Loading...
HomeMy WebLinkAboutBLD02-285walem,an ~. xaa enaain8 181 Quincy Straet Suite 301 Pool To~waend, WA98368 Phone (360) 379.3208 Fax (360) 383-7673 ~J CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-2858-1 Issued: 02/12/03 Parcel Number: 985 210 201 Job Address: 2208 Walnut Street Zoning: RR=II Type: VV=N Occupancy: R`3 Total Occupant Load: N/C Nature of Work: Revision #1: chance stemwall foundation to monolithic slab Owner: Carol Uneer Contractor: Craie Johnson Construction - CRAIGJC992N2 (379-8594) GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Note: see original permit BLD02-285 for other inspections. REQUIRED INSPECTIONS APPROVED/DATE SLAB k S tb 3~ CL > S~ 2~ ac s e U t ~- 7 ~ Forms ~ Monolithic SIab/Foundation ~ ~~, Reinforcement Insulation - R-]0 to bottom of footing Anchor Bolts w/ 2 " x 2" x 3/16" washers FINAL See original permit Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Pmni[ #BLD01-285R•I GENERAL CONDTTIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may resuk in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilaed with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible far protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca113852294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling We Building Department's final inspeMion. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Departnem at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 ... _~_ . _.._. ..,r .. __._ ..._ ~ e Watennaa & Katz Building 181 Quincy Shell Suite 301 PoA Tow~~send, WA 98368 Plwne (360) 379-3208 Faz (360) 383-7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-285 Issued: 01/21/D3 Parcel Number: 985 210 201 Job Address: 2208 W gloat Street Zoning: R-II Type: VV=N Occupancy: RR=3 Total Occupant Load: N/C Nature of Work: Single-family Dwelling Bathroom Addifion Owner: Carol Unger Contractor: Craig Johnson Construction - CRAIGJC992N2 (379-8594) GENERAL CONDTI-IONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-4I7-2702 REQUIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Footings Forms Reinforcement FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents Crawl Access FLOOR FRAMING Joists Blocking Positive Connection Treated Wood to Concrete Anchor Bolts & Washers FDN Vents Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 RF,niTiRF,n iNRPF.fTI(1NC Building Pefmit #BLD02-283 ~A UDi.A(1[7Ti'TT A TTi - - -------' PLUMBING aiaw~iai/LA11:I F Rough-In (D-V-T & Clean-Outs) Water Supply Pipe Insulation (R-3) Pressure Reduction Valve req'd. if pressure > 80 psi MECHANICAL Bathroom Fan - 50 cfin Environmental Air Exhaust ducting, insulation (R-4), and terminus (3' from openings into building) FRAMING: walls 31 S~a3 Roof Rafter Positive Connection ~a S ~ ~ ~-(-- Blocking ~ ~~ Attic Venting Ceilings Windows Ufactor - .40 or better NFRC wtndaw sticker must be on windows at inspection time Window Safety Glazing Air Seal Fire Blocking (if applicable) Weather Resistive Barrier INSULATION Floor (R-30) 3 J b'a3 Wall(R-21) p4SI~ ~ Lt/ Ceiling (R-38) Baffies ~' ~^` f Vapor Barrier. paint 6 mil black poly in crawl space DRYWALL NAILING Walls Ceiling -water resistant wallboard shall not be installed over a vapor retarder or on ceilings framed at greater than 12 " on center Ca1148 hours before you dig for utility tine locates 1-800.424-5555 Page 2 of 3 Building Pe~tnit lIBL,D02-285 FINAL House Number -check fo'r' S"'nSnn~eTS of final Plumbing Mechanical Vapor Battier Paint Certificate Insulation Certificate (if applicable) Smoke Detectors throughout per 1997 UBC -one in each sleeping room and in ecich'separate area/hallway leading to sleeping rooms Final -Building `GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's re¢istration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut dowmwhile this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction. shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty.-four hours,noticeis required. Public Works approval must be received prior to scheduling the Building Department's,fmal inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. CaII for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. I0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 V F~ •~.~ ~, ., ~~