Call 385-2294 for Inspection
Permit Number: BLDO2-273 Issued: 02/28/03 Parcel Number: 993 800 005
Job Address: 2260 Seaview Drive Zoning: R-I Type: VV=N Occupancy: RR=3
Total Occupant Load: 7/1 Nature of Work: Addition to sinele-family residence with attached earaee
Owner: William Bradford West Contractor: Black Cat Construction-BLACK000660Z
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: All elements of engineering require inspection prior to cover
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
Porch/Deck Piers
UFER
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
~.~
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
~Gt S S~e~
Forms y'~ p' d 3 ~ L (.
Reinforcement
Anchor Bolts ~ BP washers
' ' ' Gtr ~ ~~
FLOOR FRAMING
Joists -engineered BCI plan shall be on-site at time of
Inspection \ l
~ [~
Beams -engineered
Blockin
~
/1
g n
K~~
Positive Connections
Treated Wood to Concrete /
3 I 03
Anchor Bolts & Washers / ~
b I
Post to Foundation Wall Connection
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
71Zg103
Gas Supply ~.
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
ape nsu anon -
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under
Seismic Restraint -strap tank @ 1/3 points
I8" A. F. F.
Pressure relief valve drain to exterior, terminate
6" - 24" above Bound
MECHANICAL
Whote house fan
LPG Stoves - provide specs on-site
Sowce Specific Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and temrinus (located 3' from openings)
~'
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
i,
RF,OiJIRED INSPECTIONS
i
Pamit p HLDtrL273
APPROVED/DATE
FRAMING ~.
~
Walls ~~
Ceilings/floor -engineered BCI plans to be on site ~ \ t^ -
Roof-Mod~ing engineered trusses-see architects letter
ki
l ~„ ~j~ ~f0~
'D
ng
B
oc ~
Truss Positive Connections ~ ~ . ,~
.
Roof Venting -gave and ridge vents }
~
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better for unlimited glazing ~ ~ i O 3
i
NFRC window sticker must be on windows & i
~~oors at inspection time ~ _ . _ _..,_ __-
------"--
Fresh ~i - nI`f'd'ke =`HV~AC Integrated option & wall ports __._
Doors U-Factor - .20 or better/Rated doors @ garage/house
Air Seal
Fire Blocking
Weather Resistive Barrier ~' 13
INSULATION
Floor (R30 )
Walls (R-21)
Q ~ "1~3b~o3
Ceiling (R-38)
--- ~
_ --- -
--
-- - ___--
apor$amer: paint
Baffles
6 mil black poly
DRY WALL NAII,ING
Walls
Ceiling
~~ ~~ ~ 2(~G`~ ~
Garage/House Occupancy Separation
FINAL
Public Works Sign-Off
LPG
House Numbers - 5" minimum
Plumbing
MechanicaUHeating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
~~
r• 0'1
r~easroozzn
:,
ENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Fa~7ure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. Att elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to rnver.
4. Owner or owner's agent shall review and oversce correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report correMions are completed.
6. The Bolding Department is unable to pass 5na1 inspection on your project until Public Works
requirements have bcen completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to kcep your
building permit active.
9. Revisions require submittal and approval prior to maldng changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Cat148 hours before you dig for utility line locates
1-800.424-5555
Page 4 of 4