Loading...
HomeMy WebLinkAboutBLD07-027QORTro�y� BUILDING PERMIT City of Port Townsend �wA Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD07-027 Permit Type Residential - Addition/Remodel Project Name REMODEL DECK Site Address 2206 SHASTA PLACE Parcel # 955900095 Project Description Adding sq.ft. to existing deck Names Associated with this Project License Type Name Contact Phone # Type License # Exp Date Applicant Pace Maria L Fee Information Project Details Project Valuation $2,000.00 Entered Bid Valuation 2,000 DOLL Building Permit Fee 69.25 Units: Heat Type: State Building Code Council Fee 4.50 Bedrooms: Construction Type: Technology Fee for Building Permit 5.00 Bathrooms: Occupancy Type: Record Retention Fee for Building 3.50 Permit Plan Review Fee 50.00 Total Fees $ 132.25 Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Print Name Date Issued: 02/28/2007 Issued By: PWESTERFIELD Signature Date _ Date Expires: 08/27/2007 PERMIT # JBL r U-) 02 `' SCOPE OF WORK: CITY OF PORT TOWNSER PERMIT ACTIVITY LOG DATE RECEIVED/'1 16 % DATE ACTION INITIALS 2 ENTERED INTO CHET CA — to Planning — No evidence CHECKED FOR COMPLETENESS eZlto 7 S' 6.e f In o "4 S J2- C' i k �'if�c �! IC 40 CC) to 0 LL LL W OF W N z 0 00 fA W 0 x Z ~ Q0 w m wa Qa N Q zw Om vy W =1 tan g z U pz Lua Lug w O J d aQ zJ_ LU LU :a w U F O U) Z _y z xa L� W(.1 C) 0U 0 WW w0 00 zW OO p w w wCn a a- C7 Z Z O O U m Ow x yH 7 0z U a a_ z 00 LLi U � LLa N H as z0: -a 00 <c):a U Q W xx (nr m 0 O CL 0 O N N N O W Q p a W m U) r - N 0 ti O p J m O z H W M U') a� O Cl 0 rn un u� O O Z J LU U Q a W X d 0 Z O F- H U N a z z LuLu o0 g z ~W a J U U) LU p H U W O w 0- o o w NO W a' LU � 0: z ~ p O a 0 U LAJ Q n a N z Z O U W M Z r z W O U LU Q n a U) z z O H U W IL CO) z • Z O U W a U) Z a O X W �Z N 0 co LL M m oa (° o Ct)O J M J O Q � U � z 000 F" a LU 0 U) > ?w Z U Q W N W W m aU) w2 F- W Ci W w z O F U W a U) z O LL O W F- z F- O LL J O Z w LL J J Q x W z O Q J N Z 0 J z LL O w O Za J W Ln 2 U (� p m J z LL Z O U W a U) Z a O X W �Z N 0 co LL M m oa (° o Ct)O J M J O Q � U � z 000 F" a LU 0 U) > ?w Z U Q W N W W m aU) w2 F- W Ci W w z O F U W a U) z Participating Cities: - Bellevue - Bothell - Kenmore - Kirkland - Issaquah - Mercer Island - Sammamish - Snoqualmie - Woodinville - —40 MyBuildingPermitxom BASIC STAIRS "BLUEPRINTS FOR SUCCESS" Stairways with 4 or more - riser5 require a hand- rail. SEE TIP SHEET #003 for more information on the requirements for handrails. Min. required Stairway width i5 36" The minimum headroom of a Stair io 6-8". (Measured vertically f a plane parallel & tangs to the 5talrway tread rio5inoo.) Stair 5tringer5 and trim may project into the required Stairway width no more than 1-1/2" on each Side. TYFICAL STAIR ELEVATION n Overhead obstruction. No more than 12'-0" without a landing. GENERAL INFORMATION: 1. CONSULT WITH YOUR LOCAL PLANNING DEPARTMENT REGARDING REQUIRED SETBACKS. 2. OBTAIN A BUILDING PERMIT BEFORE COMMENCING CONSTRUCTION. 3. THE INTENT OF THIS SHEET IS TO ADDRESS THE BASICS OF PRIVATE RESIDENTIAL STAIRS CONSTRUCTION ONLY AND DOES NOT ADDRESS THE SUBJECT IN GREAT DETAIL. ADDITIONAL INFORMATION CAN BE FOUND AT YOUR LOCAL BUILDING DEPARTMENT, HOME IMPROVEMENT STORE, OR LIBRARY. TIP SHEET #001 Page 2 of 2 OCTOBER 2002 eCity( 4 M Participating cities: - Bellevue - Bothell - Kenmore - Kirkland - Issaquah - Mercer Island - Sammamish - Snoqualmie - Woodinville - 4K. MyBuildingPermit.com BASIC DECKS "BLUEPRINTS FOR SUCCESS" Ledger Board Joist Hanger. SEE DETAIL a e4 Wood 2 x _ joists Wood 2 x _ 24" max overhang lost to bm. connection See detail DECK CONSTRUCTION NOTES: I. The following illustrations & information may be used for decks whether or not they require a permit. ( see tip sheet #000) 2. All wood must be pregoure treated or naturally decay r6oistant. 3. See Tip Sheet #003 for guardrail requirements TIP SHEET #005 Page 1 of 4 OCTOBER 2002 Joist span See Span Table Page 2 j Girder beam, See Span table page 2 Footing See detail a e3 Continuous Solid 2 x _ blocking betweenjoists r -11 TYPICAL DECK I'a ei GENERAL INFORMATION: 1. CONSULT WITH YOUR LOCAL PLANNING DEPARTMENT REGARDING REQUIRED SETBACKS. 2. OBTAIN A BUILDING PERMIT BEFORE COMMENCING CONSTRUCTION. 