HomeMy WebLinkAboutBLD02-275weeem,en ~ x~ ~i~
181 Quiecy Street Suite 301
Pml ToumsrnQ WA 98368
Phone (360) 379-37A8 Faz (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDO2-275 Issued: 01/16/03 Parcel Number: 974 402 301
Job Address: 611 Brvan Street Zoning: R_II Type: VV=N Occupancy: R-3
Total Occupant Load: No Change Nature of Work: Construct 450 sa. ft. deck. stairs and railings.
Owners: Keith and Katie Fleming Contractor: A.M.C. Enterurises - AMCEN* *013MG
(385-6905)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks ~
Deck Pier Footings
Reinforcement _
~U S ~ 2 ~ ~ ~ 6 3 ~~ C(~
~ ~' ~` `~ `'~'~'~
FLOOR FRAMING/DECK
AI! framing members to be pressure treated ar wood of
natural resistance to decay
Posts
$.03
seam 5,
Joists (2" x 6'~
Positive Connection
Post-to-Pier
Post-to-Beam
Treated Wood to Concrete
Lag Bolts @ ledger - 3/8" x 4" lag screws @ 12" o.c.
Blocking
FINAL
House Numbers posted (minimum 5'~
Guazdrails y
Handrails `~jL, l
8.03
Stairs ~
Smoke Detectors throughout existing construction per 1997
UBC
Deck -Final
•
Cai148 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
Pttmit # BLD02-275
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istrstion ~'
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
constrnMion entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Sails
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works anoroval must be received prior to
scheduline the Buildine Department's final insuecton.
7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2