b Comment[DP110]: HO—implemented. Development regulations have been adopted. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-28 I b b b b b b •, Comment[DP111]: Delete this policy here, Pohcv 47.11 : Encourage Jefferson Transit t cover in the TDM efft to desi n and rovide facahties that foster bic rcle use, Policies P 5 { g b b b b Comment[DP112]: HK3-detailed measures have been implemented. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-29 q ® PUBLIC TRANSPORTATION - r 000 49th St. P, � 0 �t PORT TOYWNilSt N JJ_ 1 1! J,... �iaSClft s Ave — 'J � F Sr va Y T, 1 � VQ SIN 1 7thASt � s 9th't J 2- T T E 0 Transit Stops Transit Routes Parks Public Schools ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-30 Ferries n V�ntC11 y: Comment[DP113]: Move these items to Washington State Ferries policies?? Ferre service is provided by the Washington State Ferre System via the Port Townsend-Coupeville ferry. The route is 4.3 nautical miles across Admiralty Inlet. The ferry service can accommodate autos trucks motorcycles,pedestrians and bicyclists. Current Sservice is provided by two 64--car Kwa-di Tabil class ferries. Crossingtime.is annroximatel,-30 minutes. Schedules vary according to the season,with fewer crossings during the winter months. Service begins at 6:30 a.m.in Port Townsend with the last ferry leaving Keystone at 9:10 p.m. Daily ridership averages about 1,164 passengers and 992 vehicles/drivers for a total of approximately 2,157. (Ridership in the draft 1996 Comprehensive Plan was listed as approximately 2,220.) 'Fable 6-2 WS F.Ridership Statistics b Quarter Taman-1 thru March 31 65-282 65,361 130 643 April 1 thru une 30 942-53 112 586 206 839 Jul-\-1 thru September 30 128.502 170.582 299 084 October 1 thru December 31 73,955 76,539 150.494 Total 3622-0 425188 787 391 Goals and Policies The City should coordinate with the Washington-State Department of Transportation(WSDOT) Ferry Division_ regarding ferry vehicle queuing and vehicle holding and the impacts to SR20 and City Streets. -The WSDOT Ferry division has implemented.a reservation system which has significantly reduced the impacts from fert)�queuing and vehicle holding. b eeeffiffietida"68fis -, L-1z Efforts to improve ferry and bus schedules are ongoing and should be supported by the City to increase mobility and to decrease the number of single occupancy vehicles arriving at the ferry dock ' T+ransit service and connections between Port Townsend and the Kingston ferry terminal also playa rale in reducing vehicle trips.- The City has been advocating for and coordinating e-with the Port of Port Townsend to develop a moorage float and dock facility for'passenger ferries and other seasonal cruise boats at the Quincy Street dock facility. Comment[DP114]: HK3—not sure we can The City participates as a partner with local oups to 4g-e-�advocate for-the establishment of Port do this. Townsend to Seattle passenger ferry service to support tourism and economic development as well as ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-31 „ a a e.._..mb,.WSDOT to continue to-study the feasibility of direct vehicle ferry service between Seattle and Port Townsend. [Pfd. Ne 2670 § 1.80 m b -7-_-4494 Comment[DP115]: HK3—This intro was moved from Policy direction and edited as an intro to the policies Goal 8:—Encourage and romote Ferre System programs that improve service to Port Townsend-im rove accessibility and reduce impacts from vehicular traffic Sup ort the expansion ferry from nsend to Policy E6.1-3: othepr Puget Sound urban areas ass well asrth San JuansIslnds Port Vitoria,B.C.,and Seattle and Renumber in fmment ui 1d dr6]f cooperate with state and federal governments and the Province of British Columbia to explore the feasibility of direct ferry service from Port Townsend to these locations. tt Policv 8_2444: Encourage handicapped accessible improvements that meet the requirements of the Americans with Disabilities Act(ADA) on the Washington State Port Towns end- Coupeville Ferry. Policv�.3444'�: Coordinate with the WSDOT Ferries Division and Peninsula Regional Transportation Planning Organization (PRTPO)to set a level of service(LOS) standard for the Port Townsend-Ker r, e-Coupeville ferry.The City should encourage a LOS standard of a one-boat wait on weekdays and a two-boat wait on weekends. Policv 8.444-6: tie-tiWork with the WSDOT Ferries Division to study alternatives relating to parking needs for s er-f fer-ffi ftna ler ,,.r-f. fee--_�ra vehicle queuing operations,dai1G parking for van pool and car pool users,and continued improvements to the reservation system. , ”t b b par-kili b b b b s b b Comment[DP117]: HK3—much has been implemented Parking + ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-32 �lnventary: Off-Street Public Porkinq Facilities In addition to parking designatedwithin the public right of way,the following facilities provide public aLn-�ci" • -jeffeison Transit Park and Ride(Haines Place Transit Center The Jefferson Transit Park and Ride,located on the corner of 12L Street and Landes Street,-is-a-3. sties site which contains 247parking stalls and ten recreational vehicle stalls. • Rack Alley Parking Lot(Original Townsite,Block 40,Lots 6 8) The Back Alleyparking lot is owned by the Cite of Port Townsend and is located in downtown at the end of Tyler Street at the base of the bluff. This lot is gravel and does not have markedparking stalls. The lot provides far apt�roximately 17 parking vehicles. • Skateboard Parking Lot(Original Townsite,Black 52,Lots 5&71 The Skateboard Parking Lot is owned.b,the City of Port Townsend and is Located in downtown between Washington Street and Jefferson Street,just east of Monroe Street. This parking lot also encompasses the adjacent Washington Street right of way. This paved parking lot provides 44 parkingspaces. • Cotton Buildino/Elevated Ice-Cream Parkino Lot(Original Townsite,Block 6,Lot 4) This parking lot is owned by the Cite of Port Townsend and is located on the Port Townsend Bay side of Water Street between Ouincy Street and Madison Street.This paved parking lot provides 12 parkingspaces. Goals and Policies (Future parking management in Port Townsend recuires a variety of alternative parking strategies,and must alion with the City's overall transportation system goals.This Plan encourages parking management control rather than costly public investment in building new parking lots.It also acknowledges that we cannot,and do not wish to,build enough parking lots to accommodate all cars. The parking management strategy seeks a balance in providing adequate space for cars,but also provides incentives for people to use cars less frequently.It encourages the use of a shuttle bus for visitors or employees to the Historic Downtown,promotes Transportation Demand Mi-ftanagement techniques,and explores new ideas to minimize potential environmental and community impacts by constructing smaller parking lots scattered throughout town.For the most part,however,the control of future transportation and parking problems must be addressed through strategic planning and proactive management involving the City,Jefferson Transit,the Washington State Department of Transportation,and business and property ownersi. Comment[DP118]: Hk3-from Policy Direction-moved here as an intro and Cornrner'c'iol F-lisnt'or'icDistrict edited/updated Parking problems are most apparent in the Downtown.It is unlikely that enough parking can be supplied to meet future demand.While parking recluirements far buildings in the Historic District-have been eliminated in the Historic District to stimulate redevelopment,there ate increasing numbers of housing units in the core and commensurate pressure for parking for residents. ee t!he Haines Street Park-and-Ride fffeilil�)-facility has become an essential part of the Downtown parking management strategy.11 `'-�—� ` — Jefferson Transit-34 a visitor shuttle to and from the Park-and-Ride facility for summer tourist use.Over the long-term,the City ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-33 should work with Jefferson Transit,WSDOT State Ferries Division and Main Street to increase the use of the Park-and-Ride facility by ferry walk-on passengers,-43downtown and Port employees,and Downtown residents. The City should continue to review the amended fl441-,e parking code regarding+e-dt off-street parking requirements for redevelopment and new development in the Commercial Historic District.4"-3+� ,_+ e City's parking code should allow the use of alternative transportation modes,TDM techniques,and the required use of the Park- and-Ride arkand-Ride facility,as options to providing new off-street parking spaces.This could be achieved through the use of maximum and minimum parking spaces or by reduced parking requirements for developments served by alternative modes (e.g.,the use of the Park-and-Ride facility,installation of bike racks,etc.).Parking management strategies and parking code requirements should distinguish between areas where nonmotorized improvements are desired(i.e.,the Commercial Historic District and future mixed use centers),and areas that are more auto-oriented(i.e.,community commercial and manufacturing areas). b b b b b ' par-kili � 0 0 b eettfifffibktfi- -ffftet b 0 b b b b b Comment[DP119]: HK3—delete. Moved Goal 9--�: Encourage the City,Transit and private interests to establish coordinated parking strategies to from policy direction. achieve overall transportation goals and to ensure that parking standards do not act as a deterrent to new Deem to be covered by development or redevelopment. e policies. Policy 9�.1: Encourage private developers to address parking demand by participating in the cost of shared parking facilities,agreement with others for the joint use of parking spaces and through the use of bicycles,carpools,transit,and the Park-and-Ride facility. Policy 9-7.2: Encourage private and public employers to provide bicycle parking facilities on or near their properties. Policy 9-7.3: Develop a date and implement-ft4fteetl parking requirements that encourage new development and the adaptive reuse of historic structures;limit the construction of new impervious surfaces;and provide for parking needs of residents and employees. 9-7.3.1 Review—.and where appropriate,reduce off-street parking requirements for new commercial development -79.3.2 Reduce parking requirements to provide incentives for the revitalization,, adaptive reuse,and preservation of existing historic structures within the Downtown Parking District and commercial zones lying within the National Register Historic District. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-34 9.3.3 Review residential parking needs in the downtown core "� Formatted:Tab 9-7.3.3 Distinguish between areas where nonmotorized transportation should be stops: 1.5', Left encouraged as a top priority(i.e.,the National Register Historic District),and areas Formatted:Indent: that are likely to be more auto-oriented(i.e.,the Gateway Commercial District). Left: 1",Hanging: 0.5",Tab stops: 1.5", Policy 9-7.4: Implement parking strategies that maximize the ability for the greatest number of people to Left use the Downtown,emphasizing the accommodation of non-motorized travel and transit Comment[DP120]- "per�-rte rather than automobile parking places, 02 Ba�ll:a}'::> 51�h:::_ Cot7,a�Q pttk'n �66t7pI��ll%a:Q t�:°�bt7 uQQ: l�triina,,Ctsa a�:tua ptt� t7,:tvupto it7tiiQw°: 1 .._v. - t7 1t7a ei_ ttwitrt ale w tlleQ at7d ft?Q tt tt7 t��af ttt n r¢uiba8?www- ^ w Pat i d t a Il�aa@P Idea tllt4 __ _w _ __ ___ w w_ w _ _ w _ _____M Comment[DP121]: HK3 Suggest move 7.14 here to follow 7.4. this is just a move get PolicyX39 6: Develop a Parking Management Plan that addresses eneetifftges, short-term anda�������^� similar policy together. long-term parking needs in the Commercial Historic District and other commercial areas„`e et- ��- Policy X21: owners should be responsible for providing parking and for managing parking demand generated at the site,to avoid any spill-over parking on neighboring properties and streets. Policy;-;9_8: Develop parking lot design standards that assure pedestrian friendly parking facilities by providing protected pedestrian links between parking facilities and employment and other service centers,arterials,transit facilities,and green space. Policy X9_9: New and redeveloped residential areas should be planned to accommodate adequate off- street parking.This will encourage narrower streets. Comment[DP122]: HK3—repetitive. Policy X9.10: Consider prohibiting Parking and driveways���on arterial streets Suggest delete this. Part unless a determination is made that adequate right-of-way exists to provide mobility,safety of local streets policies. and alternative modes of transportation. Comment[DP123]: HK3 Policy--,44f}9.11: Develop and promote incentive programs that enable property owners to reduce parking demand. Policy-744-9.12: Ensure that off-street parking continues to be the primary source of parking supply for mixed use centers and commercial corridors within the City. Policy X9.13: Continue to maintain existing on-street parking in neighborhoods where off-street parking in neighborhoods is inadequate,by protecting parking first for residents,and second for customers and visitors. Policy X9.14: Manage the supply and location of off-street parking in commercial areas to support a balance of travel modes consistent with the Comprehensive Plan. Itm�Itt•�� .1 i......m ..t.��umr4sl •lttt��tt�,���r��ttr����t�flis•v���7• �r�a�tw••�,t�a �l•��tttka �t�is�rIt�� •l�tt�;t��;tut�l�tt�•t�7•tr��tl . ---------------------------------------------------------------------------------------------------------------------------------------------------- 1 tt�ttt t tt�t;tt�m°�i l a t lrrt Esta tit �tllt�t�;tltt..t t�stti°�7 pest trtttltt ttt;tsta ttlt"r�{t�.s�.,11�tr@w ttti°ttl lltt ia�l tta�!t 6x l ti" Comprehensive Plan 2016 Transportation Element 1 6-35 Level of Service (LOS) & Concurrency Management Level of service standards anda transportation concurrenciprooram are key requirements of the Washington State Growth Llanagement Act. The purpose of these requirements is to ensure that the transportat on network adequately serves the current and projected population and the land use plan. Transportation projects and programs needed to serve growth must be in place either when 4Towth occurs or within six years from the date of the development permit approval. I2 eo�ulations implementing concurrenc,-and level of service are conta ned in the InAIC. The Citv has adopted level of service D as the standard for its roadways and intersections,which is consistent with the LOS standards established in the P121'TO I2 egional Transportation Plan.The Transportation Functional Plan projects the performance of Port Townsend's arterials and collectors underrroojected future traffic conditions. Q , and fe,-Frte� . " . I lie GNLA the J=ps impt . . s. , seetifag t b bLILb' -LILI —LY Comment[DP124]: HK3—delete.Too detailed. Covered by next paragraph and the policies below ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-36 The City should also study and consider setting LOS standards for pedestrian and bicycle facilities.In addition,promotion of transportation demand management(TDAI) strategiees could also alleviate the need to build or expand roadways,and make the transportation system operate more efficiently and carry more vehicles and people.By looking for new ways to define and measure levels of service based on Comprehensive Plan goals,this element seeks to assure the continuation of levels of service that the community can afford,while meeting its vision for the future comprehensive transportation network. Gal g _ 1 Set�appropriate level of service standards to romote desired land uses to reduce traffic K p 125]: Comment[DP onestion•-aril to increase the efficiency and safety of the overall transportation s�stem and to exr and travel R28,H 3 u da e choices. b. , Comment[DP126]: HK3—delete; Pyolic 10Q.1 Ada t and a date as necessary r: r .,,a ' `a clearl defined and — — p --� r- y unnecessary in LOS consistent policy describing which existing facilities are maintained by the City.'"� s4iftd4d section. Redundant to b f,,...eafeg_ es of sffeefs� policies in sections 3 and 4. a r ed b These stfeefs that the Gfy has iii the past,sha]4 be as lawest p"a-14Y.ill eHf5fffi b ' b the but ktfe iief safe b Comment[DP127]: HK3—partially Policy . 10.2: Ensure that any transportation improvements or strategies required to mitigate completed;eliminate rhe impacts are constructed or financed concurrent with development ordetail on"how to". Ahin six years of Comment[DP128]: the date a permit is issued. HK3--implemented— clarifying changes Polic-v 8-.410.3: n Es-tff 4s acnrrr fflid iffipleffietif--Maintaina Concurrency Management System to monitor Comment ID the level of service standards and the transportation impacts from new development. . HK3—the city nowhas �" an concurrency ord nance b 3FY43'r�)i` > beffietif ,ineltAinob Comment[DP130]: Policv 5-X10.4: Adopt and implement level of service(LOS) standards on roadways and HK3 change to match intersections,that generally correspond to level of service D Plan terms OS D .Recognize that Transtter s on Master ms ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-37 maintaining this level of service will result in some peak-hour auto congestion,especially during peak tourist days. this J=PS � b b ^` Comment[DP131]: HK3—delete— commentacy,opinion— does not add to the b policy. b b Comment[DP132]: HK3—delete Policyr X10.5: Work with Tefferson Transit,and other reoion� al transportation providers.-to redundant to policy 8.3 implement the communitG-'s vision of a transit system which promotes an active lifestyle and and 8.4. . . . reduces dependence upon the automobile. In partnership with these entities,study and consider a�'._"` '_� LOS for publicaotransit. Comment[TJ133]: SG will see if the City can do this b s yeftr 13Y-20-20. b b b Comment[DP134]: HK3;R28;the details of �r� r: _ i �._7a Policyr . 10.6: S�,tudlr and consider setting a level of service standard for how to achieve should pedestrian and bicycle facilities which supports the vision of linking the community via a be left to JTA comprehensive system of convenient pathways and bikewa;s.. functional plans b • b . b b b Comment[DP135]: HK3—these policies i geffiefif Stfategywere in Section 3h b b however,they ace b redundant to the polices above and can be deleted. Comment[DP136]: HK3—This policy is Rights-of-Way Management also from section 3 related to concurrency management It can be Goal 114: Preserve long-term options for the future public use of public rights-of-walldeleted as it is redundant to policy 8.4 Policyr 114.1: Encourage the use of existing,underused,or undeveloped street rights-of-wall to provide nonmotorized public access. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-38 Policy 114.2: Set aside specific unopened rights-of-way for greenways,regional stormwater drainage facilities,and pedestrian access on hails. Policy 114.3: Take advantage of integrated corridors such as transmission lines,unopened street rights-of- way,and other public lands for trail or bicycle path connections. Policy 114.4: Use the following criteria to consider if public rights-of-way should be vacated or left unimproved: a. Street continuity and property access; b. Future utility needs,including stormwater facilities,and capital facilities plans; c. Consistency with Land Use and Transportation Elements,as well as the overall Comprehensive Plan; gid.Csrs«:roc Inclusion of the rioht-of-wav in-- � "ion- Comment[SG137]: a plicable functional plans;and 1 broadened this a bit- 4-e. Preservation of open space and environmentally sensitive areas. ROW may be affected by NMP,Parks, Policv 118.5: Prohibit the vacation of street-ends that abut shoreline areas or marine bluffs.Preserve these Gateway,and shoreline — plans. areas for public access and public viewpoints. Policv 811.6: Earmark street vacation monies to a reserved transportation system improvement account for the purchase of rights-of-way or transportation facility easements. b Formatted:Indent: Left: 0",First line: 0' Comment[DP138]: HK 3-the NMP is completed and adopted Transportation Financing comment[DP139]: HK3-this policy is more appropriate in the capital facilities section or other section of the Goal 128:4� -Raise revenue to fund planning,design,construction,operations and maintenance of needed Pian as it covers both rights of way and city transportation system improvements. property and is not a transportation issue. Policy 182.1: Ensure that the City's six-year Capital Facilities Plan and Transportation Improvement Program is coordinated and consistent with the City's Transportation Element. Policy 182.2: Secure adequate long-term funding sources for transportation through a variety of methods. These methods may include,but are not limited to: a. Encouraging public/private partnerships and/or cost sharing agreements for financing transportation projects that remedy existing transportation problems,or that foster economic growth in Port Townsend(this private sector involvement may include:Transportation Demand Management programs.Negotiated Transportation Agreements and/or small area plans where developers provide transportation improvements such as integrated transit,pedestrian and bicycle connections into new developments,and mitigation payment systems such as impact fees); b. Encouraging the use of 6eA-improvement districts{lam}as allowed-by property owners to upgrade roads to meet Cit, road standards_,­"Beiiefit Ape" ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-39 b here local Comment[DP140]: benefits are clearly identified; HK3-there is no such c. Requiring impact mitigation payments through a concurrency management system; thing?? d. Seeking grant funding from the federal or state sources,,I,..,� T m a ' Comment [SG141]: b 9 Agree.But,if we broaden it a bit,it will include LID and RIDS. e—Exploring the establishment of a-s+—, ' 'STM_'transportation benefit district;; Comment[TJ142]: pal TIB,PRPTO "' Transportation Alternatives Funding, WSDOT Pedestrian& ±trete g �o Bicycle Program and Safe Routes to School Program f. Earmarking monies received from street vacations for the purchase of rights of-way, Comment[DP143]: and HK3-suggest delete— g. Impact fees that require new development to pay its fair share for transportation the neames of the /_ improvements,based on its proportionate share of the impact{mrd-Te )�rFF programs changeregularly '444 (Deeeffiber-7, 4998'j. Comment[DP144]: Policy 182.3: Transportation improvements and expenditures should be prioritized according to the HK3updatefor fOIlOW1Y1 ranking: current available g g fund ng method a. Projects that correct safety hazards in the transportation system,with the highest Formatted:Indent: priority given to the safest routes to school; Le t: 1.25' b. Projects that maximize local transportation revenue sources by using(obtaining) federal or state grant monied; Comment[DP145]: c. Projects that are coordinated with other construction activities such as Cit, projects HK3 update relating to stormwater,water or wastewater utilities as well as projects which coordinate with other private or public f utilities .g.,Ptigpef ;i Comment[DP146]: d. Projects that incorporate nonmotorized improvements or transportation demand HK3-delete names techniques with street Improvements;zed that change over time e®Projects that correct roadways with high maintenance costs that are prioritized according to a pavement management system,, e.f. (Projects that enhance the ability of the transportation system to adapt to climate chano Comment[DP147" 02—re siliency,climate Policy 128.4: —Normal maintenance and street repair should generally be funded from revenues received change from gas tax monies and from associated utility funds (e.g.,stormwater)in relation to the benefits received by that utility for improvements made to the utility during maintenance and repair work. Policy 128.5: _Thirty-five percent(35%) of the revenues generated from the(two) one-quarter percent real estate excise tax funds should be reserved for nonmotorized projects. l'New-f�olicy 12.6: Ensure that new development contributes its fair share of the cost of transportation facilities.programs and services needed to mitigate the impacts from-gr owth.l Comment[DP148]: R31—added. from Redmond. different from 10.28 above which addresses impact fees only. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-40 Policy 412.7: Cost of establishment,improvement and/or maintenance of City streets,sidewalks, trails and other transportation facilities should be equitably shared by those most likely to benefit from these improvements. Policy 412.8: Ensure that the City's participation in a local improvement district(LID)is proportionate to the benefits derived for thegeneral public rights-of-way. -_Pohcy'�. -12.9:=ra ffi see6eai 3-rim dhcre. Aggressively pursue fundinLy from federal,state,and Comment[DP149]: private sources for the improvements contained in the Gateway Plan.) HK3-moved from section 3 above. Will be Policy 12.10 : Earmark sufficient and dedicated funding for construction of pedestrian and bicycle inserted here and system improvementsb b renumbered b Comment[DP150]: HK3-this funding policy was moved here from section 5.Keep, but delete the"how tos" Comment[DP151]: HK3-this policy is .he stfeet iffipfa-�effieiits listed ifi this Aafi ffid shewfi aii Table V1_1 FU611 1 1-11-11 1 1-1 1 _�-.ektele from section 5 related to funding but can be deleted as it is redundant to 10.2.b. above l b areas Comment[DP152]: b HK3—these are c7 1 narratives from policy direction for financing. r Delete. These are covered by new narratives,by the goals and policies,and by the projects under implementation. ir��n ®rti$� � ® ���n� Comment[DP153]: (Transportation Demand ��r��� ment �r��e�� d HK3-delete-covered by other goals and policies Comment[DP154]: Transportation demand management(TDM)focuses on actions and strategies fee that reduce HK3-separate TDM the demand for new or expanded facilities,offer alternatives to singfrom Implementation.le occuaant vehicle travel and make the see new overall transportation system more efficient.Examples of TDM improvements include: �� '� "ra Implementation below. " � I ;park-and-ride lots;parking management This is consistent with programs;and street improvements that facilitate transit,pedestrian and bicycle use other plans we havereviewed Goal 13-k Develop a comprehensiv Comment[DP155]: b b � transportation demand management( DM)proms am From p and other incentivees to improve the efficient use of the tlanspartatian system and to achieve Port Comment[DP156]: Townsend's land use object tives Move much of this to below all .11 1 :.::..... � = rte•ry�wIrrn � =aavr= a 7 riw v. Comment[DP157]: HK3-move to implementation below. ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-41 Comment[DP158]: HK delete;completed Comment[DP159]: Policv 1 3.1: Proceed with the development of a coordinated TDM Program to be adopted by HK delete;completed — P g P , the City with involvement of Jefferson Transit and the private sector. Policy 13_2: Develop a TDM Implementation Plan that includes,at a minimum,the following strategies: a. Parking management programs for the Commercial Historic District and new "' Formatted:Indent: developments that provide incentives for encouraging park-and-ride use and Left: 1.25" nonmotorized travel; b. Transportation management and support services to enhance transit use; c. Demand management regulation to create an environment in which arterials and collectors can operate more efficiently, d. Monitoring and program evaluation to assess the success of various strategies and to determine how well each program is achieving its target goals; e. Studer and encouragement of tele-commuting as a TDM strategy,and —Development and implementation of a comprehensive public education and community involvement program aimed at more efficient use of the City's transportation system,and long-term changes in travel behavior that will minimize the need for road building programs. Formatted:Indent: f• Left: 1.5", No bullets or numbering Policy 133 34-4,: Prepare a Transportation Demand Management(TDM) ordinance as part of the City's concurrency management system.Incorporate TDM actions as impact mitigation measures for development. PoEcv 13.46-.44: Promote transportation demand management(T'DM�provrams amono large em lovers and employment centers to encourage transit,ride sharing and nonmotorized travel. Comment[DP160]: HK3-This was moved from section 6 to here. .y .y Renumber in final I ply en ation draft.. Formatted: Heading Goal 142-: Develop a comprehensive transpartatian system through public and,private financing strategies 2,Indent:Left: 0", development regulations and concurrency,transportation demand management(TDM)and incentive First line: 0' lira_®gramsi Comment[DP161]: Move much of this to llolla 14 42.1 Iii e a�„ aU rw zQrir� :zi.a@ I�[:zir riz�ira@ri:�irt�� iQr d ir�,�x:w a:Qrir�,a�,t�i:a ath ih� .I`r:z�,r�,IrQrrr:zt�iQrix below Formatted:Indent: Left: 0",Hanging: 1" Comprehensive Plan 2016 Transportation Element ( 6-42 TRANSPORTATION EMPROVEiVIENTS Formatted: Normal J Formatted: Normal Table 6-4,Transportation Improvement Projects,is a snapshot in time which summarizes the Citv of Port / Formatted: Font: Townsend's identified multimodal roadway system improvements needed to address capacitG and operational Bold issues based on the forecast travel demands.The table contains the projects identified in the 2006 Transportation Functional Plan. Followino Table 6-14�is a list of priorityproiects identified in the Formatted: Font: Non-Ntotorized Transportation Plan. Bold Formatted: Font:11 T�blp 6� 3�: Trans ortation Im rovement Proects� pt, Font color: Background 1 Formatted: Font color:Background 1 Construct a new two-lane minor arterial Formatted: Font:11 . Howard Street South Park Avenue to Discover' with curb Putter,sidewalk lighting bicycle Road pt, Font color: lanes and drainage. Background 1 Construct a new two-lane minor arterial Formatted: Font Rainier Street Discovery Road to 20th Street with curb Putter,sidewalk lighting bicycle color:Background 1 lanes and drainage. �—{ Reconstruct road to minor arterial Formatted U Discovery Road Mill Road to Rainier Street standards with curb,gutter,sidewalk, Formatted bicv-cle lanes and drainage Rainier Street to McPherson U Reconstruct road to minor arterial Formatted �J Discovers Road Street standards with curb Putter.sidewalk Formatted Table bic-cle lanes and drainaP e. Formatted McPherson Street to Sheridan Reconstruct road to minor arterial Forma �—{ EJ Discovers Street Road standards with curb Putter sidewalk Formatted U bic Acle lanes and drainaPFormattedormae. tted U �—{ Reconstruct road to minor arterial EjDiscovery Road 1911, Street to Hastings Avenue standards with curb,gutter,sidewalk, Formatted bicv-cle lanes and drainage. Formatted U Reconstruct road to minor arterial Formatted Hastings Avenue Sheridan Street to Discovery standards with curb,°utter,sidewalk, EJ r Road Formatted U bicycle lanes and drainage. Formatted EJ Mill Road Discovery Road to SK 20 Construct a rouandabout. Formatted .,5 SK 20 and Sheridan Street Intersection Construct a sio�nal or.roundabout. Formatted U Discovery Road and Construct a one-lane roundabout in Formatted Howard Street Intersection coordination with improvements along Formatted Howard Street. Ej EjDiscover)Road and Intersection Intersection traffic control improvements Formatted � �—{ Sheridan Street such as a signal or roundabout. Formatted U Blaine Street and Kearney Intersection traffic control and turn lane Street Intersection improvements Formatted . Kearney Street to Washinoton �—{ Arterial mobilit-\-and intersection Formatted U p � p a SK 20 Street im rovements,including the rohibition oFormatted tted left-turns. Formatted ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-43 SR 20 and 121,Street Intersection Prohibit left turns from 1211,Street onto SR 20 Formatted:Space After: 0 pt,Line spacing single Add curb °utter,sidewalk lighting and Howard Street 201,' Street to Hastings Avenue Formatted Font ® drainage.where necessary. color:Background 1 Howard Street Hastlnos Avenue to 351,Street Overlay an ° ter si d add curb utdewalk r liohtino bike lanes and drainage. Formatted: Overlay existing road and add bice-cle lanes, Centered, Space Hastings Avenue City Limits to Howard Street '" After: 0 t Line r shoulders dradnaoe and sidewalks. p Overlay existing road and add bi ycle lanes, spacing: single, Hastings Avenue Howard Street to Sheridan Street shoulders drmnaoe and sidewalks. Formatted:Space Add sidewalk bic%-cle lanes lighting and After: 0 pt,Line Sheridan Street Sims Way to Discovery Road stri mo.where necessary. spacing: single Discovery Road to Hastings Add curb °utter sidewalk liohtino and Formatted:Space Sheridan Street Avenue bic%-cle lanes signing and striping where After: 0 pt,Line necessary. spacing: single Sheridan Street to San Juan Add curb °utter sidewalk hohtino and 19 Street Formatted:Space Avenue drainage. Add sidewalks and liohtino and stripe After: 0 pt,Line Lawrence Street Kearney Street to Walker Street spacing: single bic%-cle lanes. Landes Street 121,Street to 191,Street Add sidewalks and bic%-cle lanes. Formatted:Space After: 0 pt,Line McPherson Street SR 20 to Discovery Road Add sidewalks and bic)lcle lanes. spacing: single Formatted:Space After: 0 pt,Line spacing: single Formatted:Space After: 0 pt,Line spacing: single Formatted:Space After: 0 pt,Line spacing: single Formatted:Space After: 0 pt,Line spacing: single Formatted:Space After: 0 pt,Line spacing: single Formatted:Space After: 0 pt,Line spacing: single Formatted:Justified ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-44 Formatted: Heading CAPACITY RF'L-ATF_P! QVP4E�T' 2,Justified,Adjust nein r7rx�nv rrrinr } nr���T Tn rrnrr7nrr��nrc space between Latin and Asian text, Adjust space between Asian text Formatted: Heading 2,Justified,Adjust space between Latin a �itravev t f t r,,, and Asian text, 4a�4. cr� .;a.ay4, carr ,_F'sra4�r ccr^" 1. UPmacer Adjust space 04 ��4 ,•• fg^r'ciPa r em ""� analysis 4 &m Aaan -ven'ae between Asian text a '} Formatted: Heading 2,Justified,Adjust space between Latin 2pesefve RO��''a'-limes. and Asian text, b,dt •;.Scrscrc�icrrs..;) ; 4 � cr' `.rc'rv=c Ad'ust space between Asian text Formatted: Heading cr,...;a.