3. THE INTENT OF THIS SHEET IS TO ADDRESS THE BASICS OF PRIVATE RESIDENTIAL DECKS CONSTRUCTION ONLY AND DOES NOT ADDRESS THE SUBJECT IN GREAT DETAIL. ADDITIONAL INFORMATION CAN BE FOUND AT YOUR LOCAL BUILDING DEPARTMENT, HOME IMPROVEMENT STORE, OR LIBRARY. • r Participating cities: -Bellevue -Bothell -Kenmore -Kirkland - Issaquah - Mercer Island - Sammamish - Snoqualmie -Woodinville - MyBuildingPermitxom BASIC DECKS "BLUEPRINTS FOR SUCCESS" SPAN TABLE FOOTING SCHEDULE FOR OUTSIDE DECKS All fasteners nails bolts screws etc. must be corrosion resistant 5 any based on use of No.2 Hem -Fir or better Follow manufacturer's instructions for timber connectors. Connections 50# 15F loading (10# Dead Load + 40# Live Load) 1 Joist on deck beam; toenail each end (3) 8d 2 f3ricloin6j or blockin to joist; toenail ea. side, ea. end Beamspans and footings assume max. 24" overhang 3 2x deckirwl to joist or deck beam; blind and face nail (2)16d Joist Size Spacing Span Girder Beam spans between posts c to c ft' - in" and footing type. 4x6 FOOTING 4x8 FOOTING 4x10 FOOTING 2X6 12" 10'- 0" 6' max. A 8' max. B 10' max. C 16" 9'- V 6' max. A 8' max. B 10' max. C 24" T- 11,, 7' max. A 9' max. 13 11' Max. C 2X8 12" 13'- 2" 5' max. 5 6' max. 5 8' max. C 16" 12'- 0" 5' max. B 7' max. B 9' max. C 24" 10'- 2" 6' max. 5 8' max. B 10' max. C 2X10 12" 16' - 10" 4' max. 5 5' max. B 7' max. C 16" 15'- 2" 5' max. 5 6' max. B 8' max. C 24" 12'- 5" 1 5' max. 5 7' max. B 9' max. C FOOTING TYPES TYPE 51ZE NOTE: A 12" X 12" X 12" Fier blks. may be substituted for Type A footin s B 16" X 16" X 12" C 18"x18"x12" DECK CONSTRUCTION CONNECTIONS All fasteners nails bolts screws etc. must be corrosion resistant Follow manufacturer's instructions for timber connectors. Connections Nailin 1 Joist on deck beam; toenail each end (3) 8d 2 f3ricloin6j or blockin to joist; toenail ea. side, ea. end (2) Sd 3 2x deckirwl to joist or deck beam; blind and face nail (2)16d GENERAL INFORMATION: 1. CONSULT WITH YOUR LOCAL PLANNING DEPARTMENT REGARDING REQUIRED SETBACKS. 2. OBTAIN A BUILDING PERMIT BEFORE COMMENCING CONSTRUCTION. 3. THE INTENT OF THIS SHEET IS TO ADDRESS THE BASICS OF PRIVATE RESIDENTIAL DECKS CONSTRUCTION ONLY AND DOES NOT ADDRESS THE SUBJECT IN GREAT DETAIL. ADDITIONAL INFORMATION CAN BE FOUND AT YOUR LOCAL BUILDING DEPARTMENT, HOME IMPROVEMENT STORE, OR LIBRARY. TIP SHEET #005 Page 2 of 4 OCTOBER 2002 so so Participating cities: - Bellevue - Bothell - Kenmore - Kirkland - Issaquah - Mercer Island - Sammamish - Snoqualmie - Woodinville - TIP SHEET MyBuildingPermit.com BASIC DECKS #005 Page 3 of 4 "BLUEPRINTS FOR SUCCESS" I OCTOBER 2002 18" min. Girder beam Corrosion resistant metal column cap. Follow manufacturer's installation45` 4 x 4 knee brace instructions. - cf� 1/2" lag bolt top bottom (typical) ALT. KNEE BRACE DETAIL Pressure treated 2 x 4 knee brace face nailed ea. wood Foot. side of Foot and beam with 4 - 16,1 nails at each face and connection. 3 KNEE BRACE DETAIL NOTE: a e3 Knee braces are req d if distance from grade to top bf post exceeds 4'-O" Pressure treated wood post with I reooure treated pre -manufactured metal wood Foot. post base Oct in concrete footing. Follow manufacturer's installation instructions � Concrete column footing see sheet 2 for dimensions 1 clear �Lo grade 2 FOOTING DETAIL T.21c3 GENERAL INFORMATION: 1. CONSULT WITH YOUR LOCAL PLANNING DEPARTMENT REGARDING REQUIRED SETBACKS. 2. OBTAIN A BUILDING PERMIT BEFORE COMMENCING CONSTRUCTION. 3. THE INTENT OF THIS SHEET IS TO ADDRESS THE BASICS OF PRIVATE RESIDENTIAL DECKS CONSTRUCTION ONLY AND DOES NOT ADDRESS THE SUBJECT IN GREAT DETAIL. ADDITIONAL INFORMATION CAN BE FOUND AT YOUR LOCAL BUILDING DEPARTMENT, HOME IMPROVEMENT STORE, OR LIBRARY. Participating cities: -Bellevue -Bothell -Kenmore -Kirkland - Issaquah -Mercer Island - Sammamish - Snoqualmie -Woodinville - 01 �. MyBuildingPermit.com BASIC DECKS "BLUEPRINTS FOR SUCCESS" Siding Sheathing Interior floor framing 2x rimjoi5t - - 3/8" x 6" lag bolt and asher aocembly 1" m 1" minim I 3" 3" typ. typ. 6" (:::� LEDGER ELEVATION T -2 0-C-4,1 Flash or caulk for water tightneoo 2 x 4 decking 2x preSSure treated Hem/Fir # 2 ledger TIP SHEET #005 Page 4 of 4 OCTOBER 2002 Minimum 18 ga. U -type joist hanger follow manufacturers installation instructions ----z Flashing with drip Deck joist Ledger to be Same Size a5 joist, min. 2 x 6 Attach to existing rimjoi5t with 2 rows of 3/8" Ox 6" lag bolts and waoher5 Spaced at 6" on center and Staggered a5 Shown. Note: Forjoiot opan5 le55 than 10 feet, ledger can be attached to rimjoist with a Single row 3/8" Ox 6" lag bolts and wa5her5 Spaced at 6" on center. GENERAL INFORMATION: 1. CONSULT WITH YOUR LOCAL PLANNING DEPARTMENT REGARDING REQUIRED SETBACKS. 2. OBTAIN A BUILDING PERMIT BEFORE COMMENCING CONSTRUCTION. 