Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD07-009 (oversized drawings not scanned)
• • eol,Trosyy BUILDING PERMIT C' co City of Port Townsend WAStitf1,77 Development Services Department — 250 Madison Street,Suite 3,Port Townsend,WA 98368 (360)379-5095 Project Information Permit# BLD07-009 Permit Type Residential -Addition/Remodel Project Name Site Address 11 VISTA BLVD Parcel# 963700002 Project Description Renovate existing garage into family room;replace some windows in house Names Associated with this Project License Type Name Contact Phone# Type License# Exp Date Applicant Syverson Kirsten A Owner Syverson Kirsten A Fee Information Project Details Decks–Residential 84 SQFT Project Valuation $15,723.72 Manual Input 528 DOLL Plan Review Fee 172.41 Technology Fee for Building Permit 5.31 State Building Code Council Fee 4.50 Building Permit Fee 265.25 Record Retention Fee for Building 10.00 Permit Total Fees Paid $457.47 Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced,or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of he proper,r authorized agent of the owner. Print Name 'NI, ���: L'j/L _-- Date Issued: 02/16/2007 Issued By: PWESTERFIELD 410 CITY OF PORT TOWNSEND PERMIT ACTIVITY LOG PERMIT# Loo7 Qp ci DATE RECEIVED: (/A 7/07 SCOPE OF WORK: - ' RPoa j *e. ext.411-1 ►9c, e (n+ -Pam (•.( mope) . t2 k e � i cn soofie, -Puri v� Sid€ of' hPtcSe- DATE ACTION INITIALS Entered into TRIPS IA 7�a7 �u.r ESA-to Planning $h prefi yp oo ex ? -no evidence f ESA- ai Vested Date Checked for Completeness 1 2-1 2,(U� SIA-c. .e)ce,,,> -,'0,T) Ta rein c 1h/ d- s e XP a k vim- i n Too l�'�'`-��' - 2-? �� 0 e y Pam S i o�� �po -e -�•%s �, ( . - p-eAre.Co w o-e_s ex o2.0_61. 2-s .0D. s1^-, S 310. Z. reAll& 0d2 n Q + -e At r b► VoCS --tee 211 s ik app ,? 1-e e) TS ajia,in. Ok -P s,/1+ sk4 s^e flee/114'0-1. z- I‘-a 7 \\Bcdjermits\forms\BUILDING\Permit Activity Log.doc • 11. SORTp City of Port Townsend • es Development Services Department Waterman-Katz Building 181 Quincy Street, Suite 301,Port Townsend,WA 98368 (360)385-0644 FAX(360) 385-7675 email:jwalat@ci.port-townsend.wa.us CITY OF PORT TOWNSEND SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT EXEMPTION WASHINGTON STATE SHORELINE MANAGEMENT ACT(RCW 90.58) Applicant: Gary and Kirsten Syverson Case Number: LUP04-127 7314 Steilacoom Blvd. Lakewood, WA 98499 Project Location and Legal Description: Lot 2, Island Vista Addition to the City of Port Townsend; addressed as 11 Vista Blvd. Proposal: Remodel and expansion of single-family residence on bluff property. Adjacent Waterbody: _Strait of Juan de Fuca Admiralty Inlet _X_Port Townsend Bay SMP Shoreline Designation: x Urban Suburban _Natural _Conservancy Aquatic PT Urban Waterfront Special District Findings &Conclusions 1. The proposal made by the applicant to undertake construction described above within the shoreline of the City of Port Townsend and/or its associated wetlands is exempt from the requirement of a substantial development permit. Specifically, the proposal constitutes: Normal Maintenance and Repair_Development not exceeding$2,500 x Single-family home for owner's use _Other: 2. The proposal will not materially interfere with the public use of public lands and waters or the private use of adjacent private lands nor will it result in any material expansion or change in use beyond that previously existing. 3. The proposal is consistent with the policies of the Shorelines Management Act and the City's Shorelines Master Program. In consideration of the above, the proposal is found exempt from the requirement of a shoreline substantial development permit. The following conditions must be complied with in development and subsequent use of the property. Conditions 1. All development shall be in substantial conformance with the site plan submitted with the shoreline exemption application and with the geotechnical report prepared by Robert Leach and Bill Payton of NTI Engineering and Surveying for the property(dated 10/21/04).The recommendations listed on page 3 of the geotechnical report are hereby incorporated as required conditions. (Exhibit A) 2. There shall be no further expansions to or addition of any structures seaward of the existing permitted development(i.e.,within the allowed setback area)without prior review for conformance with the Shoreline Master Program and any other applicable laws and ordinances. 3. This exemption does not excuse the proponent from complying with other local, state and federal ordinances,regulations, or statutes applicable to the proposed development including but not limited to the city's environmentally sensitive areas ordinance. The proposed structures have not been reviewed for compliance with the International Building Code. That review will take place through a City building permit process. 4. Per the Port Townsend Shoreline Master Program, the setback specified through approval of a subdivision takes precedence over the other methods of calculating setback for view purposes. The required setback for Lot 2 as shown on the face of the Island Vista plat is 25 feet. The proposed site plan,with ten-foot extension of the living room, shows a setback of approximately 60 feet or more and therefore complies with setback requirements. 5. The building permit shall not become effective until such time as the applicant enters into a"Hold Harmless Agreement"with the city in a form and manner approved by the City Attorney. Said agreement shall acknowledge the applicant's awareness of bluff stability and erosion conditions; shall acknowledge that shoreline defense works shall be prohibited in the event of continued erosion and land sliding; and shall relieve the City of Port Townsend of any liability for approval of the development and the engineering design of the development facilities. 6. The building permit shall not be issued until a Notice to Title regarding presence of an Environmentally Sensitive Area on site is recorded with the County Auditor. The Notice to Title may be combined in one document with the Hold Harmless agreement. 7. All development shall be in substantial conformance with an engineered stormwater management and erosion plan prepared in accordance with the city's Engineering and Design Standards and approved by the Public Works Director. 8. Any vegetation removal within 25 feet of the bluff is subject to the City's Environmentally Sensitive Areas ordinance (PTMC 19.05). No vegetation removal in the 25-foot bluff buffer shall be permitted without review by the City for conformance with all applicable regulations. 