HomeMy WebLinkAboutBLD02-276wa~aaaxa~s,~m~
181 Qiunry 3tttet. Saute 301
Port 7owroend. WA98368
Phoro: (360) 379-3206 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
I CONSTRUCTION PERMIT & INSPECTION RECORD I
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDO2-276 Issued: 12/30/02 Parcel Number: 948-312-203
Job Address: 130514th Street ZoninE RR=3 Type: V-N Occupancy: R-3
Total Occupant Load: NC Nature of Work: Add Dormer to SFR (see 01-012 for house)
Owner: Home Towne Construction Inc. Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REOiJIRED INSPECTIONS
•
APPROVED/DATE
FRAMING:
Walls
Roof - re-engineered truss plan to be on-site at
time of inspection if trusses are disturbed
Ceilings 1~~~
Posts, beams & headers _ /-r U1 S ~-
Windows -escape ,~
~
Windows Ufactor - .40 or better
NFRC
i
d
i
k
b ~/~ ~
1 ~~ S
ow st
e ore
w
n
c
er must -)
windows & doors at inspection time ~" 11 ~ l ci ~
Air Seal ~jl i
C
i''
Truss Positive Connection ~
~~
Weather Resistive Barrier ~ ~O
INSULATION
Wall (R-21
Ceiling (R-38 )
Baffles
Vapor Barrier: 4 mil poly
WALL NAILING
D u $ ~ 3 Z~ C,3
Wa11
Ceiling ~" CL
I ~^ C~r~'u.~fi-
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pamil#BLDOI-012
FINAL
House Numbers - 5"
Smoke Detectors
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and s City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be. temporarily stabilized with mulching, plastic sheeting, etc. SoiLc
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must tie received prior to
scheduling the Building Deaartment's final inspection.
7. Final Inspebtions are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact thrBuilding
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2