3. THE INTENT OF THIS SHEET IS TO ADDRESS THE BASICS OF PRIVATE RESIDENTIAL DECKS CONSTRUCTION ONLY AND DOES NOT ADDRESS THE SUBJECT IN GREAT DETAIL. ADDITIONAL INFORMATION CAN BE FOUND AT YOUR LOCAL BUILDING DEPARTMENT, HOME IMPROVEMENT STORE, OR LIBRARY. a as Participating Cxes� - Bellevue - Bothell - Kenmore - Kirkland - Issaquah - Mercer Island - Sammamish - Snoqualmie - Woodinville - MyBuildingPermit.com HANDRAILS "BLUEPRINTS FOR SUCCESS" Handrail Shall be Smooth with no 4��NV1 / /INN GNr i�� 11110014 Irail endo be returned he wall. AN VIEW TIP SHEET #002 Page 1 of 1 OCTOBER 2002 Height of handrail i5o be measured vertically from a plane parallel & tangent to the Stairway tread nooingo. TYh1CAL HANDRAIL ELEVATION Handrail may pproject a max. of 3-1/2" into required Stair width. 1-1/2" Min. Handgrip: not Ieco than 1-1/4" or more than 2" in diameter 'Z/i See Tlf SHEET TYh1CAL HANDRAIL DETAILS #003 for more information. GENERAL INFORMATION: 1. CONSULT WITH YOUR LOCAL PLANNING DEPARTMENT REGARDING REQUIRED SETBACKS. 2. OBTAIN A BUILDING PERMIT BEFORE COMMENCING CONSTRUCTION. 3. THE INTENT OF THIS SHEET IS TO ADDRESS THE BASICS OF PRIVATE RESIDENTIAL HANDRAIL CONSTRUCTION ONLY AND DOES NOT ADDRESS THE SUBJECT IN GREAT DETAIL. ADDITIONAL INFORMATION CAN BE FOUND AT YOUR LOCAL BUILDING DEPARTMENT, HOME IMPROVEMENT STORE, OR LIBRARY eCityGov. T -I L Com' (0 - C,9-, Agn,ecas zzo4 -rwy7.-4 BWO5.-107 o� 7 IN41'1O'421E W.00' 1= 24 16.34' 0'24'2611' 3141' I ! 0 33 ,, u N _ S89'16*38'W _ • I, J 16'1411 Ri 30O.O6' ST. ' 102.94' I � 38 FF63.76' 63. 76' I � 32 I w �� 2- I I J7 V w ti �$ h 8 27 g 26 14' I 20' 20' I• w 1612.64' �� w 36 120. �. w Isar 1 •W ' 102.1 J I I, hI . 35 is 102.40' N) I �� 34 8 I h I1 N � ' V 20' 20' 102.67'/ I NI✓ N o� 7 IN41'1O'421E W.00' 1= 24 16.34' 0'24'2611' 3141' I ! 0 33 ,, u N _ S89'16*38'W _ • I, J 16'1411 Ri 30O.O6' ST. 102.94' W. 76' 6176' FF63.76' 63. 76' I � 32 �� 2- V 29 g 28 8 27 g 26 to12+v'w I 20' 20' w Z Ig:- N ii `� .r 9.87' s6rl6,3gw sarlemv A if* -W sm 1' ' W t 11 (20' 11 47' 78.77 65.76' 63.76 63.76 �. . . � ....... . . r. • . � -9 � 0. � . . - . . � . i S,9.9'1 6'38"W seg' 16'Ja'11► J 4;�W�,ezX4 KENNETH A. CLARK, a.37- L.S. �- L.S. NUMBER 12223 - • - - • - - genpr trreceipts Page 1 of 1 • p pOHT TO o �y m m o Receipt Number: MENEM �¢w I $0.00 M11 BLD07-027 IN 955900095 Plan Review Fee Millis $50.00 I $50.00 BLD07-027 955900095 Technology Fee for Building Permit $5.00 $5.00 $0.00 BLD07-027 955900095 State Building Code Council Fee $4.50 $4.50 $0.00 BLD07-027 955900095 Building Permit Fee $69.25 $69.25 $0.00 BLD07-027 955900095 Record Retention Fee for Building P $3.50 $3.50 $0.00 Total: $132.25 mY`' CHECK 1236 $ 132.25 Total $132.25 genpr trreceipts Page 1 of 1 LU ao > �E It�- C� - \. /- cc M4 .:Y 0 CL LL 6t+TT£9# 1N31b'd sn •all 'swals/,s lail:)eag NolNaad soot OO 90 Uvw b L 6L68 -£S8 -£SZ Jo (SZ££))I:)3a-L 19-998 js4u8wwo:) .io suoi;son0) MD-3101-�MM ;coq Builunotu;sod aaddn uo polle;sui aq sAemle;snw slaijoeae - s6uijieb • •s.ia3npoad .aagwn-j pa;eaal Aq papinoad suopepuawwwoH 4:)npoad ay; m0110; pue pea.a sAemly • '93ao; jeaa4el spaemol s}unow4a)13eaq;o apis iaAel oldial • 's;nu pue'saaysem 313o(I'app 43ea uo s.aaysem;el;'s;joq:aaempaey aa;aweip„Z/L asn MOWN uol;elle;sul -ssnil paaao;ulaa a4101 s1ai:)2a8 Jol�aaa Ilelsul of anoge suollanalsul a41 mollod •ssnil aql jo apls gaea of aleld a magas pue x14e'siaualsel pue anlsagpe uollanalsuoa 6Ulsn (lanpoad 6uluagl6uaals ao 6ulAJlpow uo sl!elap papuawwoaaa aoj apin6 s,aaanlae;nuew ssnil mollo; pue aas) -ssnil ag1;o lg61a4 Ileaano aql of lna'poomAld „Z/L wog; apew saleld gllm paaao4ulai aq lsnw sassnal„t7 x„Z pooh :sassnal paaaaui6u3 y;iM asn ao; suoi;an a;sul •lsloN paaao;ulaa aql o1 slaNaea8 jolpaa Ilelsul 01 anoge suollanalsul leaaua6 aql mollod •qam agl jo apls pea of polq magas pue xl}je 'saaualsej pue anlsagpe uollanalsuoa 6ulsq (•lanpoid 6uluagl6uaals ao 6u1/,;lpow uo sllelap papuawwoaM aa aoj apin6 saaanlae;nuew lslof ollo3 pue aas) aleld done deb wnwlww„g/L anew g16ual o11na sNaolq„g x„Z woaj apew saauapps gam gllm paaaojulaa ag lsnw slslof-1 pooh 's;sior-I :aagwnl paaaaui6u3 41im asn ao; suoipna;sul -Ualg6ll•slnu pue'siagsem N:)ol'saagsem lel; ppy•paeoq pueq ul aloq lloq aaluaa llup uagl'slloq„Z/L 6u!pnaloid om1 aq1 oluo lalaea8 Nollaa(l aaglo aq1 aplls'slloq aalawelp„Z/L'oM1 Ilelsul pue 'aa6ulals aq1 g6noaql Illap pue �liew :aa6uuls agl uo saloq lloq pasoddo Alleuo6elp oml Malas •lloq „Z/L 6ulsn 1a�laea8 lunow •paeoq pueq Tap aql g6noaql 6ullllap'aloq lloq aaluaa aq1 ao; Illap pue l iew •sla�laea81'01� aaa oM1 uaamlaq aa6uuls aaluaa aq1 galmpues :s.196uia4s aaay; uey; a.aow ao'aa;ua:) a aney sale;s anoA 3I aa6ulals puoaas aql aoj leadaa •ua1g611•slnu pue'saagseM Iaol'saagseM 1e14's1loq aalawelp„Z/ L 'aaagl Ilelsul paeoq pueq aql ao; auo pue aa6ulals aql uo saloq pasoddo Alleuo6elp oml:saloq aaigl aql