„c4...�4 c n Ana.,,..rxa, r7;..,.,,,,,., u„ rr,,.,a , n•.4.�.r•.i,. 4..Fr.,,,.r;4•,.;r,. ,�i 2,Justified,Adjust pi-Ogi-am on Sr fkhm. ln4ude space between Latin 'I ffl--iris and Mk4E ty e and Asian text, Adjust space # between Asian text nt.fr , .. ..;ra Formatted: Heading rdaet d 404: �4 2,Justified,Adjust "nom --"I-'--'S space between Latin te—r3e���aer•�a�,r« and Asian text, Adjust space r •• B .,,.• .,,r •4 between Asian text ."3-eR.a=4•. Formatted: Heading 2,Justified,Adjust ;'de-n``d t`,—folif—limes. The space between Latin V_ffld_`_4_ r,. }4 Fr , and Asian text, o f and tem ; tfy Adjust space ae* raa* between Asian text _Pw�--e�r'4 _to'& 4, Formatted: Heading e®saart—ts—�§srre— 2,Justified,Adjust less—thali space between Latin and Asian text, 1,Reeog; ��TZ ••� t,, +� Adjust space between Asian text ' �`tfa4ie Formatted *, Formatted UE�--{{ n,p. efve ROrh F•,.F,•,.,.limes. Formatted Formatted 'e�vtat� g �g€ s tk��g Formatted EJ ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-45 CAPACITY R'L-r€P «VP4EF� Formatted: Heading R-OAP4LA-y- F444 TO 2,Justified,Adjust space between Latin and Asian text, 4. As taffie v4umes ba4d. Adjust space rdaett 404:b ra 4 between Asian text ,a „ Formatted: Heading ds(e- 144 11117 2,Justified,Adjust space between Latin and Asian text, bjeyele Adjust space R*' � � between Asian text �^ Formatted: Heading sti6fways. iffld eenneet 2,Justified,Adjust ent to `ad space between Latin and Asian text, 1. Gentteilarzd 'ase aeeess Adjust space between Asian text Formatted: Heading 2,Justified,Adjust space between Latin 1 and Asian text, Adjust space 2.eq'340 ROW ”' between Asian text Wv dtb to 'i33tt €E to$ Formatted: Heading rr..�er f' OW ,.a'af lig 2,Justified,Adjust b'dt , ,, ,,,, ,„ __ space between Latin .. ..P...................." r..;, .. 7,.;F and Asian text, Adjust space between Asian text r, .c. nam Hca 1—T7e t Wit. Formatted: Heading establRsb shatt4e sefviee. and 2,Justified,Adjust space between Latin and Asian text, Z o7 r, Adjust space area between Asian text R. l/ C; ..n,r..., is x1 r..,7,... _. ,, w ...;,. .. ,.F Formatted: Heading gateway PeA'elapffleyt v7. 2,Justified,Adjust ., tst�rs�ete} space between Latin and Asian text, 1. Ge tfel iteeessto space between Asian text elae�raeteia�@s;-t— ' r�a�s reed¢ emote—anal,—° Formatted EJ alt�-isat�ro� ��d=^y—aeegs� �' OX�Sts. Allow Formatted EJ Formatted E:1Formatted EJ Non-Motorized TranSDortation PlanPriority roJects 2010 ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-46 Sidewalks and Bicycle Lanes Formatted:Title, Hastings Avenue(City Limits to Discovery Road) None,Space Before: Discover)-Road i Road to Sherman Street) 0 pt, Don't keep with � 91 Street McPherson Street to Sheridan Streetl next, Don't keep lines together Landes Street(12r1,Street to 1911-,Street Admiralty Avenue(San Juan Avenue to Spruce Street) Cherry Street F'Street to Q)Street) Redwood-Cherry Street(Q)Street to�N'Street) W Street(Redwood Street to Walnut Street Walnut Street(0 Street to«'Street Jackson Street Garfield Street to Walnut Street) Lawrence Street(Kearney Street to Monroe Street Harrison Street N ashin ton Street to Lawrence Street) SidmalkFormatted:Title, 0 Sheridan Street(SR.20 to 19LIL Street None,Space Before: e Jefferson Street(Adams Street to C)uinc S�reeet) 0 pt, Don't keep with e Quincy Street(L7ashinoton Street to_Tefferson Street next, Don't keep lines together Washington Street(Adams Street to Quincy Street Multi-Use Trail Prole - Formatted:Title, 0 West End Loon None,Space Before: Haines Place throucA the Port of Port Townsend 0 pt, Don't keep with next, Don't keep ic�cleLar�ca lines together Sheridan Street(191L Street to Hastinos Avenuel Formatted:Title, Trails None,Space Before: • 0 pt, Don't keep with 38 Street(San�uan venue to Hill Street next, Don't keep • McClellan Street Ravine(Larr)-Scott Memorial Trlines together DAImproverne its Formatted:Title, � Downtown Historic District None,Space Before: 0 pt, Don't keep with next, Don't keep lines together Formatted:Title, None,Space Before: 0 pt, Don't keep with next, Don't keep lines together Formatted: Heading 2,Justified,Indent: Left: 0",First line: 0" ---------------------------------------------------------------------------------------------------------------------------------------------------- Comprehensive Plan 2016 Transportation Element 1 6-47 Style Definition: Heading 3:Font:Not Italic, Underline, Font color:Auto Formatted: Formatted: Font: Swis721 Blk BT,30 pt, Not Bold Formatted: Font:36 pt, Font color: " Background 1 1 � r s,V, ,M.. d � � 5 r, w ,I, lllllli�i� I Utilities Element Comprehensive Plan Update 2016 Page 7-1 Utilities Element T-,k II t, r,f ("r,n+n n+c Formatted: Default 1;�T4' YT .��T '-T............................................................................................................................................................3 Paragraph Font, Check spelling and T irl"T7 T'r'y 4�\1 Y C 9_ Y Tf T�'C ................................................................2 t ............................................................... grammar �.e ��errert ........................................................................................................................................................ Formatted: Default , Ftte 'tt ............................................................................................................................................................ Paragraph Font, Check spelling and zrt� �eree�F ee '' ............................................................................................................................................. grammar � t ire .......................................................................................................................................... r Formatted: Default Paragraph Font, �ilti'G'ZCC,,.C1 .J'47LET1TSP'11� .......................................................................... .' Check spelling and t` .....................................................................................................................................................................) grammar Witteeiq,'ef-ett} ............................................................................. Formatted: Default , .......................................................................... Paragraph Font, .................................................................................................................................................................. Check spelling and grammar { -efffianee............................................................................................................................. ztet` e rre ................................................................................................................................................7 Formatted: Default Paragraph Font, ezteT 1 _............................................................................................................ ............° .......................... Check spelling and .................................................................................................................................................. o grammar EJ ........................................................................................................................ Formatted Formatted t o t effi Formatted 40 Formatted EJ GifsSfefffiwoef T1 lrt ................................................................................................................................................ Formatted . Formatted EJ _ Forma=, " ttedEj ....................................................................................................... v Formatted rt` t` terrrfrrtr�eirry............................................. Formatted EJ Gffble 4''ele� er�..................................................................... 4 3 � ...................................................................................... Formatted ` EJ t ......................................................................................................................................................... Formatted EJ Ser-le-lee t i sem dIng ......................................................................................................................................... Formatted i E Ea E egr� „ ». ��7�:........................................................................................................................................4 Formatted ter' rfii��t ie2.....................................................................................................................................................44 Formatted e .......................................................................................................................................................................4 4 Formatted Ej Pig -t- - eit�tt}en...................................................................................................................................................4^ Formatted Selid WfsfeNifna ............................................................................................................................................1� Formatted EJ Formatted U Formatted Formatted Formatted Comprehensive Plan Update 2016 Page 7-2 Utilities Element Formatted: Heading 1 INTRODUCTION The Utilities Element oLwdes future utilit;-service within the Cite of Port Tow send,,,.planning area and ensures that adequate utility services will be available to support existing and future development in the Citi The goals andand policies included in the Utilities Element are designed toto promote efficient,cost-effective utility service while meetinor community needs and protecting both existinor neighborhoods and the natural environment. The City of Port Townsend provides water,wastewater and stormwater utility services to Port Townsend residents,as well as water service to some areas outside the City limits. The City contracts with a private company for solid waste and rec;cling collection. Several public and private utties operate within Port Townsend providing electricity and telecommunications services (cable television,wired telephone/data services,and internet and cellular services). Planning Context Under the Csrowth illanagement Act,olanned land use patterns and growth must be suoported by adequate levels of utiliti-service. The Utilities Element must therefore ensure that adequate services are available to serve the growth and land uses in the Land Use Element of the Comprehensive Plan. Functional plans for each utility system must also accommodate project ted Growth in their respective service areas,based on these adopted growth allocations CHALLENGES -AND OPPORTUNITIES, 1Vlajor challenges related to the provision of utility services include the following A changingclimate The City faces the challenge of res ondino to climate chancre both in designing facilities for changing seas levels and in ada ting t� o changing w� eather patterns that impact water sem?and quality and the hydrology of the Cites wetlands and natural dra n oar e waw e A significant backlog of overdue maintenance--Some of the Cites utility infrastructure is nearing the end of its useful life. e A pressing need for modernization-With rapid), chancing technology and the desire for universal access to the Internet and other services,the Citv faces the challenge of working with providers to extend the latest technologies and services-to this community. —Planning for growth and fluctuations in demand—Although extending utility service into unserved areas is generalhv theresponsibility of new development,the City must ensure that utilities are adequately sized and the overall system coordinated. Seasonal fluctuations in the Cites population present a challenge as the Citv seeks to avoid over-sizing utilities and to balance o erating costs o—Changes in the regulatory environment--As the Cir =rades to comply with new regulations (e.o�., water quahty,stormwater discharge permitting,etc.)ratepa;ers could be impacted. Comprehensive Plan Update 2016 Page 7-3 Utilities Element Strong commutiir support for sustainabiliry presents an opportunity to implement innovative solutions. The Ciry may seek funding mechanisms to assist in utility extensions/upgrades that support Comprehensive Plan goals such as promoting affordablei_ housincr and enhancing economic development. ~� Formatted: Normal UTILITY GOALS & POLICIES General ili y Policies The availabilit,-of utilities is an important factor considered by developers when deciding where and whether to build. Safe and reliable utility service is important as wellto the people who live and work in Port Townsend. Utility policies and availability must support the land use plan and policies. Consistent with the GNLr1,public utilities are generally not extended beyond the city limits. However,the City does provide water service outside the city limits where previous agreements exist and for the service area identified in the Coordinated eater Supply Plan and the Citi-'s eater Master Plan. Goal 19:4�e-eEnsure the provision of utilities to address current needs and planned growth and development, consistent with the Land Use Plan. Policy 19.1: _Ensure environmentally sensitive,cost effective,safe and reliable utility,service that is compatible with the surrounding land uses. Polio,1.9.2: ®Encourage the joint use and provision of utility,corridors,facilities and services. Polio,19.3: _Coordinate planning and development review with other jurisdictions when utility,additions and improvements cross jurisdictional boundaries. Polio,19.4: _Ensure that above-ground utility installations and facilities (e,@ -���� Mowers antennae structures)are located and designed in a manner most compatible with the surrounding neighborhood and natural characteristics of the land. Policy 19.5: Where feasible install new and, v ��� ���� '�,relocate existing utility,a:�, lines underground. z z � Comment[DPl]: HK3—delete comments b~ be the b b b b bfattfid b b HK3-Eliminate these details.Outdated; Comprehensive Plan Update 2016 Page 7-4 Utilities Element Policy-14.6: _Work to ensure reasonable and equitable utility rates and regulations for Port Townsend residents by offering regular testimony before the WUTC when appropriate-. Policy-14.7: _Periodically review the scientific research on risks associated with exposure to electromagnetic fields (EMF� ilf warranted by new information or changes to state or federal regulation,modify-policies and regulations Policy-1-1.8: --Ensure that public and private utilities minimize the clearing of trees and vegetation in the management of utility corridors and street rights-of-way. disffsfefs F.,-t.e,.L, -ZF- - -- ef �I'ohc��1-1.9: Develop-ftresilient utility systems where planning and investment decisions account for channinn conditions such as climate chanve sea level rise natural disasters technolonical changes and increased renewable enerLyv generation. Comment[DP3]: 02—new policy a�ePaficy 11.10 Encourage the use of innovative technologies to:provide and maintain addressing resiliency, utility services;improve efficiencL of existing services:and to reduce,where possible,the etc. overall-demands on utility systems.) Comment[DP4]: 02—new policy on Qty-Water technology,resiliency, etc. Overview � Comment[DPS]: The Port Townsend Water System is a publicly owned water system operated bi-the City of Port Townsend M-36—this intro(and as a self-supporting enter_rise utilit-. Operations and s,-stemlannino are guided b tthe current City of Port others under each policy Townsend Water Svstem Plan and provisions of Chapter 246-290 of the Washington Administrative Code section,address the required inventory. (WACI, Orou_ A Public Water Supplies. The Cit)-is the water service provider to an area of approximately 11 sduare miles,including�roperties within the Citv boundaries and adjacent areas south and west of the City. F'ieure 1-4 of the 2008 Water Svstem Plan delineates the Cites water service area. Water Supply and System Capacity The City of Port Townsend's source water is supplied from the Bit Quilcene and Little Quilcene Rivers.The river diversions 28.5 mile transmission pipeline,and Lords Lake(500 miction o�allons and Cite Lake 140 million gallons) storac e resei-�voirs are known as the Olvmpic Gravity Water Svstem (QMVS). Water IiCrhts permit diversions of 19.4 million gallons er day(md)from the Big;.Quilcene River and 6.2 mpgd from the Little Quilcene River. illinimum instream flows below the diversions are 27 cubic feet per second(,cfs,) and 6 cfs,respectively. The diversions and sections of oipeline trarsitino the Ohvmpic National Forest are permitted by the US Forest Service. An intertie at Four Corners can provide an emerc'rencv supply of untreated water for the Tri-Area C)uimper Water Si-stem. The Port Townsend Paper Corporation (P`I`PC) utilizes most of the water su o1 v throuh an intertie at the southern Cite-boundary. PTPC has leased the OOWS from the City since its construction and has been responsible for its operation and maintenance. The agreement,which expires in 2020;currenfly allocates the City a maximum quantity of 5 mod and 1'TPC is entified to the remainder of the available water su hv. Comprehensive Plan Update 2016 Page 7-5 Utilities Element The Cite operates a 3 mod membrane water filtration treatment system which is expandable to 3.6 mgd Sodium hypochlorite is added for water disinfection. Within the municipal distribution system there are two storao_e reservoirs;a 39-foot tall, 5-million o�atlon concrete reservoir that serves the Citti's low elevation zone and an 84 foot tall,1-m llion gallon steel stando' e that serves the Cites high elevation zone. The booster station at the reservoir site supplements high flows that ma, exceed standoff ep stora re ca acitv bi-transferring surplus water from the 5-million gallon reservoir. There are approximateli 100 miles of distribution system pipelines serving 4,746 customer connections as of 2015. A booster oump station at Chestnut and F'Streets provides increased water pressure for the iNlorgan Hill area. g Detailed descriptions of the Cit)-'s water system and plannin2 information are included in the eater Si-stem Plan. Water Service— Generali Goal 24-0:4" Provide safe,reliable,and economical drinking water to all Port Townsend residents. 24-8.1: Reduire all new development to connect to the Cit��'s water system as a condition of develQl2ment. Comment[DP6]: HK3--aligns with the Policy 24-0.2-4-: _ Redir ue new development to construct water system next policy to match improvements necessary-to serve the development consistent with ef,,tee&4ens dere _"'I":ti city code the-City enoi_�eering-design and construction standards and Comment[DP7]: Washington State Department of Health(i-.+_—DOH)regulations and requirementsz_--ftee HK3..Update language and provided that the costs of the extensions are paid for by the developer or new customers;off-site impacts are mitigated;all necessary permits are obtained;and all right-of- way issues are resolved. Policv 2444.3-2: Ensure that water service extensions are consistent with this Comprehensive Plan,adopted level of service standards,the Cies Water System-Plan,and the Iefferson County Coordinated Water System Plan(CWSP). b Comment[DP8]: HK3-delete;updated. Not relevant since there is no longer a tri Area -Illy - system or water Policy 2444.4---1: Following installation and approval by the City,ensure that all water main extensions are reservation system owned,operated and maintained by the City. Comment[DP9]: HK3—delete;covered Policy 2-144.54: Meet federal and state water quality requirements. in capital facilities;not necessary to repeat here Policy 2-144.6-7: Coordinate water supply,delivery and service systems with adjacent water purveyors. Policy 2-144.7-9: Organize and participate in water education programs and develop and distribute materials to inform citizens about water system issues and concerns.Emphasize public health,water conservation and watershed protection as essential elements of the education program. Water Service - Out-of-City Goal 344:TEnsure the continuity of high quality water service to the out-of-City service area,without sacrificing the ability to serve the residents of the City. Comprehensive Plan Update 2016 Page 7-6 Utilities Element Policy 344.1: _Establish boundaries for the out-of-City service area that are based on the need to balance current service obligations with known limitations in the carrying capacity for the water resources available to the City.The City Council may adjust boundaries on an interim basis if an emergency exists. a .r b b b r b Comment[TJ10]: (Ken)HK3- Delete Policy 3447.24: Allow service extensions outside the out-of-City water service area only for system looping, 11.2 and 11.3. we fire flow requirements,other specific system needs that provide enhanced service within the provide water to all service area,or to meet prior contractual obligations. customers within rhe service area. If we can't, Policy 344-.3�: Continue to satisfycontractual obligations which require the Ci provide water to the Port die service area — q I p boundary needs to Townsend Paper Company(PTPC).When renegotiating contracts or leases with the PTPC, change. give consideration to City water utility needs,historical partnership arrangements with PTPC,conservation requirements and opportunities,maintenance of the water system,in- stream flow needs and other related issues. Water System Planning Goal 44-22:Te,4111tegrate water system planning with all other related planning efforts. Policy 44-2.1: _Ensure that the City's Water System mer Plan is consistent with the goals and policies of this Comprehensive Plan. Comment[DPll]: HK3-update (Policy 44-2.2: _Participate in the-regional water planning efforts b z to protect and enhance the overall water resources of eastern Jefferson County.1 Comment[TJ12]: HK3-use a broader Policy 44--2.3: _ i�Participate in the development and a dp ates of the Jefferson CountyCoordinated category as the listed Water System Plan (CWSP) as a member of the Water Utilities Coordinating Committee groups have been (WUCC)and the WUCC Steering Committee. superseded by other entities. 442.3.1 Coordinate City GMA and water system planning with the CWSP process. 4-12.3.2—Assure that appropriate procedures are followed in the preparation of the CWSP, particularly public involvement processes and environmental review procedures. RIA 17 44 .3.3 Detailed I—Implement peme nat the Plan other ylat adoptedtb�shhedC itCoumcilt Plan and (HK3Comment[TJ 13]: p ( -Superseded in the development of the CWSP. Policy 4422.4: _Regularly update,and implement the City's Water System ' , � -Plan,and monitor the effectiveness of the CiWs water system. Comprehensive Plan Update 2016 Page 7-7 Utilities Element Policy 4-1-22.5: _Cooperate with the U.S.Forest Service to protect and enhance the water quality of the Big and Little Quilcene rivers.Reo ularhv�4update the Watershed Management Plan f� which serves as a guide to protect river resources. Policv 44--2.6: Use the joint County City GMA population forecast to develop�'����6 and 20 rear Comment[TJ14]: projections of water demand for the Citi--'s water service area. M-1;Also,water I—„ftre. system planning interval Comment[DP15]: Policv 44 .7: —When projecting future water demands ,anticipate possible reductions in demand HK3.. which could be achieved through water conservation programs. Water Supply Goal 543:TDevelop and maintain water supplies to meet the needs of future City water utility customers. Policy 54-3.1: _Reserve and develop the supply system capacity required to meet the current and future water demands of City water utility customers. Anticipate possible negative impacts on summertime water suooly and duahty due to climate change. (Policy 543.2: Protect surface water rights.Cooperate with the PTPC,the Point No Point Treaty Council Comment[TJ16]: and other entities to maintain existing minimum in-stream flows HK3-Instream flows pfeg+ftffi-for the Big and Little Quilcene Rivers. for the Big and Little Quilcene Rivers were Policy 544.3: —Protect groundwater rights and supply. adopted by the state. Water Conservation Goal 644:4" Promote the conservation and prudent use of water resources. Policv 644.1: _Ensure that water conservation is an integral component of the City's water supply planning program and that new development is designed to conserve water resources. Policy 644.2: _Encourage all City water customers to voluntarily conserve and prudently use water resources. Policy 644.31: _ U date the as Emergency Water Shortage Response Plan rec Lured to ensure Comment[TJ17]:ompleted that the essential needs of Citv water customers are met and that available water is HK3 C distributed equitably.Give priority to the basic public health needs of all customers in the case of a severe water shortage. Policy 644.4: —Examine opportunities for water reuse and recycling as an approach to reducing water Lupplv demands.Reeyehii z z z> zr b --de -94 ffnd eaffiffier-694 btf4d n s;fffid Comment[DP18]: HK3—delete how tos Policy 74-4.5: _Promote voluntary conservation and prudent use of water by all customers,including the and detailed lists; mill,through City programs,and programs developed in cooperation with other agencies. outdated Comprehensive Plan Update 2016 Page 7-8 Utilities Element ,4.5p L9 ® lesi6-fi stfttefttfes - Comment[DP19]: HK3-delete the detail Water Quality measures Goal 84­5�,:4" Protect and enhance the quality of all surface and groundwater supplies. z r.. .... .. ..a... c r .. r Comment[DP20] HO—No longer the Policv 84 .1-2: Provide water that meets all state and federal water quality standards for source water and strategy. domestic suppler to City retail customers. Policy 84 .2-3: Develop and enforce a cross connection control program as required by the Washington State Department of Health and the Federal Environmental Protection Agency Policy 84�.34: Protect groundwater resources through the identification of aquifers and regulation of activities in aquifer recharge areas. Policv 8.4 nticipate potential chances in water duality due to climate chane. b b L7,,a4h Comment[TJ21]: Hk3 we no longer have Water Supply System Performance any groundwater Goal 94-a':4� Develop a more efficient water distribution system. supplies. Policv 94{6.1: _Approve new service connections under the following circumstances: a. When sufficient water quantity and pressure exist to meet minimum design and construction standards in effect at the time of development;or b. When the necessary improvements are scheduled within the six year Capital Facilities Plan(CFP). 417— c. 1—c. When development is proposed in an area where existing water system levels of service are below standard and no improvements are scheduled in the CFP,allow the project applicant to provide needed system enhancements to allow development to proceed. Policy 94{6.2: _Ensure that new system connections do not reduce levels of service to existing customers. Policy 94{6.3: _Design and construct all water system connections and extensions in accordance with the standards contained in the City's Design and Construction Manual. Comprehensive Plan Update 2016 Page 7-9 Utilities Element Policy 94 .4: _As financial resources become available,improve the existing distribution system in order to satisfy minimum standards for pressure and fire flow. Water System Financing Goal 1--�0:4" Nlanage the City water utility in a fiscally sound manner. Policy 1-70.1: _Operate the Water Utility as a self-supporting enterprise that maintains fiscal solvency and rate stability. Policy 10-7.2: _Complete replacements and improvements to the water system in accordance with the Capital Improvement Program (CIP). Policy 10-7.3: _Establish fees and charges that recover utility costs related to development. 4ffnee-_-4h the Watef Master-Plan pali Comment[DP22]: HK3—delete. Doesn't Policy 10-7.45: Require mitigation pftyfnerrt for off-site impacts related to system extensions i^ e-i— � work this way. New development pays the cost to extend if it Policy 10-7.56: Permit latecomer agreements for system extensions in accordance with the�v� triggers a need to MC and State law. extend. .1�r1 Comment Policy 10 .6-7: Ensure that the water utility rate structure allocates costs fairly between different classes of Hk3-pTMc&state customers and service areas. La w> Comment[DP24]: HK3-Clarification ® Comment[DP25]: Policy 10--�.I V: Provide water utility rate assistance to low income customers—,&s HK3-delete. Redundant to 14.5 8f 4te Comment[TJ26]: Wastewater HK3—Too specific, delete citation oVerVIeW Comment[DP27]: The Port Townsend Sewer System is a publicly owned wastewater system operated by the Citi-of Port M-36-this Townsend as a self-suo p ortin,&nterprise utility. Operations and si-stem lannino are°guided by the Citi-of introduction addresses Port Townsend Wastewater Facilities flan (2000). The Citi-collects wastewater from a service area of the nventory approximately seven square miles. Primari-collection of wastewater is achieved thoouh oraviti-sewer linesrequirements , though the City maintains a series of lift stations and force mains to overcome chanes. in toroo� Collected wastewater is discharged to wastewater facilities for treatment. Some portions of the City are not yet served by municipal sewer. In locations where extension of City sewer is impractical,installation of septic si-stems is permitted provided they are designed and installed to meet Health Department standards. As the boundaries of the Cites sewer service area are the same as the urban growth boundary,sewer service mai-not be extended beyond the city limits... SystemCapacity Sewer si-stem capacit v is dependent on a number of factors,includ ng adequately sized pipes to collect wastewater,properly sloped pipes to allow adequate craviti-flow,the capacity of downstream treatment facilities to accept wastewater,and the level of inflow and infiltration into the si-stem. An updated hydraulic computer model of the Cites wastewater si-stem was completed in 2000,and the Cite updates and uses this Comprehensive Plan Update 2016 Page 7-10 Utilities Element model to evaluate the effects of chancres to the sewer si-stem resulting from new development on system capaciti-. Hi-draulic modeling;does not show an; current capac' v deficiencies in the Cites collections s however,capacir) mai-become an issue at various locations as the city develops and population increases. Infrastructure Replacement Much of Port Townsend's existin4 sewer infrastructure dates from the 1940's and 1950's. Sewer infrastructure in the Historic District is even older much of it datino from the 1920's and 1930's. These facilities have reached the end of their useful life,and man)-are in need of replacement. The Wastewater P4�,:�ie­,Plan establishes a list of recommended capital improvements to the sewer system,ranked in pr ority order which includes extensive replacement of wastewater collection oipes,elimination or replacement of lift stations rehabilitation or improvement of a�ino�interceptor lines. A complete list of proposed ca Qital improvements is included in Appendix G of the Wastewater Facilities Plan. Public Health & Safety Goal 191:T'e- Nssure proper disposal of wastewater to protect ground and surface water supplies. Policy 1-91.1: _Ensure that all existing and new development within the Port Townsend Urban Growth Area(UGA) ve adequate wastewater collection and treatment facilities and that connection to the sanitary sewer system is required wherever practical,or environmentally necessary t. �t f3 ftre , rrr."a �7 h��i h �r7 z.,., i 9 nnrn�I 6, 1Comment[DP28]: HK3-delete; The Polici 1I48.4.2 EHeepf fer kt s_i—._Ie lktffif yfesfaefiee Hri apareelgreaterDetails to implement S DA UC the policy are covered by PTMC and EDS b _'___..._-__. - ktrid - _._-_ -'i.