Loading...
HomeMy WebLinkAboutBLD02-283Waterman & KazzBUildirg 1 B I Quinry S"ee4 Swte 301 Port Towr"end WA 98368 Phoce: (360)379-3208 Fex: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-2$3 Issued: 04/17/03 Parcel Number: 932 000 001 Job Address: 1632 32"d Street Zoning: RR=II Type: VV=N Occupancy: B/A-3 Total Occupant Load: 182 Nature of Work: Remodel portion of building to "Community Clubhouse" Owner: Dan Harbin Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 3G0-417-2702 RF.nTiTRFTI TNCPF.f TT(lN~ APPRnVF,D/DATE TEMPORARY EROSION & SEDIMENT CONTROL Temporary erosion and sediment control measures shall be installed on-site as needed during construction to contain dirt and sediment on-site. Adjacent rights-of- way shall be kept clean through sweeping of paved surfaces, tire wash, etc. FOOTINGS -per engineer design G~c-r~n,lo2 Pc-2~tf s'-r& - D~ S ZD o j Setbacks p~ Footings Forms Reinforcement UFER _ Interior spot footings ~'. ~ ~ Z-! f~ amp Column bases Footings Forms Reinforcement Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 1'emtit NBLD022B3 REQUIRED INSPECTIONS APPROVF,D/DATF. FOUNDATION -per engineer design PoJCt.~f- ~~p ~' q t 03 Stem Wall Forms Reinforcement Anchor Bolts Vents - 2 required Crawl Access FLOOR FRAMING Joists Blocking Shield under Posts ~ G~ lZ-~ lrj 3 ~~~ Positive Connections ~ ~-~' L( ` Treated Wood to Concrete Anchor Bolts and Washers Foundation Vents PLUMBING: Barrier-Free Compliance Required D-W-V Rough-In Water Supply Gas Supply Water Hammer Arrestors Pipe Insulation - R-3 Hose Bibbs - backflow protection required Hot Water Heater Seismic Restraint PTR Valve Drain to exterior MECHANICAL Source Specific Exhaust Fans @ bathrooms (SOcfin) and kitchen (100 cfrn) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls ~ ~g btk ip ~~ G S~~ Clv`' I~cM~ f., Beams l D~ ~ ~~ Roof Attic Venting Window Safety Glazing Window U-factor - .40 or better Doors -10 or better Skylights - .SB or better Continued on next page ~: Call 48 hours before you dig for ut-~ity line locates I-800-424-5555 Page 2 of 4 L. RF.(li1TRF.n TNSPF.CTIONS APPROVED/DATE Prnvit #BLD02-283 FRAMING continued Air Seal Fire Blocking Draft Stop Weather Resistive Barrier INSULATION Walls - R-21 Roof-R-38 vault/R-38 attic Vapor Barrier - 4 mil poly 6 mil black poly in crawl space DRYWALL S/8 inch type X drywall throughout Walls Columns Ceiling LIGHTING See approved plans and NREC Lighting Summary PARKING - Brnrier Free required (1) Van Accessible Space (20'x16') with signage FINAL Property address posted -min. S" members Fire Department Sign-Off Electrical Sign-off (L & I) RampBarrier Free access Plumbing - Barcier Free Required Mechanical Source Specific Exhaust Fans @ bathrooms (SOcfm} Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) Restroom wall and floor covering per UBC 807 Insulation Certificate Door panic hardware Main exit may have key locking device with sign at exit: "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS" with 1" high letters on contrasting background Exit Signage Exit Illumination Final -Building CaII 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 3 of 4 r Pmnit gBLDdl-283 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut dawn while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aouroval must be received prior to • scheduling the Building DenartmenPs final inspection_ 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. CaII for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building Depardnent @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 4 of 4