9. The Applicant is encouraged to implement the recommendations in the DOE pamphlet "Vegetation Management: A Guide for Puget Sound Bluff Property Owners. A copy of the DOE pamphlet has been supplied to the applicant. Native, drought tolerant species, especially those that provide good habitat, are recommended to help preserve the bluff habitat. Excessive irrigation of lawn or landscaping may cause bluff instability. CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTM ` City Hall,250 Madison Street,Suite 3 t� Port Townsend,WA 98368 - Phone: 360-379-5095 Fax 360-344-4619 fir- RESIDENTIAL � BUILDING PERMIT APPLICATION NEW CONSTRUCTION,REMODELS,&ADDITIONS Property Owner's Name(s) - .S4y6 /y, Mailing Address 27- .--Vet,(466 - City,State,Zip i)PLIA6* r n Phone —I Permit No. .33 L,b0T - 009 Property Street Address _ ;2;tvi 1>tn Zoning District Parcel# q623 3 7o0 C Legal Description: Addition.15\A440 V 1i; Block Lot(s) Z General Contractor's Name (/ Sq%JRs- LJ Mailing Address ti 1 V ,. "1-11B I,V C Phone / Q .3 11 !' ) (0,C Cell Phone 26-tor 3 r ' t L 0 State License Number City Business License Number 3 tI"4O Authorized Representative/Contact Person: Phone: Estimated Value of construction$ 3�, Financed By (�/bf- _ Date Work is to Begin MpAtte .�-- Date Work is to be Completed 21DP q- Scope of Work: Please check all items that apply for the type of building permit you are requesting: New House Addition I New Garage or Carport Repair/Remodel Garage Repair/Remodel House Accessory Dwelling Unit Manufactured Home Other(please describe): Floor Area: the proposed structure is to be used for: Finished Heated Space sq.ft: 5 2 i Garage sq.ft: Unfinished Heated Space sq ft: Carport sq.ft: Unfinished Basement sq ft: Porches sq.ft �,�. Semi-Finished Basement sq ft: Decks sq.ft Storage sq. ft: Other(please describe): n.n__...�__a_ __a o_aa:_�✓_LL..n..��u..__i n_u:___ r��.._.__.i_a_-__a ra__\/%__a_�a,r cun,u%naan111_..C__a:__ CITY OF PORTtOWNSEND RESIDENTIAL BUILDING ALT APPLICATION NEW CONSTRUCTION,REMODELS,&ADDITIONS Property Site Area/Coverage Information: 1. The total area of the property in square feet 2. 1 2. The total area covered by existing and proposed structures in square feet: �[ (total ground coverage from the outside of walls or supporting members) I O fl Percentage of lot coverage: (2=1) ' 'IV Impervious Surfaces: Please provide the square footage of the roof area of the proposed and existing structures,and the square footage of the total area covered by porches,walkways,patios and driveways. Do not include decks allowing drainage to earth below. IProposed House Roofprint sq.ft l /3 Existing House Roofprint sq.ft: It-t(Q V Proposed Garage Roofprint sq.ft: Existing Garage Roofprint sq.ft: 4 01 Proposed Porch/Walkway sq.ft: Existing Porch/Walkway sq.ft: Proposed Driveways sq.ft: Existing Driveways sq.ft: Other(describe): Other(describe): Total Proposed Impervious sq.ft: Lq 7 3 Total Existing Impervious sq:ft: `i 13 Total Proposed+Existing sq.ft to 1612 Percentage Impervious:* Q� I 1" (Impervious surface=lot sq.ft) V I P *If total impervious surface is equal to or greater than 40%of the lot area,you must submit a written stormwater plan to address run- off. Please check which plans you are submitting with this application (2 sets needed): Site Plan PUTT 4' 1)g4437.0 Interior&Exterior Wall Bracing(panel locations shown on floor plan) Drainage Plan(if 40%or more impervious) Typical Wall Framing Details(section from foundation throng,h roof) Foundation Plan �," Elevations 0IQ1(at AkLA h Floor Plan O�,�j1,44 4 Mao k 2003 WSEC*Compliance: Prescriptive_ Component_ Floor Framing Plan WSEC Construction Checklist(Washington State Energy Code) Roof Framing Plan Other. Installing Manufactured Home Yes><No Year: Make: Was the manufactured home originally constructed within three(3)years of proposed placement? Yes No 2) Manufactured home must be placed on a permanent foundation with the space from the bottom of the home to the ground enclosed by either load bearing concrete or decorative concrete or masonry blocks so that no more than one foot of the perimeter foundation is visible above grade;and 3) Roof must be composed of composition,wood shake or shingle,coated metal,or a similar roof material;and 4) Title to the manufactured home must be eliminated as a condition of building permit approval. C:\Documents and Settingslkathy Reed\Local Settings\Temporary Internet Files\Content.IES\KKEJGPMR\Application- ceno.+e..•:..10V11113.d4.i:....0!_Ol10ew..iiN1.d.... o..s•1.d A r . ' , . CITY OF PORWNSEND RESIDENTIAL BUILDING ALT APPLICATION NEW CONSTRUCTION,REMODELS,&ADDITIONS Special Conditions Please check YES or NO as applicable . YES NO 1. Is the property within 200 feet of a fresh or saltwater shoreline? D 2. Is the property within the Port Townsend Historical District? 1 X 3. Is the property located within or adjacent to an environmentally sensitive area? I X 4. Will this proposal involve any sewer,water or other utility extensions that will,or could serve vacant properties other than the project site?If yes,please attach information identifying the utility extensions and �/ sites. vdvtboe1 me- 1 q ECC:M t4� — IfirOr4tNt-Ge- 1� 5. Have any special conditions been placed on this property,or has the property been subject to any conditions on any prior action of the City(if"Yes"to any of the following,attach copies of appropriate documents): X Subdivision/Short Plat/Boundary Line Adjustment? SEPA(environmental review)? Variance? Conditional Use Permit? Street Vacation? Planned Unit Development? Restrictive Covenant? Easement? 6. Are any properties within 800 feet of the site owned or controlled by the applicant,any relative or business associate,or any parte ,corporation�,Pr other entity affiliated with`e applicant? (If yes, �/ attach list) , V I STA A j1 7. Have any of the properties listed in item#6 been developed within the last two years?