HomeMy WebLinkAboutBLD02-281Waterman and Katz Building
181 Quincy Street Suite 301
. Port Townsend, WA 98368
Phoce (360) 379-3208 Fax (360) 383-7673
CITY OF PORT TOWNSEND
L.J
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STI'E
Ca11385-2294 for Inspection
Permit Number: BLDO2-2g1 Issued: 01/22/03 Parcel Number: 984 904 904
Job Address: 1757 Maule Street Zoning: RR=II Type: V-N Occupancy: R=3
Total Occupant Load: N/C Nature of Work: Divide room in existin¢. unheated detached studio for new
bathroom.
Owners: Garv & Jodie Goatcher Contractor: Millenium One Homes - MILLEOHOlOMM
(Todd Eskelin - 301-9912)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REOUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS APPROVED/DATE
n
PLUMBING
Rough-In (drains, vents, traps and clean outs)
~~{ Sip ~,~ 'Z-~ S_ [ U 3 ~ L ~-
Water Supply
Pipe Insulation (R-3) ~ 1
~' C~ r~ ~~
Pressure Reduction Valve in > 80 psi
Water Heater
Seismic Restraint - 2 places
R-10 under if electric
Pressure relief valve drain to exterior
MECHANICAL
Bathroom Fan
Environmental Air Exhaust ducting (w/ backdraft
damper), insulation (R-4) and terminus (located 3'
from openings)
FRAMING f
S S~ P{ ~[ s 1 ~' ~ C. ~--
~~t
watt .
Fire Blocking ~^~i-- C~v,~~u.~ci-
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #8LD02-281
REQUIRED INSPECTIONS APPRnVFn/DATF.
DRYWALL NAII.ING
wall
~~~j63 paste ~-~~
Ceiling
FINAL
House Numbers -check for 5" members
2 ~~ 103 p~Q 5~~,
Final -Plumbing I
Final -Mechanical (,-~ C L
Final -Building ~~
~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut dawn while this is accomplished
2. Temporary erosion and sediment control (TFSC) measures shall be installed on-site and inspected
prior to beginning construction; ca1138S2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. App&cant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pan
(ABWP) require inspection prior to cover..
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required. inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspeMion.
7. Final InspeMions and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits eapire if no progress bas been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least orn inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Bm7ding
Department at 379-5086 orior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i
Ca1148 hours before you dig for utility tine locates
1-800-424-5555
Page 2 of 2