ao; Ilup pue �lieW saa6uuls mels aql jo auo;o aae;ans aplsul aq1 pue paeoq pueq Tap aq1 lsule6e 1apea8 e meld •aa6uuls aad auo'slalaea8 Nollaaa Z saalnbaa Uollellelsul :saa6ula;s oM; Aluo aney saie;s anoA;I :saa6uujS .qe;S •Ualg6ll•la�lDea8 puoaas ao; leadaa •slnu pue'saagsem 1:)ol'saagsem 1elj'slloq aalawelp„Z/L'oml Ilelsul pue 'lslof cool;Tap aql g6noaql Ilup pue �aew'saloq lloq pasoddo Alleuo6elp oml Malas •ua1g611 ?g'slnu'saagsenn 1:)Ol'saagsem 1213Ilelsul'la�l:)ea8 1011aa(l ag1Jo agog aaluaa o1 slloq lsod aql jo apls gaea uo 1ajaeJq Nolpa4 a uolllsod •(mol auo )? g6lq auo) u01laaalp gaea wog; auo:slloq 6ullunow ow gllm lsod Ilea Ilelsul :;sod 1!ea aauao:) ,ualg6ll•slnu pue'saagseM �laol'sapls gloq uo saagsem 1elj'slloq aalawelp„Z/L'oM1 Ilelsul pu2'lslof �laap aql g6noaql Ilup pue ilaew :1ailaNg' aad saloq lloq pasoddo Alleuobelp OMI Malas •ualg6il •1nu pue aagseM �aol 'aagseM gl!m aplsul 6ulanaas 'aplslno woaj aagseM ql!m lloq Ilelsul •1ajaea8 1 011:)aa aq1;o aloq lloq aaluaa aql g6noa4l Ilup pue liew •alglssod se lslof Tap aql ;o dol agl 01 asola se lalaea8 101Iaa0 aql PIOH •paeoq pueq aql lsule6e wags 6Upeld'Aeg lslof ag1;o apls gaea UO lalaea8 � 011:)a(l a16uls a uolllsod-palunow aq II!m lsod aql aaagm slslof Tap aql uaamlaq'paeoq pueq sjaap aq1 Jo aplsul aql 411m 4snij16uipolq ppy slloq 6ullunow oml g1lM Iensn se lsod Ilea Ilelsul :s;sior ihaa uaam;aq pa;e:)ol;sod Hieb ua1g611•slnu pue'saagseM Maol'sapls gloq uo saagsem 1eIJ'slloq aalawelp„ Z/L'om1 Ilelsul •lslof aool3 Tap agl g6noaql IIPP pue iIaew :saloq lloq pasoddo AIleuo6elp oMl laalas •lslof Tap ay1 lsule6e lalaea8 Flo-Wa4 aql;o apls aql pue'paeoq pueq aq1 lsule6e 1apea8 101ilaa(l aql ;o aseq agl 6ulaeld:lloq dol aql oluo 1ape.i810lIaaa a apps •slloq 6u11unow„zh oml 4i!/\Alensn se lsod flea agl gaelly aslor *)9a ay; o4 waae[pe;sod Hieb ua1g611•slnu pue'saagseM �aol'sapls gloq uo saagsem tell 6ulsn aanaas •s1a�DNO Nollaa(j oml ag1 uaamlaq lslof aool3 asnoq agl 4DIMPUeS •lai:)eJe JOINDa(Jpuoaas JOJ anoge sdals aloq aaluaa leadaa •slloq aalawelp „Z/L ,oml llelsul :lslof cool* asnoq aql g6noaql IINP pue �l.iew:saloq 1loq pasoddo AIleuo6elp oMllaalas •alog palllap aq1 olid pue aloq agl g6noaql (aagsem g11M)lloq e gsnd •paeoq aa6pal aql pue lslof wu ag1 g6noa41 alog„z/i e 11PPlapeig 101Iaaa a41;o lloq aaluaa aq1 aol �aew'asnog aq1 aplsul wog j :asnoH o; paeoq aa6pa-j 6ulaoq:)Uv •suoi;:)na;sui 6ugunow .aayaan; pue 'suoilea;snili'uoi;ewao;ui aol wo:)•)101-)P9p•MMM;isiq suogonagsu� uoi;elle}sul w31sAs a.3N3Vaa No7N030 Guard installed on all decks over 30" above nrad.."fhi- rz• , J- _,- Typical Door with 3 Risers Landings are required on each side of each exterior door. Landings shall not be 6A more than 1-1/2" lower Than the top of the threshold. Exception: -..The landing shall not be more than 7-3/4" lower than the threshold provided the door does not swing over the landing. CONSTRUCTION MATERIALS Decay resistant woods heartwood of redwood, cedar, black locust and pressure preservatively treated wood are all acceptable material for use in deck construction. Field applied treatment is not an acceptable method. Fasteners for pressure preservative treated woods shall be of hot - dipped galvanized steel, stainless steel, silicon bronze or copper. Field cut ends, notches and drilled holes of pressure preservatively treated wood shall be retreated in the field in accordance with AWPA M4. IRC R319 & R320. Illuminate stairs with controls ---- located at top and bottom of stairs. 6' 8" ri M in 36' min - landing . Min. 10' run � 36" min Max. 7 314" rise landing City of Port Townsend Development Services Department Waterman & Katz Building 181 Quincy Street, Suite 301A Port Townsend, WA 98368 (360) 379-3208 Fax: (360) 385-7675 2003 IRC This tip sheet may be used as a guide for single-family residential uncovered deck permits. Submittal Requirements: 1. Two Site Plans showing dimensions of your deck and its relationship to existing buildings or structures on the property and the distance to existing property lines drawn to scale. Include the project address on the drawings. 2. Two Plans showing the framing layout of your deck. 3. Fill out a building permit application. 4. If your deck will occur on a steep slope, please contact your local building department for additional requirements. NOTE: Joist For framing detai member sizes, see page 3. Joists — Decking - 24" max. overhang Joist Tr_ spacingSupport post,ost see span table �� page 3 ,see Post -to -beam connection see detail page 5 Deck Construction Notes: Joist span, see span table page 3 Continuous solid 2x blocking between joists \ �F 'T Girder beam, see span table page 3 ' Footing, seepage 2 24" maximum beam overhang Typical Deck 1. The illustrations and information in this tip sheet may be used for decks whether or not they require a permit. See Tip Sheet 0 for permit requirements. 