(If yes,attach list.) 8. Have you previously discussed this prot' with a i staff member? If ye ,who and when? Gr._ i Jul 2vetf- b Applicant Certification The applicant hereby certifies to have knowledge of those sections of the International Residential Code and the Port Townsend Municipal Code pertinent to the above project and that the applicant is responsible for constructing in conformance with these codes;the applicant understands that the permit,if issued,expires in six months unless work is started;that the permit,after construction has started,will expire after one year if an inspection is not made to show significant progress on the structure;the applicant agrees to abide by the ordinances,codes,regulations,restrictive covenants,deed or plat restrictions,and water and sewer plans attached hereto;the applicant certifies that all information given above and on accompanying plans is complete and accurate to the best of their knowledge; and the applicant understands that this information will be relied upon in granting permits and that if such information is later found to be inaccurate any permits may be withdrawn. C:1Documents and Settings\Kathy Reed\Local SettingslTemporary Internet Files\Content.iE51KKEJGPMR\Application- Deni.de..Miw10%7nQ..iloliwwOL De.,,,r41.iw.. D....1 ea A CITY OF PORT1LNSEND RESIDENTIAL BUILDING PILIT APPLICATION NEW CONSTRUCTION,REMODELS,&ADDITIONS The undersigned hereby saves and holds the City of Port Townsend harmless from any and all causes of action,judgments, claims,or demands,or from any liability of any nature arising from any non-compliance with any restrictive covenants,plat restrictions,deed restrictions,or other restrictions which may have been established by parties other than the City of Port Townsend. Complete Application Port Townsend Municipal Code,Section 16.04.140,Vested Rights-Substantially Complete Building Permit Application: applications for all land use and development permits required under ordinances of the city shall be considered under the zoning and other land use control ordinances in effect on the date a fully complete budding permit application,meeting the requirements identified in this section,is filed with the Development Services Department. Until a complete building permit application is filed,all applications for land use and development permits shall be reviewed subject to any zoning or other land use control ordinances which become effective prior to the date of issuance of a final decision by the city on the application. An application for a building permit shall be considered complete when an application meeting all of the requirements of Section R105.3 of the International Residential Code,2003 Edition,is submitted which is consistent with all then applicable ordinances and laws. In addition,to be considered complete,such an application must be accompanied by complete applications for a subsidiary land use or development permits needed,such as a complete shoreline management permit application and/or complete applications for other discretionary permits required under the ordinances of Port Townsend. An application for a partial permit under Section R105.3.1 of the International Residential Code,2003 Edition,shall not be considered complete unless it meets all requirements stated above and contains plans for the complete structural frame of the building and the architectural plans for the structure. - _ � 1,t---- d ,Z �— Signature of A;. to .rized Representati e Date s> . • \(Lica- For Official Use Only Permit No. Building Official Approval Date Issued Balance Due$ Date Validation Stamp below: Owner/Representative Signature Date C:\Documents and Settings\Kathy Reed\Local Settings\Temporary Internet Files\Content.1E5\KXEJGPMR\Application- OneG.InnF:.do�7nO..a.i:....oL9nDur+.+:1M1.1.... D....n A..s A • City of Port Townsentfb Development Services Department -" ENVIRONMENTALLY SENSITIVE AREAS QUESTIONNAIRE Permit applications are reviewed by our staff to make a preliminary determination of the presence or absence of an Environmentally Sensitive Area on the property,pursuant to Chapter 19.05 ofthe Port Townsend Municipal Code. To help us make this determination, please supply the following information. General Information: Applicant Name: t�1"77r Phone ,• , Mailing Address: ,t Property Address(if different): • Description of Proposal(include site plan): ZIL5Aintlat4EWISTite ' +140 The proposed new construction creates - sq. ft. of impervious surface. What best management practices are proposed? Sensitive Qio L Is anyArea portionuestof the ns:property within or near a mapped Environmentally Sensitive Area? (Maps are available a e Building and Community Development Department) YES NO 2. Is there any standing r running water on the surface of the site at any time during the year? Yes No If YES,please describe: 3. Has any portion of the site been identified as a wetland? YES NO If YES,please describe: 4. Is the site characterized as: Forest Meadow .°)Z%C,leafed Mixed C:\Documents and Settings\Kathy Reed\Local Settings\Temporary Internet WSEC Residential Construction Checklist T. City of Port Townsend Development Services Department a = - ''t 250 Madison Street,Suite 3 '; - Port Townsend,WA 98368 =- (360)379-5095 Fax:(360)344-4619 Ast Washington State Energy Code (WSEC) 2001 Residential Construction Checklist Complete this form in addition to WSEC forms. Please answer the following questions: TYPE OF PROJECT: -1.New construction,or addition over 750 square feet Must meet whole house and spot ventilation requirements, and show full WSEC compliance as a stand-alone project. A detached, habitable structure such as an Accessory Dwelling Unit regardless of size must also meet these requirements. -o House addition under 750 square feet Possible trade-offs are allowed with the existing building for WSEC compliance, such as increasing ceiling insulation. See WSEC component performance forms. NOTE: A house addition less than 500 sq.ft. does not require whole house ventilation. Spot ventilation is still irequired. TYPE OF HEATING—Please check all that apply: Electric L-o Wall Heater "Baseboard -ii Forced Air Furnace u Radiant Floor(Boiler)-o Other Non-Electric: Propane:-o Radiant Floor/Baseboard(Boiler) } PG Stove -o LPG Furnace -a Other LPG -;Heat Pump i Oil Furnace -i Woodstove an only be used as secondary heat source) VAPOR RETARDERS: Vapor retarders shall be installed toward the warm surface as represented below. Select one option for floors,walls, and appropriate ceilings: • Floors: i Plywood with exterior glue Poly plastic(greater than or equal to 4 millimeter thick) 1 Backed baits • Walls: 1 Poly plastic (greater than or equal to 4 millimeter thick) 1 Face-stapled,backed batts Low-perm paint • Ceilings: I Not required where ventilation space averages greater than or equal to 12 inches above insulation Face-stapled, backed batts I Poly plastic (greater than or equal to 4 millimeter thick) I Low-perm paint SEE BACK C:1Documents and Settings\Kathy Reed'Local Settings\Temporary Internet Files\Content.IE51KXEJGPMR\Application- Residential%20Energy%20Code%20Checklist[1].doc Page 1 of 2 WASHINGTON STATE VENTILATION AND INDOOR AIR QUALITY(2000 