HomeMy WebLinkAboutBLD02-285walem,an ~. xaa enaain8
181 Quincy Straet Suite 301
Pool To~waend, WA98368
Phone (360) 379.3208 Fax (360) 383-7673
~J
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-2858-1 Issued: 02/12/03 Parcel Number: 985 210 201
Job Address: 2208 Walnut Street Zoning: RR=II Type: VV=N Occupancy: R`3
Total Occupant Load: N/C
Nature of Work: Revision #1: chance stemwall foundation to monolithic slab
Owner: Carol Uneer Contractor: Craie Johnson Construction - CRAIGJC992N2
(379-8594)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Note: see original permit BLD02-285 for other inspections.
REQUIRED INSPECTIONS
APPROVED/DATE
SLAB
k
S
tb
3~
CL
>
S~
2~
ac
s
e U
t
~-
7 ~
Forms ~
Monolithic SIab/Foundation ~ ~~,
Reinforcement
Insulation - R-]0 to bottom of footing
Anchor Bolts w/ 2 " x 2" x 3/16" washers
FINAL
See original permit
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Pmni[ #BLD01-285R•I
GENERAL CONDTTIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration number
and a City business license. Failure to provide proof of this documentation prior to work may resuk in job
shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to
beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilaed
with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding,
etc. once construction is complete. Applicant is responsible far protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP)
require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements
have been completed and inspected. For Public Works inspection ca113852294; a minimum of twenty-four
hours notice is required. Public Works approval must be received prior to scheduling We Building
Department's final inspeMion.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by
the Building Department within one year. Call for at least one inspection per year to keep your building
permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building Departnem
at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
... _~_ . _.._. ..,r .. __._ ..._ ~ e
Watennaa & Katz Building
181 Quincy Shell Suite 301
PoA Tow~~send, WA 98368
Plwne (360) 379-3208 Faz (360) 383-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-285 Issued: 01/21/D3 Parcel Number: 985 210 201
Job Address: 2208 W gloat Street Zoning: R-II Type: VV=N Occupancy: RR=3
Total Occupant Load: N/C Nature of Work: Single-family Dwelling Bathroom Addifion
Owner: Carol Unger Contractor: Craig Johnson Construction - CRAIGJC992N2
(379-8594)
GENERAL CONDTI-IONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-4I7-2702
REQUIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents
Crawl Access
FLOOR FRAMING
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
FDN Vents
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
RF,niTiRF,n iNRPF.fTI(1NC
Building Pefmit #BLD02-283
~A UDi.A(1[7Ti'TT A TTi
- - -------'
PLUMBING aiaw~iai/LA11:I
F
Rough-In (D-V-T & Clean-Outs)
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve req'd. if pressure > 80 psi
MECHANICAL
Bathroom Fan - 50 cfin
Environmental Air Exhaust ducting, insulation (R-4),
and terminus (3' from openings into building)
FRAMING:
walls 31 S~a3
Roof
Rafter Positive Connection ~a S ~ ~ ~-(--
Blocking
~ ~~
Attic Venting
Ceilings
Windows Ufactor - .40 or better
NFRC wtndaw sticker must be on
windows at inspection time
Window Safety Glazing
Air Seal
Fire Blocking (if applicable)
Weather Resistive Barrier
INSULATION
Floor (R-30)
3 J b'a3
Wall(R-21) p4SI~ ~ Lt/
Ceiling (R-38)
Baffies
~' ~^` f
Vapor Barrier. paint
6 mil black poly in crawl space
DRYWALL NAILING
Walls
Ceiling -water resistant wallboard shall not be
installed over a vapor retarder or on ceilings
framed at greater than 12 " on center
Ca1148 hours before you dig for utility tine locates
1-800.424-5555
Page 2 of 3
Building Pe~tnit lIBL,D02-285
FINAL
House Number -check fo'r' S"'nSnn~eTS of final
Plumbing
Mechanical
Vapor Battier Paint Certificate
Insulation Certificate (if applicable)
Smoke Detectors throughout per 1997 UBC -one in
each sleeping room and in ecich'separate area/hallway
leading to sleeping rooms
Final -Building
`GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's
re¢istration number and a Ciri business license. Failure to provide proof of this documentation prior to
work may result in job shut dowmwhile this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction. shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty.-four hours,noticeis required. Public Works approval must be received prior to
scheduling the Building Department's,fmal inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. CaII for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
I0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3