___. regardlessef 4s- - - . b QiTtef 49.04 P ,,I-ee ffibef 6 ncu Comment[TJ29]: HK3)—Too specific. 11-9.2:- Allow the use of individual on-site septic systems for new development not required to PTMC/EDS set the connect to the city sewer system under�i11—s' e€". 1 ol? 18.14--a+44.4-2-, ds and details. . stern provided the s)-stem meets Health Department requirements and is designed to Cite standards. Comprehensive Plan Update 2016 Page 7-11 Utilities Element b r b s b b d„__„7e,..-.-.erif perffi4. [Ord. Ne 2746,iC 2'7 (Tl,,,-,,.-,-.ber/_ 4(199)1 Comment[TJ30]: (HK3-same—details to C�* _�_wp wAw� u 4A__1�4w4�A tw51 t1iA tt lfi Al rttttwtli tfA lw to n7i Iwi tliw lt7it� is lt7rlr implement the policy U1A. 1 1 A 07t�trn:A nrt 5tan��� tib nn�� o � St.L -.- �➢�ars.�n��aA � n���t��.(„�A��r�� are not nPTMCand PbwA l ” _wfllltdw EDS Comment[DP31]: HK3—policy moved up from below. Police 1-91.3:4-4 Require existing development served bar on-site systems to connect to the CiWs wastewater collection and treatment system when sewer service becomes reasonably avalable. - . b b , thart 269 feet b b Comment[TJ32]: HK3—delete. Details 1 . wM..11i •ira• rtt ar �aa7.1r �ium •�7tr�ro•tta•1• ta f :t 1• �i i •trL.,I�mta•]a �lare in PTMC and EDS r�°�tl���,,��w�°��t v�,w,t•^�t��rmt,,,,�:�tl�:�°��w,,,,,,rr�;�:°���w�,,,q°�a�t �•:"t::n�� �w�°�ll�� tiraw��t��°*> ����Eia�° Policy 11$.24: Maintain and repair wastewater collection lines to prevent leakage into ground and surface waters,as well as to prevent infiltration into the system which would place unnecessary strains on collection line and treatment plant capacities. Policy 11$.43: Ensure that commercial and manufacturing uses do not place unnecessary strains on the CiWs wastewater collection and treatment system-.- b Comment[DP33]: Io I HK3—combined into k 18.3 b b Comment[DP34]: HK3—combined into Policv 11-9.54: Coordinate with efferson Count,)=Health De artment to re uire periodic inspections and HK Delete this detail pumping of septic systems. Comment[DP35]: System Development & Management Hk3—clarfyactuat practice Goal 129:Te,eEfficiently develop and manage the Cies wastewater collection and treatment system. Policy 1-12.1: _Encourage infill development and the gradual,phased expansion within the Port Townsend Urban Growth Area(UGA). [Ord.No.2825,§ 3.3, Qanuary 6,2003)]. Comprehensive Plan Update 2016 Page 7-12 Utilities Element Policy 128.2: _Develop and implement an adequate maintenance schedule for all facilities,and place highest priority upon upgrading aging parts of the system. Policy 128.3: _Pursue water conservation as a means to reduce waste-flows,minimizing future facility costs and environmental impacts. Policy 128.4: _Recognize that growth and development mai:require the City to expand its wastewater collection and treatment system capacities within the 20 bear planning horizon. Policy 128.5: _Establish locational criteria for a new or expanded wastewater treatment facility that assures compatibility with the surrounding development and the natural features of the surrounding land,water and vegetation,as well as longi;term use in light of projected sea level rise and climatechano�e. Policv 128.6: _Establish and maintain standards for wastewater collection and treatment facilitIr design. r i.rn „rn b b b b 49.6.6 b rr r a �7 hohc a r __ erg Comment[DP36]: HK3-delete the detail. System Development Phasing . Adopted design standards anPTMC Goal 1328:4� Coordinate wastewater facility planning with land use,environmental,economic cover this;and sting development,and growth management objectives. state standards regulate much of this Policy 1328.1: Prioritize T4 --wastewater system infrastructure improvements and service extensions in a manner consistent with the adopted Wastewater Plan and through the 6-near CIR Pohey-23 a fffilefi�1. Comment[DP37]: HO-update Policv 1328.2: Do not extend the wastewater system into areas outside the Port Townsend Urban Growth ® Area(UGA). Policv 1328.3: Develop and maintain a Wastewater Plan and censure that the Plan is ttpd*r-e� consistent with the Comprehensive Plan. Wastewater System Financing Goal 14247:4" Nllocate the costs of wastewater collection and treatment in an equitable manner. Policy 142 .1: Operate the Wastewater Utility as a self-supporting enterprise that maintains fiscal solvency and rate stability. Comprehensive Plan Update 2016 Page 7-13 Utilities Element Policy 14a-4.2: Complete replacements and improvements to the wastewater system in accordance with the current Wastewater Svstem Functional Plan c„pifal 4ffip.,,__effien "r-egit Comment[DP38]: HK3.. Police �� 14 . 3: ;' nary e Identify revenue sources ecessfor wastewater system related materials,projects,facilities,personnel,and maintenance and operation of equipment. Policy 14D-4.4-3: Ensure that new development pays its fair share of the costs of wastewater system development through the use of system development charges. Policv 14a-47.54: Continue to provide wastewater utiliry rate assistance to low income households • Comment[TJ39]: HOToo specific Stormwater art'fownsend's surface nater system consists of wetlands and constructed systems that manage drainage Comment[DP40]: provide flood protection,and water quality treatment Surface water manaoement is imis important to meet social, M-36. the following economic,and ecological needs including flood protection,erosion control,water suoolliroundwater addresses inventory and recharge fish and wildlife habitat and recreation. forecast need. Impervious surfaces in an urban,growing community such as Port Townsend can affect surface and groundwater quality through stormwater runoff containin212ollutants from roads and parking lots and landscainc. Impervious surfaces can also decrease groundwater recharoe and increase the quantity of peak flows of runoff. The existing surface water drainage s;stem is meetinp capacity requirements under normal conditions. However in some areas of the Cite,the system has become inadeduate to serve present needs during lame infrequent storm events. Problems include flooding and ondino caused bvinadecluateh-sized pipes,ditches and detention facilities. As new development and redevelopment occur.Low Impact Development ID) practices would be implemented to conserve native soils and vegetation,protect hydrologic processes (e.o.infiltration ,and reduce and treat overland stormwater flow to more closely match native forest or prairie conditions. Selected examples of LID techniques include bioretention planters,rain oarde ns and permeable sidewalks to provide water duality treatment and reduce stormwater flow. Stormwater Utility Port Townsend's Stormwater Utility manages stormwater and surface water in the Cite limits. The boundaries of the Cirv's stormwater service area are the same as the city limits. The Utility develoos policies,basin plans,development design standards and capital improvement pro�ecl is in order to maintain and restore the duality of Port Townsend's surrounding waters,improve drainag and reduce flooding. The Citv currently operates a storm system maintenance program that includes cleaning catch basins,oi-,�es and other facilities.alone;with a street vacuum sweepinppropram. The maintenance programs remove sediment and pollutants from Cite-owned and operated storm systems and streets,which reduces flooding and non-point source pollution from being dis�haro ed into water bodies in the City. As the Cite- develops,greater demand is placed on the Utility to provide plannincr,reg�ulatory oversicht, can'ital p IecI t implementation and maintenance services it provides today. Comprehensive Plan Update 2016 Page 7-14 Utilities Element Stormwater Quality Goal 1522:4" Protect and manage Stormwater quality through the use of current design practices and standards�ta minimize the impacts of land use development and stormwater runoff,on natural systems,fish and wildlife habitat and public health.1 Comment[DP41]: HK3-clarification Policv 152-2.1: Review each public and private development project to ensure conformance with the standards of the City's Stormwater ll a ffto , 0fa:r�����ra"I.-I la�ttgEnoineerino Desion Standards 7 and the Department of Ecology's Stormwater Management Manual for-Western Washinotonp'171_�to-ensure that discharges of Stormwater into ponds,drainage corridors,wetlands.crnoundwatei,salt water and other water bodies,da not result in a dem adation of water dualitv.1 Comment[DP42] HK3—move 22.4 to b b b here r. r Comment[DP43]: HK3—delete— PolicSr 152-2.3: Regularly update the EnoineerinoDesio�n Standards and the Stormwater iNianacrement-Planredundant—covered by t to maintain up-to-date policy 22.1 practices and standards and to promote law impact development(LIDtechnidues that combines engineering with the preservation of natural s st�� ems. Comment[DP44]: HK3—addresses _fistffe that . ,11--61 current stormwater practices Stormwater Quantity nl@4+ par flr--ire-rsn C r+nmr �r r rn rh Co moentd[DP45]: Goal 15-224:TManage Stormwater quantity in a way that mimics nature i.,_a-ele.e eh f,,fel'-Liti s, e f fhe�(i.e.,ft"natural drainage systems" approach)L.Ai'le„„......fig t a .rr b b Comment[DP46]: HK3-This is covered Policv 15 .1: Preserve natural surface and subsurface drainage systems to the maximum extent possible. by goal 22 and policies b z b Comment[TJ47" HK3—delete the detail Policv 152—;.2: Pursue strategies intended to reduce Stormwater runoff to levels not likely to cause flooding, —it is m codes and significant erosion to natural drainage-ways or significant degradation of water quality ds stern IIIV— �. Comprehensive Plan Update 2016 Page 7-15 Utilities Element . b. . g f eg , Comment[DP48]: HK3—outdated delete Policv 15z—;.3: Ensure that stormwater quantity from new development does not exceed natural historic the"how tos„These flows,unless regional facilities are in place which can accommodate the increased flows are covered by design without detrimental impacts to other properties. standards,SW Manual and regs (Policy 15 .4: Comment[DP49]: Protect wetlands and other environmentally sensitive areas HO—reword for clarity fromfrom floodino and increased runoff from new development and land clearing activities a and current practice. Stormwater Facility Maintenance & Operation Goal 16-224:44-FnNlaintain stormwater facilities to ensure their proper and intended function. Policy i6-24.1: Inspect and maintain stormwater facilities in accordance with the Best tnManagement Practices of the Department of Ecoloz-Stormwater Management Manual= fef the r, Policy i6-24.2: Ensure that 44trk-w44 private property owners+e�maintain stormwater t r t,•~a facilities in accordance with Best Mananement Practices and.t-he ; � f Afttt fer 4te P � Comment[TJ50]: HK3—update Policy 164.3: Allocate adequate resources to maintain stormwater facilities and natural drainage systems. term noiogy Stormwater System Financing Goal 1625:4� Provide financial resources to appropriately operate the Stormwater rti-�g Utility and construct capital improvements. Comment[DP51]: HK3,02,M36—Cable Policy 1625.1: Maintain stormwater utility rates at a level appropriate to conduct necessary operations and TV and maintenance activities and capital improvement projects. telecommunications have been combined Policy 16 .2: Establish fees and charges to recover utility costs related to development and,where feasible, into one section in this new draft These allocate costs to user classes to reflect the true cost to the utility. sections and policies have been extensively Policy 1625.3: Pursue a wide variety of funding options,including low interest loans and state grants. updated due to changes and advances in �� �� ��� technology in the last 20 years;and to address Telecommunications in Port Townsend include both wired and wireless telephone sers,vicecable and satellite res l ency;however, television and high-speed broadband technologies. As telecommunications technologies have evolved, general policy mentis convey ence of these technoIocies has occurred,resulting in multiple communication services mipratiri�into mit. consolidated networks. Comment[DP52]: M-36. Section begins with inventory Comprehensive Plan Update 2016 Page 7-16 Utilities Element Conventional telephone service in Port Townsend is provided by Centur)-Link. Telephone facilities consist of transmission lines and switchino facilities. Centur)Link currently uses both cooper and fiber optic cable to provide telephone service and data/internet service. Cable services are provided by Wave. Cable facilities consist of a microwave relay site and a branchinc,trunk s)stem of overhead and buried cable. Wave currend)operates both copper and fiber optic cable to rovide cable television_phone service via voice over internet protocol(V0I1') and data/internet service. Northwest C7pen cress Network )aNetis a non-profit wholesale telecommunications provider which currently operates a fiber optic network which provides high-speed broadband infrastructure in Port Townsend. Cellular phone service is provided by a number of different providers. Cellular facilities consist of switching stations and antennas or towers which transmit and receive radio signals. Correnti)-there are nine antennas located throughout the cit)-. Goals and Policies: (Iggj17 4 �C e lra�an� tr, h 6awllr.a �rrrr� rrrnun�aa eta in�w luta➢a arw t b A nwSauaA hath a u � tiws a�aa.r,to all Port Townsend-residents and businesses.��� Comment[DP53]: HO—existing policy Folic)- 17 . 1: Negotiate mutuall)-beneficial franchise contract conditions that support the delivery moved to here. of high-dualit)-cost-effective services desired by Port Townsend residents and businesses within all areas of Port Townsend. �t to ecommumcations rove ers to'al 4: akP a'al1(;�A P'alb . dao a�)w,1�`��r y2. � A`�'or`.. `a`�at � �^�,rk ��^I41a`„kpa�, rmh ".r p �i. rta 611 o64t#4t46vWslnfrastructure r ga ii,, of Policy 17 .3: I2eduire wireless communication structures and towers to be desipgned and sited to minimize aesthetic impacts. Po[at) 1?7a�,h.2,1. ®q,irtai� r;tg?,t Ixira.QT ,r�aqLMdIr(tvOrka air in i w@t ht.iyrraorr,. �aolaa),1729.6.';5. lira 111akprartP,aow, athair 1h("sone gr;a oakIhIal rate na t0r lalur �l.( �a;,rt'ta Yatialmralatl, W:1 I I ::::I and � '�,St, tatia�w�lmrltllt IJ11 2,11,14 xaN` rizw ir(; ,1arriw l <,arrizriz�ti;ri�'altaoir`�: orizriILAI a a0owr airlR g,�tc r 1➢P,tQwN ll Pa IrN t a1I h(, ak�'qp a@ sura@ 1oa al a@ to m-lpaz 1��. Pohc)- 17a-6.47: Ensure wireless communication facilities will not be detrimental to public health, safetyy vel�fare�. Comment[TJ54" 02-added as similar terminology is on other plans. Cli i-Ali+�i n� C.- pyiee Comment[TJ55]: HK3 replacedwith policy XX.2 above under new section "Telecommunications" Comprehensive Plan Update 2016 Page 7-17 Utilities Element Policy 17-26.4-8: Ensure that communication tft4le service incorporates the latest features and improvements as they become technologically and economically feasible. Comment[TJ56]: HK3 (Policy 17.9: Promote improvements and additions to communications facilities needed to accommodate demand. Comment[TJ57]:z HK3 Policy 17.10: Implement the recommendations of the Economic Development Element of this Plan to assist in providing state-of-the-art telecommunications infrastructure for business,education Qublic affairs,and consumer uses.) Comment[TJ58]: Still relevant? Comment[TJ59]: b HK3—Included in b policy XX.2 above. Comment[TJ60]: HK—Included in a b policy XX.2 above which is written more broadly. ally .....:fir wl �1on wlwwr wl ww�1 1 i rmi �1@ Comment[TJ61]: '-� HO we don't do this Service to Public Buildings Comment[TJ62]:HK3-Moved up to new Goal 18 :4� Use advances in`e'�-�� &�cable and wireless-technolo ig_esy to improve communications to section and from public buildings. ommunications" Policy 18 .1: Require that eftWe service to and from major public buildings allows programs to originate from,and be received at,the same location. Policy 18 .2: Ensure that tft44e service to schools,medical facilities,police and fire stations,libraries,and other major public buildings allows intercommunication among locations as such capabilities become technologically and economically feasible. Focal Access Programming Comment[TJ63]: Goal 19-8: Assure that the local cable utility provides a high quality of local access programming. Need to stili review this for currency Policy 19-8.1: Ensure that cable service includes one or more cable service channels that are responsibly and fairly administered in the public interest. 28.1.1 --Work with the local cable franchisee to establish a minimum level of service standard for public,educational and governmental(PEG)programming. Consider a LOS standard of.30 public access channels per 1,000 in population. Policy 192-8.2: Prepare a Community Television Plan to guide the administration of local access channels. Policy 192-8.3: Ensure that administration of local access channels emphasizes opportunities for programming of local interest,for example: a. Locally produced programs by organizations or individuals working with video,film, slides,or live performances; Comprehensive Plan Update 2016 Page 7-18 Utilities Element b. Educational programs for credit and/or for training purposes,or public meetings by local educational bodies; c. Public meetings held by governmental bodies;and d. Tele-conferences,and training programs by governmental bodies. Policy 192$.4: Work with the cable franchisee to establish adequate local studio facilities.1 Comment[DP64]: Review.... Tnlnrnrnrni ir�ir-�+inr�r ° wri l w4� ri �ms�=si wtvr= wlw� i w Comment[TJ65]: HK3 Moved up to new section, "Telecommunications" b "I'll-P11 I 111 11 U Comment[TJ66]:z HK3 Pa��i 7 w w ...... � lrl �w� �: �i�����lt��� rw���r�-� -�•�i' �t w� -��=i���w� ;l�s-g i��! -~�w���=l�t-www:4� Pa��i7w �....._-����t������1�•���rowr�$rd���-•��~� r�� r =����r�=�i=���-� a��:1-����w�-i��i� tl��-�� w:W � 4�=w ���~�=� w�l����w Comment[TJ67]: HK3 Moved up to m new section, b "Telecommunications" x.r:n .. „and a nsu ffi,r ttse I Comment[TJ68]. Still relevant? Electricity Electricite is distributed in Port Townsend biJefferson Public Utilitc-District#1. The PUD maintains a variety of transmission lines,distribution lines and substations in the area for provision of power to local customers. Goal 420:To work with the serving utilities to plan and allow regional and local improvements to electric facilities and include prospective service plans for facility development within the City's Comprehensive Plan. Policy 240.1: —Ensure that City decisions respecting electric utility facilities do not negatively affect the availability of safe and efficient electrical service in neighboring jurisdictions. Policy 240.2: —Accommodate additions and improvements to electric utilities in a manner consistent with the needs and resources of Port Townsend as well as other neighboring jurisdictions. Policy 240.3: —Encourage the serving utilities to make additions to and improvements of electric utility facilities to provide adequate capacity for projected future growth. 2-30.3.1 —Provide the electric utility with annual updates of population,employment and development projections. 2-30.3.2 With the utility provider,jointly evaluate actual patterns and rates of growth,and compare those patterns and rates to electrical demand forecasts. Policy 2-30.4: _Recognize the need for electric utility facilities that are sufficient to support economic development. Comprehensive Plan Update 2016 Page 7-19 Utilities Element Policy 240.5: _Encourage the serving utilities to coordinate and cooperate with other jurisdictions in the implementation of multi-jurisdictional electric facility additions and improvements. Coordinate procedures for making specific land use decisions to achieve consistency in timing and substantive requirements. Policy 20.6: —Encourage the use of joint utility corridors,provided that such joint use is consistent with limitations prescribed by applicable law and prudent utility practice. Policy 240.7: —Work with providers to appropriately place electric utility facilities within public rights-of- way. Policy 240.8: —Continue to implement the City's existing agreement with the serving utilities regarding vegetation retention and management. Policy 2-30.9: _Continue to work with the serving utilities to eliminate the use of pesticides and herbicides in the management of electric utility facilities and corridors. Poficy 2-30.10: In cooperation with the Bonneville Power Administration(BPA),other direct energy providers,and the serving utilities,examine the possibility of purchasing electric power directly from BPA or other energy providers as a wholesale customer. rn..,a 7n 2782,-+;.2-, ,Na-,_; ffibef 44,_20W4 ci hnm�i > Comment[DP69]: Still relevant?? Energy Conservation and Alternative Ener Sources Comment[DP70]: Goal 241:�' Promote the efficient use of energy and resources,and the use of non-fossil-fuel alternative 02.. energy sources and technologies. Policy-321.1: _Facilitate and encourage the efficient use of resources to delay the need for additional facilities. Policy 2-31.2: _Promote the conversion to cost-effective and environmentally sensitive technologies and non-fossil fuel or cleaner energy sources 'e.g.,selff„ne--gy fl -....,.] ___ „a-,-\IComment[DP71]: 02—broaden to Policy 2-31.3: _Ensure that City facilities and personnel conserve energy resources I� .g,„__ ne`he address resiliency Comment[DP72]: Policy 2-31A _Work in partnership with the serving utilities to promote public education efforts which HK3-delete detail-. emphasize the efficient use of energy and resources. Policy 2-31.5: _Encourage construction of an electric car charging station in downtown Port Townsend. Policv 241.6: Utilize technology to reduce energy use and conserve rr��esaurcesl. Comment[ 3]: nA sta s��e���re� Solid Waste 02 Docket Item#2" Overview While solid waste collection is managed by the City,Port Townsend maintains an interlocal agreement with Jefferson County for disposal of collected solid waste. This interlocal agreement also authorizes.Jefferson efferson Countv to include Port Townsend in Comprehensive Solid Waste iManap -it Plan. Port Townsend's Solid Waste Util ty administers the Cites solid waste recyctino and yard waste collection for all residents and businesses through a contract with Waste Connections of Washington,Inc. for the City. The Cit;'s Solid Comprehensive Plan Update 2016 Page 7-20 Utilities Element Waste Utility also develops and manages Port Townsend's rec vcG linor.pro4ram,waste reduction,hazardous waste education and special collection events. Collection Process and Solid Waste Facilities Solid waste is collected every week along with either yard waste or rec-cting which are collected every other week. The collected waste is brought to Jefferson Count,'s Transfer Station located off of Jacob Miller Road. Residents of unincorporated Jefferson County,as well as City residents are allowed to use this facility for self- haul dist osal. All solid waste produced in Port Townsend is brought to the Klickitat County Roosevelt Regional Landfill. All recyclables collected from singles famil-,duplex and multi-family residents are brought to-efferson Countv's Recycling Center off of Jacob 1Vliller Road while yard waste from single-family and duplex residents is taken to the Cite--'s Compost Facility located on Jefferson County's site. At this time,the caoacitie, of the Jefferson Count-Transfer Station,the Roosevelt Landfill,_efferson Counti's Recycling Center and Port Townsend's Compost F'acilit-are sufficient to meet current and future Cit-needs. Goal 2-32:44-Fftihlanage solid waste in a responsible,environmentally sensitive,and cost-effective manner. Policy 422.1: —Follow the solid waste management hierarchy established in federal and state law,which sets waste reduction as the highest priority management option,followed by reuse,recycling,and responsible disposal. Policy 242.2: _Promote the reduction and recycling of solid waste materials through differential collection rates,providing opportunities for convenient recycting,and bar developing educational materials on recycling,composting,and other waste reduction methods. Policy 2-32.3: —Seek to create a market for recycled products by maximizing the use of such products in the City's daily operations. Policy 2-32.4: —Contract with private haulers to maintain a cost-effective and responsive solid waste collection system. Policy 242.5: _Examine the feasibility of establishing a solid waste transfer station within Port Townsend in order to reduce costs to Cit-residents. Policy 2-32.6: _Manage solid waste collection to minimize litter and neighborhood disruption. Policv-322.7: _Protect air,water,and land resources from pollution caused by the use,handling,storage and disposal of hazardous materials and substances. Police—2-32.8-7 —Reduce City use of hazardous materials and safety manage,recycle and dispose of toxic products used in City operations. Policy 2-32. 99: Continue to participate with Jefferson County in the implementation of Jefferson County's Solid Waste Management Plana Comment[DP74]: HK3—change to full policy Comprehensive Plan Update 2016 Page 7-21 1 ErHead,n finition: 2:Font:Not Style Definition: Heading 3:Underline Formatted: Font: Swis721 Blk BT,30 pt r€ f _; 7 G,. J f�i�/W Edi �i,���lr ^°•� m ... ria/oo� i s u. Nu i t i INTRODUCTION 11714.1 Lua p"94b s4-.4,b1 t1a 4-.1... t-p"9tttl F td tb-ti .s k�.'xu"�--�-�-9-�P$9d:-""r 1j rrile.'n is�.4.b.-tafl4 identify and.d o.onjitt at4'.._t PV7ip"da Qbti_4;:PV7i4:t'a�,ti. -- -- _. .-. .- -- -- - -as---- o&iaaotvlfM-0. lat4 0u1a�4alit zruby 1a yQ.P:-ga��llPa a�Pa4atso.oii�bad&��biPd�� PPvl�ao�QtvvA 7ls --auifl,_4t71siuuA.-ca ital improvementsIkvlrA ta4 1aa:o iufl4 aN it t CrPv A_ll Pv1 tt t714 a ll 17A° r 4 4 aft C b pao iuNA; p 4 a ili:. td illiPs4_ tt71uN A_°a id 4 ray, .. .............. a t.l llit i A aN Co n oPv tvv ut7lrCy 4.'hp 4 u C tCsabt7l , Capital facilities fns„�represent the infrastructure,or foundation,of a community and are integral to accommodating growth. Capital facilities are defined as public facilities considered necessary for community development.Utilities include private and public enterprises__that supply Port Townsend with water, sanitary sewer,solid waste,storm drainage,electricity,telecommunications,and cable television.While some of these capital facilities and utilities are provided by the City,others are provided by other government entities and private companies. The Capital Facilities Plan-of the Comprehensive Plan consists of twa portions: this 20-year Element and the 6-year Capital Facilities Program. The the overall policies and strategies for the provision of adequate public facilities and services.It includes policy direction for funding and ongoing budgeting,a selection process,and maintenance of capital facilities for economic development.This Elemente-pIftrot also contains an inventory of existing and proposed capital facilities,and identifies deficiencies in capital facilities and the actions necessary to eliminate such deficiencies. z - Comment[DP1]: HK3-these paragraphs The Capital Facilities Program,as described at the end of the Element,includes the Cit s 6-year Ca ital ore froom,exis�gp�, Improvement Program and annual budget,as well the functional plans for various capital facilities and moved here to serve as departments which are incorporated by reference to this Element. ntroduction. PLANNING CONTEXT Growth Management Act Requirements The Growth Management Act(GMA)requires that communities adopt comprehensive plans tha are designed to guide orderly development and growth over the next 20 years. Cft r t fteir GMA addresses capital facilities and utilities independently regarding planning requirements,particularly concerning funding issues. Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-1 r--i+n ili+inr rrl-�r�r�ir�rs rnrvi�irmm�r�+r r`r� ii+iii+inr The County-Wide Planning Policy Reg!lirmmeri+ The Capital Facilities Q.T 1,:r,",s Element of the Plan must*kl be consistent with the County-Wide Planning Policy for Jefferson County(Policy#2, "Promotion of Contiguous and Orderly Development and the Provision of Urban Services to such Development").The relevant sections of that Policy are summarized below: • The full range of urban governmental services at the adopted level of service standards will be planned for and provided within urban growth areas (UGAs),including:water;,sanitary sewer;,piped fire flow;,and stormwater systems. • New development must meet the adopted level of service standards established for UGAs as a condition of project approval. Standards must include interim provisions for urban facilities identified in the capital facilities plan.New development will be required to contribute its proportionate share towards provision of urban facilities identified in the capital facilities plan. • Urban services and facilities will not be extended beyond UGA boundaries unless needed to protect the public health or welfare,or to protect an area of environmental sensitivity. ®—The minimum design capacity for all planned capital facilities will be based upon the total population projected for the service area at the end of the 20-_gear planning period. ffn • �'l " � � a 1$+ t: � tl 1 ;§ V llo- m s : rte;l� awal ltr;�d ; :1 � : r Comment[DP2]: HK3—to match the outline of other chapters of the Plan for this update,narrative from the existing plan has been included under the section challenges and opportunities and edited as appropriate Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-2 Quality of Life Capital facilities fM4 -_,:,:.: directly affect a community's quality of life.Determining the appropriate type, location,and amount of public facilitiesft ,.,:r , is a key component of the Comprehensive Plan.These facilities will significantly influence the community's growth over the life of the plan. Participants in the Port Townsend 2020 process defined several objectives as important to the quality of life in Port Townsend.These objectives are described within the Community Direction Statement contained in Chapter III of this Plan,and include: • To enhance the diversity and strength of Port Townsend's economic and employment base by encouraging environmentally sound businesses,with minimal impacts on natural resources. • To maximize the safety and security of Port Townsend residents by encouraging residential development within distinct neighborhoods that are provided with adequate public facilities and utilities. • To carefully redevelop shoreline areas and increase their accessibility both from the land and from the water. • To reduce reliance on the automobile and encourage the establishment of pedestrian and bicycle oriented transportation options. • To take an active role to ensure the preservation of Port Townsend's manor parks,open spaces, environmentally sensitive areas,and marine vistas. • To promote the highest standards to preserve the natural environment and Port Townsend's high quality-of life. • To maintain and enhance Port Townsend's standing as a center for the arts and cultural events,and to build the City's status as a regional center for learning. • To preserve a tangible link to Port Townsend's celebrated past by ensuring the preservation of the Cies manor historic sites and structures,and by encouraging new compatible development. • To provide a variety of housing choices for Port Townsend residents,including affordable housing. All of these aspects of community development are dependent upon the provision of adequate capital facilities and utilities. , Concurrency To serve new growth and development,the GMA requires that certain facilities and services be provided concurrent with new development.In the case of transportation improvements,a financial commitment to provide them within six gears must be made.Facilities which are subject to concurrency in the City are transportation,water,wastewater,and stormwater. .g., , g , . ; Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-3 ftgfeeffietif on .g., Essential Public Facilities The GMA requires that the comprehensive plans of cities contain a process for identifying and siting "essential public facilities" (Chapter 365-195-340 WAC). "Essential public facilities"is a specialized term that relates to larger"regional"facilities,like landfills,prisons or airports.Typically,it is difficult to find locations for these facilities due to neighborhood opposition. The GMA gives local jurisdictions authority to define essential public facilities which are subject to a separate siting process.The County-Wide Planning Policy for Jefferson County includes a list of difficult to site facilities and services (i.e.,CWPP 4.1).This list is not intended to be all inclusive.Rather,it should function as a guide for the City,service providers,developers and residents.Listed facilities include: • Local waste handling and treatment facilities such as landfills,drop-box sites and sewage treatment facilities • Airports • State educational facilities • Essential state public facilities • Regional transportation and stormwater drainage facilities • Utility facilities • State and local correctional facilities • In-patient facilities (including substances abuse and mental health facilities) The Comprehensive Plan . . Aewe-ecr-peheies-should establishop licies be-es-�, to ensure that essential oublic tle,,;e facilities are compatible with adjacent or nearby land uses.4` .The County-Wide Planning Policy for Jefferson County includes a list of criteria for the siting of essential public facilities 11-1� •1- � * � -�' Geffipf .These criteria have been incorporated inpolicy 7.1 of this element. Comment[DP3]: Renumber the reference Endangered Species Listings In March of 1999.the National Marine Fisheries Service aNINIFS) determined that the summer chum oii, atino from Hood Canal and the Strait of duan de Fuca represented an Evolutionavh Significant Unit Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-4 (ESU),and formally listed these fish under the Endangered Species Act BSA) as a threatened species. NOAA Fisheries listed 44 steelhead stocks for protection under the federal Endanoe� red Species Act in dila) 2007. , t " -" ."Port Townsend has no salmon streams within its City limits,but is surrounded on three sides by a sensitive marine habitat,and draws its water from rivers that are significant spawning grounds.The US Forest Service and Cit-signed a 20-)-ear renewal of three special use permits for the operation and maintenance of the municipal diversions and transmission lines in 2009. One of the new permit conditions includes a requirement to maintain a 27 cubic feet per second(cfs)instream flow in the Big;.Quilcene River below the municipal diversion.The minimum instream flow for the Little Ouilcene River is 6 cfs through the diversion. Endangered species listings could have profound importance on capital facilities lannin2,and there necessitates r-eeffiphast5-es, the Cies commitment to take utmost care of our natural systems.The City has already taken important steps,including: • Capital Facilities -The development of a wastewater treatment facility with secondary treatment,the creation of the Stormwater Utility preserving and enhancing natural drainage systems,reducing the rate of increase of toxic runoff related to automobile use through development of a nonmotorized transportation system,and management of the drinking water system with the needs of fish in mind. • Regulation-Passage of environmentally sensitive areas regulations,regulation of activities through the Shoreline Master Program,implementation of best management practices for development under the Engineering Design Standards Manual,and adherence to the controlled growth principles of the GMA. In the future,the City will participate actively with other jurisdictions in the development and implementation of regional management plans for protection of the listed species,will continue to improve the protection offered by our regulations,and will implement the capital facilities projects called for in this element of the Plan to improve the wastewater,water,and stormwater systems of the City. . 