Code): 4 1110. Prescriptive Approach—Simple Form For the Washington State Energy.Code(2001 Edition) Climate Zone 1 IA, Site Information Building Department Use Only 1; 2 - .51- Vts-rn A 012 Addrips: liAl l%); P)kvx5. Notew City: o1%c 1r31i) .2tM) VaiL. state&IJ A. . mix cj t 3 tvR contact CQ t.ttiE: Phone: 3tt o .m"t 11(er" Pry 411 t D Fax: d 3 ) j i _! t�_ Table 6-1 PRESCRIPTYE REQUIREMENLS°"FOR GROUP R OCCUPANCY CLIMATE ZON1 (Unlimited Glazing Option Only) Glazing GlazingU-Factor Doot2 Wall Wall Wall Slab' Option Aiea10 - U- Cduing3 Vaulted Above Into le' Floors On I %of Floor Vertical Overhead" factor Ceiling3 Grade Below Below Grade —., Grade Grade III Unlimited Group R 3 ft 0 ,.1 0.58 0.20 R-38 R-30 R-21 R-21 R-10 R-30 R 10 Occupancy 6i / Only See the code text for footnote references This project complies with the following: 1 The project is a single family residence or duplex. ✓ The project is wood frame OR all of the insulation is interior or exterior of the framing. 1 All bulling components meet the requirements listed in Table 6-1,Option HI. ✓ The project will meet all other provisions of the WSEC and VIAQ. The project will take advantage of-the following exceptions to the prescriptive option: ❑ 682.6 Exception 1.One door,that is 24 lt.2 or less,that does not meet the standards is allowed. Location of the door taking this exception Cl 602.6 Exception 2.Doors with a U4actor of 0.40 allowed without calculations,Option til only. Location of the door(s)taking this exception Copyright 2002,wsUCEEPO2-056 Copied by permission from the Washington State University Cooperative Extension Energy Program Prescriptive—ale Forth—Ornate Zone 1 5/31/2002 • • 2001 EDITION TABLE 61 PREESCIMPTIVE °"FORrUP R OCCUPANCY CLl1IiATE ZOI§E • ��rn U-Factor Walk.. Wag. g�4 OpSan swain ° c Vaulted beed4 Fbors en %ofFloor Vertical Overhead" U-Factor came Grade � tirade I. Grade 12% 0.35 0.58 0.20 - R-38 R-30 1 R15 R-15 R-10 R-30 R-10 II.* 15% 0.40 0.58 020 R-38 R-30 'R 1 R-21 R-10 R-30 R-10 EU.' Unlimited - 0.40 0.58 0.20 R-38 R-30 R-21 R-21 - 1t 10 ' R-30 R10 Group R-3 Occupancy. Only * Refer Case 0. Nominal R-values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. liormimum requirements for each option listed. For example,if a proposed design has a glazing ratio to the conditioned floor area of 13%,it shall comply with all of the requirements of the 15%glazing option(or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 ofthis Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings. `Adv`denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings. 4. Below grade walls shall be insulated either on the exterior to'a minimum level of 12-10,or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material,manufactured for its intended use,and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter.insulation shall be a water resistant material,manufactured for its intended use,and installed according to manufacturer's specifications. See Section 602.4. 7. Int.denotes standard framing 16 inches on center with headers insulated with a minimum of R-5 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing. 9. Doors,including all fire doors,shall be assigned default U-factors from Table 10-60. 10. Where a maximum glazing area is listed,the total glaring area(combined vertical plus overhead)as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U-factor of U0.40 or less is not included -in glazing area limitations. • 11. Overhead glazing Shat!have U factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3S"are exempt from this insulation requirement • Effective 7101/02 - 33 • • 11 • • In what room is your whole house fan located? • What size is the whole house exhaust fan? U 50-75 CFM(1-2 bedroom house) �+80-120 CFM(3 bedroom house) `0100-150 CFM(4 bedroom house) LI 120-180 CFM(5 bedroom house) Note:the whole house fan shall be readily accessible and controlled by a 24-hour clock timer with the capability of continuous operation,manual and automatic control. At the time of final inspection,the automatic control timer shall be set to operate the whole house fan for at least 8 hours a day, and have a sone rating at 1.5 or less measured at 0.10 inches water gauge. Spot Ventilation: Source specific exhaust ventilation is required in each kitchen,bathroom,water closet,laundry room,indoor swimming pool,spa and other rooms where excess water vapor or cooking odor is produced. Bathrooms,laundries or similar rooms require fans with a minimum 50 cfm rating at 0.25 inches water gauge;kitchens shall have a fan with a minimum 100 cfm rating at 0.25 inches water gauge. Outdoor Air Inlets: Outdoor air shall be distributed to each habitable room by means such as individual inlets, separate duct systems,or a forced-air system. Habitable rooms include all bedrooms,living and dining rooms but not kitchens,bathrooms or utility rooms. Where outdoor air supplies are separated from exhaust points by doors,undercutting doors a minimum of i/2 inch above the surface of the finish floor covering,distribution ducts,installation or grilles,transoms or similar means where permitted by the Uniform Building Code. When the system provides ventilation through a dedicated opening, such as a window or through-wall vent,these openings must: • Have controlled and secure openings • Be sleeved or otherwise designed so as not to compromise the thermal properties of the wall or window in which they are placed. • Provide not less than 4 square inches of net free area of opening for each habitable space. What type of fresh air inlet will be installed? (See figure below) U Window Ports U Wall Ports C:\Documents and Settings\Kathy Reed\Local Settings\Temporary Internet Files\Content.IE5\K3 ,JGPMR\Application- Residential%20Energy%20Code%20Checklist[1].doc Page 2 oft 'WINDOW REPLACEMENT PERMIT City of Port Townsend Development Services Department • 250 Madison Street a r Port Townsend,WA 98368 (360)379-5095 Fax:(360)344-4619 A window replacement permit is not required if ALL of the following conditions exists: • You are replacing existing glass with like glass. For example, the neighbor's baseball went through your window, and you need to replace the windowpane. • There is no change to the window frame(s)or sash(s). This window replacement permit is required if ANY-of the following conditions exist in your project: • A different kind of glass in being installed,for example single-pane glass replaced with double-pane glass. • The window frame is being replaced. Please complete a residential building permit application, rather