Loading...
HomeMy WebLinkAboutBLD02-275weeem,en ~ x~ ~i~ 181 Quiecy Street Suite 301 Pml ToumsrnQ WA 98368 Phone (360) 379-37A8 Faz (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDO2-275 Issued: 01/16/03 Parcel Number: 974 402 301 Job Address: 611 Brvan Street Zoning: R_II Type: VV=N Occupancy: R-3 Total Occupant Load: No Change Nature of Work: Construct 450 sa. ft. deck. stairs and railings. Owners: Keith and Katie Fleming Contractor: A.M.C. Enterurises - AMCEN* *013MG (385-6905) GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks ~ Deck Pier Footings Reinforcement _ ~U S ~ 2 ~ ~ ~ 6 3 ~~ C(~ ~ ~' ~` `~ `'~'~'~ FLOOR FRAMING/DECK AI! framing members to be pressure treated ar wood of natural resistance to decay Posts $.03 seam 5, Joists (2" x 6'~ Positive Connection Post-to-Pier Post-to-Beam Treated Wood to Concrete Lag Bolts @ ledger - 3/8" x 4" lag screws @ 12" o.c. Blocking FINAL House Numbers posted (minimum 5'~ Guazdrails y Handrails `~jL, l 8.03 Stairs ~ Smoke Detectors throughout existing construction per 1997 UBC Deck -Final • Cai148 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 Pttmit # BLD02-275 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istrstion ~' number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled constrnMion entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Sails shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works anoroval must be received prior to scheduline the Buildine Department's final insuecton. 7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2