Loading...
HomeMy WebLinkAboutBLD02-278W atemun & Katz Building- 181QuvwySlnel,Style301 Port Towaund WA96368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THLS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOZ-278 Issued: 01/29/03 Parcel Number: Treehouse PUD. Lot 1: Unit 4 Job Address: 2205 Ebonv Street Zoning: Treehouse PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 3/1 Nature of Work: Construct single-family residence with garage. Owners: Madrona Village LLC Contractor: OED Builders LLC - OEDBUI.0431D1 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries ~ 360-417-2702 RFniTiRF,n iNSPF,CTiONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS /~ iy Setbacks ' ~ « S se_c~~ ~'' C ~ Footings ~~ Interior Footing ~ C~ •^^~`~ Expanded Footing for engineered retaining walls Forms Reinforcement UFER GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding Tra Seal Protection Ca1148 hours before you dig for utility line locates 1=800-424-5555 Page 1 of 4 Permit q HLD02-278 REQUIRED INSPECTIONS APPROVED/DATE SLAB Setbacks Forms 21 zr f a3 Interior Footings Reinforcement - #3 @ 24" o.c. each way @ slab ~JQ SSeL~ (~P/' G ~ Engineered Holdoums ~j- ~ a,N,~ u,(-p~ Anchor Bolts -per engineered shear wall schedule UFER Porch/Deck Piers ~/~ 0 3 ~~ (~ o FOUNDATION J-e ~ ~ ~ ~ w W ll St C ~ 7 /t r 63 ~'LS ~'°' S'~~'''" G em a ~ L ~ GUh.}o~+. . ~.ti Engineered Retaining Walls ~,~ 4 ~~ ~ , Forms , Reinforcement 2 110 f 0 3 J~ u~- ~ a SSe.~ ~S~eN,/aQJ Anchor Bolts - @ shear walls per engineering ~ G ~ ~ ~ ~,,~~~ Engineered Holdowns FLOOR FRAMING -engineered BCI plan shall be on-site at time of inspection 3~ 13 ~ D 3 ~ a S8-e~ Joists - hydronic or electric radiant heat requires revision i i ll ti t t LL pr or ns a on o a Engineered Holdawns ~ ~^"~ ~' Engineered Beams & Headers Blocking Shield under Posts Positive Connections Treated Wood to Concrete PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Gas Supply ~ Water Hammer Arrester @ clothes & dishwashers ~ a' Hose Bibs (backflow protection required) Pipe Insulation (R-3) ~- q ~ b ~ D C Pressure Reduction Valve if > 80 psi ~ ~ Z Water Heater Q t G v Seismic Restraint -strap tank @ 1/3 points li f l d i i u ~ ~ / Pressure re va ve ra n to exter or, tern nate e 6" 24" b d ~ ~ ~ y ~ ) - a ove groun 0 / G 1: ..J Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 PermitXBLWL278 uFnrTruFn 1N~PF,C'TiONS APPROVED/DATE MECHANICAL LPG Stove -manufacturer's installation instructions shall be on-site at time of inspection. ce If hydronic Jloor heat is proposed, revision required ~ `i ~ Whole House Fan @ @ utility room -Max. 75 CFM 5 KitchenBath/Laundry Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) FRAMING -Minor Improvement Permit shall be issued & on-site at time of inspection Walls Engineered Shear Walls Ceilings Posts, Beams & Headers DF #1 at second floor framing 2 x 12 stringers ~~ Roof Blocking 0 3 Rafter Positive Connection - (-H1 and H2) ~/ ~ l' Roof Venting - eave and ridge vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better Skylight U-Factor - .58 or better Air Seal Fire Blocking Weather Resistive Barrier INSULATION ~ F-oor (R-30 & R-10) Walls (R-21 ) D `E~ ' Ceiling (R-30vault/R-38 attic ) Vapor Barrier: paint ~ 3 / Battles 7 DRY WALL NAILING )ti-t;" ot_ z-t a3 Walls ~ ~'~ -~k~~{L. Ceiling Enclosed Usable Space under Stairs ~ `'~' ~ ~ /'~`-~' Garag ouse ccupancy Separation ~ ~~ ,. ~ ~1 i ~_~ ,~ , Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 rye s su~x~s REQUIRED INSPECTIONS APPROVED/DATE FINAL - No occupancy permitted prior to final plat Approval for Phase I Public Works Sign-Off Parking -1 space required House Numbers - 5" minimum Plum ' MechanicaUHeating ~(~ `7 J D'j apor amer amt e ~ cafe -- _ ,- ~ Insulation Certificate ~ .(~ ~ Smoke Detectors ~~ Final-Building ~ ~ C~ l Uv" GENERAL CONDITIONS V I J 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 1, 2. Temporary erosion and sediment control (TESL) measures shall be installed on~ite and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construclion entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed daring construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection ca11385-2294. A minimum of twenty-four hours notic 7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Budding Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field Contact the Building Department (379-3208) prior to making changes to the approved plans. 1D. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility tine locates i-800-424-5555 Page 4 of 4