than this permit,IF: • The window size is being increased or decreased. • A new window with a new opening in the building wall is being installed. If your project includes electrical work, we provide Labor & Industries (L&I) electrical forms in our office. Call L&I at(360)417-2700 for more information about electrical permits. A detailed floor plan of the dwelling is required. Label all rooms, and indicate door and window locations and sizes. If you are replacing all the windows, check here otherwise indicate on the floor plan which one(s) you are replacing. (NOTE: A door with 50% or more glass is considered a window.) Please verify that the replacement doors and windows meet the minimum U-factors required by the 2004 Washington State Energy Code: .40 or better U-Factor for Windows: Yes ,No .20 U-factor for Doors: Yes ./ No NOTE: the International Building Code (IBC) has specific requirements regarding safety glazing at hazardous locations, emergency escape windows in sleeping rooms, and smoke detectors. See attached IBC section to determine if any of your glass needs to be safety glazed. Name of Legal Owner(s): I ULA Mailing Address: 2 Z '/} crj} \ --�(�PC(- 1 City, State,Zip: •-L� ¢ _ D24"1$' Phone: 317o -3 1 C( �� � iz ) � �t http://www.cityofpt.us/DSD/Forms/NeedsToBeGrouped/APPlication-Window Replacement Permit.doc Page 1 of 3 01/11/2007 Property Street Address: l l A - Zoning District: Parcel# Legal Description:Additionle[ Z 351410 Utclitock Lot(s) Contractor's Name: Mailing Address: City, State,Zip: Phone: Labor and Industries License#: Expiration Date: City Business License#: Expiration Date: Estimated Value of Construction: $ Estimated Start Date: Estimated Completion Date: Applicant Certification The applicant hereby certifies to have knowledge of those sections of the International Residential Code and the Port Townsend Municipal Code pertinent to the above project and that the applicant is responsible for constructing in conformance with these codes; the applicant understands that the permit, if issued, expires in six months unless work is started; that the permit, after construction has started, will expire after one year if an inspection is not made to show significant progress on the structure;the applicant agrees to abide by the ordinances, codes, regulations, restrictive covenants, deed or plat restrictions, and water and sewer plans attached hereto; the applicant certifies that all information given above and on accompanying plans is complete and accurate to the best of their knowledge; and the applicant understands that this information will be relied upon in granting permits and that is such information is later found to be inaccurate any permits may be withdrawn. The undersigned hereby saves and holds the City of Port Townsend harmless from any and all causes of action,judgments, claims,or demands, or from any liability of any nature arising from any non-compliance with any restrictive covenants, plat restrictions, deed restrictions, or other restrictions which may have been established by parties other than the City of Port Townsend. Complete Application Port Townsend Municipal Code, Section 16.04.140, Vested Rights - Substantially Complete Building Permit Application: Applications for all land use and development permits required under ordinances of the City shall be considered under the zoning and other land use control ordinances in effect on the date a fully complete building permit application, meeting the requirements identified in this section, is filed with the Development Services Department. Until a complete building permit application is filed, all applications for land use and development permits shall be reviewed subject to any zoning or other land use control ordinances which become effective prior to the date of issuance of a final decision by the City on the application. An application of a building permit shall be considered complete when an application meeting all of the requirements of Section 105.3 of the currently adopted International Residential Code is submitted which is consistent with all then applicable ordinances and laws. In addition, if applicable,to be considered complete, such an application must be accompanied by complete applications for a subsidiary land use or development permits needed, such as a complete shoreline management permit application and/or complete applications for other discretionary permits required under the ordinances of Port Townsend. �--- (k°13 12 b -I Signa o Ap ' ant or Authoriz Ppr eigtative Date For O ial Use Only • -'' �1 �� Building Official Approval Permit#: Date Issued http://www.cityofpt.us/DSD/Forms/NeedsToBeGrouped/Application-Window Replacement Permit.doc Page 2 of 3 01/11/2007 i • Zi a 4, a: o 0s # - m R �Q. e o • • III 'o_ © is 1-4Eivr,Rlcic.S-- 5'T — tY a ` a41 �p 4 ear o D iil 44 es� �-49o f gft 'ia � w �' - 2 l \ 3 14,..0.. l d1 \to -t. ,�: iat 1'I _ � V ri h i id N fit+ �/; 0 T t tit , dl 41 t a� i - as I '�� F 3 al o - --,7-..,-... 11 it. p- t 'A *F `› 1 41 - �� _ �� _ `1.is * RR to T ST de r 1 6t�a' S'! Zi`W / Si so TZ1,cti,' lf.--"tak V it { 14- yjA i O� , A - at it 4 13 1, cof N.e sr 1110 %_ E -- i .ry Pt 11 AI, = 4 t r V(-f$a $ — S -16 ; -- \r .?O3"3JZLs`1G\-` -1-"--M-i s i I - c `x d '3 —r_ i` g4 1 F _ L ' 1. to y(1 !t 16 f _ G s p. L i • e - �s rye i i _ s — —1ST f i / CI I-. i fa ? r' ~`— T:: I ' f - • ! tff�'____ ` j Lot 1 r � til O 1 ���� .rf flrf' .. d O f A - Figure 2 �, ^y •o ... - ..y. .___ ...• _.„- ._ ,--.7, I _. , . e ope try Jaffarapn Camino Sarvicae GIS �i2ori.. 9 • � �• 15T ST,ria 777.7. 1, " ,.. { Subject Adjacent Properties t ' : --,17..,..7.7.. .'..71- --'":^7-.' ' h _ GRANT ST. . I•, ` ,y7, ti k A Top o'bluff a `�` • -� a...,-? -'.-.44.-.4-7:1-YL,-1,1A-.7k.,41 * ' { �F ` Toe Of bluff ' .,,--ce,.. -a. '.•. 'y ,: : - _:A -.. -S •.. 'R ..'` u'• - _ *, i ,ms's y .a+ ,ee Wit` -:•'-'7.-•' :'.1;•:-:-,, w,�_`.y_ -i -•`iE "S �n N '" ..L`.r � fie "�, '� �;ii 74 ��• � `� il -i- ^ t- a ��. ac R sri-K-. J s 'mak+ Figure 1 4it - - _ _ ".-7,,--7,:1!"-;"....."--'::". - "`' 'E ,� •, " ..--cam r,:; 't` "x� �" '< r�arzs�v ►sfter$an Caurly sntral Sswuiaas SISis,,,,-,..-.,---, `.. ! - �' '':s 8 • • oinr rok. ti� y� City of Port Townsend Development Services Department BUILDING FEE SCHEDULE 1. To find your project's valuation,multiply the square footage by the appropriate values below.