Loading...
HomeMy WebLinkAboutBLD02-272Wstmnen & KetxB~tildug 181 Quiory Street, Swte 301 Port Townarnd WA 96368 Phase: (360)379-3206 Fax: (360)365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-2728-1 Issued: 02-OS-03 Parcel Number: 933 301 601 Job Address: 251 47th Street Zoning: R_II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load:2/4 Nature of Work: Change to Monolithic Slab Engineered Insulated Panel Construction Owner: Nikolaus Wickl Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE See also original inspection record SLAB Setbacks PQ S~~ ~ ~~ ~~'~ Forms Monolithic Slab }~ C, L ~ C:o.~^~C ~ ~" Reinforcement Interior Footings Anchor Bolts & Washers Engineered Holdowns UFER FLOOR FRAMING Joists -engineeredBCl plan shall be on-site Blocking Positive Connections Treated Wood to Concrete Engineered Floor Straps FRAMING Engineered Insulated Panel Walls f'_ .' ~' e r~ 'G- T~ ~o'H Engineered Shear Walls p e H y r R Q ~~(9Lo f ~-er Engineered Headers, Post & Ridge Beam ~'ngineered Connections ~ ~' ( k ti° `'ma ,~y,, ~ y U tG ~ I ~'~ L INSvI ~~6oY b~ vim 1 -I~~J wm~,aa a x~ au;la~ I81 Quiury 36ecP, Suite 301 Pwt Tounamd, WA 98366 Plme: (360) 37?3308 Faz: (360) 385-7675 FINAL -Wet-signature jor engineering required prior to final inspection approval See also original inspection record .RAT. (`tINDTI70NS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result is job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall .review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspecion is required sfiter inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Publie Works inspection calf 385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a noo- residemial project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE. WITH THE APPROVED PLANS. Waterman &. Katz Hull dieg 181 QuimryStree( Stite 30] Pmt Tvwn4en4 WA 98368 Phone (360) 379-3208 Fez: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOZ-272 Issued: 01-14-03 Parcel Number: 933301601 Job Address: 251 47th Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load:2/4 Nature of Work: Detached Gara¢e with upstairs ADU Owner: Nikolaus Wickl Contractor: Owner GENERAL CONDTI'IONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHl;ED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL ilt Fence as needed Drive Off Matto restrict sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement LIFER Interior Footings FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Shear Wall Holdowns • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r~as~-noz-zn { RE UIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Joists -engineered BCI plan shall be on-site Blocking Positive Connections Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers PLUMBING: Rough-In (D-V-T & Clean outs) ~ ~ D ~ !' i ~ tL t ~ 31 ~a 3 Water Supply Water Hammer Arrestor at clothes and dishwasher Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (minimum R-3) Pressure Reduction Valve if> 80 psi W t H t 't~ ~ er a ea er S P Seismic Restraint - 2 places ` ~ ~ Pressure relief valve drain to exterior, terminate " " C~~~ ~ l2 6 - 24 above ground ~. MECHANICAL Pellet Stove -manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan Source Specific Fans Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from openings) FRAMING Walls S h ll S~ ~~2, impson S ear Wa s a Ceilings " al ~ Roof -engineered truss plan shall be on-site ' ~ Rafter Positive Connection `(~C~ Blocking Attic Venting - @ ridge & eave Windows -escape Window safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows and doors Air Seal Fresh Air Intake (Window Ports) Fire Blocking Weather Resistive Barrier Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~i a B~oz-zn RF,OiTiRED INSPECTIONS APPROVED/DATE INSULATION loor (R-30 ~( "1 ~ U S l ~ S ,~-e ~,{ ~pT alts (R-21 Ceiling (R-30) gL- j Bafi7es Vapor Barrier: PVA paint primer DRY WALL NAILING Walls ~ ~,p/~/ Ceiling O !iD`" / Gazage/House Occupancy Sepazation ~}~ tS~ 03 FINAL House Numbers - 5" Plumbin g (~ ,/ ~1 ~ ~ ~ ~ t-- 7t '1> cc/ b3 r MechanicaVHeating V ~o~ N~ -z-~`~~~tiit~~a-~+~Rkr~.01~(~( Insulation Certificate Smoke Detectors Vapor Barrier Paint Certificate Final -Building G .N .RA . CONDiTTONC I. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. Alt elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is repaired. Public Works anaroval must be received nrior to scheduling the Building Department's final inspection. Ca1148 hours before you dig for utility lice locates I-800-424-5555 Page3of4 ~~ Paroit#BLD02-2T2 ~, 7. Final Inspections are required prior to occupancy; A Cerfificate of Occupancy is required fora noo- ' residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4