Loading...
HomeMy WebLinkAboutBLD02-276wa~aaaxa~s,~m~ 181 Qiunry 3tttet. Saute 301 Port 7owroend. WA98368 Phoro: (360) 379-3206 Fax: (360) 385-7675 CITY OF PORT TOWNSEND I CONSTRUCTION PERMIT & INSPECTION RECORD I THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDO2-276 Issued: 12/30/02 Parcel Number: 948-312-203 Job Address: 130514th Street ZoninE RR=3 Type: V-N Occupancy: R-3 Total Occupant Load: NC Nature of Work: Add Dormer to SFR (see 01-012 for house) Owner: Home Towne Construction Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REOiJIRED INSPECTIONS • APPROVED/DATE FRAMING: Walls Roof - re-engineered truss plan to be on-site at time of inspection if trusses are disturbed Ceilings 1~~~ Posts, beams & headers _ /-r U1 S ~- Windows -escape ,~ ~ Windows Ufactor - .40 or better NFRC i d i k b ~/~ ~ 1 ~~ S ow st e ore w n c er must -) windows & doors at inspection time ~" 11 ~ l ci ~ Air Seal ~jl i C i'' Truss Positive Connection ~ ~~ Weather Resistive Barrier ~ ~O INSULATION Wall (R-21 Ceiling (R-38 ) Baffles Vapor Barrier: 4 mil poly WALL NAILING D u $ ~ 3 Z~ C,3 Wa11 Ceiling ~" CL I ~^ C~r~'u.~fi- Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pamil#BLDOI-012 FINAL House Numbers - 5" Smoke Detectors Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and s City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be. temporarily stabilized with mulching, plastic sheeting, etc. SoiLc shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must tie received prior to scheduling the Building Deaartment's final inspection. 7. Final Inspebtions are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact thrBuilding Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2