HomeMy WebLinkAboutBLD02-271waxuavud~
181 Qrinry Street. 3uita 301
Port Towroend, WA98368
Phone: (360) 399-3208 Fvc: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for
Permit Number: BLDOZ-271 Issued: 12/11/02 Parcel Number: 001013 001
Job Address: 315 Jackson Street Zoning: MII-B Type: VV=N Occupancy: F_1
Total Occupant Load: NC
Nature of Work: Remodel commercial snace to create restrooms meetin¢ ADA requirements, and loft with
water heater accessible by permanently installed ladder.
Owner: Port of Port Townsend .Contractor: Same as Owner
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUII2ED:
Electrical - Contact labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from construction shall be deposited in approved
areas off-site in accordance with all state and local laws
and ordinances.
FOOTING -Under bearing wall between restrooms.
Forms
Reinforcement
PLUMBING -Barrier Free design required
Rough-In (D-V-T & Clean outs) // ~/J
~GUv ~ ~5 1 Z/~Z~~L ////
Water Supply - I ` ~
Pipe Insulation (R-3)
Pressure Reduction valve if> 80 psi
Fixture and Mounting Heights
Water Heater
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground pointed down.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
~~ _ - -
S
_-~.EOUIRED INSPECTIONS APPRnVF'n/nATF.
MECHANI -- ---- -- -----
Water Heater - ufacturer's installation instructions
rite a i of inspection
Drip Pan Access
Source Specific Fan QBathroom -terminus 3'
from building openings
Environmental Air Exhaust ducting (with backdraft
/~/~ n)
damper), insulation (R-4) and termination (3' from ~
building openings)
FRANIING
Floor Framing - BCI plan on site at time of inspection
Walls
Positive Connections
Ledger
Beams
Ceiling
Blocking ~~~ ~ O
Threshold -maximum %"
Fixture Mounting Heights and Dimensions
Fireblocking
DRYWALL
Walls
/
~
Ceiling ~~
~~
l
INSULATION
Fill exposed cavities
'
Wall-R-21 l r1~~
~
Ceiling/Loft Floor Framing - R-30 c
FINAL
Property address posted - mim S "numbers of contrasting
color posted near the main entrance of the building and
visible from the street per City ordinance.
Fire Department Sign-Off
Electrical Sign-off (L & I)
NREC Lighting
Bamer Free Access
Thresholds
Door Clearances
Lever Hardware
Plumbing
Wall & Floor Sanitation
Final -Plumbing
Final -Mechanical
Final - Buildin
J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permit #BLD02-271
GENERAL CONDITIONS
~1. ContraMors working on this projeM are required to have a Labor & Industries contraMor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspeMed prior
to beginning construction; call 385-2294. Measures shall include installation of sik fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, Mc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complMe.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected For Public Works inspeMion ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works aunroval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialprojeM.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department (a3 379-3208 prior to malting changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3