2. All wood must be pressure treated or naturally resistant to decay. Treat all cut ends with end -cut solution. Use ground -contact treated wood. 3. Fasteners, hangers, nails, etc., must be stainless steel, hot -dipped galvanized, or as specifically required for the specified wood preservative used. The coating weights for zinc -coated fasteners to be in accordance with ASTM A 153. Provide documentation in the field showing the required fastener protection considering the wood chosen for your deck. 4. You may modify any components of this tip sheet with justification by analysis or calculation. Any modifications must be reviewed prior to permit issuance. 5. See Tip Sheet 1 for stairs, 2 for handrails, and 3 for guards. 6. This tip sheet is intended to represent good construction practices for deck construction and related IRC requirements. 7. All wood assumed to be Hem -Fir #2 or better. GENERAL INFORMATION: • Consult with your local planning department regarding required setbacks. • Obtain a building permit before starting construction. • The intent of this tip sheet is to address the basics of private residential deck construction only and does not address the subject in great detail. Additional information can be found at your local building department, home improvement store, or library. • Existing building Flashing See details 1&2 page 4 ,--- Decking 1/4" spacing recommended for drainage If an exit or egress from the existing building passes under the proposed deck, or if there is an existing patio under the proposed deck, 6'-8" minimum clearance must be maintained. Please indicate openings in existing wall in elevation view. NOTE: Pier blocks may be substituted for Type A footings. See page 3. 1" clear Typical Deck Section • 0 Basic Decks Page 2 of 5 36" minimum high guard with intermediate rails spaced so that a sphere 4" in diameter cannot pass through. See Tip Sheet 3. 4 & 5 /—detailing details g for alternate page 5 detailing and notes. l Knee braces are required if distance from grade to top of post exceeds 4'. See detail page 5 4x4 posts min. w/ 8'-0" max. height Manufactured post base cast in footing 3,000 psi concrete (no special inspection required) Finished grade - (2) #4 ea. way, 3" 11=1 11=) 11=1 clear to bottom of III—III=III- footing. Footing I I=1 I I=1 I I=1 I I—III=1 I—I to bear on III=III=III=III=III—III- undisturbed II—III—ITI—III—III III I earth. • • Basic Decks Page 3 of 5 Span Table Footing Schedule For Outside Decks Spans based on use of No.2 Hem -Fir or better See Deck Construction Note 3 page 1. 50 p.s.f. loading (10 p.s.f. Dead Load + 40 p.s.f. Live Load) Follow manufacturer's instructions for timber connectors. Beam spans and footings assume maximum 24" overhang Nailing 1 Joist on deck beam; toenail each end (3) 8d 2 Bridging or blocking to joist; toenail ea. side, ea. end (3) 8d Joist size Spacing of joists Max. span of joists 3/80x41/2" lag screw max. spacing on 2x ledger Max. span of girder beams between posts / footing type 4x6 IFooting 4x8 Footing 4x10 Footing 2X6 @12 in @16 in @24 in 9ft- 10 in 8ft-9in 7ft-1 in 5 i 6 i 7 i 5ft-5in 5ft-8in 6ft-1 in B B B 7ft- 2in 7ft- 6in 81t-0in B B B 8ft- 10 in 9ft-2in 9ft- 10 in C B B 2X8 @12 in @16 in @24 in 12ft-9in 11ft- 1 in 9ft-0in 4 i 4 i 5 i 4ft- 11 in 5ft-2in 5ft-7in B A B 6ft-6in 6ft-11 in 7ft-5in B B B 8ft-Oin 8ft-5in 9ft-1 in B C B 2X10 @12 in @16 in @24 in 15ft-7in 13ft- 6in 11ft-0 in 3 i 3 i 4 i 4ft- 7in 4ft- 10 in 15ft- 3 in B B A 6ft-Oin 6ft-5in 6ft-11 in B B B 7ft-5in 7ft- 10 in 8ft-5in C C B FOOTING TYPES TYPE SIZE NOTE: A 12" X 12" X 12" Pier blocks may be substituted for Type A footings B 16" X 16" X 12" C 18" x 18" x 12" *Footing sizes based on assumed soil bearing pressure of 2000 p.s.f. Contact your jurisdiction for additional restrictions. Deck Construction Connections All fasteners nails bolts screws etc. must be corrosion resistant. See Deck Construction Note 3 page 1. Follow manufacturer's instructions for timber connectors. Connections Nailing 1 Joist on deck beam; toenail each end (3) 8d 2 Bridging or blocking to joist; toenail ea. side, ea. end (3) 8d 3 2x decking to joist or deck beam; blind and face nail (2) 16d 1" 4b a NOTE: Refer to Deck Construction Note 3, page 1 for requirements on 2 Ledger Elevation page 4 Basic Decks Page 4 of 5 1pe joist hanger. installation as joist, existing rim ge 3 zJ — ...,............,.e on page 3. r7l G