* 2. Go to the Fee Table below to determine your Building Permit Fee. 3. Multiply the Building Permit Fee by .65 to determine your Plan Review Fee. This is the minimum fee due upon submittal of your application. You may pay all the fees at submittal time if you wish. 4. Your project may have additional fees,such as Public Works. Please see the Public Works permit fees sheet. RESIDENTIAL FEES Note: Fees quoted before the time of permit application may be subject to change. Separate structures will be valued separately. Foundations: $14.98 x Patio Slab: $4.92 x = Manufactured Homes:$7.15 x = Garages: (Includes slab/runners,blocking,hold-downs,skirting,utility Wood Frame $25.03 x = connections,etc.A separate electrical permit is required) Carports: Dwellings (includes finished basements): Gable $16.10 x Wood Frame $95.17 x 52.8 =65fg 2.4q:74.Flat $12.12 x = Masonry $99.81 x = Storage Room $56.62 x = Storage Sheds: (Over 200 sq. ft. floor area) Unfinished, unheated,to be finished in future Insulated $25.84 x = $37.15 x = Un-insulated $20.49 x = Basements: Pole Buildings: Semi-Finished $22.50 x = Slab(<300 sq.ft.) $3.94 x = Unfinished $17.17 x = Slab(>300 sq.ft.) $2.94 x = PLUS Building $13.27 x = Covered Porches: $25.84 x = Townhouses: $71.38 x = Decks: $12.49 x 54 =)p99.0 1p PLAN REVIEW FEE: 4.27. S1 Stairs, per lineal ft.$129.88 x = BUILDING PERMIT FEE: 5 7. 7Lc �O Railings," " $15.43 x = HOUSE NUMBER: $3.00 per address TOTAL VALUATION: �j � 'Aq g, 92 STATE BUILDING CODE SURCHARGE: $4.50 TOTAL FEES: RECORD RETENTION FEE: $3.00-$10.00 TOTAL VALUATION BUILDING PERMIT FEE $1 to$500- $23.50 $501 to$2,000 $23.50 for the first$500,plus$3.05 for each additional$100 or fraction thereof. $2,001 to$25,000 $69.25 for the first$2,000,plus$14 for each additional$1,000 or fraction thereof $25,001 to$50,000 $391.25 for the first$25,000,plus$10.10 for each additional$1,000 or fraction thereof $50,001 to$100,000 $643.75 for the first$50,000,plus$7 for each additional$1,000 or fraction thereof $100,001 to$500,000 $993.75 for the first$100,000,plus$5.60 for each additional$1,000 or fraction thereof $500,001 to$1,000,000 $3,233.75 for the first$500,000,plus$4.75 for each additional$1,000 or fraction theteof $1,000,000 and up $5,608.75 for the first$1,000,000 plus$3.15 for each additional$1,000 or fraction thereof * The Building Department establishes building permit fees based on Section 108 of the International Codes. The fees are calculated using the estimated fair market value of the project (material + professional labor costs). The value includes the total value of all construction work, including finish work. The Plan Review Fee, which is 65% of the Building Permit Fee, is paid at the time of application submittal. The Building Permit Fee,and any additional fees, is paid at the time the permit is issued. All fees are based on fair market values. The values may be adjusted to coincide with the quality and individual characteristics of your project. The Building Department will establish an estimate using"good"values per square foot for similar buildings in the region. These estimates are updated on a regular basis. The valuations were taken from the MARSHALL& SWIFT Residential Cost Handbook and Building Standards, March/April 2002, and are estimated square footage values for residential and accessory buildings. P:\DSD\Department Forms\Building Forms\Fee Schedule-Buildings.doc/3/1/2006 Grantor(s): Syverson Grantee: City Hold Harmless Indemnification Covenant Page 1 Jean M.Walat City of Port Townsend Waterman&Katz Building,Suite 301 181 Quincy Street Port Townsend,WA 98368 HOLD HARMLESS INDEMNIFICATION COVENANT AND NOTICE TO TITLE Grantor(s): SYVERSON, Gary and Kirsten Grantee: City of Port Townsend, a Washington municipal corporation; Shorelines Exemption# LUP04-126 THIS COVENANT is made on this day of , 2004, By Gary and Kirsten Syverson (hereinafter "Owners"), residing at 7314 Steilacoom Blvd., Lakewood, WA 98499. This Covenant shall constitute a burden upon, and run with the real property described herein. Legal description: Owners own the following described real property that is currently vacant, legally described as Lot 1, Island Vista Addition, City of Port Townsend, Jefferson County. Assessor's Property Tax parcel no. 963-700-001 NOTICE IS HEREBY GIVEN to the Grantor(s)/Owner(s)of the above-referenced real property,to potential purchasers and future owners,to agents or representatives, and to any other concerned person or entity: 1. A BLUFF IN EXCESS OF 100 FEET HEIGHT IS PRESENT ON THE SUBJECT PROPERTY. THE PROPERTY IS THEREFORE SUBJECT TO CHAPTER 19.05, ENVIRONMENTALLY SENSITIVE AREAS (ESA's),PORT TOWNSEND MUNCIPAL CODE. THERE IS A 25 FOOT BUFFER FROM THE EDGE OF THE BLUFF; LIMITATIONS ON ACTION IN OR AFFECTING THE BUFFER OR STABILITY OF THE BLUFF MAY EXIST. Grantor(s): Syverson Grantee: City Hold Harmless Indemnification Covenant Page 2 2. IN ADDITION,THE SUBJECT PROPERTY IS WITHIN A HALF-MILE OF AN ACTIVE BALD EAGLE NEST. BALD EAGLES ARE KNOWN TO USE LIVING AND DEAD TREES IN THE VICINITY. SPECIAL CONDITIONS REGARDING DEVELOPMENT AND USE OF THE PROPERTY ARE DOCUMENTED BELOW: In accordance with and in consideration of the Shoreline Substantial Development Permit Exemption LUP04-126 and conditions contained therein, Owners acknowledge, covenant, and agree as follows: 1. Owners propose to construct a single-family residence on a lot situated on an approximate 100+ foot bluff, approximately 90 feet from the edge of the bluff. Owners agree that they are fully aware of the risks inherent in building at close proximity to the bluff. 2. The bluff along the property facing the Port Townsend Bay has not experienced significant slope failure or stability problems; however, construction and site development can seriously affect slope/bluff stability. Development of the property is subject to the provisions of a geotechnical report dated 10/21/04 prepared for the property owners by NTI Engineering and Surveying, 717 S. Peabody Street, Port Angeles, WA 98362. Bluff erosion in the general area provides sediment for sand nourishment for beaches below the bluff. 3. Owners, as their free and voluntary act, accept and assume all risks of loss or damage arising out of the conditions described herein, and further agree to relieve and hold harmless the City of Port Townsend, its officers, agents, and employees, of any liability for approval of the development and the engineering design of the development. 