2 , CAPITAL FACILITIES INVENTORY, This section provides a brief summary-of existinc publicly owned capital facilities and services that sup ort and provide services that are needed b)the residents and businesses of the Cirl. The descriptions are intentionally brief the documents listed at the conclusion of this Element contain more detailed information on existing and planned capital facilities in the Citi Fire and Emergency Medical R Fire and Emerp�enc, Services are provided by Tefferson County fire Protection District No 1,commonly referred to as East�efferson Fire and Rescue(E F[�R). Ef FR provides fire and EiNIS services to the Citi of Port Townsend as well as the unincorporated Tefferson Counti-communities of Cape Georore,Chimacum, Irondale Kala Point iNlarrowstone Island and Port Hadlock EJFR has a total of six stations,three of which are staffed 24/7. EJFR is equipped with six engines,two tenders seven ambulances two utility vehicles two brush trucks and five staff vehicles. Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-5 Police The Port Townsend Police Department provides community ohdri through problem solving,crime prevention and law enforcement in the Cit)-,and backup for surroundin2iurisdictions.The Police Department's operation center is located in the south wino of the Mountain View Classroom Building,.This space contains a properti-&evidence room,a classroom,a physical fitness training room,a citizen police volunteer room,a squad room and administrative space. gf VI Domestic r The Citv of Port Townsend's municipal water system is supplied b gravity from the Big and Little Quilcene I2iver�throuoh the Lord'-s Lake and Cit Lir fly reservoirs and a 30-'mile ipehne. The existin surface water system has been in operation since 1928. In addition toserving t� he Cit ,water is provided to the Port Townsend Paper Company The Citv provides treated water for approximatehv 4,950 connections in a service area which totals 10.8 sduare miles. In addition to the city limits,the water service area includes the Glen Cove Area to the south of the Citi-and an unincorporated rural area lust to the west of the Citi-. The system consists of 30 miles of transmission oipipes,100 miles of distribution pipes,700 fire hydrants,a one million gallon standpipe and a five million ogallon reservoir The Citi-is currently constructing a microfiltration water treatment facilitG to comi�ly with federal Safe Drinking eater regulations,alone with a new five million gallon reservoir to replace the existing 35 year old reservoir. Sanitary Sever The Citi-owns,ooerates and maintains its Wastewater Utilit, which has a service area that encompasses the Port Townsend UGA(currently the Cite-limits). This si-stem consists of approximately 70 miles of c cavity sewer,three miles of force mains,seven sewaco�e lift.,;tatio ris,1,250 maintenance holes,one compost and bio: solidsfacility and one secondar-wastewater treatment facility-. Some properties in the Cite are served b) private septic systems. Storrnvater and Surface Water The Cites stormwater system consists of conveyance detention and treatment facilities as well as natural s-stems rhatt4iie4 collect stormwater and surface water runoff within the Cit-limits. This s-stem includes approximatel;25 miles of storm pipes,1,400 catch basins and 100 storm maintenance holes as well as raing�ardens detention and treatment r onds,infiltration trenches and roadside ditches. Transportation The Cites transportation system includes 93 miles of roadway,of which 8 miles contain bicycle lanes,31 miles of sidewalks and 34 miles of trails.Public transportation facilities are operated bpJefferson Transit Authoritv and include the Haines Place Park and hide and various transit stop shelters.The Washington State Department of Transportation is responsible for the maintenance of the 2.7 miles of State Route 20 which is within the City limits;and its associated facilities and the�N'ashington State Ferries is responsible for the Port Townsend to Coureville fere-)-route. Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-6 General Government The City owns Ieases,and operates a number of other capital facilities to provide administrative, maintenance,or special services. Facilities include: • Beech Street Nlaintenance Shoos • Carnegie Library • City Hall • Cotton Building • Girl Scout House • Golden Age Club • Golf Course Clubhouse&ihlaintenance Shoos • Harrison Street Parks Maintenance Bwldin, aterBarn) • Kuhn Street Office • Mountain View Commons • Charles Pink House e Pope Marine.Building Parks and Recreation Port Townsend's park system consists of four communityparks and 2419 neirhborhooLurban pocket parks. The Cit`'s parks and recreation areas feature ball fields,rla grounds walking paths, wetlands,communitti gardens,a dopark,a skate park,picnic areas,an indoor pool,and restrooms. The Citi also owns a 56—acre 9-hole public golf course which is currently operated under lease. It includes a driving range,putting oleen chit�pin greens,and a clubhouse with a pro-shop and lourip Fort Worden is a 434--acre State Park with over two miles of saltwater shoreline located at the northeast corner of Port Townsend. The.42 arkoffers 80 campsites,35 housing units and other overniht accommodations for family vacations,conferences,reunions and retreats. The parrs main campus is or erated by the Fort Worden Lifelong Learning Center Public Development AuthorithFort Worden PDA), .Jefferson County owns and maintains two small parks within the Cite:North Beach County Park and Court House Park. jh=f efferson Count;also owns the tefferson County Fairgrounds property andT they r provide maintenance for all of the Larry Scott-Memorial Trail,including the section within the cit,-limits. Public Educational Port Townsend School District No. 50 (PISD)spans approximatel; 58 square miles and serves over 1,200 students in preschool throu,h twelfth grade. PTSD has one elementary school,one middle-school and one hioh�, school. Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-7 CAPITAL FACILITIES GOALS & POLICIES The following goals and 7policies, form the foundation for the Capital Facilities f a 4�, Element of the Port Townsend Comprehensive Plan.4 Sffffeffienf._ Capital Facilities - General Comment[DP4]: Goal 1:4" Plan and provide adequate public capital facilities rfa-_,.,. , to address current needs and x1 3—changes in this ® section are growth and development. housekeeping updates Policy 1.1: _Design public facilities to be compatible in scale and design with surrounding uses,and to incorporate common design elements that enhance a sense of community and neighborhood identity. Policy 1.2: ®Determine capital facilities ftft4-- -needs based on adopted level of service standards, adopted population projections,and the growth patterns established in the Land Use Element.Use population projections for the 20-_F� eyear planning period or ultimate build- out under the growth patterns established by the Land Use Element to determine City needs for water,wastewater and stormwater facilities. e5 6 Policy 1.3: _Promote conservation of energy,water and natural resources and the use of alternative technologies in the location and design of public facilities and utilities4f e �r� I Policy 1.4: _Provide adequate public facilities and responsive and efficient public services in order to attract and support commercial and manufacturing development consistent with the Economic Development Element of this Plan. Phasing of Capital Facilities 44s. Goal 2:'fie-pPhase the timing and provision of capital improvements in a manner that promotes orderly growth and development and the efficient use of City resources. Policy 2.1: _Ensure that the growth and development patterns established by the Land Use Element minimize facility demands for transportation,water treatment and distribution,wastewater treatment,surface water management,and police and fire protection„ Policy 2.2: _Make efficient and cost-effective use of existing public facilities,including such techniques as: conservation;demand management and improved scheduling;shared use of public facilities;and the use of alternative and emeiging technologies. Comment[DPS]:02 Policy 2.3: _Expand public facilities,or construct new public facilities,only when necessary to achieve efficient service delivery or attain identified levels of service. Policy 2.4: _Identify and designate urban capital facility ftft4tt � -growth tiers which are consistent with and support the growth and development patterns established in the Land Use Element. g -- Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-8 �I' -� Policy 2.5: _Within the framework of the annual Capital Improvement Program (CIP)process,prioritize the provision of capital facilities,services and utilities. z z z b Comment[DP6]: HK3—delete the"how Policv 2.6: _Consistent with policy2.5,above,the City should not provide facilities,services and utilities tos". covered by in unserved areas unless clearly specified within the annual CIP.However,developers and functional Plans and the home builders may,at their own expense,provide facilities,services and utilities for new CIP/CFP development in presently unserved areas,provided bfts-c�adopted level of service standards are met. Levels of Service Goal 3:4� Provide adequate public facilities that achieve and maintain the level of service standards for the existing and future population. Policy 3.1: Use the following level of service standards for public wastewater and water facilities: Table 8-7-1: Water and Wastewater Level of Service Standards TA13LE V11-4!WATER&WASTE;X ER LEVEL OF SERVICE STANDARDS Formatted Table Gi+y­. Raw Water Supply "&ft eftpiff 4'a-Sufficient capacity to fulls serve Cite customer demands t . c._ __ ;4 n n / t / �_ "- = Areft! ___ Formatted: No Spacing Raw Water Storage s nrv) � � A Minimum of 60 days of storaoe for City Formatted: No customer demands Spacing r..; ! re u.W 11, ....c .. .. Formatted: No Spacing r �" d w, f cf "I flow volume that meets peak demand and Water System �� fire flows. r �n__ .. _ Formatted: No Spacing Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-9 iTA13LE VII-4!WATER&WASTE;X ER LEVEL OF SERVICE STANDARD& Formatted Table Formatted: No Spacing Wastewater System level that allows collection and treatment of peak wastewater flows and meets Dept. of L,colo" Formatted: No criteria Spacing Policy 3.2: Use the following level of service standards for determining the need for vehicular transportation facility improvements: Table 8-7-2: Transportation Level of Service Standards TABLE VII-2!ARTERIAL/COLUECTOR LEVEL OF SERVICE ST I I ITI I I"C Urban Corridor D Other Roads w/in Urban Growth Area(UGA) D Policy 3.3: Use the following level of service standards for public facilities: Table 8-7-3: Public Facility Level of Service Standards TABLE VII-3:PUBLIC FACILITY LEVEL OF SERVICE STANDARDS, r ffieesGeneral government Facilities that are safe facilities meet applicable codes and are fulh�accessible Facilities that are properl,-sized,designed for their intended purpose,and flexible to evolve to meet future chanoino demands Fire&Emeroencv Services 76n sq. c i, 44n h��._, . n�Average response time 8 (Provided b)-Jefferson Fire and Rescue ee minutes 90%of the time for fire and medical calls in fteAfte rncrrracs the cit Comment[DP7]: Verify with EJF Police Protection: Facilities and equipment sufficient to meet the demand for police services Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-10 T R 13 ti VII-3!PUBLIC.T("R R C"TT T'T'Y Y EV T OF SERVICECollC"T'RATT9 A mF9 C' --- -ii _. _�__7 647 "I peptflff'iefir Parks �7.6 acres/1,000 population Comment[DP8]: *Local service standards for equitable access. Judy to address distribution and function and as outlined in the City comment on access and distribution. of Port Townsend Parks.Recreation and Open Space Functional Plan T T,.i-.,.,,.,,�-,-,,.�-.f s ,. f,.}-.1',lied by fhe 71(lT-1 Stormwater and Surface ace��aterxw.arrrmcrn� crrc cfef ffi_r.,fe f ffii.,,effi iif Mffiih.i A level of conveyance detention and treatment that meets the DOE Stormwater Manual adopted by the City or as defined in the CitNas Stormwater Master Plan Concurrency Management Goal 4:4� Ensure that water,wastewater,stormwater and transportation facilities are provided concurrent with new development,based on the City's adopted level of service standards. Policy 4.1: ®Evaluate each development to ensure that it meets the Cites adopted level of service standards for water,wastewater,and stormwater facilities prior to issuance of a building permit.Evaluate each development to ensure that it meets the Cites adopted level of service standards for transportation facilities within six years of issuance of a building permit. Policy 4.2: ®Review and condition each development to ensure that appropriate provisions are made for facilities,services and utilities not required for concurrency,including,but not limited to: a. Fire and emergency medical services (EMS); b. Parks,open spaces and trails; c. Law enforcement;and d. Schools and school facilities. Policy 4.3: ®Provide the following options for applicants when adequate public facilities are not available concurrent with the impacts of development: a. Mitigate all development impacts on levels of service;or, b. Revise the proposed development to reduce impacts and maintain satisfactory levels of service;or, Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-11 c. Phase the development to coincide with the availability of increased water, wastewater,and transportation facility capacity. Comment[DP9]: HK3-completed for Funding & Financial Feasibility transportation Goal 5:4� Provide needed public facilities within the City's financial capabilities or within the CiWs authority to require others to provide such facilities. Policy 5.1: _Base fke cGapital fPacilities PPlan>�on estimates of local revenues and external revenues which are reasonably anticipated to be received by the City. 5.1.1 _Consider a wide variety of potential funding sources to finance the capital improvements specified in the Capital Facilities Plan,such as:real estate excise tax; user fees;general obligation bonds;and impact fees. 5.1.2 _Match revenue sources to capital projects on the basis of sound fiscal policies. Sound fiscal policies include:cost-effectiveness;prudent asset and liability management;ensuring that the length of financing does not exceed use of the CiWs borrowing capacity,prudent use of the CiWs borrowing capacity;and maximizing the use of grants and other external revenues. Policy 5.2: ®Finance the six-gear Capital Improvements Program to assure a positive balance between available revenue and needed capital facilities and utilities.If projected funding is inadequate to finance needed capital facilities and utilities based on adopted level of service standards and forecasted growth,make adjustments to one or more of the following: a. Level of service standard; b. Land Use Element;and/or c. Sources of revenue. Policy 5.3: _Ensure adequate funding is available for long term operations and maintenance costs prior to the construction of new capital facilities. Policy 5.4: _Ensure that new development pays a proportionate share of the cost of new capital facilities and utilities needed to serve thate development. Policy 5.5: ®Ensure that developers provide capital facilities and utilities concurrent with new development,or provide a contractual agreement for the phasing of facilities and utilities, subject to approval by the City. Consistency with Other Plans Goal 6:TEnsure that the Capital Facilities Element is consistent with other City,local,regional and State adopted plans. Policy 6.1: Ensure that functional plans �.,t` � and subarea plans � � f � Comment[DP10]: r-`n`-Plan)) are consistent with the goals and policies of the Comprehensive and HK3—delete specific Capital Facilities Plans. references Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-12 6.1.1: —Where found inconsistent with the Comprehensive Plan,process initial adoption--Of/revisions to functional plans and subarea plans as a Comprehensive Plan amendment during the annual amendment cycle. Policy 6.2: On an annual basis,reassess the Comprehensive Plan to ensure that capital facilities; needs,financing,and levels of service are consistent and that the Plan is internally consistent. Essential Public Facilities Goal 7:4� Ensure efficient and equitable siting of essential public facilities through cooperative and coordinated planning,with Jefferson County and other jurisdictions within the region. Policy 7.1: _Work with Jefferson Counter to jointly develop specific siting criteria and standards for essential public facilities.Elements of the siting criteria should include,but not be limited to: a. Proximity to major transportation routes and essential infrastructure; b. Land use compatibility with the surrounding area; c. Potential environmental impacts; d. Effects on resource lands and critical areas; e. Proximity to urban growth areas; f. Public costs and benefits,including operations and maintenance; g. Current capacity and location of equivalent facilities;and h. The existence,within the communitvl of reasonable alternatives to the proposed activity. Policy 7.2: _Ensure that the Comprehensive Plan and implementing regulations do not preclude the siting of essential public facilities. Unincorporated Areas Served by the City Goal 8:4" Ensure that urban level public facilities and utilities are only extended into UGAs and LAMIRDs and otherwise extended only if consistent with official land use designations- Policy 8.14�: ®Cooperate with Jefferson Counter to contain urban growth within appropriately designated UGAs,ensuring that commercial and manufacturing areas outside of UGAs: a. Are rural in character,scale and intensity; Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-13 b. Are served at a rural level of service;and c. Do not accommodate businesses and services that directly compete with uses within UGAs;or d. Are approved Major Industrial Developments (MIDs),which MIDs are permitted and approved consistent with GMA and interlocal agreement between the City and Jefferson Counter providing for siting and permitting criteria. . IS1711 ITV (`f ®I Q St. Df 1 Comment[TJ11]- This section has been } 7 i — C�_' r%^rn I I®t moved to the new Utility Elements section. ,,, fid i y land 5 �trrd- g s tindefgfetind 9. -2 .4eknowledge fhe ............ 94! '1 ' eftsfttre reftlie)ft rr,..:.-.,.... 1,.. J-,.EV IT rrf`f" .,. S F-11111 U.— re!-arz"ci r. Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-14 ('if®i IA/,n+ r I Ifilifci �`,,gmed;A4 ._. b ohe�-448! "� : : ------------ _e kefne kof �> y .. G, Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-15 "1 11 ILI 1/l6,nf^r Q%iccn,f rn Dinnninn t5 ," �. s. 61 �. :7: 6 �. gf 6 9. Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-16 �. PHhe�-44A .. . �a ._. g g' �. gs, . \/l6,nf^r nR inlifxi t 6 t y ,. g' .. ' 6 t 1_A,r+^r Q' ;FQ%cmc^rrt O rNrf^rrvn n rt% Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-17 �. . . As 1/l6,nf^r Q%inrn f°innne-;nn . 1"611-1 . ------------ �zts�r£��Zr g' � � Met V Poher 4:74 F1 (`ifai 9/46�cfaane�f�r I Ifilifar ��hlir t�l �lid•a �. ��ffai g s. ,. Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-18 pftf,eel[Ofd.No.2746, 3.2, Peeeffibef 6, 4999'1. Vef t S fhe S , Ghffl3fef 49.04 PTNIG;and ,—eeeffibef 6--1499+ . n bpidbille "b . b gf n ffeafffietif 7„ �T Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-19 SYMMS 4 �. C.'eicf�relt f 1�esal�tr-te^sltnraf �_ nA�nra�nrrae^sltnraf Ufbffn Gtowth Afea [Ptd. Ne). 2825, AS "annal,6,WAY. peen"open upgrawng agkg . design.Wher 403! Pahey 4A4! SW gav gvewth fateeftsf and allawanees. 20 yefff gf so 49.6.3 Defefffinie the appfeplafe eelleken pipe fe)install based nipent 4444 . g 49.6.6 Design fteafffietif ffteilities s.- er�f�r�t f`1a3e 'l [-,M.ent PGoal 20�4'e) eeer-dinfffe wftsfewoef faeiIf�-planning-�4h land Ia��irues 7 7 and gfewfli ffianageffietif objeelives. Comprehensive Plan Update 2016 Capital Facilities Element ( 8;-20 eensi,4t i T-2 c of flits, ele flier,. \/4f�acfaasao�far �'eicf�rala �iraPararirar^e �. ("iffy e�tane�f���r�l�l Poher 2-2.4! v, t v Poher 2-2.2! :Pse the PGR SL 6, t doe pfaeffia ,ifftnelfffIds'. Of wftfef, is es.t n n . g . s Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-21 t �> �. �. epperrr�iE t3afilring and 'g . Rneettfage tindefgfetindg in lit �. s, stiffffee, �. I"IF, I F-11111 1-1 1-11 1-11 �f�sr e P�f�r ��_�' i°Fei flA�ira#°cnra�rar�m $. �"tn�r�fi�ra_ 1-1 b Adgef t I SH 11 1 FH rrl6 A9� °0' rr! �ir4�Y9 P'1 Y9� Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-22 -. 6"ll� lif�i r%f Q^M1;e f% : l 1 26.`1. g, h.,:l,l:......,. y.. F-6111-11 6 b -28.4.4 WHAt b b Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-23 1?till: ffiee�ietgsheld by g f l bed ,.t(l � �" s. Polier 29.' in g 4 fer-btts'nes-s'7 r' g 6 . �. ' 4ece Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-24 g s . Rneettfitge a g ag" s " g her-bieides,in �. eg; S S , Cranrei%i ('`�ncnrvsrnfi�n "" y .. s. RK-ft on enefgysettfees, .g.,selff enng�t nowN go, Na. 2782, YKeyernbef 49,2404f �:rtlir! \/46��f� nn�r���e�rsle�raf . , , -> > dEfftienal ffiSar4a.,------------ �> S' by ffiff. 1 t Comprehensive Plan Update 2016 Capital Facilities Element ( 8;-25 efder-fe)fedttee eesfs fe Gtfr fesidetifs. Manage selid witsfe , . g , CAPITAL IMPROVEMENT Comment the: Hk3. Following thee format of other cities, the detail in the section The 6-year Capital Facilities Plan encompasses the most current Ca itp al Improvement Program,which is is not deleted from the supplemented b, the most current adopted City Budget,and the-+4e adopted functional plans specific to Comprehensive Pla as it is covered by individual City Departments,programs and other service providers. For detailed information and reference and explanations concerning existing,future and improved facilities,as well as the method€of financing them,the incorporation of adopted functional reader must consult these documents. The Capital Facilities Element incorporates by reference the plans and the annual 6- information and analvses presented ttin these other documents. The Caoital Improvement Prooram,,,� year CIP adoption through its referenced documents,provides inventories of existinc and proposed capital facilities,forecasts process by the City. future needs for facilities,identifies deficiencies and necessary improvements of capital facilities,and provides a financing plan. The Capital Improvement Program and supplemental plans are separate documents. Documen!a IEg� ted by Reference Functional plans are major.components of this Capital Facilities Element. The following functional plans are incorporated b reference and may be consulted for more detailed information ieorardino existing and planned facilities,service standards and facility development • Six Year.Capital.Improvement Plan (2016—2021 —adopted dearly • City of Port Townsend Parks,I2 ecreation and Open Space Functional Plan (2014 • Cit of Port Townsend Non-Motorized Transportation Plan (2011) • Cite of Port Townsend Transportation Functional Plan (2009) • Cite of Port Townsend eater System Plan (2008 Department of Ecolog i Stormwater i\ilanatrement iNianual for Western Washiri ton 2005 Wastewater Facilities Plan (2000 .As t3aff ef ifs bttdge�lliiig Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-26 . . . eftf3ifft!pfief]6 es 'I 1c,11- are and F1111-1 Plan by fhis fefefenee.j. - g . ss. ; fffiffftsis6 year- pefieds'.. 6 , s. 6 t 40, 4996,fhe Gig- � �.' , ftP ft efe ltdtliel Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-27 YEAR TAB"1W6"T'B"lTVTATL'Y;AT"T9 TbB�ATbT TY R'-6'TA�ATTRI AREA WAAMER Y2AlPU kT iON 4494 r s s 494 r s . DS TYPE OF FACILITY SAMPLE LEVEL OF SERVICE Y„ .E F,,.-,-,,.-,-,een+ OfTeers per 4,000 I— r design000 pepula6en Comprehensive Plan Update 2016 Capital Facilities Element ( 8;-28 g :raerriafftellify".e.,a ,g CHI "I N Comment[DP13]: HK3—delete entire section. descriptions of methods used and gffdepf ft philf- opt ons for setting LOS e fise.1 r 9 996 fh-.,,_..h 2004. a441�� b �. .. 4:ci-'ev rt`.rci n n nn n •g., applied,When n . n n I—L 11-1111F Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-29 J y 11 u y , y -• deffiffnd in... u u. NT­ 11 11 J J .i - feasible. lly Any °u s . 11 1 and . Comment[DP14]: b HK3—delete this section,. The"how to" is unnecessary not Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-30 t . 11 ninI" btI L11-11-1 LI11—1 n .. .. n. n n sed efti final, t fesifs fhe Gify Getineil, . e Planning g cvrrrrrrrrrr � Wfttsn tAffli Yif7g--gfe ul"/> b tiblie (e.g., n t. b n ftlid n n nftdepfed n detelopffietif . n n t Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-31 t. '' "' Formatted: Heading . 2 Formatted: Heading TAMI C: X/11__5 2, Left Formatted: Heading 2 Formatted: Heading s 4 2 Formatted: Heading -PUBLIC.FACILITIES 2 Formatted: Heading v 2 Formatted: Heading Formatted: Heading 6H sq. f+//4HHH e3hee, 2 Formatted: Heading s,//pefseti2 2 cn� cn� Formatted: Heading teefis EDE c �n��o c y2 r� c n�rr vo 2 Formatted: Heading TSubl'e Fae.14ie&Stib+e4i 4-94, 4&,43-3 $13 238 862. Formatted: Heading 2 WATER SUPPr v Formatted: Heading ry Formatted: HeadingRa-t-IrN,ftfef 9 S 2 Formatted: Heading 2 y y Formatted: Heading 2 Formatted: Heading.. 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-32 Formatted: Heading 2 oxa�nn�a n�aan�n rc nine r�xnn Formatted: Heading ., 2 Formatted: Heading ., t 2 y Formatted: Heading ., y Formatted: Heading m hr_cro�h�a m ria r_r� m x aha raron 2 Formatted: Heading Formatted: Heading 2 b f B aTDRi MAT- iD IDO-H,.,,,.,a,,..a,. - m1-,4 ,6Q m a��n���e r Formatted: Heading 2 Formatted: Heading aQT Ar COSTS man er_ x sx 44&,Q#' <_ nnnn m 22,547,94& 2 Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading eT2 Formatted: Heading 2 Formatted: Heading 2 t Formatted: Heading 1-1 2 Formatted: Heading a "figin-4-946, t � t ss. TAPFormatted: ., �a�� N Heading Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-33 IKAKAAD nC nT KITIAI V AN/Ail AM DAX/ KII I Q IMULTi-USE REVENUES Formatted: Heading 2 Formatted: Heading ry 2 Formatted: Heading 2 Formatted: Heading 8,94;,266 2 Formatted: Heading Re.!r.,., 2 Formatted: Heading 2 Nore),e.Vehiele R�ei e 44- ,nekided " r-e-ee��� Formatted: Heading Formatted: Heading 2 Formatted: Heading �v e T�rc it r> QTc 2 Formatted: Heading P3e-ee1Frpffien Formatted: Heading 2 G r' ,. -w: *fe- „* Formatted: Heading v u..a 2 Formatted: Heading Formatted: Heading Adbli e W,,fks 4� " r,.ra 2 S -24 3 Formatted: Heading 2 Formatted: Heading 2 NGLE PURPOSE REVENUES Formatted: Heading ry 2 Formatted: Heading ne Gulfs. n..d c. ad.. a. c sys4s 2 9 Formatted: Heading 2 tr .� Formatted: Heading 2 y Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-34 MULTI-USE REVENUE, � Formatted: Heading Formatted: Heading ry 2 �__ Formatted: Heading 2 Formatted: Heading , 2 Formatted: Heading 2 Formatted: Heading fr�tee Ed 2 Formatted: Heading 2 Formatted: Heading ry 2 Formatted: Heading ry 2 Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading D.Parks and4teefea4en 2 Formatted: Heading 2 Formatted: Heading 2 �efiefit!Ob14' +: r r7„b4 c . - 9422 _ - Formatted: Heading Formatted: Heading 2 Formatted: Heading met 2 Formatted: Heading 2 Formatted Formatted Formatted far-�A.,4r e) Re-.-,.,,,.:eer- . 40,000 T niefi '7har-f Formatted EJ -S Formatted Formatted Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-35 MULTI-USE REVENUE, "' Formatted: Heading c. , .,. .. ... 2 fa.y"nien Wh .c Formatted: Heading Formatted: Heading Formatted: Heading , ee adin 2 Formatted: Heading 2 Formatted: Heading E. Reads,BE' 2 Formatted: Heading 2 Nr �T h: , ride,44-, Formatted: Heading . � 2 -t Formatted: Heading -1 GP-Lion Fttel., n��inn .. ��� 2 Formatted: Heading . Formatted: Heading Formatted: Heading Formatted: Heading c K�� not . ��� 2 Formatted: Heading t .. l ., .iii Formatted: Heading 2 y Formatted: Heading ., 2 Formatted: Heading ., 2 Formatted: Heading S t 2 Formatted: Heading r r-b n Ar-f al m iidnknweffipefenLR-22 2 Formatted: Heading ., r iar7 t 2 2 Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-36 IN4uT Tr uSE Formatted: Heading ` Formatted: Heading y 2 ��nnn�ronn "� Formatted: Heading ° Formatted: Heading ° 2 Formatted: Heading F / � 2 Formatted: Heading 2 Formatted: Heading Formatted: Heading Formatted: Heading Of 2 Formatted: Heading €�r 2 12,199,844 Formatted: Heading ° Iftble Formatted: Heading --7 2 Formatted: Heading ° 2 Formatted: Heading 2 Formatted: Heading a 2 Formatted: Heading ��� 2 Formatted: Heading �n tir „ Formatted: Heading rrtte—} 2 - „ Formatted: Heading SRP t 2 Formatted: Heading 4,n24,487 or 2 Formatted: Heading Formatted Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-37 MULTI-USE RT;B7ENTTE Formatted: Heading Formatted: Heading w .n 2 Formatted: Heading 2 r1 :"liftT, r: _ fin 22r, Formatted: Heading ., 2 Formatted: Heading . 