Basic Decks Page 5 of 5 Alternate Knee Brace Detail: 2 x 4 knee brace face nailed ea. side of post and beam with 4 - 16d nails at each face and connection. �1 Knee Brace Detail page 5 Secure ballusters Non -corrosive metal post/beam connector 2" diameter lag bolt p & bottom (typical) Pressure treated wood post NOTE: Knee braces are required if distance from grade to top of post exceeds 4 feet. Secure ballusters Solid blocking 24" max. Non -corrosive metal post/beam connector (�� Alternate Joist -to -Beam �1 Alternate Joist -to -Beam page 5 Conditionpage 5 Condition Beam splices to occur over posts with 1-1/2" min. bearing 18" min. Girder beam Corrosion resistant metal column cap. Follow manufacturer's installation instructions. _E ,, �� 4 x 4 knee brace Alternate Knee Brace Detail: 2 x 4 knee brace face nailed ea. side of post and beam with 4 - 16d nails at each face and connection. �1 Knee Brace Detail page 5 Secure ballusters Non -corrosive metal post/beam connector 2" diameter lag bolt p & bottom (typical) Pressure treated wood post NOTE: Knee braces are required if distance from grade to top of post exceeds 4 feet. Secure ballusters Solid blocking 24" max. Non -corrosive metal post/beam connector (�� Alternate Joist -to -Beam �1 Alternate Joist -to -Beam page 5 Conditionpage 5 Condition CITY OF PORT TOWNSEND lA&LOPMENT SERVICES DEPARTMENT* Poor ropy City Hall, 250 Madison Street, Suite 3 �o y Port Townsend, WA 98368 Phone: 360-379-5095 Fax 360-344-4619 ca o .1r RESIDENTIAL BUILDING PERMIT APPLICATION NEW CONSTRUCTION, REMODELS, & ADDITIONS Property Street Address 22oco j has ICS p q ace Zoning District Parcel # Legal Description: Addition ffam t tA-6hfeBlock Lot(s) QS General Contractor's Name N bot l wo rr- m eft w Mailing Address New Garage or Carport Phone Cell Phone State License Number City Business License Number Authorized Representative/Contact Person: Phone: Estimated Value of construction $ 2000 Q Financed By � � Date Work is to Begin 3 0 7 Date Work is to be Completed Scope of Work: Please check all items that apply for the type of building permit you are requesting: New House Garage sq. ft: Addition New Garage or Carport Unfinished Basement sq ft: Repair/Remodel Garage Repair/Remodel House Decks sq. ft: Accessory Dwelling Unit Manufactured Home Other (please describe): Floor Area: the proposed structure is to be used for: Finished Heated Space sq. ft: Garage sq. ft: Unfinished Heated Space sq ft: Carport sq. ft: Unfinished Basement sq ft: Porches sq. ft: Semi -Finished Basement sq ft: Decks sq. ft: Storage sq. ft: Other (please describe): P:\DSD\Forms\Building Forms\Application-Residential Building Permit.doc Page 1 of 2 9 9 CITY OF PORT TOWNSEND RESIDENTIAL BUILDING PERMIT APPLICATION NEW CONSTRUCTION, REMODELS, & ADDITIONS Site Area/Coverage Information: 1. The total area of the property in square feet: 2. The total area covered by existing and proposed structures in square feet: ` , r, total round coverage from the outside of walls or supporting l 2-' X � gpporting members) Percentage of lot coverage: (2=1) Impervious Surfaces: Please provide the square footage of the roof area of the proposed and existing structures, and the square footage of the total area covered by porches, walkways, patios and driveways. Do not include decks allowing drainage to earth below. Proposed House Roofprint sq. ft: Existing House Roofprint sq. ft: Proposed Garage Roofprint sq. ft: Existing Garage Roofprint sq. ft: Proposed Porch/Walkway sq. ft: Existing Porch/Walkway sq. ft: Proposed Driveways sq. ft: Existing Driveways sq. ft: Other (describe): Other (describe): Total Proposed Impervious sq. ft: Total Existing Impervious sq. ft: Total Proposed + Existing sq. ft: Percentage Impervious: (Impervious surface _ lots . ft *If total impervious surface is equal to or greater than 40% of the lot area, you must submit a written stormwater plan to address run off. Please check which plans you are submitting with this application (2 sets needed): Installing Manufactured Home Yes No Site Plan Was the manufactured home originally constructed within three (3) years of proposed placement? Yes No Interior & Exterior Wall Bracing (panel locations shown on floor plan) 3) Roof must be composed of composition, wood shake or shingle, coated metal, or a similar roof material; and Drainage Plan (if 40% or more impervious) Typical Wall Framing Details (section from foundation through roof) Foundation Plan Elevations Floor Plan 2003 WSEC* Compliance: Prescriptive_ Component_ Floor Framing Plan WSEC Construction Checklist (Washington State Energy Code) Roof Framing Plan Other: C -v-. l