4. Owners agree to and shall hold harmless and indemnify the City of Port Townsend, its officers, agents, and employees, from and against any and all liability, loss, claims, suits, damages, costs or expenses(including attorney's fees)that may at any time arise or be set up because of reduction in value or damage to property or personal injury by reason of the conditions existing now or hereafter on or around the property, or due to any construction or development or design pursuant to the Shoreline Exemption or any building or other development permits issued there under. 5. Owners agree that their representation herein and agreement to hold harmless and indemnify the City of Port Townsend shall be binding upon Owners, Owners' heirs, successors and assigns, and shall run with the land described herein. Grantor(s): Syverson Grantee: City Hold Harmless Indemnification Covenant Page 3 6. Under the Port Townsend Shoreline Master Program, shore defense works such as bulkheads or seawalls may not be constructed on spits,hooks, bars, barrier beaches or similar accretion terminals or accretion shore forms. 7. Heavy construction equipment and/o materials shall be kept away from the edge of the bluff. Excavated soils shall not be stored on site without engineering approval for location and amount. 8. Owners shall maintain groundcover and revegetate disturbed areas. Native, drought- tolerant vegetation should be used for landscaping. Heavy irrigation or other activities that would contribute large quantities o f water to the soil should be avoided, as excessive water may cause slope erosion and instability. 9. Any vegetation removal within 25 feet of the bluff is subject to the City's Environmentally Sensitive Areas ordinance(PTMC 19.05). No vegetation removal in the 25-foot bluff buffer shall be permitted without review by the City for conformance with all applicable regulations. 10. Surface water shall not be allowed to flow over the face of the bluff and cause erosion of the bluff face. This can be controlled with vegetation and using berms or swales to direct runoff to a drainage system. 11. Surface runoff from hard surfaces such as roofs, driveways, walkways and patios must be controlled as specified in an engineered stormwater control plan. 12. Silt fences or other sediment control devices may be needed during construction to avoid sediment runoff, erosion and silting of stormwater facilities. 13. An engineered stormwater control plan must be approved by the City to ensure compliance with the above conditions. All drainage control devices must be maintained in good working order and inspected at least once a year. 14. The Applicant is encouraged to implement the recommendations in the DOE pamphlet"Vegetation Management: A Guide for Puget Sound Bluff Property Owners. A copy of the DOE pamphlet has been supplied to the applicant.Native, drought tolerant species, especially those that provide good habitat, are recommended to help preserve the bluff habitat. Excessive irrigation of lawn or landscaping may cause bluff instability. Grantor(s): Syverson Grantee: City Hold Harmless Indemnification Covenant Page 4 15. The property is subject to the City's tree conservation ordinance. No trees may be removed prior to issuance of a building permit. Additionally,because the property is within one half mile of an active bald eagle nest, and because eagles are known to use large trees along the subject bluff as perching sites,no trees shall be removed from the property without prior review by the City. Replacement of removed trees may be required. 16. Owners shall record this Hold Harmless Indemnification Covenant and Notice to Title with the Auditor of Jefferson County, Washington. 17. This Covenant shall not be revoked or amended without the consent of the City of Port Townsend, pursuant to an adopted resolution by the Port Townsend City Council entered during an open public meeting. HIS COVENANT is in effect on the same day and year as first written above. �� • A t, 8 U • d Wright, (erim Director Date Development S- ices Department City of Port Townsend Grantor(s): Syverson Grantee: City Hold Harmless Indemnification Covenant Page 5 GRANTORS/OWNERS Gary Syverson Date Kirsten Syverson Date STATE OF WASHINGTON) ) ss. COUNTY OF JEFFERSON) I certify that I know or have satisfactory evidence that Gary Syverson and Kirsten Syverson signed this Hold Harmless Indemnification Covenant and acknowledged it to be their free and voluntary act for the uses and purposes mentioned therein. DATED this day of , 2004. Print name: NOTARY PUBLIC in and for the State of Washington, County of Jefferson, residing at My commission expires: [Pre-ink notary stamp 1" from margin] STATE OF WASHINGTON ) ) ss. COUNTY OF JEFFERSON ) ! :.::: ;iklf .°:,::,::'.:::..1:!:•:::•°.:ri::: : :•:°:•°'•,:°°• :::-i":;",:',..-3Y,,.:44; :lik:::;. H:•;;Ntift'llgi •''''''•".-:.:L g • '' — --.--11 :::••°.-'••°' °'°'°•::'" :-:.:'' r i' 1suiII1 ' , 0 - z , : ,, , . ...._ ",::.:.„.:,:.,:.,.,.,R i!".4,'3'...• ' •4::::.ii!"-!!!!!ii:!!!iiil'iil!!:. ' :, ti N .., ° : a �` `. • " 1.4 c zz 7.3 ii _' •" z- i o'r I. a.. E.-.: ,./�q1l1.. �- - '£fT 7 Liii [+1 to 1 tel ..q_.) u * R f �' 0 • .,_ \o \ > to 2 \ q a co 0 � . 0 kk Z \ / o � o - wz - co 0 \ j § o r a. w K5 k 2 m . 2 — ? § # $ a ao owo re) § 2 \ 0 = cu f 2 � CD o # I— R 2g \ R / 2 44 § z 2 § 2 C4 W4 CA CZI % 5 ® + § S 2 / § ilt k cc U co o a re I u 2 w Uco o R o w $ < o ® C 2 fi4 t ( < 0a. « 2 / � 2 � ■ INI ' / a - N 0 0 Pi Z ® Ua. C = E• 0 0 . \ � > � a � w t � k co � 8 00 0 E . 0 2 / § F w 22 § § ILL O 2 R § 0 2q 2 N � W ilmi © § & I- I- Q ~ k § 2 k � k ® w CA § 5 f $ m 0 g2 0 C 22 « 2 a CO z \ [ \ \ / / 9 R i J co 2 0 z _i z < \ & k k 2 2 k 0 d - m k to 2 g §_ - rt---j4D ®4 O'-'` q 2 $ 2 ® CO /! a.. I « w LUiii B 2 § ■ -I o \ � ' a u) k < 0 g 0 0 0 k k Li r 2 ma « 0 0 • • o*°°RrrOw CITY OF PORT TOWNSEND c3 '_',,`i1 i DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT N¢ For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want \.) the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: (G.- 8 - 0.1 \ PERMIT NUMBER: 6 0- —0� / SITE ADDRESS: 1 \/ i3t& PROJECT NAME: CONTRACTOR: / CONTACT PERSON: ,GIS C.p PHONE: 13 32`S C) TYPE OF INSPECTION: S h�e f r-cciC flat 1 (-).5 AWKroU te,)\ ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS ` Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector ` �g Date k4Vo Qi Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready for inspection. i 0 °i°°pTrOw CITY OF PORT TOWNSEND aiiiy 6" '_ ''t i DEVELOPMENT SERVICES DEPARTMENT .� � INSPECTION REPORT CP For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. ATE OF INSPECTION: �p - ) O�` / PERMIT NUMBER: ) .0 C)7-- DO SITE ADDRESS: I 1 V I S'i—Gt PROJECT NAME: CONTRACTOR: CONTACT PERSON: �G,56h PHONE: (Q 1 Q_5-6 TYPE OF INSPECTION: ) f 5 U t aj^(cYL&. 