2 r,., riff..eet",Re__,,ntie,. Fid Formatted: Heading 2 Formatted: Heading ., Total Fee an 24i rg,& 2 Formatted: Heading 1 7: U 'I'. -1 c �I Yl1/fl, A77 - Utt �te Formatted: Heading ., cr7r -r : a 2 Formatted: Heading M: Ta _r r,, --22$6� 2 Formatted: Heading Total Fee „.a r~r� ..�,,,, Formatted: Heading Formatted: Heading 2 re.,,e.,.. ,,r r...,a fef(,,�,,,. Formatted: Heading , 2 R...-.,r r a f fe- Formatted: Heading Geffiffidntfr Pet. 2 Formatted: Heading 2 Formatted: Heading , 2 Formatted: Heading 2 11:7 r r-T-M Formatted: Heading 2 TOTAT,POTENTIALI-Y AVAILABLE REVENUE Formatted: Heading Ri(T TT'T'T TTb'.T-`i AATTI b'T9T.n!"TAT T2T TTS T$!`@b'Y.n 77 '2/1�7 2 ar ca URGE Formatted: Heading 2 Formatted Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-38 TABLEVII 7 Formatted: Heading 2, Left Dn I (�TQ Formatted: Heading 2 4996-2-N4 Formatted: Heading x 2 M:64-44-TTCL,' ULVF_, TTTL'C Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading TSE T � . 7 , Formatted: Heading c ..M,fer-Vehiele R-e se ter'„_, cTn nn� c i o ����� 2 Formatted: Heading 2 Sfr-ee,:V ffe * n v ._r„r.,,,. Formatted: Heading 2 Formatted: Heading 2 r Formatted: Heading 2 Formatted: Heading 2 g y y y Formatted: Heading 2 Formatted: Heading TAPI 2 Formatted: Heading 2 Formatted: Heading ry 2 ffpItts"Pefie-i if" New veven i Formatted: Heading 2, Left L�r Tr T�rTvc Formatted: Heading 2 r c nn c i n2r c n �n EJ Formatted ormatted F Format t ted EJ Formatted EJ Formatted U Formatted Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-39 SFormatted: Heading 2 txna,n„„n� Formatted: Heading 2 Formatted: Heading 7 C12'I �/flfl 2 c..i_,efft 17..1.7:,- S -& s, Formatted: Heading Liei:f±e,, 4,444,4-;-3 4- 23 2 Formatted: Heading 2 Formatted: Heading T$ �v 2 nyri� 2yn �yznn '> c 4,;46,994 2 Formatted: Heading 2 y^7!1!1r r 4,6`6,86's Formatted: Heading 4—,46 _' 2 w�nc-rtiw�n-rry enc cry nog �n2 ��^ ons Formatted: Heading 2 Formatted: Heading c�rrtin�rcv�n�rtn c^ nn nnn c^ �o� inn c� cnn con �} 2 Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading 2 n,a zzz Formatted: Heading 2 Formatted: Heading 2 r r� & Formatted: Heading i ice, 2 bending &"e- -Formatted: Heading c t,.,T_ t 2 595,0 Formatted: Heading r 4e-r� 2 Formatted: Heading � 2 y Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-40 S Formatted: Heading 2 Reye„„n2 Bftlffl+ee, Formatted: Heading 2 Formatted: Heading y 2 Formatted: Heading ry � 2 S>` 1�tftlr> Formatted: Heading ry 22--t')----' 9—,344,484 2 S Formatted: Heading 2 Formatted: Heading r .__.... a :. :,. ..,, d Heading F Formatted: 20 4` t Formatted Heading 7 I'll Fef 4,000 2 needs. 6 1 ppfef ;2,20 J. 441t"',lie)iner-eases,in ef-fiee ' 6 ���� Formatted: Heading , ., 2 Formatted: Heading ing t t 2 NNTAM Formatted: Heading ., 2, Left Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-41 Tn%A/KIQC:Klr) ("ADITAI DDn I (" TQ I nQ ("ADA(~ITV AKIAI V� I� ® Formatted: Heading 2 �q� Y, p� Formatted: Heading 4994-499"rf.,....,:�:..... 444 2[Tr 'C7 Formatted: Heading 4996-2004 Gr—,._f 4 4-29 Z4 8 F4;4- 2 4' 7 c 2, r�4. �644 �644 Formatted: Heading 2 Formatted: Heading ry . �. 2 Formatted: Heading 2 Formatted: Heading 2 TABLE 1 f5 Formatted: Heading 2 ('_'x X/C:DKIKAC:KIT L r)KAIKIIQTDATI\/ (-NCQ( �: Formatted: Heading 2, Left S14ARE 4996-2-004 -RQ NO-T-DEG Formatted: Heading ��cr m���1()XT96 2 Fc -P G c-osT-fe� 4994 4999 9 0 4 2-047 44 Formatted: Heading 2 444 N-L-v'�^T�ry 8 Formatted: Heading 8 - R�11 91=F-)G 8 2 44 Sttbf,,,"„ 8 8 8 0 8 Formatted: Heading Formatted: Heading i D rtiTE,'r-rrc 2 48 4-W40 4446v,4 8 8 8 0 8 8 Formatted: Heading y r>r>�it Tr u�r T T 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-42 -07;SHARE 4996-2-N4 PR'--%,-FEGTED CAPITAL FJ4� Formatted: Heading DEcr mIPT1erXr 2 QP T 499 2-00 24W4Q 240-2— 444 r i-P r 8 8 8 8 8 0 8 Formatted: Heading L- 1T'T 'f 4 7�77 -R 48 8 8 0 8 8 Formatted: Heading 8 y r i�r �r n Tyr 8 8 2 4-0 �T-ry��tir1 Tr Tr r� r� g g g g g g �� Formatted: Heading g GAA n BE A,/"' 2 r 4»rR Y'- -i- - -, - , 8 0 8 Formatted: Heading r- .. ,d i� 8 8 8 Formatted: Heading 2 r Trlar -7- 7 4,264,4H .4 r r Formatted: Heading . —12 , vnl�ra�fi�sr�° Formatted: Heading 2, No bullets or numbering o 7 binif tie), � - Formatted: Heading Ptrb4ie c.r - rzcri:� .._......r . . � Formatted: Heading . . . 2 �., F:.. Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-43 4he"men IPS sfing iFormatted: Heading ., 2 2 4` g -- -the Formatted: Heading ., 2 fefs a,__. , s • ,000 to 40,000 vange g t s. Space.. ; TAMI :fly __4 Formatted: Heading 2, Left t"TIT®IEDn ICY"TQ I nQ (" ADA("`ITV ®KI®I VQIQ — r) rq kn%ic1Ir)r)r) nnni dn+inn Formatted: Heading 2 nrn4 tx,,,.n..e,n Ws.wn %e na 4494 ZWKS"; 4 a 47 Formatted: Heading 2 4 994 4 996 4'isn ifien 8 0 A Formatted: Heading adin 4996 2HH r-....__-.k 4_1� �4 2 -r,,,,7 s V_20414 4,444 _5�1 _5�1 � �� Formatted: Heading 2 Formatted: Heading 2 NTone far-this y pefied Formatted: Heading ° Based an GQ Gauneil feeeffiffiendfffiens',the t was fedneed to 760 sqnate W pev 4,WWW population.Ws 2 Formatted: Heading '` Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8;-44 -Pending —E-11 DIII-E- r b b � Formatted: Heading t Formatted: Heading - ""� Formatted: Heading 2 TAMISR ALII_1'7 Formatted: Heading ., 2, Left (' TIT®I DDD ICY"TQ I nQ (" ADA("`ITV ®KI®I VQIQ ® formatted: Heading rr r� �_, t t t Hil 4494 , Formatted: Heading 2 Formatted: Heading 4-,4-'Ig48 $� 8 {-5�-�} ,� 2 4'..,.71-1. r Formatted: Heading Gffp—s-.- Formatted: Heading ry 2 Formatted: Heading 2 TLARI C: 1 3 Formatted: Heading 1, 2 I IRI 1(" Q ARRTV Formatted: Heading 4W6-24N 2 Nc" RrrsTrO Formatted: Heading 2, Left cos-T-(o 499-7 4998 M9 0 4 24P Formatted: Heading F U-- 2 Formatted: Heading ry Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-45 -07;SHARE 4996-2-N4 PR'--%,-FEGTED CAPITAL FJ4� DESCRIPTIO Formatted: Heading -D F -E -N GIR T 2-00 2 2402 4.T444U 4 4 8 8 4 4 Formatted: Heading P4 7- 4 2 P 444 14 4 �4 0 4 0 Formatted: Heading 42 iU GA-1 Com' 4 2 L'r\U 17718 C1L'R4yL f 4£4 "C`7 7r z'i1]'7vt 44 Formatted: Heading 4 2 P 444,40 444,4644 4 4 8 8 4 4,J444,440, Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading ., 2 7�U�ti7tr��rc 444 RLL � 4 44 4 0 Formatted: Heading 8 RX4SL'7 Tr 8 4 0 2 L'7R P 444 RR4 'C- 7 4 44 44 4 �4 �4 4 44 Formatted: Heading rrzrT7 ATr r_, 2 444 RR4 'C- 7 4 44 44 4 �4 �4 4 44 Formatted: Heading 8 427,A 448 2 ,.T 4 4 4 £4 4 Formatted: Heading 2 Formatted: Heading 2 4T,Tr T-�r44444 Z44444 4444 �4 4 Formatted: Heading 2 Formatted: Heading t_ 7 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-46 t � "' Formatted: Heading 2, No bullets or numbering , o 0 L 1,_.. fi Pffe:r.t:e. 44 .49 n :n-t�en: Formatted Heading � 2 t Formatted: Heading . . . ., ., 2 79,999 ; .� , Formatted: Heading , 2 bends, ,see 44ble V11-8 .4'his ffiene�-Aeeill ee)-,�ef eeffiptifer-s ffs well fts, g �. ,. t "� Formatted: Heading 2 s. , . Formatted: Heading TLA I C: ALII 1Formatted: Heading ., .� 2 Left I I�2f�ARV ® Formatted: Heading 2 r:ffi e P a 72 ie Ar-eff ver,_ n PT e v ..e fv- p�H =, tPita r T r, er Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-47 t J "' Formatted: Heading 4994 4996-r. 44-4 449 2 Formatted: Heading 4996-2004 r..,._ f 4-14-29 4-,-"-30 £4 } 2 4'e ,7 ,,,. of 26,04 4,494 0 fy��� �� Formatted: Heading 2 4aeJt Formatted: Heading ry 2 Formatted: Heading 2 TABLE --� Formatted: Heading 2 Formatted: Heading 4996- PIR"O.-FECTED CAPITAL F44W 2, Left Formatted: Heading DEcr mIPTIer�r 2 49W 49W 49W 2WO 2M t Formatted: Heading 2 4-0 400 SP e r rr-r1440N 8 8 8 8 8 8 8 " Formatted: Heading 2 8 444 `rNIO K STA44-(;) T 8 ,_ 4 0 8 8 8 8 F4 Formatted: Heading 2 (`<\T r(lIT TrCT,'UC/llt,'U Tl7i7 '-r r 4-C444 44 44 44 44 £4 Formatted: Heading 2 44 � r,r-rrrtirrnr v Formatted: Heading E44 E44 449 E44 2 ', �, Formatted: Heading - 2 Formatted: Heading 2 „r>�tir�r rc. Formatted: Heading 2 444 4 r'r '-L'T" 44 44,440 44,44 44 44 44 44 44 Formatted: Heading l PT4'Rvrr>v SALLI -TING 40 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-48 97/6 4996- Formatted: Heading -E -DESCRIPTION C4P C4 2 --]�T 2402- C C, 49W 49W 4999 2.000 2.004 24P 4.0 4�44 P'41F'RIP 44 g a-,-6v,4 g g £4 Formatted: Heading 44 44 44 � 2 4-0 "'P,4'v-x4,L4U4@T' 4�� 47 8 8 8 8 8 0 Formatted: Heading � 2 4-0 & 8 8 8 8Y' 8 ^� Formatted: Heading 44 G r 144,R wIOv v 44 2 S 44-? a?-7;0 -3-5)0 8 ?E19 -'-(40 8 a-4,J4 Formatted: Heading c --210 4(4 8 8 2 Formatted: Heading 2 d p�,P�1T i A T 'fYl'f d Y CA A r r r r Formatted: Heading { 2 Formatted: Heading 2 Formatted: Heading n T 2, No bullets or numbering Gr-ffnfs 7 � rT�ti-rtc. Formatted: Heading 2, No bullets or numbering ,_.fen rffe:7:,:e. Formatted: Heading ftnds.441311- 2 YAMI C: X/11--4-&-� Formatted: Heading y ("ITV n\/AfNlC:f 1 ®/ADLfC \/V. . . -I I Yt�l� (" iTi/ ! inniTC' 2 Left l vrI�iAin Inn n\ Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-49 Formatted: Heading 2 Formatted: Heading s. ss, ft2 Ka -r.: ,- Formatted: Heading 2 2 Heading , Pa rare Formatted: He Formatted: Heading 2 Formatted: Heading Bell f 2 Formatted: Heading tee 2 Formatted: Heading pe r��.r 4.42 7 Sffeef end par-it 4.4 Aenie c,,,-:r:,:,.. „ra benek,,., fee-feff. _, _elefs. Formatted: Heading 2 Formatted: Heading ., G,,,e ,,,; -r..: y Formatted: Heading -r..: .r Formatted: Heading M�ft: Pffi_R 4.4 �a �y- Formatted: Heading "s ." 2 Formatted: Heading a„w,.. c,..e,,, 4.4 - 2 ,ed b""fetil'sfs. Formatted: Heading ., c .. 2-44 -P, .:,., ..,.. d Park. Formatted: Heading -59Formatted: Heading ry 2 Formatted: Heading 9 2 Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-50 4` t � � � � Formatted. Heading ., ., 2 fttfttie t t t J=—.. t "' Formatted: Heading 2 ei lffipffef of t Formatted: Heading � 2 TAMI�C: Formatted: Heading 2, Left ®6I.1�: �("` ��TI�"'11lI 6f\11-1 � �"'tl��l°JTi/ (" AMT®I DDn IC(-'TQ I nQ ("ADA("`ITV ®KI®I VQIQ ® Formatted: Heading 2 Sere ?..,,,, A 4 7.6 Ne v .,, _ Pep-64eH pef-P4610 Aefe,-, e+ Formatted: Heading reelrie AtzPrz'crJi2 Pe4ereftet 2 " 40 Formatted: Heading 9 4994-4996 4«,,.-.,.+:,.. -3 g Formatted: Heading 4996-2004 Gr—,._f44-4,29 -9 8 {9} ��� 2 4,H .7 s 42HH- 4-4-94 ---,9 1� Formatted: Heading Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-51 N-., R �rt rt p 6,4 ter t` "' adin Formatted: Heading rtrerrtr 2 S 4-; £4 "' Formatted: Heading Formatted: Heading TABLE 1 2 A VQ (� ATIQKI Q. S TV Formatted: Heading 2, Left 7 SHARE TSR'l-EEG 'ED CAPITAL Formatted: Heading -P DESCRIPTION 4996 PROJE 2 C- Formatted: Heading pp p r arc. 2 -)04- 4171AKs �'r>T'v:'�T Formatted: Heading P,4GR 0 40 40 40 40 2 AGI'Y64S44ON yg ?Fl ?41 2 -ra c-rRrr-r 400 -_ ,4 �g 4 4 4 g g Formatted: Heading j ikaR1 PL- E4 43 40 40 40 2 sidb efff C . ,_ 46-4 46-4 46-4v Formatted: Heading Pf eTeefl- 40 40 40 40 2 Formatted: Heading r T�e r T�ry 2 PR"-F- -14) arc. 0 0 0 0 0 0 0 -5) Formatted: Heading 9 44 2 T v�rT�Tr 41 7 41 41 41 8 Formatted: Heading F4 2 ?-5 - T` d d d �E 4) 8 8 8 8 Formatted: Heading S4,Rtiti4-r-P RK, 44 2 IA442R- 4-44 Formatted: Heading -1 C--Gt1RR y6IGI11 2 P1RKi WRQ\rT 2—i2rcS�S2Pft2C��"G'- Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-52 0/ SHARE TSVAti-EEG ED CAPITAL Formatted: Heading C- `-4 "44 41` 64 64 64 64 64 64 64Formatted: Heading ., -L- i>>vvPrr-vr, , , -12 Formatted: Heading c«:64-P1 PN4, 2 - 4-44 `' ^yr ,_ 1,4 Formatted: Heading ry �4 „,v v T�r,w £4 £4 £4 £4 2 T,. 40'«-44 e yr 4� 4 44 44 44 44 X044„ Formatted: Heading 8 vvPOPT'S 46'C-4 4 g 40 2 44Ac 9�) 4) g vv -RRA4 (4ti ' 44IJ4 44,J4 8 Formatted: Heading 44 44 44 2 4 4-44 9 p: ,S £4 £4 £4 £4 44,44 44 Formatted: Heading vt r ti:,-rT�tir1 44 2 %"�\-1 Tll II�YJ�ry +4AL+7RR 8 8 8 8 8 8 8 , Formatted: Heading L�tir,rr�r T r 2 F 4-4 , � G 0 In L'G46Ivc , £� Formatted: Heading T ri�v rti�r c r r 44 44 44 44 2 - -- �?f� Formatted: Heading t=P c eEt 4(4 8 4 4 4 4 4 2 Formatted: Heading 2 ' Formatted: Heading 44 �4 44 44 44 44 4 2 Formatted: Heading ry Formatted: Heading n T 2, No bullets or numbering -444,Si4-4R!6shHws, o � Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-53 Formatted: Heading 2, No bullets or numbering . y. Formatted: Heading 2 '' "' Formatted: Heading na lengfh. , a . r n„_r.... 2 TAMI�CXfl}4-�- Formatted: Heading I InAKA DV nE TVD V Q-11-DECTC 2, Left T GT 9T5 PLER !"' IT 1r- 1 !`1 rl T 1r- 1 Formatted: Heading IAOL" 2 /®c—k I+ ('�srarr�+m � o Formatted: Heading ° LAcr.lu�l+ �t�er o "' Formatted: Heading ° r 2 Formatted: Heading `17F (li(li(5 0 2 pr D^r li Formatted: Heading 2 Kir%+ nAniret,4R rl o Formatted: Heading ° 2 ITGTAL 14454, -99 �4�0"O ° Formatted: Heading 2 Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-54 G4"- . seffle "A" nn 6­1-1­1111­�­­j Formatted: Heading t I- 2 t . , t I'D" 2-W WILL, I'll �., A0 L.11 11 ILL— -e Gifts be Formatted: Heading 2 . ILI in eeffipliffnee;eefifh fhe GNLA ffnd A 1 j-_-_ A"---, A--- ­­1- 1_1­ Formatted: Heading T X/11 f5 Formatted: Heading ., 2 Left of SHARE Formatted: Heading D NO DEcr~m IPT 2 TE QP C-T 2002- -ai��rr�ry Formatted: Heading }a 2 ur>w—v car. Formatted: Heading ySR22 ' 2 ?4 ?4 �'�"�'� ` Formatted: Heading 44 c'G ;LFF c*4'0 �4 4644 2 AA-'S'- rc rrn�rn Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-55 0/ SHARE n Al-FEG ED CAPITAL r, r, -RQ fb� 2004 Formatted: Heading DE 4996 2 TE QP C-T 240-2- 4Q 4£4 u4f"N':,v,r c-r �4 Formatted: Heading 4 ^rcr`rnv rr`r 440 2 tv�rt.Tcrrti�.T 4 t -,c r «mac-r g Formatted: Heading g C:(-- r r G-rr» 40 2 ?S rr,, .-2 � c�, ?74-?04 0 0 0 8 Formatted: Heading 4.0 4 4-144"4 4)" 944,440 8 8 Formatted: Heading 43 17A- a E� 43 40 0 2 rcur-r� a�T -1 rP (\C-r ?Fl S41 43 43 43 43 Formatted: Heading 4 _aZa 11,N 40 0 0 2 440 44) 90 G4'4-'L- -,� g g , Formatted: Heading u rr u�r r>L �ve v 2 ?Fl $44 �` ��nL-` = 0 444-6444 214" -14)" -14)" V40-644 -4.� 22-64" Formatted: Heading 40 40 40 0 0 40 2 4.0 Formatted: Heading 43 43 43 43 43 2 ,w PP v rw 4-0 � 2-4-40 4=}� A- � A- � A- � A- � --(4� =17�^ Formatted: Heading 44 n f I)rTTcrrf"TC1TT 44 2 4.0 2-40 Z,-yyy Z,-yyy Z,-yyy Z,-yyy Z-,gyg g Formatted: Heading F4 AN FA4Grr 44RSY 2 4za--�4 2-4-a44 2-4-244 4-4421- 4}4�- 4.6-74� Formatted: Heading ry 44 44 44 44 44 4 4644 4644 2 Formatted: Heading arc. 2 r,v� r'r��"' T�� _, a_, Formatted: Heading rn R,�1 r r c-CTT, v �4 2 90 ?Fl Nk)N- 0 4-'-46v,4 0 0 0 0 0 Formatted: Heading j rr>-r'ruv 1-7v r-r g 2 Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-56 0/ SHARE PR'l-EEG ED CAPITAL Formatted: Heading NO DE cr~RTR-rTd-% .T 2 TE C442 C-T 240-21- 1 4Q 'znzr iTw"T)T TAT 4 T.T 4�4 -4R4',FRIA1 /C—r Formatted: Heading 43 R-G�— 0 0 0 0 2 i�,n�U rtiTrc��rc,.1-rc ? 'n'r,,)PRT'4* 4440 4444644 24E}d 24E}d 24E}d i d 2144d �4E Formatted: Heading �i�,rTTCT� T�tirT �4 �4 �4 �4 2 -3 TRANS. REPAIR d ESE) d d d d d ESB Formatted: Heading o �T T.T r' �4 �4 �4 �4 2 ao 4(4 4r- 1 RrTry £4 £4 £4 £4 £4 £4 Formatted: Heading c'- Y 2 444 r':1"lrcuc 8 8 8 8 8 8 8 Formatted: Heading 4:k4RKPTG 1=04' �T,l� T,7L T`1T G`r�T)T Y a a a . � � t , Y Y Y Y Y 44 Formatted: Heading PTU f-TT T- ,'C c 0 1 0 0 2 - 4�4 4 cTr �, ? X04 a-444(4 Formatted: Heading L �T("Y TTTlL'C t1 T1�,1 27 27 27 27 4-0 „a , Tr- g g g g g Formatted: Heading T 1 „rT�ti�rt Rt r T r'c 2 TTr TT tcI ^. t, 644_ (4 0 4144,4644 Formatted: Heading 43 E) € 43 43 43 43 2 AT 4 4�nn 2-�_ , 2 -2 , 2-4-2444 Formatted: Heading Formatted: Heading 4 NT-NTT i A T 4a-4---14 ,_,_r r r r2 r -57 � r r Formatted: Heading 4(4 8 2 Formatted: Heading ry Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-57 Formatted: Heading 2 elate I ram c�ril®i I� i i"�° 7 \ % A/Qr)nT t'_'rnn+ /1 r)r)01 M inriinn\ Formatted: Heading 2 riesl�a+_oaf enema®i rrv��i�i ram I/ OL r Comment[DP15]:H K3—delete-this whole section now is covered by the adopted Water System Plan. Formatted: Heading Z 81 /®rn� \/Alpe+ter aai o� A rm� irr n+ C7 I arili+i c 4'he Heading Formatted ea ing is 2 - fefage t "' Formatted: Heading Z 4'feRfed Wo . Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-58 ., stood it" g Formatted: Heading Fo n level of Serviee A OSI Wait The enforif LOS l Formatted: Heading t IMF� –111-5 -11 per eonneenon L— , , 1.11.—Jeefed hons'ehold sln-*Hbn�wf of he 20 year g st of;60 gs4lons' per eftpint per day. Raw Alater Sfefage troffiffoly 6-2,9H Formatted: Heading S lords lake 7 N Q990 PTM4HWM.y he 2WO4 popul ofAeQ-Q494 results in an LOS -tiffifffely 50,000 - -r. a w� c, , t �; The enforif LOS of 754 gallons per day per eapini is basedg gFormatted: Heading divided by he 4%4 pepelatien of 7,953.The adopted LOS is based an the r-eqnifed-,�elnffie of treated wftfef, 2 ealedand as SWW gallems pef earmw6an QWW gallons per emnefe f�;heefs, far-fire flew, �k 21-S414)of the � -------------- population estimate PRNS 40,;20 eonneenons').This effleelation t Based an an LOS "� Formatted: Heading ;.4 million gffllons' per day in the year 2WW4 Qw,based an a gojeefed pepelation of 9,494).T 2 2000 �X4-lmn the rfe,,tf twenty years,the Gy will hwe to he the dam of lords lffk�e.The estimated eosif far-this yajeet 1 S17 friMm.The raw woof storage Mlities are suPlahm,hrengh the si�year p1mining peried(see The City has a suffaiefor amentif of treated woof storage hnMes based an the LOS of 475 gallons per em3ifa frli1e Q00')I The etmmiij and asseeiated with g woof to the Gify resident,,, over the ne,-tf si�years, are , 24 hrengh , other Operating lffipffef of LOS y Formatted: Heading in eamplianee with he GM A 1 element;emb development me"me*Ie 0't - "� Formatted: Heading 2 act the Gt;Roftwer a, TAMI I--'71 Formatted: Heading 4 Left Comprehensive Plan Update 2016 Capital Facilities Element ( 8;-59 % A6 % A/ AT D Q1 IDDI V (" ITV (� (" A ITAI DDn ICY"TC: I nQ (" A A(" ITV ANIAI V(:I(: Formatted: Heading 2 r 4494 , 2,� �r,n2�' Formatted: Heading 2 Formatted: Heading 4996 nnn4 G....___.k 4-,- 44 2 4'ef 7 ,,s, of 20"" 4,4-94 �Q r j yy --',8a—+644 Formatted: Heading 7 7 7 7 2 Formatted: Heading 2 Formatted: Heading 2 917 VT 22 Formatted: Heading -�4rirt> Tc1i�i�r�� ��ry ciz>� z>i 2 1°�"lT— T"2'L;S®' '�Y�t'lL'�Y mST'�T »rtivrrrrr>pv,NTcpp, Formatted: Heading 2, Left Formatted: Heading 2 — _ c..rke A....,, Ar a m 4s.,,n rs,..,:.,,� Formatted: Heading Pefieie Aa,l,.i�,l.i�, -e✓ +444 Formatted: Heading 2 4994-4996 r'..,,.,.: Formatted: Heading 4996 -2HH r....__-*k 2 �^7� ^7��r1 r1r 1r1 ,,r1r1 r1r 1r1 r1r 1r1 s Formatted: Heading 'T'�.fa ,,s of 2004 "--4,,^T7�, VC7' ----0 �, VC7 0 •, 2 _ Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading 2, Left Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-60 G!4V OP POR-f rf OWT S-F"-r"D' Adepfed t - " "� Formatted: Heading -T4nie4zeFi a �,���,��[ 6-,44,440 _ Formatted: Heading 2 4994-4996 M�nni �� 4-14 ��F�1?�5 44 Formatted: Heading 4996 2nn r-...._,_,k 44,ag F4 2 4'ef 7 ,,s, of 20"" 14,4-94 r� r j n- nO Formatted: Heading 7- 7 - 16-,440-,46A47 7 - 2 � Formatted: Heading e 2 Formatted: Heading 2 -r�TZTr TT 2 Formatted: Heading 2 o- SHARE f A 1C9'C Formatted: Heading 4996- j 2 ��„����,�,� Formatted: Heading 4�i NO2, Left Formatted: Heading Ar- 00 24P 2 vTr>Tar�-ate -7 4- 8 0 0 0 8 0 0 4--4640 Formatted: Heading 8 8 2 ? a 8 0 0 08 0 0Formatted: Heading 8 c-r� TTri�n�r40 2 44� ? 2 RRS` ' d SEH Formatted: Heading 4 44 4 2 ,yip -R 4-0 444 -3 8 0 0 0 8 0 0 4-,264, Formatted: Heading 8 8 ST'G� 4(4 2 -R 4 )4 ?a ? 4 441-ARRA 8 4 0 0 8 0 4-,;4" Formatted: Heading --tl) FSH 40 2 4444 ?r � ?3 44 T 8 8 8 8 8 8 8 4yH)) Formatted: Heading 44 ;M-P «VR4A- 2 Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-61 of eHnrsE 4996 rsmerec�a�r��nrs�a�r -- -FECTE =PIT A DESCRIPTIO 499.6 PROJE formatted: Heading y AT 4C- D 0 c-osT-( 4994 4999 4999 00 2404 24P -R 4)4 -510 -5�1 -5�1 W� 0 0 8 Formatted: Heading 8 �ry r:'� 4(4 4(4 4(4 4(4 2 cvc�r`r�T :61-PG RAP -R 4 )4 44 Fi `F'rT 4) F} 4W4(4 44,41 8 0 0 8 Formatted: Heading 8 F4 F4 2 Q Cr�'T _ci 4{4 1"W` 44 44 44 44 44 44 44Formatted: Heading g cgr�tiv A t-r 2 RES-�RVPIR rzTn nr,TT 0 _ Formatted: Heading 8 4� 2 =�Ac 4{4 Q4;-Wt 44 �4 �4 �4 44 �4 �4 44 Formatted: Heading 8 43 PiPET rN 2 Formatted: Heading 7�T7��T i 9 T r r r r r r r r r Formatted: Heading roti-r r c 8 4(4 4(4 4644 2 Formatted: Heading 2 tgFormatted: Heading 2 gs "41 SNARE 0 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-62 � Formatted: Heading rTT t Formatted: Heading ��-rrT> c��c-rr�T r,Tc-rT>T>zT1-rTr�vr rT gTT 2, Left PROJECTED9flfl!_ GAPITAJFlYb'$J' SHARE rr�c��rrs�r S� Formatted: Heading ® 4Q Are e) 20P C: 4-� -5�, OU4LOP 2 24" 4 Formatted: Heading T�rl�Ta rtic 4�4 2 _ Formatted: Heading 44 l�T>�ti r cr rTrti 44 �4 4 �4 440 440 2 -1-0 -1-0 2 Formatted: Heading 8 8 Ur,1'T�E 8 0 4 0 40 40 40 2 :,ZO -'�O 4 8 4 0 8 Z-1619 Formatted: Heading g 8 2 N-PROGRAM 4-0 4-0 'f T?1T�T"L�'T? t v, v, 43 4 43 8 8 43 � Formatted: Heading 8 �,14S'r i T�tirT 2 -Pi-P T TNrr Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-63 SHARE- 4996- j rrRc��rrs�r Formatted: Heading TE ON C4_P C4 ® 4 C- Formatted: Heading 2 IT,Tr 1-�r ,- Formatted: Heading 2 Formatted: Heading t_ 7 2 t � Formatted: Heading { 2 "41 SNAP 7 CR0 7 CR "' Formatted: Heading 2) ineltides, 'I. line" 2 -r rzr c rrrr �i ,�� v Formatted: Heading rv�a Iry v stir T r r�ry a P�Tr,C4'Citi,jPJ r A NTw,. 2, Left _RQ NO 49-916 PAQ� Formatted: Heading Q 4C- DO 49 499-7 499,9 4999 2-000 2.N4 2402- AT 0 24P 4 Formatted: Heading y y c-rrmrr-c itrr-cr yyy 40 40 40 yy yy 40 2 Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-64 Se,,ie SHARE- 4946- T2iDAl-EEG 6ED CAPITAL Formatted: Heading 4C- DO 46 499-7 4998 4999 24N 24N 24P 4 �0 40 $ 2 C4v rr 8 8 8 8 8 8 Formatted: Heading 4 0 P4RLL� 40 2 -Rr3F1 r0 4�4 -3 C4, 8 8 8 8 8 8 Formatted: Heading 8 2 Tr>�.Tr�r�tiv T�T� -R ZO -310 4-0 $ L-'4'RR`ARP 8 -1-" -1-" 47" 47" Formatted: Heading 8 Purtir-zaAM 8 40 40 40 40 8 2 T�ri�r c i r c A,•r 2 Tf Tti * � � 44 44 44 44 44 44 44 4-,6444; Formatted: Heading 9 4 0 1-41=444440N 4T0N 0 2 * 4�4 44 ? 4 X00 " Formatted: Heading g ACQy64S -4(-)N 4610 40 4610 40 40 40 0 2 40 -144 8 �� '�w'T' 8 8 8 8 4-6 8 Formatted: Heading g rtir,aT T-r4610 4610 2 t -44 �r��T-rra tir L�r�rr T�ry nrmrcr�rr�. �. 2 Formatted: Heading „t>�tiTtr r�-rc 14 Formatted: Heading 2 Formatted: Heading -rrti-r-T c 40 40 Formatted: Heading 2 Formatted: Heading 2 t Formatted: Heading . Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-65 gsNew Pe-eelopffiefif'T t ;- feeet-ec4 ,e) 4'efitl es—liffifffed pfejeef eesf in 4996 dellffs, far-the yeiffs 4996 fe)2004 "' Formatted: Heading 2 ftindifig of fes'�ng an'. . Goes,sil.'- 7 Wfffefshed ffifffiftgeffiefif plan and titAfffe. Formatted: Heading 3rN':'TF4 c)�c- PAI Mrcr-EL4 ArrEGYPc 2, Left Fri 6 2404 Formatted: Heading tri F rrEcGRrrsTrernr 2 GIP RC—T C08T-( 4994 4999 4999 WN WW 24P -R ZO -'�O 4-() 8 8 4 0 2-5�7Formatted: Heading g RM-ERG R Tw g g 2 -R :ZO -240 40 -2 AIL4LLv Formatted: Heading y inn stir r�- r r_;nr 4 g 8 8 4 0 2 -R :ZO -240 9�) 4- -3 L4N,VNC-- A- -3W 0 A- --(4� --(4� A- A- 4a—W40 Formatted: Heading y 44=k- —rte r g 2 -R Z 40 4 rv'- 4,R c"`. Formatted: Heading 4 k4 8 8 k4 £4 £4 2 r�ri�r v�ry�.,•r, Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-66 SefVie 0 SHARE- 4946- —j Formatted: Heading rrEcCHIrs TAlT4T 2 C4-12 EC4 44W 4998 4999 2WO 2004 Ar- NVIA cvc�r-nr 4 Formatted: Heading r 1-r(-)N l A 44(-).T 4 4 8 8 4 0 0 2 -R :ZO -240 4-0 £i 43 ?0440 44,4 47� 0 43 0 0 � Formatted: Heading 2 -R :ZO -240 4-0 Formatted: Heading 4 F} 4 8 8 F} Fl 2 a -vurar � � 7 0 0 Formatted: Heading 8 Lr yr>��v 8 8 2 -444 -244 4-444� Formatted: Heading 43 L'? Tom- 43 2 -744 4 Formatted: Heading 4 4 44 44 4 44 44 2 rtir c�r`n riz r 1rr`Trti.T R 3H 3H 4-44 ?=rE}E} d 4 8 8 ?4,444 8 d " Formatted: Heading 4 4 4 H 2 Formatted: Heading 2 1N,-NlTi 9 T r r r r r r r r 40 40 40 40 41JI 2 Formatted: Heading rr�-r-,rc Formatted: Heading ry �� Formatted: Heading , gs e-Gfffftt- 0 feeerec4 0 ,e) 4'efal es-liffifffed pfejeef eesf in 4996 dellfffs fer-fhe rear-s' 4996 fe)2004 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-67 4' New Sfftfe r-eqtiffeffiefif 1-, _,-7„ : 1""0 s. Ptinded 1 T„__e,7 w„ r\_`N.' Comment[TJ16]: Tri Area water system is err now owned and operated by Jefferson County PUD Comment[DP17]: - This section is now covered at the eeffibined g'etindwoef ig ffllens ef - . el beginning of this ti- element"Inventory" sf&rb qfti ,, ftef"Iyfet3fesefif flits, b . 'fid 3y7.c�-zcrc LCr-rrrn,.r,f - S �. �"ztt�r�i-tt�'F t 2 > d 1-11,11111 "nn nnnr Using feeeffiffiended t hettsieheld si5-e-o-f 2.36- Based en ffn t n n :nn nnn n - . U w&Wfffe.-C+„ rccccc—cam crcrt-rrvr2cyc t "' Formatted: Heading 2 - d Wo ef —c t "' Formatted: Heading 2 7 0 15", �� t - Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-68 be ftezepfed t Formatted: Heading 6 � 2 ; Based en fhe t ef gP 1, C� I, _AE_ Cj 74 _JE fespeetlk-ely(see 44bles,V114,VII-8 ffnd VII-24 fhr-etig g -gs bends,gr-ffnfs .,d/ef„+L,ef,. t 6 Formatted: Heading � " 2 ., rmatted: Heade�. Formatted: g ssn � 2 eendition ,y 4491r VN-28 Formatted: Heading RAW WA4,RR�4_'zry 4'Ri RtAcvvVi(_2R - rive 2, Left C'44" OP I��AU'f'I"�\Ey7T7C�T7Tl ,GAIJTrf RI_' --- ___ -- _- ---- A '- ,__-_ Formatted: Heading 2 -T4nie4zeFi a De fie e ffey ��� c�p��nn p� ^� Formatted: Heading 4994-4996 rl`..,.,,.,.�:..... -9444 2 Formatted: Heading -r,, 7 ,,. c2), Formatted: Heading 2 Formatted: Heading " e 2 ' y Formatted: Heading " 2 Formatted: Heading VP-29 2 -r'v�'V'PP3N'_a_t�R S4,PP �G -ry i _A v r-A c r-t��ri�� Formatted: Heading " { C'44f" OP POW4, CpT 7Tl 2 4 �i 4T 41 -PRI Formatted: Heading _'—�-�-r��� --- 1=(-)S --- ---- - — -- ---- 2, Left Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-69 i _ t _5 _ �; "' Formatted: Heading c s n nr a m 2 T:.w,n�eFi a yyenn ir~ars 4494 47Q''& 2"� 1-9 , Formatted: Heading 2 4994 49964'...M :� .84 444444 44 f44�4�} Formatted: He ading 4996-2004 (-«.._r.+L, 2- 0 34 '1 7 �. 0 �'-"7 "/ 2 4'efitl its, „c2004n�� 60 41, _'5 Formatted: Heading 2 Formatted: Heading New 2 y Formatted: Heading 2 Formatted: Heading 2 ("`��rrmrtf ��rilifi�c Comment[DP18]: HK3—delete. Covered by Adopted Wastewater Master plan zcirorr`rncrr. tF.11-1 111F11111) -1 if 460 t ef 420 , t 4` '' -' 44bles, Formatted: Heading rftnnaneing !. pfepese2 • g , J=Ps Formatted: Heading 2 Formatted: Heading 2 -r�urr Vll (4 Formatted: Heading cv� c'rtw��'rtra r r�r r tir T«rr r T r'rr�t �'r�rc�T'r 2, Left ("T'C)L \L'12 PU44'O3X'P TC�TTTI C�i�T in PR -- — ---- - -- Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-70 Formatted: Heading ry c s n nr am 'T'nie zeFi d f_PGPD 12"0 Tr r..s,ffey 4494 _ , , Formatted: Heading { } Formatted: Heading 4996-2004 Gr-ewf4 44,29 5 2 -r,,,,1 ,,. of 2004 44-94 44-39-,280 1 "� y Formatted: Heading 2 J Formatted: Heading 2 Formatted: Heading 2 cv� c�r�w� art r?err,t rc vT�r . � Formatted: Heading 0 2, Left Formatted: Heading -DESCRIPTIO 2 g OG 49W 4999 4999 2490 2404 §� 44- L` 8 8 8 0 8 Formatted: Heading c� r rA rr_z�r� 2 R 4-44 -P r1trT-r 8 4 g g g g 444-,-744,J4(4 '—I'-Formatted: Heading 4 8 2 R 4 +-44- Formatted: Heading 44 Pin 2 T il7T"Y-1'r�' §� -11.0 8 200-,004 8 8 0 8 2-04,00 0 � Formatted: Heading g GOY64c44ON g 2 r, rrr_cTr --r --t—y 4400 -174 y -174 g a-W40 20-644 2"00 g Formatted: Heading s R IIF4 8 8 8 8 8 2 "ter`'-rpt' '-rid 44 44 -_, £4 44 44 £4 Formatted: Heading �4 NT-P ()Gn 1MT g 2 * �c Formatted: Heading {� R-L�S 2 1 c'r1:64-P Tri 4, -5-00 8 8 0 8 8 0 Formatted: Heading v r_mr A I-r_r\r r_r N 2 Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-71 7;SHARE 4496- PR'--%,-FEGTED CAPITAL FUTUR -RQ fb� 24"r ,m��s �re OSTS Formatted: Heading -D --7 N-Q-T 2 .� -R 8 4 8 8 0 8 8 Formatted: Heading �} 2 d rlar 22-5- - Formatted: Heading 40 2 Formatted: Heading 2 Formatted: Heading t161111-1 -1 2 gs e-Gfffftt- 0 a 0 . Formatted: Heading 4r4u ' 2 Formatted: Heading c44+AR � BESG IPTI N r 6 4496- t t € ? 2, Left -rte �tb Formatted: Heading GF l} F46 449Z 449-9 44W 2-4644 a-44 a-442- .4 211�1 4- GONI, R-V44 ,;4'T c 44,444 44,44(4 44 44 44 44 44 44 Formatted: Heading CENV IED F A r,I 2 -R "��Q- v'T' "r�A `T 0 4- a-" - Formatted: Heading T�nor v�rr Tyr �r Testi 40 40 8 0 0 0 2 �e Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-72 oi, cu.+rpt rtc<vnY roti T �� , t � t .. t t Formatted: Heading 44 TE aa-4�64 RE 2 cv�v oU J-1)TINT7T 4 Formatted: Heading r T -ry_a TT 43 43 43 43 43 4 2 Tr-rTr ,-rT�tirT ? ? t 44,J40 44,4644 8 8 8 8 8 8 Formatted: Heading ry 2 :64 TI P��S1G PTT°'' , Formatted: Heading r�,n�U rti�rc�rc>`T-rc 4 4�4 4 N-R�- ? 4444(4 a-44-644 " Formatted: Heading l 0 &444440 8 8 8 0 0 0 2 rTL', c-'`'-rTr"`T Formatted: Heading r r0 eRvrar rLrvPVLL 0 Z4,46VI4g y g Formatted: Heading 43 43 2 4-0 cu(tiP Formatted: Heading 8 �� 2 AN N:6 _1 -roti-r_ r c y y y y y y � y � y g Formatted: Heading ry 40 40 40 40 40 40 40 40 � 2 r Formatted: Heading 0 re�n 499"dollars, tee - 0 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-73 TTfC_ 7 Formatted: Heading 2 s s C°�¢arnxro�as�*�®a KAnntine-mynciyie Comment[DP19]: HK3-delete t y setir-ees',of ftinding far-fhe pfe)'eefs far-ft st.-��-effr-t3iftn'-­ pe'-]ed. Per-fhe t3tift3es'es, of fhis' GPV,the Glfr lifts, identified te!'+ftffi- Ine-eelof Com,.-._:, "' Formatted: Heading 2 �, t � 5' "' Formatted: Heading 44ble V11-;;. if is ffnkipafed f". 2 Formatted: Heading 2 44917R VN_;; Formatted: Heading STGRA i rvv e iN e G R 2, Left Formatted: Heading C- T-DO G Ifo 24P 2 _5�1 C'�U 1 PX 4 R nT�c'rw i�r ��T 44 £4 4 44Formatted: Heading 2 ,w Tr>v T�ry -, 4- Formatted: Heading 8 8 4(4 8 2 CT Tl�l?T�'T TtTT'I"A 2 r „vTr Formatted: Heading i�r��tiTr r'rc 2 444 r 4 4 44,'d 4�E,64 4E -? 4�;?� 1 r � 1 Formatted: Heading 2 Comprehensive Plan Update 2016 Capital Facilities Element ( 8-7-74 Formatted: Heading DEc r~m IrsTIa rnr 2 G co-ST ;T�,, . 44W 24W 24" 2402— C—7-D () 1 2#44 £� r O ^� Formatted: Heading 2 Y g g formatted: Heading 8 r 1161TC444 T I 11- 40 §� 2 Formatted: Heading cvc ir-T�r 2 2 :61N `RSR; 4-' `� 7 � Formatted: Heading 7 7 7 7 Jv 2 44,444 £4 £4 Formatted: Heading 0 � 4-44 444PP - <T g g formatted: Heading � TTrTS c� 4 ,rnu-r_,T 4 4 4 �4 4 4 �4 �4 Formatted: Heading 2 T T T_TT. rcc 0 0 0 0 4 0 0 Formatted: Heading 2 a Y g g g g g g g g Formatted: Heading STANDARDS 2 �r -2 D OT. c o o- � � � � 0 4 0g g Formatted: Heading 8 8 8 2 14) a yr ti�r�e e,�+E z 4 g g g �4 4 g �4Formatted: Heading � � �ti-ruvv u�cTrTc 7 rr ; cn.T 2 all T\rMT C\f C N TrC 1'F' g g g g g g Formatted: Heading 8 44�4 £0 2 Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-75 Formatted: Heading DEc Cm TTsTra rnr 2 CG CO-ST ;T�" . 4499 24W 24" 2402- 7-D () 2#44 -411 2 LTx eN(:Aar „T A7A7TA7� Formatted: Heading 2 4-44 GATGMB�S!N I- T>v,DT �z nTrrr-r ", 0 0 Formatted: Heading 2 4-44 c-ry r r-r PR44 r<--rc 440 44 �4 Y 4 4- -3 Formatted: Heading 2 Formatted: Heading 2 Formatted: Heading 2 n T TrT:�T [ n ion r TFormatted: Heading 4 44 2 2 IMPLEMENTATION Formatted: Heading 1 Capital Facilities Proects 1. Update the concurrency management system as needed. 2. Consider new revenue sources for capital facilities and implement as aP�rorp iate. 3. In future planning phases,if fort'fownsend's Urban Growth Area is extended be,and the current city limits,cooperate with Jefferson Countv to study the capital facilities needs of the potential unincorporated portion of the Port Townsend Urban Growth rea UCT 1).If a UCT 1 lamer than the City's incorporated boundaryis designated,develop a reements with Jefferson County to coordinate the lannino and development of capital facilities within the unincorporated portion of the UGA. 4. Update as needed the process and criteria for evaluating selecting and financing ip fat proiects listed in the Capital Facilities &Utilities Element On�oin� 4—Annuall; update the Capital Facilities Element as necessary to reflect the capacity of facilities,land use changes level of service standards and financin� capabilit)-. Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-76 t � . � H ,.TC-)-rR"S. 4-2. 2) if ftnd when feqttifed by lw&. 44. 4' Gvftnf t*' g- 4s 46. 6' Sfefffi ge s . 48. C--fft3tfA Pffi4+�te:' 49. 12fe)Jeef", . �> -24. Ongeit-71- tise ., Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-77 5. 26-6. 6—Annually update the Capital Improvement Program to ensure consistency with the Capital Facilities Q_Trac, Element. 7-7. -7—Annually appropriate the coming gear's Capital Improvement Program in the C' v's Budget. I Ifilifi�� �I^rvnr%r%+ ft. G�Ondtie� .g., Formatted: Normal g �. 6 Comprehensive Plan Update 2016 Capital Facilities Element 1 8-7-78 Formatted: Font: Times New Roman, 72 pt 9 Formatted: ro Formatted: Font: Times New Roman, MONOMMINNI 72 pt Style Definition: List Paragraph: Font: Space After: 8 pt, Add space between paragraphs of the same style, Line spacing: Multiple 1.08 li Formatted: ry Formatted: Font: �, r, ;rii ", ,, 1 E✓ wrmm Ft: wis7230 pt orma S1 BIkBT, Swis72 „ tted: Font: 1 Blk BT, 30 pt 12 �r 1 r (�f ;rr u � �pw� .�'ra�Irr/�l � m "��'��'�' .; a,, �� „�,l��Gldviyl�r�'�"%/%l�il�Jl1 ✓err���J"��w rr mr ra �V;� r fir✓ /M rrJ✓iG �� ✓ I !"✓r ���l✓ ,�; � i .'�✓�� ✓�>� ��i' /y.,/�,�alp � 1 � � ��a�'✓/IGl�F✓`'° wd;P I� f ii%'�aa��it i�i ,, ,,,;,^r�,. ,;:,� "��'N/ IDhI,��✓/�✓ji�,,'��✓�4�,d0���'11 r7; - ;;:✓ rN�l m ' "'�i''�6 ,0 �,� mw 'r"�,�t/�Jr�'�y ,;,, �l�;✓�� ,1✓��u0� ,k'�d�'l�d y"��✓r� ii,✓ '� ��Yrr�✓"r �I' 7p1✓i�,�r gra�.. � r,'v� �,i( �N"r,✓�///allk «�%lei i'/9✓(�uI�V�70 �✓� r/ ;1� � i„�r r i ✓ r ey �� ✓r a 7K�p m ✓��G>d �( � >�RdN l✓ '*��rr / � �" !"i ,;,, /�'�"�r r� i 1/ply lN"�1����!