Loading...
HomeMy WebLinkAboutBLD02-269Watomev & KatzB~rilduig 161 Q~oey Slmet, Suite 301 Pat TowremQ WA 96368 Phone: 3603793208 Fax 3 6 0 3 8 57675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLD02-269 Issued: 11/22/02 Parcel Number: 948 303 001 Job Address: 1235 Landes Street Zoning: R-DT Construction Type: V_N Occupancy: R-I Total Occupant Load: NC Use of Building: Claridge Court Apartments Nature of Work: Unit 116: replace gvpcrete with plywood underlavment. install new floor and window coverings. Owner: Quantum Management Systems Contractor: Discovery Bav Construction - DISCOBC090B9 SEPARATE PERMITS REOUIItED: Electrical -Contact Labor and Industries @ 417-2702 GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: Permit Revision required for work beyond the attached scope of work e.g., repair/replacement of structural floor members REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION Materials from demolition shall be transported to and disposed of in off-site location meeting all qualifrcattons as set forth in state and local law. FLOOR FRAMING /FINAL / Underlayment ~~2 ~/~~ Ca1148 hours before you dig for Utility line locates 1-800 424-5555 Page 1 of 2 Permit # BI.D02-269 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries Contractor's Registration Number and a City Business License. Failure to provide proof of this documentation PRIOR to work may result in job shutdown while this is accomplished. 2. TESC -Temporary erosion and sediment control measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc., once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All engineered elements including sheathing, nailing, holdowns, ABWP's (alternate braced wall panels), etc., requires inspection PRIOR to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after Inspection Report corrections are completed. 6. The Building Department is unable to pass Final Inspection on your project until Public Works requirements have bcen completed and inspected. For Public Works inspection call 385-2294. A minimum of 24 hours notice is required. Public Works angroval must be received prior to scheduline the Buildin¢ Deoartment's Final Insuection or issuin¢ a Temporary Certificate of Occupancy. 7. Final Inspection and Certificate of Occupancy (nonresidential only) required PRIOR to occupancy. 8. All building permits eapire if no progress has bcen made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to kcep your building permit active. 9. Revisions require submittal tit approval prior to making changes in the field. Contact the Bu~7ding Deparlmeut ®379-3208 prior to malting changes to the approved plans. 10. POST THIS PERMIT ON-SITE W1TH THE APPROVED PLANS. Call 48 hours before you dig for Utility line locates 1-800 424-5555 Page 2 of 2