a -ns Installing Manufactured Home Yes No Year: Make: Was the manufactured home originally constructed within three (3) years of proposed placement? Yes No 2) Manufactured home must be placed on a permanent foundation with the space from the bottom of the home to the ground enclosed by either load bearing concrete or decorative concrete or masonry blocks so that no more than one foot of the perimeter foundation is visible above grade; and 3) Roof must be composed of composition, wood shake or shingle, coated metal, or a similar roof material; and 4) Title to the manufactured home must be eliminated as a condition of building permit approval. PADSD\Forms\Building FormsWpplication-Residential Building Permit.doc Page 2 of 2 CITY OF PORT TOWNSEND RESIDENTIAL BUILDING PERMIT APPLICATION NEW CONSTRUCTION, REMODELS, & ADDITIONS Special Conditions Please check YES or NO as applicable YES NO 1. Is the property within 200 feet of a fresh or saltwater shoreline? 2. Is the property within the Port Townsend Historical District? 3. Is the property located within or adjacent to an environmentally sensitive area? 4. Will this proposal involve any sewer, water or other utility extensions that will, or could serve vacant properties other than the project site? If yes, please attach information identifying the utility extensions and sites. 5. Have any special conditions been placed on this property, or has the property been subject to any conditions on any prior action of the City (if "Yes" to any of the following, attach copies of appropriate documents): Subdivision/Short Plat/Boundary Line Adjustment? X SEPA (environmental review)? Variance? Conditional Use Permit? Street Vacation? X Planned Unit Development? X Restrictive Covenant? Easement? x 6. Are any properties within 800 feet of the site owned or controlled by the applicant, any relative or business associate, or any partnership, corporation, or other entity affiliated with the applicant? (If }es, attach list. 7. Have any of the properties listed in item #6 been developed within the last two years? (If yes, attach list.) 8. Have you previously discussed this project with a City staff member? If yes, who and when? X The applicant hereby certifies to have knowledge of those sections of the International Residential Code and the Port Townsend Municipal Code pertinent to the above project and that the applicant is responsible for constructing in conformance with these codes; the applicant understands that the permit, if issued, expires in six months unless work is started; that the permit, after construction has started, will expire after one year if an inspection is not made to show significant progress on the tructure; the applicant agrees to abide by the ordinances, codes, regulations, restrictive covenants, deed or plat restrictions, and water and sewer plans attached hereto; the applicant certifies that all information given above and on accompanying plans s complete and accurate to the best of their knowledge; and the applicant understands that this information will be relied upon in granting permits and that if such information is later found to be inaccurate any permits may be withdrawn. P:\DSD\Forms\Building Forms\Application-Residential Building Permit.doc Page 3 of 3 CITY OF PORT TOWNSEND RESIDENTIAL BUILDING PERMIT APPLICATION NEW CONSTRUCTION, REMODELS, & ADDITIONS The undersigned hereby saves and holds the City of Port Townsend harmless from any and all causes of action, judgments, claims, or demands, or from any liability of any nature arising from any noncompliance with any restrictive covenants, plat restrictions, deed restrictions, or other restrictions which may have been established by parties other than the City of Port Townsend. Port Townsend Municipal Code, Section 16.04.140, Vested Rights - Substantially Complete Building Permit Application: applications for all land use and development permits required under ordinances of the city shall be considered under the zoning and other land use control ordinances in effect on the date a fully complete building permit application, meeting the requirements dentified in this section, is filed with the Development Services Department. Until a complete building permit application is filed, all applications for land use and development permits shall be reviewed subject to any zoning or other land use control odinances which become effective prior to the date of issuance of a final decision by the city on the application. An application for a building permit shall be considered complete when an application meeting all of the requirements of Section R 105.3 of the