�Y///ry/�,��1,11 1 / 1 lA '1, �✓�u'�rpe6yli r��� �� per .,,, ,, ;,^;� ;�„ 1 i�q i/ ✓r�i�HiJ����� ✓� l 4 � l✓r� 1� �� X111 y�IY9 irk' 1i �a�G�/r '�?r rn rr r e �✓ ld�l ui wr i �1 /,.¢ w,, ` ,,,✓r�iraj.,; d � �� i�/i����q�,°f i ��ri `�����'Ti ��G��j����yt�C������� �✓c� "( 1r!,rV���,b rl�ys Tip d �1"� m I INTRODUCTION Economic development does not take place in isolation.It is closely linked with virtually all aspects of community life,and is an essential element of a sustainable community.Because of this fundamental relationship,it is wise to consider what economic development is expected to accomplish. The term"economic development"is not synonymous with growth.That is,rapid population growth can occur without corresponding economic development '' i +es�el.Economic development usually means the strengthening of an economy by providing more jobs and Comment[JS1]: producing more revenue within the community,including tax revenues for local governments. Over the long HK s term, our economy needs to be balanced,.:a diverse Viand nimble enouoh to recover from extreme weather events eneroyissues and economic challenoes.fT,, 4tt�t4'.A diverse economy also provides a wider variety of job opportunities suited to all skill levels in the Comment[JS2]: work force. 0-2 Wording stems from "Resilient Communities for rlmenca" A primary goal of the Community Direction Statement(see Chapter+44111 of this Plan)is to provide more "family-wage"jobs.Providing better jobs and more economic opportunities should improve the communivA ability to guarantee affordable housing to all,by raising incomes rather than having to rely on cutting the quality of housing.The result of successful economic growth is to strengthen the community's tax and employment base.A strengthened tax base enables the communitV to support a higher quality of life for its residents by improving public services and amenities (e.g.,police and fire protection,roads,schools,libraries,parks,open space,utilities,etc.). Ideally,economic development in Port Townsend should balance economic vitality with sustai�abilitvfft6A4t-, environmental protection,and preservation of our small town atmosphere.How does this translate more Comment[JS3]: specifically?The answers should come from ourselves,from our own community vision.Do we want to expand �°2 our economic base?If so,what kind of diversity do we want?What are the natural resources or other features of our community that we can build on to accomplish economic development?What would be the best jobs for our residents in terms of their compatibility with our small town atmosphere? The purpose of this Economic Development Element is to provide guidance for maintaining, enhancing,and creating economic activity within Port Townsend that is consistent with the Community Direction Statement contained in Chapter IIIA of this Plan. Comprehensive Plan 2016 Economic Development Element � 9-1 PRA 4WA'RSeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� PLANNING eensider-afiens'. Growth NI naorement Act Reduiremeri Although the GNIA declared the economic development element reduirement null and void pending state funding,like manijurisdictions,Port Townsend has chosen to create and adopt an economic development element. Comment[JS4]:HK� 44 An economic lobment deveelement establishin local�oals bolicies objectives and brovisions br economicgrowth and vitality and a high aualin of life-." jChapter36.76A. 676(7)RCW). Future land uses should be closely tied to a cur's economic strategy.Accordingly,this Comprehensive Plan must be closely linked and integrated with an economic strategy to guide,promote,and attract economic development appropriate for Port Townsend.Addiftetlff�The GMA provides some direction for incorporating economic development considerations into the Comprehensive Plan.Among the 144 planning goals contained within the GMA,one pertains specifically to economic development: "Encourage economic development throughout the state that is consistent with adopted comprehensive plans,promotes economic opportunity4jor all citizens of this st{ate, especially for unemj�loyed and disadvantagedpersons, and encouragesgrowth in areas experiencing insufficient economicgrowth,all within the capacities of the state's natural resources,public services,andpublic facilities." (Chapter 36.76A. 626(5)RCW). The GMA also contains goals that apply to permits and natural resource industries.These goals relate closely to a community's economic vitality.. 'Applications for both state and localgovernmentpermits should be processed in a timely and fair manner to ensure predictability." (Chapter 36.76A.626(7)RCW). "Maintain and enhance natural resource-based industries."(Chapter 36.76A. 626(8) RCW). were developed Jay tile state to assist local junisclietions in the GMA.The Procechiral Criteria also F@68114114@144 tkat local a44cess'.44g tile pcoeecl+lces _ ty-wideI i ®li r Jefferson C®unto® (CWPP) The economic development element must also be consistent with the County-Wide Planning Policy for Jefferson County,specifically.—,Policy#7,"County-Wide Economic Development and Employment." (Chapter 36.70A.210 RCW). :Policy#7 recognizes the distinct roles of local government and the private sector: Comprehensive Plan 2016 Economic Development Element 9-2 PRA 4WA'RSeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� eThe private sector should be primarily responsible for creating economic opportunity in Jefferson County. The responsibility of local government is to assure that economic development activities are carried out in a manner that is consistent with defined community and environmental values.In order to ensure such consistency, the comprehensive plan should clearly identz,these values so that economic opportunities will not be lost due to confusion or unreliability of process." Local government is also responsible for internal coordination of capital facilities,land use,and utilities,as well as external coordination with other entities including the Port of Port Townsend The CWPP directs that the comprehensive plan give particular attention to the needs of nonservice sector businesses and industries and reconnize that some businesses are best suited for the UGA while others mai be better suited for the rural unincorporated areas." . in fhe ,. CHALLENGES & l OPPORTUNITIES The Cites 1996 Comprehensive Plan was adopted during a time of rapid growth,development,and economic expansion in Washington State Over the last decade both population growth and economic expansion have slowed markedly in Tefferson Counti and the Citi-of Port Townsend. Economic"challenges include: c,hi e„f.elf is fe) ft ehi e--e fk eImplementingr economic development goals outlined in the Community Direction Statement(see Chapter III of this Plan),in a wall which maintains and enhances Port Townsend's special character and small town atmosphere. 1. —Adapting to an older demoo�raphic,changes in the economq, and changes in how people work.An Comment[JS5]: estimated 24.6%of Port Townsend residents are acre 65 and over versus just a statewide average ofd Pc Assessment Comprehensive Plan 2016 Economic Development Element 9-3 PRA 4WA'RSeR4 c�`c��NONUrC;�€ cTcvD cF���T c cF�� 12.3%l. Taken together,the combination of democla�hic and economic data depict a communiti with two distinct economies–distinou shed between those who receive incomes from employment locally and those reliant on non-wage sources of income. iNlean�,vhile more Port Townsend residents are choosing to be self-employed(26-27%of Port Townsend are self-employed,more than double the 10%statewide averag 2. —Lingerino effects of the 2008 recession.-Port Townsend and.Jefferson Count,-were affected more severely than most of the rest of the state during the recession. While the state experienced job losses over a two--year period(from 2008-2010) followed b, net wins,. efferson County experienced a net loss of over 1,380 iobs between 2006m and 2012® a 15%decline in total employment. Only in 2013 did recovery begin to o�et underway,but only barely.Current county-wide unemployment rates are 33% above the rest of the state wag�es and incomes are lower. 3. —A lack of family waoge iobs.m The avev cre wage in Jefferson Count,is well below the state averacre. As of 2014,the averaore wage in. efferson Countyis iust above 834,500 per gear,only 63%of the statewide average. Lower wages are attributable in lame part to under-representation of traded sector employment–in higher wage iobs as with manufacturingprofessional,and technical services. Currentl-,iohs are dis�roportionateh-skewed toward lower wage occupations,as in retail and accommodations (including lodoino and food servicel. 4. —Lack of shovel-ready vacant industrial land.–appropriately zoned land with full municipal infrastructure is critical to accommodatingand at new higher wade employment. 5. —Lack of affordable housing, ®as detailed in Chapter V. Housing Element. 46. —Limitations on the Cit;'s ability to fund and provide basic infrastructure and services. Port Townsend will be forced to rely even more heavily on local sources of revenue as state and federal fundiri of community-services and capital improvements becomes increasinopl)difficult to obtain. 7 —Potential for economic disruptions resulting from limits to the availability of energ�p lies, constraints of a olobal economy,and climate change effects.-These converoino ism sues compel the Citi; to begin planning for transition and resilience. 8. The Citi has the opportunity to expand and develop emerging economic sectors The Cit)-'s historic downtown waterfront and the Port of Port Townsend continue to serve the tourist economy and marine trades ] Source:2010 US Census Comprehensive Plan 2016 Economic Development Element 94 PRA 4WA'RSeR4 NIM.c�`c��NONUrC;�€ cTcvD cF���T c cF�� respectively. Health services are e-: anding(notabli improvements bi-Jefferson HealthCare) and new economic sectors are emeroirip. O000rtunities include a craft and light manufacturing district in the Howard Streetd'o er Sims Way.Corridor, education at Fort��orden Lifelong Learning Center and facilities that su000rr the orowino local food econom�. Communir interest in develo_ino and usino renewable enero Comment[JS6]: � sources alsopresents an omortumt,. 0-47 Technological innovations are changing how r eople work. With these advancements,more businesses are locatingbased on aualit;-of-life for the emplo;ees vs. access to a major transportation corridor. In addition to newnew technologies,the City benefits from an educated ponulation---Port Townsend has agreaterrorortion of the adult population with a bachelor's degree or better as compared with adults county and statewide. Whaf ,. t 46. t e�Hte �a Comprehensive Plan 2016 Economic Development Element 9-5 PRA 4WA'RSeR4 f19 Z-77 11 The goals,policies,and implementation steps of this element will address these issues and guide future economic development in Port Townsend. ECONOMIC DEVELOPMENT GOALS & POLICIES Economic Development - Generally Goal 1:To foster a balanced,diversified,and sustainable local economy that contributes to Port Townsend's high quality of life,through the protection and enhancement of the community's natural,historical,and cultural amenities,and the improvement of the financial well-being of its residents. Policy Lb _Cooperate with the Department of Commerce,Chamber of Commerce,and the Main Street Programjeet to promote economic health and diversity for Port Townsend and the CountSr as a whole. PolicSr 1.2.= _Coordinate with partners at the state,regional and local levelef to ensure that economic development strategies are carried out(consistently, Comment[JS7]: HK-Peninsula Policv 1.3-._ Ensure consistency between the economic development strategy of this element and the goals Development Authority and CTED have changed and policies of the other elements of this Plan. na es. Policy 1.4.= _Maintain and enhance Port Townsend's natural,historical and cultural amenities in order to assist in attracting new businesses,retaining existing ones,and promoting economic vitality. Policy 1.5:- _Consider public-private partnerships and/or the formation of frpublic development authorities-e(PDAs) as a means to bolster development/redevelopment that serves the residents of and visitors to Port Townsend. . Training & Education Goal 2:To recognize the value of education as an important economic development tool and to train the workforce to develop skills for new technologies and family-wage jobs. �P'olicv 2.1-_ _Seek to expand programs of Peninsula College, '411.1-1 Western Washington Comment[JSS]: University Long Distance Learning,Washington State University Cooperative Extension,and HK 43 attract or found new institutions sufficient to provide local access to comprehensive Formatted: Font: Id vocational training and certification programs. Not Bo �Policv 2.2: _Encourage the Port Townsend School District to attain the highest standards of academic and ( Formatted: Font: vocational excellence to ensure that graduates are well prepared for the workplace. Not Bold Formatted: Font: Not Bold Comprehensive Plan 2016 Economic Development Element 9-6 PRA 4WA'RSeR4 NIM.c�`c��NONUG�€ cTc vD cF���T c cF�� Policy 2.3:- _Actively work to establish a technical trainin4 school, `e, �,....college cam us,or other educational institution in Port Townsend: Comment[JS9]: HK combining LU 2.3.1: —Ensure that decisions regarding capital facilities improvements(e.g.,transportation Pohcv 10 a network improvements)factor consideration of potential educational campus sites. Comment[JS10]: HK combining LU 2.3.2:— Consider providing tax incentives to attract a private four-gear college. Pohcrlo.8 2.3.3:— Communicate and coordinate with the Port Townsend School District and other relevant public entities when identifying potential campus sites for acquisition. 2.3.4: zz=LLaLILLIthLe feasibilit;of a trainingschool/colleore� campuson the 80--acre Cite-owned parcel(Assessor's Parcel No. 001092003L1viiicr immediatelh-adjacent and to the west of the Citi limits. Comment[JS11]: HK-LU Element Policy Marine Trades andasbeen moved u d and updated to reflect Goal 3:To strengthen the marine trades economy while protecting the natural environment and balancing city purchase of the DNR land. public use of shoreline areas. Policy 3.1= _When revising the Port Townsend Municipal Code(PTHC)to implement this Plan,maintain and enhance Port Townsend's character as a working waterfront town by allowing marine-related commerce and industry in specified shoreline areas. Policy 3.2, _Assist the Port in the development and implementation of master plans for Port properties Formatted: Font: that are consistent with the Growth Management Act and the Shoreline Master Program. Not Bold Foliar 3.3-_ _Plan and design shoreline open spaces that are compatible with marine-related industrial and" Formatted: Font: commercial uses of shoreline areas. old Not B.... ,Policv 3.4-_ _Promote the skill,motivation and availability of Port Townsend's marine trades workforce as a" Formatted: Font: regional resource of major importance to the Cies economic future. old Not B.... Policy 3.5- Encourage governmental and civilian agencies to work with local firms to identifir and transfer Formatted: Font: technology that can increase marine trades competitiveness. Not Bold Formatted: Font: Foliar 3.6 —Encourage the creation of marine trades obs that are dependent upon traditional skills, Not Bold construction techniques,and materials,such as: sail and canvas accessory manufacture;spar Formatted: Font: and rigging construction;marine-oriented carpentry;construction of wooden boats; old Not B.... . blacksmithing;and block-making and casting. 3.6.1®Support educational and vocational training efforts aimed at enhancing traditional marine trades skills,including mentorship and apprenticeship programs. 3.6.2: --Work with the Port of Port Townsend to promote traditional marine trades enterprises on Port owned lands at both the Boat Haven and Point Hudson. Policy 3.7:—. Continue to surport the -Northwest Maritime Center. Comment[JS12]: HK Comprehensive Plan 2016 Economic Development Element 9-7 PHA 4WA41SeR4 Diversified Manufacturing & Small Business comment[J313]: 0-46 .Lance-review in Goal 4:To support current commercial and manufacturing enterprises,and encourage the formation of small light of Hovee..What is businesses and the relocation to Port Townsend of small scale locally managed businesses as a vital art of Port small scale? PTAIC GI, g p GII,GII(H)zoning Townsend's economy. allows a maximum ground floor area in anv Polic-v 4.1:-. one structure to 40,000 sf.—Assist in the identification and recruitment of new businesses appropriate to Port lt2 c has a max Fax 2:1.Townsend's resources and community vision as described in Chapter lII04-of this Plan. ( Formatted: Font: Policy 4.2: ®Encourage industries to form consortia for the purposes of joint marketing,production and Not Bold Formatted: Font: other operations improvement,and joint approaches to regulatory compliance. Not Bold Policv 4.3-. _Attract emplolrers who use a wide range of job skills to create employment opportunities for all Formatted: Font: Not Bold Port Townsend residents. Policy 4.4j. _Encourage businesses to invest in modernization and environmentally sound technology. Formatted: Font: Not Bold Policy 4.5:-. _Encourage the exportation of local goods and services throughout the global economy. Policy 4.6 _Promote the location,retention and expansion of small and medium sized businesses�, - that access their markets and suppliers through telecommunications and available shipping. �Policv 4.7-_ _Encourage the location or relocation of small scale clean industry(e.g.,high technology and Formatted: Font: other light manufacturing,subscription fulfillment,catalogue sales,consulting,etc.)w4ie4thatNot B.... . has minimal impact on environmental quality Policy 4.8:- _Encourage the formation and expansion of cottage industries and light manufacturing. � Formatted: Font: Not Bold Policy 4.9- _Encourage the development of a diversity of local businesses that serve the needs of Formatted: Font: residents and visitors. Not Bold Formatted: Font: Community Retail Not Bold Goal 5:To enhance and attract small and medium sized retail businesses that serve the community's ( No B atted: Font: needs for goods and services. Id Policy 5.1-: --Promote development of retail uses tot l that serve local needs and diversif-the selection of conveniently located goods and services. Policy 5.2.= _Plan and provide capital improvements in the Gateway Corridor to attract new businesses and Formatted: Font: entrepreneurs,enhance existing businesses,and serve the retail needs of the community. old Not B.... . �Policv 5.3- _Promote the redevelopment efforts of Gateway Corridor land owners by helping to assemble Formatted: Font: parcels and design buildings_that meet the retail needs of the community. Not Bold Formatted: Font: �Policy 5.4 _Work with the Economic Development Council(EDC) and local retail business owners to Not Bold strengthen and expand Port Townsend's retail base,capitalizing on opportunities to decrease Formatted: Font: retail sales leakage to neighboring communities. Not Bold Formatted: Font: Tourism Not Bold Goal 6:To maintain and enhance year round opportunities for sustainable tourism in a manner that Formatted: Font: recognizes and preserves Port Townsend's unique historic heritage,culture,recreational amenities,and natural Not Bold setting. Comprehensive Plan 2016 Economic Development Element 9-8 PRA 4WA41SeR4 Policy 6.1Encourage a balanced mix of visitor serving uses to complement the natural,cultural,and Formatted: Font: historical amenities of Port Townsend. Not Bold Formatted: Font: Policy 6.2Z —Develop and explore Port Townsend's potential for enhanced facilities, services,,and events Not Bold that will appeal to residents and visitors year round. Formatted: Font: Not Bold 'olicv 6. 3,- -Work with a broadspectrum of the community to create public-private partnerships to Formatted: Font: develop year round visitor potential. Not Bold — Formatted: Font: Policy 6.4 - Develop strategies to maximize sustainable tourism opportunities to hel maintain exishn Not Bold industries and quality of life. Formatted: Font: Not Bold Policy 6.5- ®Develop and implement a Comprehensive Cultural Tourism Plan. Formatted: Font: Not Bold Commercial Historic District Revitalization Formatted: Font: ro Goal 7:To strengthen,preserve and enhance Port Townsend's Commercial Historic District as an active and Not Bold economically viable place to shop, conduct business and government,live,and enjoy cultural events. Formatted: Font: Not Bold Policv 7.1, _Maintain public areas and ensure a safe environment to increase the use of the Commercial Formatted: Font: Historic District. Not Bold Formatted: Font: olicy 7.2: ®Maintain and enhance the pedestrian oriented character of the Commercial Historic District. Not Bold Formatted: Font: l'olicv 7.3-® Encourage the rehabilitation,renovation,and adaptive reuse of upper floors of historic Not Bold buildings(e.g.,for artist studios,permanent housing,and office space)which will contribute to Formatted: Font: the vitality of the area. Not Bold Formatted: Font: Policy 7AZ ®Create gateways and entrances into the Commercial Historic District through the use of Not Bold enhanced plantings/street trees,and street furniture. Formatted: Font: Not Bold 'olicv 7.5-_ _Encourage development in the Commercial Historic District that harmonizes with and Formatted: Font: contributes to Port Townsend's small town atmosphere.Businesses in the district should Not Bold provide services,goods, entertainment,and community gathering places for Port Townsend Formatted: Font: residents and visitors. Not Bold Formatted: Font: Policy 7.6- Encourage the retention of existing businesses in the Commercial Historic District. Not Bold Formatted: Font: 'olicv 7.7-- ®Ensure that Commercial Historic District public improvements accomplish the followin Not Bold objectives: encourage pedestrian movement through the district and into shops and Formatted: Font: businesses;and support,rather than overshadow downtown functions. Not Bold Formatted: Font: Policy 7.8-- In cooperation with downtown business owners and the Main Street Program,develo a Not Bold parking management strategy to encourage turnover ocustomers aces and to encourage � P g r f g � g P g Formatted: Font: long-term parking in areas outside the Downtown Commercial District(e.g. use of the Haines Not Bold Street Park&Ride Lot and free downtown shuttle for employee parking). Formatted: Font: Not Bold Policv 7.9: _Work with the Main Street Program to coordinate training and educational opportunities Formatted: Font: tailored for Commercial Historic District retailers (e.g., customer service/host training; Not Bold understanding the market;diversifying the mix;and window and retail display). Formatted: Font: Not Bold Comprehensive Plan 2016 Economic Development Element 9-9 PHA 4WA41SeR4 NIM.E�`c��FlONUG�€ cTc vD cF���T c cF�� Fort Worden Campus ,Goal 8:To encourage appropriate(re)development,the City-shall encourage the implementation of the Formatted: Font: Long-range Plan for Fort Worden State Park(adopted 2008)2 as it applies to the 90-acre campus identified in Not Bold the 2013 Master Lease for the Fort Worden Campus by and between the State of Washington and the Fort Worden Public Development Authority-(FWPDA). Comment[JS14]: HK �Policv 8.1: Use the Long-range Plan as the basis for establishing allowed uses through zoning for the Formatted: Font: 90-acre FWPDA campus.Although a protect mai-be allowed through zoning,all non-exempt Not Bold redevelopment and new projects will be subject to environmental review to address traffic and other issues. Policy 8.2: _Recognize and support the FWPDA in undertaking,assisting with,and otherwise facilitating Formatted: Font: the implementation of a Lifelong Learning Center at the FWPDA campus generally- old Not B.... envisioned in the Fort Worden Long-range Plan. Telecommunications Goal 9:To provide Port Townsend with state of the art telecommunications infrastructure for business, education,public affairs,and consumer uses. Policy-9.1: Encourage local utilities to ex and ift9+ft4 telecommunications infrastructure, especially high-capacity-fiber optic cable. Comment[JS15]: HK-3 NOAA Policy-9.2: Offer incentives to encourage the establishment of"tele-work" stations in mixed use centers. broadband network-see Utilities Element Policy-9.3: Maintain up to date information regarding the infrastructure that businesses will need in the changing work place of the future. [Ord.No. 3119, §6.2, (December 8,2014)]. Commercial & Manufacturing Zoning Goal 10:To provide an adequate amount of appropriately-zoned land to support commercial and Formatted: Font: manufacturing development. old Not B.... . Policy-10.1: _When revising the Port Townsend Municipal Code(PTHC) to implement this Plan,identify- Formatted: Font: the types of commercial and manufacturing uses that are consistent with community values' old Not B.... estimate the demand for those types of uses,and scale6 the amount of commercial and manufacturing land available to projected demand and need. Policy-10.2: _Cooperate with Jefferson County-to ensure that high intensity-commercial and nonresource-related industrial activities are concentrated within urban growth areas (UGAs) where adequate public facilities and services exist,or will be provided at the time of development. . , , Comment[JS16]: Completed in 2002. recorded as 455760 - CountP adopted Ord. 8-06. Codified in JCC 2 "Long-range Pbm"meaUaa ns the Fort Worden Site Use and Development Plan and the Fort Worden Site and Facilities 600 IIIIDs 18.15Cross..reference Capital .Guidelines for Rehabilitation. Facilities Element Policv 8.6 Comprehensive Plan 2016 Economic Development Element 9-10 PHA 4WA41SeR4 Yolicv 10.4: Expand existing commercial and manufacturing zones only after assessing and mitigating Formatted: Font: adverse environmental impacts. Not Bold Policy 10.5: Encourage the infill of existing commercial and manufacturing zones before considering the Formatted: Font: expansion or creation of new zones. old Not B.... . Policy 10.6: Provide effective separation of conflicting land uses through buffering,setbacks,zone uses � Formatted: Font: allowed,and transition zones. old Not B.... l'olicv 10.7: _Achieve a greater balance between housing and employment opportunities. Formatted: Font: Not Bold l'olicv 10.8: Assure that implementing regulations permit cottage industries within residential areas, Formatted: Font: consistent with e character of the surrounding neighborhood. Not Bold �Policv 10.9: Promote development of planned office,business and industrial parks,while conserving Formatted: Font: unique physical features of the land and maintaining compatibility with other land uses in theold Not B.... surrounding area. Policy 10.10: —Encourage neighborhood mixed use centers where small scale commercial development Formatted: Font: (e.g.,professional services offices,restaurants,or retail stores) may occur in residentialold Not B.... . neighborhoods,consistent with the goals and policies of the Land Use Element of this Plan. Public Facilities & Services Goal 11:To provide adequate public facilities and responsive and efficient public services,in order to attract Formatted: Font: and support commercial and manufacturing developmentold Not B.... . Yolicv 11.1: _Update infrastructure plans and regulations on a regular basis. Formatted: Font: Not Bold l'olicv 11.2: In cooperation with business interests,work to make available necessary infrastructure Formatted: Font: funding. T . , .2, ,2Not Bo....ld Permit Processing/Regulatory Reform ,Goal 12:To ensure responsive and efficient permit processing. Formatted: Font: Not Bold �'olicv 12.1: Develop and maintain implementing regulations�rthat ensure that development Formatted: Font: applications are processed in a timely, fair,and predictable manner. Not Bold ,Policv 12.2: Establish and maintain a master use permit or consolidated permit process that allows anFormatted: Font: applicant to apply for all needed approvals at once,and for the simultaneous processing of all old Not Bo aspects of project approval. Policy 12.3: Design and implement a permit processing system that coordinates the efforts of overlapping � Formatted: Font: jurisdictions (i.e., federal,state,local)in order to avoid duplicative reviews and unnecessaryold Not B.... . time delays. Policy 12.4: Develop and maintain a permit data management system that is coordinated with other Citv Formatted: Font: departments and Jefferson County(i.e.,AssessorOffice . � old �s ) Not B.... Comprehensive Plan 2016 Economic Development Element 9-11 PHA 4WA41SeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� Policy 12.5: _Maintain license and permit fees and processes which give preferential rates and expedited � Formatted: Font: processing to activities furthering the goals of this Plan. Not Bold Policy 12.6: Balance the need to process permits in a timely fashion,while at the same time ensuring that Formatted: Font: regulations intended to protect and enhance the natural environment are regularly revised andold Not B.... . s�stematicall�r enforced. AN ECONOMIC DEVELOPMENT STRATEGY FOR PORT TOWNSEND The Strategy Introduction Traditionally,local governments have played a significant,though limited,,role in shaping how local economies perform. Regional,national and global economies have had a much greater impact on the local economy than economic development plans and policies adopted bar local jurisdictions.When local government has been involved,its leadership in promoting economic development has usually been limited to several key areas, including: • Land use(i.e.,zoning development standards,permit processing); • Public facilit5r and infrastructure investments (e.g.,utilities,transportation improvements,public safety,parks,visitor amenities,etc.);and • Marketing cooperation and coordination with other entities (e.g.,Jefferson Counter,Port of Port Townsend,Chamber of Commerce,Economic Development Council(EDC),citizens and property owners,businesses,etc.). • Like these earlier efforts,the CiWs economic development strategy'also focuses on these key areas: • Policies have been incorporated_that ensure that Port Townsend will have an adequate suppler of appropriately zoned land to support future commercial and manufacturing development. • Direction has been included that will help to guide the City in streamlining its permit processing system to provide more timely,fair and predictable permit processing.When implemented, these measures will help to ensure that the City will not miss opportunities for economic development due to delay or uncertainty of process. • Additionally,policies have been included w4ie4that will help to ensure that appropriate public services and facilities are in place to attract and support economic development. • Finally,policies have been included ,that foster cooperation and coordination with entities at the state,regional and local level � ; EDG,fo fhe t .These provisions ensure that government agencies and other entities will work together to develop and implement consistent strategies which promote the economic health and diversity of the area. In addition to emphasizing these traditional components of an economic development strategy,the City's approach seeks to clearly articulate a course of action which will help to improve the job skills available in the workforce,bolster several sectors of our local economy,and improve our telecommunications infrastructure. Comprehensive Plan 2016 Economic Development Element 19-12 PRA 4WA41SeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� The strategy seeks to maximize our potential for future economic growth in a manner which is consistent with community and environmental values.Major areas of emphasis within the strategy include: • Training/Education; • Marine Trades; • Diversified Manufacturing and Small Business (e.g.,small scale"clean"industry); • Tourism (which capitalizes on opportunities for year round cultural and educational visitation); • Retail Trades (including a Commercial Historic District revitalization component);and • Telecommunications Infrastructure. The key ingredients of the strategy are discussed in more detail below. [Note: ., Priorities for these steps should be established during the annual Budget process in light of the City's limited financial and staff resources::.] I Comment[JS17]: HK Training/Education Building and diversifying our economic base must begin with support for the survival and expansion of local small business.It is as important to prevent businesses from going out of business as it is to attract new businesses.The new cannot replace what has been the backbone of our economy,but it can enhance our economic base.How can we retain existing business and industry while setting the stage for sustainable future growth?The unifying principle of the strategy lies in improving the skills available in our labor force. Port Townsend possesses manor highly educated individuals.Nevertheless,manor possess job skills that are not directly relevant to the economic sectors we wish to encourage.To address this situation,the strategy envisions a three step scheme for improving workforce skills. The first step involves maintaining and expanding the capacity to provide rapid turn-around training for workers.This should be accomplished by obtaining additional funding for the Economic Development Council (EDC) or education partners to reestablish-,4�e the Magnet Center or launch similar training facilities.The mission -- `6g"-�-should be specific:to provide short course vocational and certification training programs to enhance competence of employees in the marine trades and retail sales sectors. Comment[JS18]: HK 43 The second step requires working with partners to develop ft local engineering/ manufacturing capability.To facilitate this,the City, S should work with Peninsula College to identify curricula and degree programs wbie4-that promote Port Townsend's economic vision.Examples of possible degree programs include two-°gear Associate's Degrees in engineering and natural resource management lddit onally Howard Street Corridor mioht serve as the location for technologically sophisticated and environmentally friendlvincubator industries that could offer educational opportunities. The final step involves supportine Washington State Parks, Fort Worden Public Develooment Authority (PDA), and other economic and educational entities in the development of a LifelongL� earningCenter er at the F'WPDA camous. -ea � g., Comprehensive Plan 2016 Economic Development Element 9-13 PRA 4WA'RSeR4 NIM.c�` Fav Tr��€ cTcvD ET EMEN4 r G y 1. 