7tkPike,V(k,-A 0 , /-g- T ,----, -(( ,"f izbe I. 0 / ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED ---------V I,�- CORRECTIONS --- Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector e i ' Date e 7 Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready for inspection. • • 4v0FITrow CITY OF PORT TOWNSEND li s E lit DEVELOPMENT SERVICES DEPARTMENT ‘5 -r--- •••`:._4'1w:0-4:W- .� 1, INSPECTION REPORT w For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 5- j-p7 PERMIT NUMBER: e LT 07 - D 0 c SITE ADDRESS: I I V is-f-&. PROJECT NAME: CONTRACTOR: CONTACT PERSON: 3GSS3t PHONE: (p 4 3 3.5O TYPE OF INSPECTION: RQ IL I n 1010► f vU 1 h Ci YY) pAl a v i - O J ' (:CkTri I L,i 4t- Y tAtk_71 `? C)klAtl?,C__ 0.17477tti '.-Pit fc.;c":=J;Li VLK_, Cci7ic&J (a6._6 ci r1 , -11.. n v( - re.:.- Owl 0/,r( `----- ( 21E, C e,( WI atiA vc37-' -RI, 7- vA,or /6 6 07--- /,?sr , __,,,,L2 6 (( 4 rte -7 (ec V 4 t� `>t&l 1; � c o ei 1-c , fig c1 At c Ai ct 7- L ' , A 4 ,4 4 / J c 7 ^ 4 wr 4 �__--__ ttl ii ell ❑ APPROVED ❑ APPROVED WITI ' ❑ NOT APPROVED ( CORRECTIONS �,,. Ok to proceed. Corrections wul be Call for re-inspection before 4r) / . checked at next inspection proceeding. Inspector IC -` Date '57 6 0 Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready for ins ection. 76 I.1 ��LIOAt • • .L0*p°RTrw CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT "t� rFor inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: -(77/ 7 PERMIT NUMBER: /06-D 07- O 07 SITE ADDRESS: 8/ 11 --1-A- &DV PROJECT NAME: CONTRACTOR: CONTACT PERSON: 04l PHONE: 10V"—3Z S7) TYPE OF INSPECTION: L/L//EIZ,GOO. /41e-/ZyXO&. fl ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceedi g. Inspector t (;. ��.._ Date Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready for inspection. • 0 04QORTTO4,4, CITY OF PORT TOWNSEND =f ' ',,` i DEVELOPMENT SERVICES DEPARTMENT '--et,3. Olt/ INSPECTION REPORT Q`w For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the !f31---- C inspection. For Monday inspections,call by 3:00 PM Friday.^ DATE OF INSPECTION: '/3/( , / PERMIT NUMBER: f3 " C6? V/ SITE ADDRESS: /1 `5(t PROJECT NAME: CONTRACTOR: CONTACT PERSON: j( k.-- PHONE: b (/ --3 Z TYPE OF INSPECTION: , ,tt, r ` Cit-d'� 11q /AJ GJ /rte L. LtAcTit I ❑ APPROVED__) LI APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector ( C Date —/- /e) 7 Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready for inspection. .... ata 1IF.€Yt'<«.>✓, MU 07 USI i 'FIfYf.F3-sus-�� p.« r3 k,._'��r ,.-.i, a y}I a A tti f t E c cv .:...-...,. .>., ; ,., .�...,.. .tet: 3...<... ...-r., .> UFO4-12 - ,{✓ i�Kltl k'�3... .: ,... .,: �S ..,;:�.«. �' nom"✓,,:r�F. ,,.>..:„:„. RACEUNDE U1�S1'. 4A1' �mr st °�i�1 r✓c��to �z +I 1 a. r a E �_ c NEWD30 E AY hn D m Yys� Ec c rE ac iE E .. a ��B,E E ��— _. 3,.:;; •A tiARAtr u e a,a,a a ",E °,,,,,.:i -• ru E u*ru E. �y €. ■ - r 12907arEY E E e t9� o L:.m'L::•"""c:::-: '„"'g.1 ig Reporting Group Search ��` --- `, s✓ R Contact Searc f r Contractor Search No Auto Wildcard Primary Parcel Only All ParcelsF o • Receipt Number: �•aOa:u BLD07-009 963700002 Building Permit Fee $265.25 $29.93 $235.32 Total: $29.93 CASH N/A $29.93 .....------_---- Total $29.93 Page 1 of 1 genpmtrreceipts • i RESIDENTIAL CHECKLIST (For 1-2 Family Residences) NAME OF APPLICANT: Date Received with all necessary paperwork: By: BUILDING REVIEW BUILDING PERMIT# L007- 009 Zoning= R . - Impervious Surface% = Lot Coverage= OK w/zoning? Septic? If yes, contact County Env. Health In a PUD? Yes/No Parking—need dimensions on site plan 1.7 Site Plan, all setbacks shown -- Address needed? Completed Plans Checklist ADU?Prepare Notice to Title Energy Code Checklist& Compliance Form If architect/engineer, plans wet stamp/signed 17 2 Sets of Plans Submitted? Garage? Attached Detached Type of Heat p If a new detached garage or ADU, give copy ✓ p of site plan to Francesca t, Floor Plan: Number of bedrooms ev,-- Typical framing details/section Number of bathrooms Foundation plan; if calcs, holddown symbol Floor framing plan; if calcs, shear wall &verbiage must be shown on plans symbol &verbiage must be shown on plans Floor framing plan Elevation(s) V" Roof framing section plan PLANNING REVIEW (if applicable) LAND USE PERMIT# ROUTED TO: DATE: Critical Area Map checked. If in CA, what is it mapped? Slope: Within 200 ft of Shoreline Ordinary High In Flood Plain? Fill out FEMA forms if yes Water Mark? Lots of Record review(all 3 must be true): 9 or fewer lot(s), plat created pre-1937, AND development requires water, sewer, or street to be extended; OR if a block is owned with one SFR& wants to build another residence. CHECK for prior Public Works permit if it was already issued! PUBLIC WORKS REVIEW MIP# ($53 due) or SDP# ($330 due) ROUTED TO: DATE: Submittal Checklist attached 8-1/2 x 11 Site Plan reviewed for all items All trees in ROW identified Septic? Need County OK FIRST Pre-app Conference? Date held: PRE#: Impervious Checked Any work in ROW beyond a driveway apron needs Engineered Plans. DO NOT ACCEPT PERMIT WITHOUT THEM! Water, sewer, and/or streets being extended? Need 4 sets of engineered plans. Any existing or proposed easements for shared utilities or driveway w/adjacent property owners? We must have the licensed contractor's name and information for ANY right-of-way work. P:\DSD\Fomis\Building Forms\Checklist-Residential Building Plans-Front Counter Sep 06.doc Revised 9/27/06 i • BUILDING PERMIT FEES CHECKLIST 43L00-2 - 009 Fees Based on Fair Market Valuation or Submitted Amount Valuation = 5).) .2.18. q 2_ FEES DUE AT SUBMITTAL ,t2 7' 5.4 Plan Review Fee (2010) MIP $50 (2164) MIP Record Retention Fee$3 (9992) SDP Fees: Street $62.50 (2164) Water$62.50 (1201) Sewer$62.50 (1361) Storm$62.50 (1401) SDP Record Retention Fee$10 (9992) PW Inspection Fee$70 (2140) Other Other TOTAL DUE AT SUBMITTAL FEES DUE AT PERMIT ISSUANCE 625-7. 75 Building Permit Fee (2000) .€17, to Propane Tank/Piping Inspection$47 (2000) 4. 50 State Building Code Surcharge $4.50 (2005) Plus $2/unit for multi-family House Number$3 (2200) $3 per unit if multi-family Hamilton Heights Recreation Fee$200 (5030) Hamilton Heights Transportation Fee$156 (2167) Lynnesfield Off-site Transportation Fee$231 (2168) Record Retention Fee$3 to $10 (9992) 13. 11,0 Other -re chnoIpay dee - 2% Other 7 2Z• 4 TOTAL DUE AT PERMIT ISSUE Notified Permit is Ready to be picked up (Who/Date/Initials): I I Impervious calculation to Finance sent (Date): P:\DSD\Fonms\Building Fonns\Checklist-Residential Building Plans-Front Counter Sep 06.doc Revised 9/27/06