International Residential Code, 2003 Edition, is submitted which is consistent with all then applicable ordinances and laws. In addition, to be considered complete, such an application must be accompanied by complete applications for a subsidiary land use or development permits needed, such as a complete shoreline management permit application and/or complete applications for other discretionary permits required under the ordinances of Port Townsend. An application for a partial permit under Section R105.3.1 of the International Residential Code, 2003 Edition, shall not be considered complete unless it meets all requirements stated above and contains plans for the complete structural frame of the building and the architectural plans for the structure. Signature of Applicant or Authorized Representative Date For Official Use Only Permit N L 1-7 -QLD Building Official Approval PIC4���� Date Issued Balance Due $ Date Validation Stamp below: Owner/Representative Signature Date P:\DSD\Forms\Building Forms\Application-Residential Building Permit.doc Page 4 of 4 0 0 "-f j 1, /L_0-� CITY OF PT TOWNSEND RESIDENTIAL BUILDING PE RIT NEW CONSTRUCTION, REMODELS, & ADDITTION�PLICATION Property Site Area/Coverage Information: 1. The total area of the property in square feet: 03/ 2. The total area covered by existing and proposed structures in square feet (total ground coverage from the outside of walls or supporting mem�rs9 Percentage of lot coverage: (2_1) Impervious Surfaces: Please provide the square footage of the roof area of the proposed and existing structures, and the square footage of the total area covered by porches, walkways, patios and driveways. Do not include decks allowing drainage to earth below. Proposed House Roofprint sq. ft: Proposed Garage Roofprint sq. ft: Proposed Porch/Walkway sq. ft: Proposed Driveways sq. ft: Other (describe): 7I4/ Interior & Exterior Wall Bracing (panel locations Existing House Roofprint sq. ft: ,5167 X Existing Garage Roofprint sq, ft: iZQ foundation through roof) Existing Porch/Walkway sq, ft: fz8 �( Existing Driveways sq, ft: X WSEC Construction Checklist Other (describe): Total Proposed Impervious sq. ft: /g j % Total Existing Impervious sq. ft: Total Proposed + Existing sq, ft: �8 5-f Percentage Impervious: 36 � -� (Impervious surface - lot sq -.,-ft). *If total impervious surface is equal to or greater than 40% of the lot area, you must submit a written stormwater plan to address run-off. Please check which plans you are submitting with this application (2 sets needed): X I Site Plan Drainage Plan (if 40% or more impervious) X Foundation Plan X Floor Plan 14 Floor Framing Plan i Roof Framing Plan \\Citypdc\bcd\All Forms\Building Permit Application.doc �( Interior & Exterior Wall Bracing (panel locations shown on floor plan) X Typical Wall Framing Details (section from foundation through roof) >< Elevations �( 2001 WSEC Compliance: Prescriptive,( Component.. X WSEC Construction Checklist Other: Page 2 of 2 IWCITY OF PORT TOWNSEND ,LOPMENT SERVICES DEPARTMEN10 poRfr, r Waterman & Katz Building, 181 Quincy Street, Suite 301A �O� �y Port Townsend WA 98368 Phone: 360-379-5082 Fax 360-385-7675 o v RESIDENTIAL BUILDING PERMIT APPLICATIONw NEW CONSTRUCTION, REMODELS, & ADDITIONS Property Owner's Name(s) ,,4CEM (,Lr-) acs Mailing Addre XffWC0tjNTyC0fjKl=7W City, Stated Zip 00 BAY*M ORIVE W Phone S-35- u 13 O Permit No. /J L-fJ o S — 16 -7 Property Street Address . ZZ 06 SllfS TA ,01,46E ,Gb,07 X838 3 Zoning District /Q - x/77 Parcel # s S 9 b01� 93r Legal Description: Addition ��/,/,/, ,DNAS� Block Lots) -9j General Contractor's Name U p Mailing Address Phone Cell Phone State License Number City Business License Number Authorized Representative/Contact Person: Phone: Estimated Value of construction $ 79y Sy/ Financed By S p A 2-D Date Work is to Begin Date Work is to be Completed `f -30 Scope of Work: Please check all items that anniv for the tvne of building nPrrrtit Vr tr am rano oaatinn- Floor Area: the proposed structure is to be used for: New House Finished Heated Space sq. ft: Addition Garage sq. ft: 3$� New Garage or Carport /VI Repair/Remodel Garage Unfinished Basement sq ft: Repair/Remodel House Porches sq. ft:Z Accessory Dwelling Unit �� Other (please describe): Floor Area: the proposed structure is to be used for: Finished Heated Space sq. ft: 1,76V Garage sq. ft: 3$� Unfinished Heated Space sq ft: /VI Carport sq. ft: y� Unfinished Basement sq ft: Porches sq. ft:Z Semi -Finished Basement sq ft: �� Decks sq. ft: 3 2 Storage sq. ft: -1//14 Other (please describe): \Utypdc\bcd\All Forms\Building Permit Application.doc Page 1.of 1