CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-28OR-1 Issued: 04/23/03 Parcel Number: 968 500 104
Job Address: 4202 Hill Street Zoning: RR^II Type: VV=N Occupancy: RR=1
Total Occupant Load: 6 Nature of Work: Revision #1: Add 2 bathrooms to first Moor, chance
doors to sliders
Owners: Zelda Kennedy & Sylvester Lahren. Jr. Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: For other insaections see orieinal permit BLD02-280
RE UIRED INSPECTIONS APPROVED/
GROUNDWORK PLUMBING r
Pressure Test
Pipe Joints Exposed (~ ~ ~', Z~ 6
Pipe Bedding
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BI,DOb280R-I
ENERAL CONDITIONC
1. Contractors working on this project are required to have a Labor & Industries contractor's registration ~-
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with matching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project. ~
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year, Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates •
I-800-424-5555
Page 2 of 2
w~ ~, x~ swm~
tst Qumry so-xt, s~tier sot
Port Towmseed, WA 98366
P1»or: (360)379-3208 Fu: (360)385-7675
~ CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-280 Issned: 03/03/03 Parcel Number: 968 500104
Job Address: 4272 HiII Street Zoning: RR=II Type: VV=N Occupancy: R`1
Total Occupant Load: 6 Nature of Work: Construct fourulex ap artment in Lvnnesfield PUD
Owners: Zelda Kennedy & 5v lvester Lahren, Jr. Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: All elements of engineering require inspection prior to cover
HOURS OF CONSTRUCTION shall be limited to 8 am - 6 pm Monday through
Friday and prohibited Saturdays, Sundays and holidays. Any exception made
necessary by special and unusual circumstances must be approved in advance by the
Building Official.
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
Tree removal is limited to those within 10 feet of the building
pad or associated development.
FOOTINGS
Setbacks J
~~Z~~~}3 t -~ ~'~l G3
Footings ff
Forms
Reinforcement
~~ (;c;~w~, -~~•
Interior Footings
Porch/Deck Piers
~ ~}~( ~G $Sr c~ 3~27~G~>
UFER ~~ ~~ ~ ~ ~ LGY„~r«~.-
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
~i s e~~
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms ~
b
Reinforcement
Anchor Bolts & BP washers ~
f
Vents - 5 required at each unit
Crawl Access I
~
,I I
I ~ 1 ° 3
`
t1
FLOOR FRAMING
Joists -engineered BCI plan shall be on-site at time of inspection ~ ~[
Blocking
Positive Connections ~ p G
Treated Wood to Concrete
Anchor Bolts & Washers /
7~ ~- 3 f ~3
Post to Foundation Wall Connection / 1
Knee wall between units for draft stop
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under
Seismic Restraint -strap tank @ 1/3 pointsl8" A. F. F.
Pressure relief valve drain to exterior, terminate 6" - 24" above
Bound
MECHANICAL l+(,L~-rte o~--
Whole House Fan @ Bath
All penetrations at 1 hour separation between units to be in I
Hour shafts. Inspect prior to covering
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
FRAMING bCr* S O!L ~ D3
Walls -one hour wall separation foundation to roof deck between
Dweldin
Units _
~~ ~ ~~ t ~ ~ '~~--
g
Doors -All room entry doors 32"net ~~ '7~r ~
D 3
Draft stops in with walls separating units t
tt t
Ceilings
See neat a e
Cat148 hours before you dig for utility line locates
1-500-424-5555
Psge 2 of 4
Pttmit p HLI702-2B0
i
RF.(liTiRF.il iNSPF,C'TinNS APPROVED/DATE
FRAMING continued
^
Roof -Engineered truss plan to be on site at inspection ~
Blocking
Truss Positive Connections
Roof Venting - eave and gable vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better for unlimited glazing
IVFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (window ports)
/ll~S~r"~~t+Fct'°R P~Kr~c+.~
g~zr/DS
~
Doors U-Factor - .20 or better/Rated doors @ garage/house ~,E o
Aga/~ i(~A~ g
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION /
"
Floor (R-30) 1(Z~ D3
Walls R-21
Ceiling (R-38 )
Vapor Barrier: paint
Baffles
6 mil black poly
DRY WALL NAILING
One- hour between dwelling units at floor ceiling assemblies
and storage
Interior raced wall panels as noted
walls
~ ~ ; ~ g~~o3
Ceiling
FINAL
Public Works Sign-Off
House Numbers - 5" minimum E
Stairs and rails
Ramp entry at ground floor units per WAC SI-30 ~ 1' l~
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate ~
Smoke Detectors
f ~
Landscaping Plan -see note about Street Trees, Page 4
Final - Buildin
n
U
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 3 of 4
r~axstnoz-zso
NOTE: Street trees (native or drought tolerant species) shalt be planted in front of the multi-family
unit. At time of planting, deciduous trees shall be a minimum of two inches in diameter at three
feet above ground level; evergreens shall be a minimum of 8-feet in height. Each tree shall be i
healthy stock, and carefnQy planted in a planting area of at least 25 square feet, ff planted within a
sidewalk, the tree shall be planted in accordance with The Tree Book, Puget Sound Power and Light
Company.
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Fa~7ure to provide proof of this documentation prior to work may
result in job shat down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 38$-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed daring construction shall be temporan7y stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. AIl elements of engineering including nae7ing, hoklowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval urior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555