Loading...
HomeMy WebLinkAboutBLD02-271waxuavud~ 181 Qrinry Street. 3uita 301 Port Towroend, WA98368 Phone: (360) 399-3208 Fvc: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Permit Number: BLDOZ-271 Issued: 12/11/02 Parcel Number: 001013 001 Job Address: 315 Jackson Street Zoning: MII-B Type: VV=N Occupancy: F_1 Total Occupant Load: NC Nature of Work: Remodel commercial snace to create restrooms meetin¢ ADA requirements, and loft with water heater accessible by permanently installed ladder. Owner: Port of Port Townsend .Contractor: Same as Owner GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUII2ED: Electrical - Contact labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION Materials from construction shall be deposited in approved areas off-site in accordance with all state and local laws and ordinances. FOOTING -Under bearing wall between restrooms. Forms Reinforcement PLUMBING -Barrier Free design required Rough-In (D-V-T & Clean outs) // ~/J ~GUv ~ ~5 1 Z/~Z~~L //// Water Supply - I ` ~ Pipe Insulation (R-3) Pressure Reduction valve if> 80 psi Fixture and Mounting Heights Water Heater Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground pointed down. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 ~~ _ - - S _-~.EOUIRED INSPECTIONS APPRnVF'n/nATF. MECHANI -- ---- -- ----- Water Heater - ufacturer's installation instructions rite a i of inspection Drip Pan Access Source Specific Fan QBathroom -terminus 3' from building openings Environmental Air Exhaust ducting (with backdraft /~/~ n) damper), insulation (R-4) and termination (3' from ~ building openings) FRANIING Floor Framing - BCI plan on site at time of inspection Walls Positive Connections Ledger Beams Ceiling Blocking ~~~ ~ O Threshold -maximum %" Fixture Mounting Heights and Dimensions Fireblocking DRYWALL Walls / ~ Ceiling ~~ ~~ l INSULATION Fill exposed cavities ' Wall-R-21 l r1~~ ~ Ceiling/Loft Floor Framing - R-30 c FINAL Property address posted - mim S "numbers of contrasting color posted near the main entrance of the building and visible from the street per City ordinance. Fire Department Sign-Off Electrical Sign-off (L & I) NREC Lighting Bamer Free Access Thresholds Door Clearances Lever Hardware Plumbing Wall & Floor Sanitation Final -Plumbing Final -Mechanical Final - Buildin J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit #BLD02-271 GENERAL CONDITIONS ~1. ContraMors working on this projeM are required to have a Labor & Industries contraMor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294. Measures shall include installation of sik fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, Mc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complMe. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected For Public Works inspeMion ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aunroval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialprojeM. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building Department (a3 379-3208 prior to malting changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3