4. Promote vocational training and educational opportunities which strengthen and increase the skills available in the workforce. 2. 2. Involve the Port Townsend School District in key discussions (e.g.,a"manufacturer's roundtable",discussed below)X13-that relate to the economic development of the City in order to facilitate a better understanding of the skills needed in the local job market. Comment[JS19]: HK 43 3. _-34.—Work with-Penin� lff College artners to develop ft local engineering/manufacturing capability.,Provide direction to Peninsula College regarding what programs would facilitate the communiWs vision (e.g.,Associate's Degrees in engineering and natural resource management). 4. 4-5—Work with a diversity of institutions such as 1.11 �� ��`' ��`� , Fort Worden Lifelono Learnino Center Peninsula College,and Washington Long Distance Learning lto increase professional education and hither education ooportunitiesh. Comment[JS20]: HK 43-City has 5. _C. In conjunction with the establishment of a technical training/education center,examine the purchased ao acre DNR property. Fort Worden feasibilit5r of attracting an on-campus research station to Port Townsend. i;fetongLearning center established Magnet 6. F6- Facilitate a formai process involving all Jefferson County School Districts,EDC,Chamber, Center no longer exists. Main Street.Washington State University Cooperative Extension,Western Washington University, Peninsula College,and the University of Washington to determine what opportunities and obstacles exist to attracting a quality four-zyear college to Port Townsend. 7. Enlist the EDC to work with the Education Foundation in recruiting a four-gear educational institution to Port Townsend. 8. ,Send letters to the Deans of Instruction of all four-year public and private colleges and universities in Washington State apprising them of Port Townsend's desire to attract a four--gear institution of higher education-T�����-�n 9. 44.—Sponsor a twice yearly—4 Workshop on"Future Prospects for Higher Education in Port Townsend"designed to attract Deans of Instruction to town and maintain an ongoing dialogue with candidate institutions. 10. 441—Designate a member of the 9tti a.rg ftna G„f.z�Development Services Department as the City's official"Education Liaison" for the college recruitment effort. 11. 42. Develop and maintain updated college recruitment information to provide to candidate institutions and the local news media. Comprehensive Plan 2016 Economic Development Element 9-14 PRA 4WA'RSeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� 12. _ Work with Main Sheet,the Chamber of Commerce,EDC and other local entities to ensure that informational and recruitment publications emphasize Port Townsend as the"City that supports culture and education on the Olympic Peninsula." 13. 4-_;4—Research,identif-,and offer appropriate incentives for businesses that provide"in-house" training and education to bolster employee skills. Marine Trades The Community Direction Statement of this Plan(see Chapter III) describes the community we wish Port Townsend to become in the next 20 years.The statement makes clear that marine-related commerce and industry and maintenance of the"working waterfront" character of the City are central to the communiWs vision. The potential for expansion of the marine trades sector of our local economy is considerable.The largest obstacles to growth of this industrial sector include:a lack of appropriately located and zoned vacant land;and a lack of Port infrastructure to service larger and increased numbers of boats.As long ago as 1985,the Economic Development Council's(EDC)economic development strategy indicated that added moorage,water side work space,large capacitor lifts and haulout facilities and port area improvements were necessary to allow expansion. Completion of the 3200 ton enhanced haul-out facility has sone-..:rte m--�v a long war toward alleviating existing infrastructure needs. The City should continue to plav a kev role in encouraging the marine trades economy.One important step the CitV took-4- ' was to plan and zone to promote marine-related commerce and industry in specific shoreline areas as part of the Shoreline Nlaster Program L7 pdate..L2LQ7 .Equall�r important is the City's role in cooperating with the Port to develop and implement master plans for Port properties which are consistent and coordinated with City plans and programs.Finally,the City should take a leadership role in promoting the skills available in Port Townsend's marine trades workforce. Comment[JS21]: �HK3 1. Work with the Port of Port Townsend to develop the infrastructure .g., _ft�,_ necessary to facilitate the growth of the marine trades economy. 2. 2. Work with the Port of Port Townsend in exploring options to ensure alternative transient moorage facilities. 3. --;7—Work with the Port of Port Townsend to obtain"pass through"grant funding to finance stormwater management planning and facility improvements on Port owned lands. 4. 4®Encourage and assist the Port in developing a master plan for the Boat Haven properties. 5. Assist the Port in the development and implementation of master plans for Port properties that are consistent with the Growth Management Act and the Shoreline Master Program. [Or-d. 2945Z 6. F6 Enhance fhe Niagnef rfffeef enfef's efforts to provide vocational training w4ie4-that expands the skills available in the marine trades,workforce. Comment[JS22]: HK 43 .� 7. --AEncourage the Port to work with the Indian Island Naval Detachment to organize and establish a yearly marine"trades show"-_that borrows upon the technical expertise of the federal government to build and enhance the job skills available in the marine trades workforce. Comprehensive Plan 2016 Economic Development Element 9-15 PRA 4WA'RSeR4 NIM.E�`c��NONUrG�€ cTcvD cF���T c cF�� 8. Cooperate with the Northwest School of Wooden Boatbuilding to organize and promote seminars,workshops,and trade exhibitions designed to attract wide attendance while showcasing Port Townsend's quality marine trades industry. Diversified Manufacturing& Small Business The economic development strategy envisions Port Townsend as the center of eastern Jefferson CountA economy and employment,with a diversity of commercial and industrial activities thriving and providing employment opportunities for residents.The strategy also envisions that cottage7dbased industries and low impact light manufacturing will have a strong presence in the community. Small manufacturers and emerging technologies deserve special attention in the Cies strategy for two principle reasons.First,small manufacturers are able to more rapidly respond to changes in the market place.Economic diversity can be strengthened if we have a variety of small companies doing different things,rather than one large company doing one thing. Second,small scale diversified manufacturing has a tremendous potential to generate additional employment opportunities (note: statistics indicate that for every one manufacturing job created,five more jobs are created in support services and other manufacturing). For these reasons,the City's strategy seeks to assist in the identification and recruitment of small scale"clean" industry and cottage--based industries wkk4S-that are appropriate to Port Townsend's resources and vision.The strategy also describes the City's role as "facilitator"in encouraging industries to pursue joint marketing opportunities ,that could lead to exportation of local goods and services throughout the global economy Implementation: 1. 4. Designate and zone a sufficient amount of land to support small scale"clean" manufacturing. 2. 2. Ensure that the 6--gear Capital Facilities Plan targets areas designated for small scale"clean" manufacturing for necessary infra-structure improvements. 3. --;7—Research,identify,and offer development incentives for new businesses and business expansions that are appropriate to Port Townsend's resources and vision. 4. 4. Establish a"quick response" team comprised of key officials and staff members who are available to meet with,and provide guidance to,prospective business developers. 5. Contract with the Economic Development Council(EDC) to develop and make available to prospective businesses vital economic development information regarding the City,including,but not limited to;;economic base„capital infrastructure.-,City permitting processes„and specific sectors desired by the City. 6. F,—Organize and facilitate a manufacturer's roundtable to identify and pursue joint marketing opportunities,and to examine the possibilities for increased foreign trade. 7. --� Review,and if necessary,amend existing zoning regulations to allow compatible home--based businesses and cottage industries in residential areas. 8. —Develop a listing of all available sources of funding for economic development efforts. Community Retail The City's economic development strategy recognizes the fact that service industries,including retailing,are the fastest growing sector of the U.S.economy.Compared to the state,relatively high proportions of local�obl s are found in the retail accommodation and food services other services and orovernment sectors which account Comprehensive Plan 2016 Economic Development Element 19-16 PRA 4WA41SeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� for about 60%of emplovment countywide versusjust over 40%statewide. ° While these jobs may not provide the desired wages or "spin off' effects that manufacturing jobs have,they nevertheless provide manly meaningful employment opportunities,fulfill community shopping needs,and boost local government revenues:; Comment[JS23]: �HK3 The Community Direction Statement(see Chapter III344 of this Plan) and the City's economic development strategy both recognize the importance of retail trades to our local economy and quality of life.The community vision places special emphasis on building the strength and vitality of existing businesses,and minimizing retail sales leakage to neighboring jurisdictions. One significant role local government can platy in promoting community retail trades lies in providing and maintaining public infrastructure and improvements in commercial districts throughout town.In this regard, the City's has�`��placed special emphasis on implementation of the recommendations of the Port Townsend Gateway Development Plan.This Plan is in reality a comprehensive public improvements plan wrieh-that could aid in improving the quality of the physical link between public and private spaces in the commercial districts along the Sims Way/Water Street corridor from the Ferry Terminal to the City limits. Implementation: 1. 4.Carry out the capital improvements recommendations contained in the Port Townsend Gateway Development Plan. 2. 2. In conjunction with the EDC,study local market conditions,identif5y areas for additional retail opportunities,and work with business owners and entrepreneurs to create strategies that build on those opportunities. 3. Help existing businesses find better ways to meet their customer's needs and expand to meet market opportunities. Tourism The Cies strategy focusses on managing and integrating tourism into the economy while safeguarding the unique qualities which bring residents and visitors to Port Townsend in the first place. Many residents feel that peak season tourist volumes in Port Townsend are at or near the saturation point. Additionally,surveys indicate that preservation of the heritage,culture and environment of Port Townsend is critical to the community.Accordingly,the focus of the strategy is maintaining and enhancing sustainable year round opportunities for visitation.Reducing the"seasonality" of the tourist industry could reduce the fluctuation in income,employment,and tax revenues in the retail and service sectors.Additionally,reducing seasonality could diminish impacts to the environment,downtown parking demands,and overall conflicts between residents and visitors. Implementation: 1. 4. Provide adequate funding to the tourism aAdvisor5ygC=roup to promote off-season cultural and educational visitation to Port Townsend. 2. 2. Enlist the assistance of the Chamber of Commerce,Main Street and Economic Development Council(EDC)in researching and identifying small businesses,organizations,and associations whk4rthat hold off—season educational meetings and corporate retreats. 3. --;7—Examine the feasibility of establishing and funding a maritime museum. Comprehensive Plan 2016 Economic Development Element 9-17 PRA 4WA'RSeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� 4. Contract with the Main Sheet Program or the Chamber of Commerce to provide ongoing customer service training for retail and service sector businesses. 5. Obtain adequate funding for the Visitor Information Center. 6. 6—. Assist the Main Street Program and the Chamber of Commerce in developing a targeted marketing program which clearly defines the tourist market, establishes strategies for reaching target markets,and communicates when and how best to come for maximum enjoyment of the area. 7. 7 Continue to ilmprove and expand signage,both directional and interpretive,throughout the Citv. 8. Work with the Main Street Program,the Chamber of Commerce and the EDC to develop a mechanism for the collection and continuous maintenance of target market information. Commercial Historic District Revitaliztation Port Townsend's plan for revitalization of the Commercial Historic District identifies three important areas of involvement for City government. First,the City's plan should ensure the provision and maintenance of appropriate public improvements in the Commercial Historic District.The quality of the physical link between public and private spaces is crucial to the proper functioning of the Commercial Historic District—and its businesses.Public improvements should help create an inviting environment for shoppers,with clearly marked streets,convenient shopping places,well-lit sidewalks and good pathways between parking areas and stores.Public improvements should provide basic infrastructure and services in a manner that is visually compatible with the nature of the functions they support. In order to implement the Commercial Historic District revitalization policies of this element,the City should develop a comprehensive public improvements program which is tailored to the specific needs of the district while reinforcing private projects. Second,the City's plan should provide adequate parking and parking management to meet the needs of customers,merchants,employees,visitors,,and residents.It should be regulated to encourage turnover of customer spaces and to discourage abuse by long-term parkers.In order to ensure well designed,maintained and managed parking in the Commercial Historic District,the City should develop a parking management strategy.The parking management strategy should take into account not only the numbers and locations of parking spaces,but also methods of enforcement-the incentives and disincentives that can be used to encourage parking in certain areas. Finally,the City should provide assistance to the Main Street Program in strengthening the Commercial Historic District's existing economic base and gradually expanding it.The City,in conjunction with the Main Street Program,should work to enhance diverse resident and visitor-based commercial activities and community events in the downtown. Implementation: 1. In cooperation with the Main Street Program and merchants,develop a comprehensive public improvements program for the Commercial Historic District , that is tailored to the specific needs of the area while reinforcing private projects.The program should: a. a--Help to develop public/private partnerships to improve the pedestrian environment: b. b Promote the use of pedestrian visible signage in the Commercial Historic District;and Comprehensive Plan 2016 Economic Development Element 19-18 PRA 4WA'RSeR4 c�`c��NONUrG�€ cTcvD cF���T c cF�� C. e.Ensure that Commercial Historic District public improvements are adequately maintained in order to create a pleasant environment. 2. 2In cooperation with the Main Street Program and merchants,develop a Commercial Historic District parking management strategy.In developing the program the City should: a. a--Examine incentive based programs,coupled with education,to reverse resistance to using more remote parking areas;and b. �,—Consider a variety of parking control alternatives,including:parking meters,chalking tires, cash boxes,-;and parking permits. 3. In conjunction with the Main Street Program,the City should work to strengthen the Commercial Historic District's existing economic base and gradually expand it.Activities which should be pursued through the Main Street Program include: a. a--Studying local market conditions,identifying areas of opportunity and designating strategies to build on those opportunities; b. b Helping existing businesses find better ways to meet their customer's needs and expand to meet market opportunities; C. e.Recruit new businesses to complement the district's retail and service mix and boost overall market effectiveness; d. Find new or better uses for under-used or vacant downtown buildings;and e. a.Seminars and short courses offered to merchants regarding:customer service/host training, understanding the market„diversifying the mix;and window and retail display. 4. 4—Coordinate with the Main Street Program to maintain an organizational structure whi&4-that is efficient and effective in promoting the Commercial Historic District.Activities which should be pursued through the Main Street Program include: a. a--Promoting events which enliven the Commercial Historic District;and b. �,—Maintaining an ongoing planning and action program involving the business community of the Commercial Historic District. Telecommunications Telecommunications in Port Townsend include both wired and wireless telephone services,cable and satellite television and high-speed broadband technologies.The CiWs strategy pays special attention to upgrading telecommunications infrastructure to promote home--based personal and professional service businesses.With two main internet providers and NoaNet/PLD fiber system,the challenge becomes distribution and connectivity rather than capacitvv.The City,in cooperation with the Economic Development Council(EDC) should play an important role in researching and identifying aspects of the City's infrastructure that must be upgraded in order to make our community"tele-friendly"for the many"footloose" businesses moving to our area.It is anticipated that implementation of this strategy will also result in fh-e- establishment of"tele-work"stations complete with F. " a ek 4 ft ,copiers,and computers in Port Townsend's mixed use centers.One day,we might think of such stations the same way we think of bus stops(today! Comment[JS24]: �HK3 Comprehensive Plan 2016 Economic Development Element 9-19 PRA 4WA'RSeR4 NIM.c�`c��NONUrG�€ cTcvD cF���T c cF�� 1. 4— the EDC to research and prepare periodic reports identifying those aspects of the City's telecommunications infrastructure that require improvement in order to facilitate economic development. 2. 2. Contact telecommunications utility providers in an effort to "fast track" distribution and connectivity of Aie pfe)"isien of high capacity fiber optic cable`e) fi.e"eff 4'._ n „na 3. Complete renegotiation of the City's current cable franchise. Measuring Our Success Without concrete targets it is difficult to monitor the success of an economic development strategy once implemented.The overall goal of the strategy is to foster a net increase of family wage'jobs. ftf leftsf 68H . "Family wage"jobs can be described as those that pair a wage or salary X13-that allows an individual or family to purchase a home within Port Townsend,feed and clothe a familv,pair for medical care,take a vacation,save for retirement,and send the kids to college(hopefully here in Port Townsend!).' 1 , As stated in the Land Use Element.the Ciry i2roposes to develop a subarea plan for the Howard StreetlDiscovery Road corridor. This corridor is envisioned as a mixed em leo Tment work district com rn ised of commercial,light industrial,and service uses,with median�and higher density residential alone the r eriphery Comment[LB25]: of the work district. Planned improvements willprovide approximately 82.5 acres of fully served, 0-15 and aea by the Pc employment land including shovel-iLL(/ industrial acreage with the potential to create 1,465 jobs (representing at their 2/11 meeting. 12.8%of the current countywide labor force(. The development of the Howard Street Corridor is part of a strateory to address as vet unrecovered job loss from the Recession and match anticipated countywide -,population growth both currently and over the next 20 S-earsl. Comment[JS26]: 0-45 To meet these employment targets,a healthy business climate needs to be nurtured in Port Townsend.This can be done by building on Port Townsend's economic development potentials;and overcoming its constraints. Positive momentum must be started.The community must see the possibilities,believe that the strategy is possible,and believe that the approach will enhance the viability and character of the community. Comprehensive Plan 2016 Economic Development Element 9-20 Formatted: Font: (Default)Times New Roman 72 pt Formatted Formatted: Font. (Default)Times New Roman,72 pt Style Definition Title Font. Bold Formatted: Font: Swis721 Blk BT, 22 pt Formatted Font Swis7 21 Blk BT, 22 pt L ro� �Ir,r ra •n o� r�, i a; u Fw r ry M I t Formatted: Left, Space After: 10 pt, Line spacing: Multiple 1.15 li,Don't keep with next, Adjust space between Latin and Asian text, Adjust space between Asian text and INTRODUCTION Formatted: Different first page header The Growth Management Act(GMA)requires consistence in planning at a number of levels including: Formatted: Font: 12 pt -Internal Comprehensive Plan consistence( .e.,within the mandatory plan elements -land use, Formatted: Heading housing,transportation,utilities,and capital facilities);and 1, Don't keep with next,Adjust space External Comprehensive Plan consistency e.,consistency with neighboring jurisdictions and the between Latin and goals of the GMA). Asian text,Adjust space between Asian The purpose of this chapter is to explain how the goals,policies and strategies of the Port Townsend text and numbers, Tab stops: Not at Comprehensive Plan are externally consistent and compatible with the thirteen state-wide planning goals of the 0.75" GMA(Chapter 36.70A.020 RCW) and the requirements for comprehensive plans contained in the Formatted: Line County-Wide Planning Policy for Jefferson County(CWPP).Table IX-1 on page IX-10 lists specific goals and spacing: Multiple 1.15 li,Adjust space policies from the Comprehensive Plan that support the 14-3 planning goals of the GMA. between Latin and Asian text,Adjust space between Asian \Afi 1 A text and numbers, Tab stops: Not at 0.5" CONSISTENCY WITH THE 13 GMA GOALS. Formatted: Font: ro Goal#1-UrbanGrowth. 10.5 pt pncourage development in urban areas where adequate public facilities and services exist or can be provided in an efficient manner. Formatted: Font: 10.5 pt Chapter IV-"The Land Use Element"and the Future Land Use Map establish land use designations and Formatted: Heading densities sufficient to accommodate the population growth expected to occur over the next 20 gears.The Plan 1, Don't keep with promotes higher density areas through the designation of Mixed Use Centers surrounded b distinct next,Adjust space p g �r g g I between Latin and neighborhoods.The Plan encourages higher density retail,service businesses and multi-family residential Asian text,Adjust development in areas where adequate transportation facilities,sewer,and water service already exist or are space between Asian text and numbers, planned. Tab stops: Not at 0.75" Goal#2-Reduce Sprawl. Formatted: Font: ,educe the inappropriate conversion of undeveloped land into sprawling low density development. Formatted: Font: The Plan contains goals,policies and implementation strategies that encourage compact,efficient urban growth, Italic and the phasing of growth within Port Townsend,through the use of"growth tiers."The Plan designates mixed Formatted use centers surrounded by higher density residential areas at five key locations throughout town.The Plan also Formatted Forma M1 connects lands with development constraints (e.g.,wetlands,drainage corridors,and steep slopes)with some of Formatted: Font: Italic the Cies remaining forested areas in an effort to create a Cite-wide system of interconnected open spaces and Formatted trails. One of the central objectives of the Plan is to attempt to retain the existing small town character of Port Townsend by encouraging new development in and around the mixed use centers,rather than dispersed widely throughout the Cite. . Goal#3-Transportation. Formatted d Comprehensive Plan 2016 Consistence with GNIA&County-Wide Planning Polici 10-1 PRA 4WA'RSeR4 Tau.GNSIS4 NCC 3AI14H 414E 6ROW414 ATEA n� (_L'TrR r"�T"f' A94 49E UT ;1�4; 4 ,Encourage efficient multi modal transportation systems that are based on regional priorities and coordinated with county and city Formatted: Font: comprehensive plans. Italic Formatted: Line The Plan contains goals,policies and strategies that ensure coordination with local and regional transportation spacing: Multiple plans.The overall transportation goal of the City is to build a comprehensive transportation network that 1.08 li,Adjust space between Latin and promotes a"walkable" town by providing pedestrian and bicycle facilities along with new and upgraded roads. Asian text,Adjust The Plan accomplishes this by text and numbers, r establishing mixed use,residential,and commercial land use designations that space between Asian support multi-modal and transit-oriented development.The Plan establishes the framework for a City-wide, Tab stops: Not at interconnected system of nonmotorized trails.Upon completion,the system would link neighborhoods with 0.5" mixed use centers,employment centers,and parks and open saces. Formatted:Title, Don't keep with next, Goal#4-Housing. Adjust space between g y f ff g g f p p f p y f Latin and Asian text, ncoura e the availabilit o a ordable housin to all economic se ments o the o ulation o this state; romote a variet�o residential Adjust space between densities and housing types;and encourage preservation of existing housing. Asian text and numbers,Tab stops: The Plan contains a number of policies and implementation measures designed to address Port Townsend's Not at 0.75" affordable housing problem.First,housing densities ranging from four to 24 units per acre are directed to Formatted: Font: Promote wider housing choices fora population diverse in age,incomes,and lifestyles.Approximately 105 acres Italic of vacant and available land have been designated for moderate and higher density multi-family housing(i.e.,up Formatted: Line spacing: Multiple to 16,and 17 to 24 units per acre).Second,the Plan directs that duplexes,triplexes and fourplexes be allowed in 1.08 li,Adjust space all single-family residential areas to promote affordability and a diversity of housing types.To further address between Latin and Asian text,Adjust affordability,the Plan directs that manufactured housing(i.e.,which meets the Federal Housing&Urban space between Asian Development Code rather than the Uniform Building Code) be allowed in all single-family residential areas, text and numbers, Tab stops: Not at provided that such homes meet the standards of the State Energy Code or its equivalent.Additionally,a density 0.5" bonus system is recommended to facilitate the provision of housing to lower and moderate income Port Formatted:Title, Townsend households,and priority permit processing is offered to builders of affordable housing Don't keep with next, developments.The Plan also includes policies designed to facilitate the repair and maintenance of the Ci Ws Adjust space between p p p Latin and Asian text, existing housing stock. Adjust space between Asian text and Goal#5-Economic Development. numbers,Tab stops: ncourage economic development throughout the state that is consistent with adopted Comprehensive Plans;promote economic Not at 0.75" Italic opportunity for all citizens of this state,especially for unemployed and for disadvantagedpersons;and encouragegrowth,all�a ithin the Formatted: Font: capacities of the state's natural resources,public services, andpublic facilities. Formatted: Line The Plan designates significant areas within the City limits for commercial and manufacturing development. spacing: Multiple 1.08 li,Adjust space Mang of these areas are already provided with a full range of urban services to facilitate development,or would between Latin and be provided with these facilities within the 20 year planning horizon. Asian text,Adjust space between Asian One of the major emphases of the Plan is to address the current"jobs/housing imbalance"in Port Townsend text and numbers, Tab stops: Not at and provide more"family-wage"jobs.An Economic Development Element has been included(see Chapter 0.5" VIII)within the Plan to facilitate economic growth and development consistent with community and Formatted: Font: environmental values.The Economic Development Strategy stresses the importance of promoting our local Garamond, t Garam11, P, < training and education capabilities,and encouraging specific sectors of the local economy including:marine Formatted: Font: Garamond, 11 pt trades;small business and diversified,environmentally friendly manufacturing and sustainable,gear-round Formatted: Font: tourism.The Strategy also seeks to revitalize Port Townsend's Commercial Historic District and upgrade the Garamond, 11 pt City's telecommunications infrastructure for the jobs of tomorrow.The overall goal of the Plan is to facilitate Formatted: Font: the provision of at least 2,700 more"family wage"jobs during the 20 gear planning horizon.{()rd Garamond, 11 pt . Formatted: Font: Garamond, 11 pt ��C omprehensive Plan 2016 �Consistencv with ONLA, &County��ide Plannin Polid 10 2�� PRA Tr...,., .,.i Tau.GNSIS4 NCC 3AI14H 414E 6ROW414 ATEA n� (_L'TrR r"�T"f' A94 49E UT ;1�;P 9 Goal#6-Property Rights. Formatted:Title, private ro ert shall not be taken or ublic use withoutjust compensation havinga been made.The ro erty ri hts o landowners shall- Don't keep with next, be protected from arbitrary and discriminatory action. Adjust space between Latin and Asian text, Adjust space between The issues of property rights and timely and efficient permit processing have been important to Port Asian text and Townsend's comprehensive planning process. Chapter IV-"The Land Use Element"was developed with numbers,Tab stops: particular sensitivity to property rights issues.In manor areas of the City,an attempt has been made to retain Not at 0.75" existingland use and zoning designations.Where substantial changes to existing land use and zoning patterns Formatted: Font: g g g g g p Italic are suggested,private landowners'reasonable use and enjoyment of the land would not be impaired,and in Formatted: Line many instances could be enhanced. spacing: Multiple 1.08 li,Adjust space For instance,the Plan directs that the development densities in certain areas of the City with stormwater-related between Latin and development limitations be reduced from 8 to 4 units per acre i.e.,from a minimum lot size of 5,000 s $.to Asian text,Adjust P P ( q• space between Asian 10,000 sq. ft.).The Plan also suggests that development densities within areas subsequently designated in the text and numbers, Ta Open Spaces and Trails Master Plan as "open space" might be reduced even further(e.g.,perhaps as low as 5 stops: Not at 20,000 sq.$.minimum lot size,or 2 units per acre).Mang of these open space areas have already been purchased by the City in an effort to better manage stormwater runoff and limit the potential for future flooding.Existing substandard lots created prior to adoption of this Plan would be recognized.However,where two or more adjacent nonconforming lots of record are under one ownership,they would be considered Formatted:Title, 11 �� Don't keep with next, consolidated into one building parcel.Mang other changes to the existingland use pattern and zoning districts Adjust space between constitute"upzones," effectively increasing the range and intensity of allowable uses and activities (i.e., Latin and Asian text, designation of additional multi-family residential,mixed use centers,and commercial and manufacturing areas). Adjust space between g 5 gAsian text and numbers,Tab stops: Finally,Chapter N-"The Land Use Element," specifically directs that future implementing regulations respect Not at 0.75" the legal rights of private property owners,and that just compensation or"reasonable use exceptions"be Formatted: Font: � provided in instances where application of the regulation would result in a legally defined"taking" of private Italic property-. Formatted: Line spacing: Multiple Goal#7-Permits. 1.08 li,Adjust space between Latin and _A lication/or both state and local ommment permits should be processed in a timely and air manner to ensure predictabili. Asian text,Adjust space between Asian Local implementation of recent state-wide regulatory reform legislation(i.e.,ESHB 1724,the text and numbers, SEPA/GMA/SMA Integration Act of 1995,now codified as Chapter 36.7013 RCW) has partially fulfilled the Tab stops: Not at 0.5" promise of this goal of the GMA.However,the Port Townsend Comprehensive Plan also contains substantive Formatted:Title, policy direction designed to promote responsive,efficient,and fair processing of local government permits. Don't keep with next, Separate policy subsections within Chapter IV-"The Land Use Element," Chapter V-"The Housing Adjust space between Latin and Asian text, Element,"and Chapter VIII-"The Economic Development Element"propose strategies for streamlining the Adjust space between local land use permitting process. Asian text and numbers,Tab stops: These sections direct the establishment of a"master use permit" or centralized process which allows an Not at 0.75" applicant to apply for all needed approvals at once,and for the simultaneous processing of all aspects of project Formatted: Font: Garamond, 11 pt approval.Several policy statements within the Plan direct the City to adopt permit processing deadlines,so that Formatted: Font: applicants will be able to plan with greater certainty. Other sections require the City to adopt expedited permit Garamond, 11 pt processes for developments that the City wishes to encourage(e.g.,affordable housing).Finally,the Plan Formatted: Font: contains policies intended to facilitate interjurisdictional coordination in the processing of permit applications. Garamond, 11 pt Formatted: Font: Goal#S-Natural Resource Industries. Garamond, 11 pt Formatted: Font: Garamond, 11 pt 1�Comorehensive Plan 2016 �C'onsistency with GNLA, &County-Wide Planning Police 10 3 PRA Tr...,., .,.i Tau.GNSIS4 NCC 3AI14H 414E 6ROW414 ATEA n� (_L'TrR r"�T"f' A94 49E UT ;1�4; 4 Maintain and enhance natural resource-based industries, includingproductive timber, agricultural, and fi heries industries. � Formatted: Font: Encourage the conservation ofproductive forest lands andproductive agricultural lands, and discourage incompatible uses. Italic Formatted: Line Because of Port Townsend's status as an urban growth area under the GMA,no agricultural,mineral,or forest spacing: Multiple "lands of long term commercial significance have been identified or designated within the City. Only a small 1.08 li,Adjust space between Latin and portion of the City's current land base is currently devoted to agricultural or forestry industries (approximately Asian text,Adjust 75 acres of the Cies total land base are considered"current use agriculture,"while fewer than 6 acres are space between Asian text and numbers, considered"current use timberlands").Very few areas within the City contain"prime"agricultural soils suitable Tab stops: Not at for fanning. 0.5" Formatted:Title, Consequently,the Plan directs that natural resource lands be protected through a combination of public and Don't keep with next, private initiatives ranging from open space tax incentives to voluntary conservation easements.The Plan allows Adjust space between Latin and Asian text, and encourages agricultural uses in the least developed portions of town,and directs that lower density Adjust space between residential areas allow certain agricultural uses "outright." Chapter IV-"The Land Use Element,"instructs the Asian text and „ numbers,Tab stops: „ City to consider adopting a right to farm ordinance to protect agricultural uses in these areas.The Land Use Not at 0.75" Element also contains policies which would allow mineral resource extraction and timber harvesting within the Formatted: Font: City Emits,subject to certain conditions. Italic Formatted: Line Finally,the Plan recommends that the Port Townsend Paper Mill should be left outside of the Cies UGA,and spacing: Multiple zoned for"resource-related" manufacturing uses.The Plan suggests that compatible light manufacturing and 1.08 li,Adjust space between Latin and accessory commercial uses be located in the area west of the Glen Cove Mill site,inside the unincorporated Asian text,Adjust Glen Cove LAMIRD. space between Asian text and numbers, Goal#9-Open Space&Recreation. Tab stops: Not at g f p p p f pp f f o.5" ncoura e the retention o o en s ace and develo mento recreational o ortunities,conserve zsh and�a ildlz e habitat,increase access to natural resource lands and water, and develop parks. Formatted:Title, Don't keep with next, One of the organizing principles of the Plan is a CitAdjust space between City-wide system of interconnected open spaces and trails. Latin and Asian text, When developed,this system would t,9��complement manor of Port Townsend's existing parks,green Adjust space between spaces and beaches,and provide a wide range of benefits including. Asian text and P P g g numbers,Tab stops: Not at 0.75" Opportunities for rest,views and contemplation and enjoyment of the natural environment; Formatted: Font: Linking key wildlife habitat areas; Italic Formatted: Line Helping to control surface water runoff and contributing to the Cies "natural drainage systems" spacing: Multiple approach to stormwater management;and 1.08 li,Adjust space pp g between Latin and Preservin i character. Asian text,Adjust g community space between Asian text and numbers, The system seeks to build upon the existing sections of the Waterfront Waterwalk,connecting the waterfront Tab stops: Not at with a larger network of trails that lead to surrounding neighborhoods. 0.5" Formatted: Font: p p per p p Garamond, 11 t Chapter N-"The Land Use Element" provides policy direction for the creation of an Open Spaces and Trails P ro Master Plan and a Parks and Recreation Master Plan.These functional plans would add detail to the concepts Formatted: Font: outlined An this Comprehensive Plan,including funding options and level of service standards. Garamond, 11 pt Formatted: Font: Goal#10-Environment. Garamond, 11 pt �Protect the environment and enhance the state's high quality of life, including air and water quality, and the availability of water. Formatted: Font: Garamond, 11 pt Formatted: Font: Garamond, 11 pt ��C omprehensive Plan 2016 �Consistencv with GNLA, &County Wide Plannin Polid 10 4�� Tau.GNSIS4 NCC 3AI14H 414E 6ROW414 A94 49E 9(4P TATT'V\IITT`1L' UT ;1�4; 4 941� Adopted in November of 1992,the Port Townsend Environmentally Sensitive Areas (ESA) Ordinance identifies and regulates to protect"critical areas"as required by the GMA.The ESA Ordinance regulates development in ESAs to avoid adverse impacts where possible,to reduce adverse impacts when avoidance is not feasible,and to compensate for adverse impacts.The ordinance defines and establishes standards for the protection of five types of areas:Aquifer Recharge Areas;Fish and Wildlife Habitat Conservation Areas; Frequently Flooded Areas and Critical Drainage Corridors; Geologically Hazardous Areas;and Wetlands.In addition to the ESA Ordinance,the Land Use Element of the Comprehensive Plan contains policy subsections which specifically address Natural Resource Lands&Environmentally Sensitive Areas,Water Quality& Management,and Air Quality&Management. These sections direct the City to continue to use,and revise as necessary,the ESA Ordinance.The element also directs the City to manage surface,ground,storm,waste,and coastal waters to ensure that Port Townsend's water resources are protected and preserved.Notably,the Water Quality&Management policies require the City to adopt and implement the Stormwater Management Manual for the Puget Sound Region.The Air Quality &Management policies seek to promote coordination between local,state and federal air pollution control agencies which set standards and regulate polluting activities.This policy subsection also instructs the City to examine the feasibility of adopting its own air pollution monitoring and control ordinance,and to continue to pursue citizen education efforts designed to reduce air pollution. Goal#11-Citizen Participation&Coordination. Formatted:Title, gncoura e the involvement of Citi.ens in the planninga process and ensure coordination between communities and jurisdictions to Don't keep with next, reconcile conflicts. Adjust space between Latin and Asian text, Citizen participation has been one of the most imAdjust space between portant components of the local planning process.The Port Asian text and Townsend City Council decided early on to involve as manor citizens as possible in a grass roots planning effort. numbers,Tab stops: The public involvement process began in the Spring of 1993 with the Port Townsend 2020 process.Between Not at 0.75" March and May, 1993,over 1,400 hours of citizen discussion took lace in living rooms throughout town, Formatted: Font: 5 p g g Italic regarding the present and future direction of the City.More than 600 citizens responded to a questionnaire that Formatted: Line sought information about the concerns and values of City residents.The product of this process was a report spacing: Multiple entitled"PT 2020: Getting Together-Final Report of Coffee Hour Process and Results."The City Council 1.08 li,Adjust space between Latin and accepted the PT 2020 report as a guide to be used in the City's GMA planning efforts. Asian text,Adjust space between Asian Beginning in May of 1994,five workgroups,comprised of City Council members.Planning Commission text and numbers, members,and citizen volunteers,worked together to develop a draft of the Comprehensive Plan for community Tab stops: Not at 0.5" review.The workgroups held more than 50 meetings as they identified key issues,considered information,and debated possible solutions.Public participation was encouraged at all workgroup meetings. Between February and July of 1996,the Planning Commission and City Council held a total of 32 public workshops,meetings and hearings as they reviewed the Plan,listened to public testimony,and directed final changes to Plan.In addition to advertisements for meetings,workshops and hearings,the City widely Formatted: Font: disseminated information,regarding key planning issues for community discussion and the major Garamond, 11 pt recommendations contained in the Draft Plan.Examples of these public involvement efforts are detailed in Formatted: Font: Chapter I-"The Adoption Ordinance." Garamond, 11 pt Formatted: Font: Chapter III of the Plan includes a"Community Direction Statement"based largely on the results of the PT:2020 Garamond, 11 pt process.Adopted by City Council resolution following several community workshops,the Direction Statement Formatted: Font: Garamond, 11 pt emphasizes the importance of open and accessible City government.Additionally,the Land Use Element contains policies designed to promote informed and active citizen participation in Ci decision-making Formatted: Font: � Garamond, 11 pt ��Comorehensive Plan 2016 �Consistencv with GNLA&County-Wide Planning Policv 10 5 Tau.GNSIS4 NCC 3AI14H 414 GR-(AV444- A 94 R_49E 9(4N4Y_\IITT`1L' UT ;1�4; 4 gpl r, processes.These policies specifically address the appropriate use of the mediaa in public participation efforts, and encourage the creation of neighborhood organizations to help citizens become effectively involved in City decision processes. Goal#12-Public Facilities&Services. Formatted:Title, Ensure that thosepublicfacilities and services necessary to support development shall be adequate to serve the development at the time Don't keep with next, the development is available for occupancy and use without decreasing current service levels below locally established minimum Adjust space between Latin and Asian text, standards. Adjust space between Asian text and Chapter VI-"The Transportation Element,"and Chapter VII-"The Capital Facilities&Utilities Element," numbers,Tab stops: directly address this planning goal. "Level of service standards"for City-managed utilities and facilities are Not at 0.75" established within the Capital Facilities &Utilities Element.The Capital Facilities chapter also establishes Formatted: Font: Italic "concurrency"management policies.These policies direct the City to evaluate developments to ensure that thele Formatted: Line meet the City's adopted level of service standards for water,wastewater and stormwater facilities prior to spacing: Multiple building permit issuance;transportation facilities must meet adopted level of service standards within six bears 1.08 li,Adjust space between Latin and of building permit issuance.When adequate facilities are not available concurrent with new development,the Asian text,Adjust Plan directs the City to lower the adopted level of service standards,modif-the land use plan, seek additional space between Asian text and numbers, sources of revenue,or pursue a combination of these options. Tab stops: Not at 0.5" Goal#13-Historic Preservation. Formatted Jae nt y and encourage the preservation of lands, sites and structures that have hi torical or archaeological significance. Formatted: Font: The Chapter III of the Plan-"Community Direction Statement,"recognizes the importance of Port Italic Townsend's historic past. In addition,the Land Use Element of the Plan contains a policy subsection that ( Formatted directIv addresses historic and cultural preservation.The policies direct the continued use of the Historic Formatted d Preservation Committee for all mandatory design reviews of developments within the Historic District.Policy Formatted: Font: statements have also been included to encourage the retention of significant historic and cultural resources bh: Italic Promoting the adaptive reuse of the upper floors of historic structures in the downtown area; ( Formatted Formatted: Font: Exploring options for seismically retrofitting significant historic structures;and Italic,Underline Establishing historic preservation guidelines to govern the demolition of historic structures more Formatted: Font:Italic than 50 nears old. Formatted: Font: The Plan provides a framework for action and will ensure the preservation of historic and archeological Italic,Underline resources in Port Townsend. Formatted: No underline Goal#14—Shoreline s Formatted: Font: 'or shorelines of the state the goals and bolicies of the shoreline management act as set forth in KCGYh90.58.02U are added as ones Italic,Underline without creating an order o�brzorzty among the maeen goals. Formatted: Font: o the goals of this chatter as.ret fo�7h in KC.[Y�36.?0�.02U - Italic This°goal is addressed in the Land Use Element under"Shoreline iNlanagement Act Goals &Policies"and Formatted: Font: within the Cit 's 2007 Shoreline Master ProgramSi( till'). Consistent with I2 CW 36.70A.580 the�oal� s and Garamond, 11 pt policies of the SNIP shall be considered an element of the Cites comprehensive plan,and the other portions of Formatted: Font: the SNIP shall be considered part of the Cites development reoulations. Garamond, 11 pt Formatted: Font: Garamond, 11 pt Formatted: Font: Garamond, 11 pt Formatted: Font: Garamond, 11 pt ��C omprehensive Plan 2016 �Consistencv with C NLA, &County Wide Plannin Polid 10 6�� PRA 4WA'RSeR4 Tau.GNSIS4 NCC 3AI14H 414E 6ROW414 ATEA n� (_L'TrR r"�T"f' A94 49E pI n;1�;P 9 941rrw Formatted: Heading f K1Q1QTr:K1 V XA/ITW TWA (%i IKITV_Xni/Ir1� DI AKIKIIKI�' 1, Don't keep with next,Adjust space Dni Ir-YCONSISTENCY WITH THECOUNTY—WIDE between Latin and Asian text,Adjust PLANNING POLICY space between Asian text and numbers, Tab stops: Not at The GMA requires that counties planning under the Act adopt Counter-Wide Planning Policies in cooperation 0.75" with the cities within the county.The County-Wide Planning Policy for Jefferson Counter(CWPP)was Formatted: Line developed and adopted bar Jefferson Counter and the City of Port Townsend in December of 1992.The CWPP spacing: Multiple 1.15 li,Adjust space is to be used as a framework for the Port Townsend and Jefferson Counter Comprehensive Plans,to ensure that between Latin and the plans are consistent with each other.The policies also establish a foundation for determining consistency of Asian text,Adjust space between Asian individual plans with the requirements of the Growth Management Act,and provide direction to coordinate the text and numbers, provision of public facilities and services throughout the community. Tab stops: Not at 0.5" The City of Port Townsend's Comprehensive Plan has been evaluated for consistency with the CWPP and is found to be substantially consistent with the policies.The following discussion briefly summarizes how the Comprehensive Plan elements are consistent with the CWPP. Policy#1.Policy to Implement RCW 36.70A.110-Urban Growth Areas. By mutual agreement,the Counter and City have prepared and adopted a Joint Population Forecast and Allocation for use in Growth Management planning.The land capacitor analysis conducted for the Plan concluded that Port Townsend's current corporate limits contain enough undeveloped land suitable for residential uses to accommodate 100% of the population allocated to the City under the adopted population forecast.A shortage of adequate infrastructure for commercial and manufacturing development still exists within the City limits. , Policy#2.Policy on the Promotion of Contiguous and Orderly Development and the Provision of Urban Services to Such Development. Consistent with this policy,Chapter VII-"The Capital Facilities&Utilities Element," ensures the provision of the full range of urban governmental services within the UGA(i.e.,water wastewater,piped fire flow, stormwater,transportation facilities) at the City Is adopted level of service standards.The Capital Facilities& Utilities Element would require that new development: Meet the adopted level of service standards for water,wastewater,stormwater,and transportation facilities as a condition of project approval;and Contribute a proportionate share towards the construction of new capital improvements.Policies within the Capital Facilities&Utilities Element require the design capacitor for most capital facilities to be based on the total population projected for the UGA at the end of the 20-gear planning period;a 50-gear population projection or ultimate build-out is to be used for water,wastewater and stormwaterFormatted: Font: facilities. Garamond, 11 pt Additionally,the Capital Facilities&Utilities Element includes policies on growth tiering and the provision of Formatted: Font: urban public services and facilities.Growth would be directed into three tiers:first,areas already characterized Garamond, 11 pt Formatted: Font: bar urban development densities which are provided with a full range of urban public services;second,areas Garamond, 11 pt currently provided with limited infrastructure which are designated for commercial,manufacturing,or higher Formatted: Font: density residential development;and third,all remaining areas. Garamond, 11 pt Formatted: Font: Garamond, 11 pt on „Comrehesive Plan 2016 �Consistencv with GNLA, &County-Wide Planning Policv 110-7 Tau.GNSIS4 NAY 3AI14 T 414E 6ROW414 A94 49E 9(4P N4Y_\IITT`1L' uT n;1 n4;44 upT r, Finally,policies are included within both Chapter IV-"The Land Use Element," and Chapter VII-"The Capital Facilities&Utilities Element,"which address water quality and conservation.These policies commit the City to actively participate in the Jefferson County Water Resources Council,which implements the Dungeness-Quilcene Water Resources Pilot Project Plan. . 2 Policy#3.Policy on Joint County and City Planning within Urban Growth Areas. At the time of this writing.Port Townsend's city limits define the urban growth boundary.There is no unincorporated UGA with which to conduct joint planning within Jefferson County.However,if the City's UGA is expanded then the City and the County should engage in the joint planning and permitting activities outlined in county-wide planning policy#3. . Policy#4.Policy on the Siting of Essential Public Facilities of a County or State-Wide Significance. The City's Comprehensive Plan includes the definition of essential public facilities found in the County-Wide Planning Policy.Although the County and the City have not yet developed specific joint siting criteriaa for essential public facilities,elements of the siting criteriaa required by the County-Wide Planning Policy have been included within Chapter VII-"The Capital Facilities&Utilities Element."Nothing in the City's Comprehensive Plan would prohibit the location of essential public facilities within Port Townsend. Policy#5.Policy on County-Wide Transportation Facilities and Strategies. Chapter VI-"The Transportation Element," emphasizes local transportation needs.This element includes specific linkages with the Regional Transportation Plan(RTP),and is consistent with the RTP.The level of service standards for highways,arterials,and transit routes have been coordinated and adopted at a county-wide level;consequently,the Transportation Element and Capital Facilities&Utilities elements employ a"regionally coordinated-level of service standard D"for roadways within the Port Townsend UGA. One of the central themes of the Plan is to encourage a"pedestrian friendly"City which is less dependent upon the automobile. Chapter IV-"The Land Use Element," and Chapter VI-"The Transportation Element," emphasize and support public transit and nonmotorized forms of transportation.The Land Use Element seeks to establish a City-wide network of open spaces and trails which is linked to the nonmotorized transportation network outlined in the Transportation Element. Policies included within the Transportation Element have been designed around the following principles: Increasing the efficiency of the existing transportation system; Emphasizing the movement of people and goods first,and vehicles second; Integrating nonmotorized transportation modes and high occupancy vehicles in system design; Encouraging employers to implement Transportation Demand Management techniques;and Formatted: Font: Assuring that new development pays a proportionate share of the cost of new transportation Garamond, 11 pt facilities. Formatted: Font: M1 Garamond, 11 pt Consistent with CWPP#5.9,a summary of existing conditions information and an analysis of system Formatted: Font: deficiencies was also prepared and included in the Draft Port Townsend Comprehensive Plan and Draft Garamond, 11 pt Environmental Impact Statement issued on January10, 1996. Formatted: Font: , Garamond, 11 pt Policy#6.Policy on the Provision of Affordable Housing. Formatted: Font: Garamond, 11 pt ��-omprehensive Plan 2016 �Consistencv with GNLA, &County Wide Plannin Polid 10 8�� Tau.GNSIS4 NGY 3AI14H 414E 6ROW414 A94 49E 9(4P TATT'V\IITT`1L' ur n;1 n4;44 upr r, Both Chapter IV-"The Land Use Element," and Chapter V-"The Housing Element,"include policies and land use designations intended to promote the provision of affordable housing.The Housing Element directs that at least 105 acres of vacant land be zoned for moderate and higher density residential uses,and includes policies which direct that higher density areas be located in proximity to public facilities and services,and jobs. In an effort to promote a wider range of housing types and mixtures,the Housing Element allows duplexes, triplexes,and fourplexes to be constructed in all single-family residential areas.The Plan also allows manufactured housing to be located on individual lots in most single-family residential areas. The Housing Element includes an affordable housing strategy which recommends the use of innovative techniques to encourage lower cost housing,including accessory dwelling units;density bonuses;impact and system development charge(SDC)waivers;and priority permit processing Finally,policies have been included within the Housing Element which direct the City to work with Jefferson County to establish a"Fair Share" distribution methodology for affordable and special needs housing. Policy#7.Policy on County-Wide Economic Development and Employment. The Port Townsend Comprehensive Plan includes an Economic Development Element(see Chapter VIII) with major areas of emphasis including training/education;marine trades;diversified manufacturing and small "clean" business including cottage/home businesses; sustainable gear-round tourism,community retail, commercial historic district revitalization,and telecommunications infrastructure.The Element is intended to create at least 2,700"family wage"jobs within the next 20 gears. [Ord.No.2825,§ 3.3, (January 6,2003)]. Policy#8.Policy on Rural Areas. This policy is not directly applicable to the Port Townsend's planning efforts.However,Chapter VII-"The Capital Facilities&Utilities Element,"includes policies intended to promote cooperation with Jefferson County in containing urban growth within appropriately designated and served UGAs.The policies strive to ensure that commercial and manufacturing areas outside of UGAs: Are rural in character; Are served at a rural level of service;and Do not accommodate businesses that would compete with uses in the UGAs. Policy#9.Policy on Fiscal Impact Analysis. Fiscal impacts are addressed through Chapter VII-"The Capital Facilities&Utilities Element." Chapter IV- "The Land Use Element,"has been coordinated with the Capital Facilities&Utilities and other elements of the Plan.The assessment includes projected revenues and expenditures,and an analysis of the fiscal impacts of providing governmental services to accommodate the projected population growth. Numerous incentives and nonregulatory options (e.g.,density bonuses,priority permit processing,open space Formatted: Font: Garamond, 11 pt tax incentives,etc.) have been identified as alternatives to regulatory programs in the implementation of Formatted: Font: Comprehensive Plan policy. Garamond, 11 pt Finally,Jefferson County and the City of Port Townsend have the option of developing interlocal agreements to Formatted: Font: Garamond, 11 pt address the issues of tax revenue sharing and the provision of regional services if an unincorporated UGA is Formatted: Font: designated adjacent to Port Townsend and if annexation occurs in this area. , Garamond, 11 pt Formatted: Font: M1 Garamond, 11 pt ��Comorehensive Plan 2016 �Consistencv with GNLA, &County-Wide Planning Policy 10 9 Tau.GNSIS4 NGY 3AI1 H 414E 6ROW414 A94 499 9(4P N4Y-\IITT`1L' pl ;1�4; 4 941� Policy#10.Policy on Use,Monitoring,Review and Amendment. The County-Wide Planning Policy for Jefferson County has been used consistently in the development of the Port Townsend Comprehensive Plan.Additionally,the Joint Growth Management Committee has served as the regional oversight boder during the development of the Comprehensive Plan. 41 } TABLE IX-1:PORT TOWNSEND COMPREHENSIVE PLAN POLICIES THAT SUPPORT THE 13 GMA PLANNING GOALS 13 GMA CHAPTER VII: CHAPTER VIII: CHAPTER IV: CHAPTER V: CHAPTER VI: CAPITAL PLANNING ECONOMIC GOALS LAND USE HOUSING TRANSPORTATION FACILITIES& DEVELOPMENT UTILITIES 41:Urban Growth 1.6,3.6,4.11,7.2, 1.3,2.1,4.3,7.1,7.2, 1.2,1.3,1.4,1.5,2.2,6.3 2.1,2.2,2.4,2.5,8.1, 5.2,9.1,9.2,&9.4 7.9,7.10,7.13,8.5, &7.3 &6.8 8.2,8.3,8.4,8.5,8.6, 8.9,9.2,10.1,10.2, 10.4,11.3,11.4,18.1, 12.2,12.3,16.1, 19.1,19.5,20.1,& 16.2,16.3,16.4& 20.2 16.5 #2:Reduce Sprawl 1.6,7.2,7.10,7.13, 1.2,1.3,2.1,4.3,& 1.3,1.5,1.7,1.9&2.2 2.1,2.4,8.6,10.4, 7.3,7.6,9.2,9.3,9.4, 7.15,8.3,8.4,8.5, 7.1 11.1,11.3,11.4,18.1, 9.8,&9.9 8.9,9.3,9.7,10.1, 19.1,20.1,&20.2 10.2,16.1,&16.3 #3:Transportation 1.6,3.8,3.9,3.12, 7.1&7.2 Refer to the 2.1,3.2,4.3&8.5 5.2,5.3,7.2,7.7&7.8 7.2,7.4,7.9,8.1,8.6, Transportation Policies in 8.7,8.8,8.10 9.2, their Entirety 9.6,10.1,10.2,11.2, 11.3,&16.5 #4:Housing 7.1,7.2,7.3,7.4,7.5, Refer to the Housing None Identified 17.9&21.4 4.3,7.3,9.6,9.9,&11.6 7.6,7.7,7.9,7.10, Policies in their 7.11,7.12,7.13, Entirety 7.14,7.15,10.1, 10.2,10.3&15.2 #5:Economic 8.1,8.2,8.3,8.4,8.5, 6.1,6.2,6.3&6.4 1.2,1.5,1.9,3.9,5.3,5.4, 1.4,2.4,2.5,8.3,8.5, Refer to the Economic Development 8.8,8.9,8.10,9.1, 5.22,6.1,6.2,6.5,6.6,6.9, 8.6,13.1,29.5,30.3& Development Policies in 9.2,9.3,9.7,9.8,9.9, 6.13,7.3,7.4,7.5,7.13& 30.4 their Entirety 9.10,10.1,10.2, 11.5 10.3,10.4,10.5, 10.9,10.10,10.13, 12.3,14.8,15.2, 16.1,16.2,16.3,16.4 &17.1 #6:Property Rights 2.2,2.7,3.2,10.3, None Identified None Identified 2.6,4.3&10.1 None Identified 10.4,10.5&14.7 #7:Permits 1.5,14.1,14.2,14.3, 8.1,8.2,8.3,&8.4 1.8,11.2&11.3 None Identified 11.1,11.2,11.3,11.4& 14.4,14.5,14.6,14.7 11.5 &14.8 #8:Natural Resource 2.2,2.3,2.4,2.5,2.6, None Identified None Identified 11.5&13.2 3.1,3.2,3.3&9.2 Industries 9.8,9.8,9.10,17.1& 17.2 Formatted: Font: #9:Open Space& 2.1,2.2,3.1,3.2,3.3, 4.2 5.3,5.16,5.17,5.24,7.7, 3.3 1.4,3.3,6.1,6.2,6.3& Garamond, 11 pt Recreation 3.4,3.5,3.6,3.7,3.8, 9.1,9.2,9.4&9.5 7.4 Formatted: Font: 3.9,3.10,3.11,3.12, Garamond, 11 pt 3.13,3.14,3.15,4.1, 4.2,4.3,4.4,4.5,4.6, Formatted: Font: 4.7,4.8,4.9,4.10, Garamond, 11 pt 4.11,4.12,4.13, 7.16,10.12,&16.5 Formatted: Font: Garamond, 11 pt #10:Environment 1.6,2.1,2.2,2.7,3.3, None Identified 1.7,3.13,3.15,4.3,5.15, 11.3,12.2,12.3,12.5, 14.4,4.7,6.4,9.3&9.8 3.4,3.5,3.7,4.4,4.5, 8.6,9.2,9.5&11.2 13.2,14.1,14.2,15.3, Formatted: Font: Garamond, 11 pt ��-omprehensive Plan 2016 Consistencv with GNLA, &County-Wide Planninc Polic�0�1, Tau.GNSIS4 NGY 3AI1 H 414 GR-(AV444- A 94 R_499 9(4N4Y-\IITT`1L' pl n;1 n444 941 Tr`V TABLE IX-1:PORT TOWNSEND COMPREHENSIVE PLAN POLICIES THAT SUPPORT THE 13 GMA PLANNING GOALS 13 GMA CHAPTER VII: CHAPTER VIII: CHAPTER IV: CHAPTER V: CHAPTER VI: CAPITAL PLANNING ECONOMIC GOALS LAND USE HOUSING TRANSPORTATION FACILITIES& DEVELOPMENT UTILITIES 5.1,5.2,5.3,5.4,5.5, 15.4,15.5,18.1,18.2, 5.6,5.7,5.8,5.9, 18.3,18.4,19.3,19.5, 5.10,6.1,6.2,6.3, 22.1,22.2,22.3,22.4, 6.4,6.5,7.2,9.2& 23.1,23.2,23.3,23.4, 17.4 24.1,24.2,30.8,31.2, 31.3,31.4&31.5 #11:Citizen 13.1,13.2,13.3, 5.1&6.4 2.1,2.2,2.3,2.4,2.5,2.6, 7.1,7.2,8.1,8.2,8.3, 1.1,1.2,2.2,2.3,3.2,9.2 Participation& 13.4,&13.5 5.13,5.21,6.8,6.12,& 8.4,8.5,12.2,12.3, &11.5 Coordination 6.15 12.5,15.1 #12:Public Facilities 12.1,12.2,12.3, 1.3,7.1,7.2&7.3 3.2,3.6,4.1,5.4,5.5,5.7, Refer to the Capital 5.2,7.1,7.4&8.1 &Services 12.4,12.5,12.6& 5.17,5.23,6.3,6.5,6.10, Facilities&Utilities 12.7 8.1,8.2,8.3,8.4,8.5,8.6, Policies in their 8.7&8.8 Entirety #13:Historic 15.1,15.2,15.3, 8.3&8.5 6.7,7.3,7.4&7.5 None Identified 7.2,7.3,7.4,7.5&7.7 Preservation 15.4,15.5&15.6 Formatted: Font: Garamond, 11 pt Formatted: Font: Garamond, 11 pt Formatted: Font: Garamond, 11 pt Formatted: Font: Garamond, 11 pt Formatted: Font: Garamond, 11 pt ��C omorehensive Plan 2016 �Consistenci-with GNLA, &Counti--�N'ide PlanninC'Police 10 1111