CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDOZ-266 Issued: 11/21/02 Parcel Number: 988 800 902
Job Address: 640 Lincoln Street Zoning: RR=II Type: VV=N Occupancy: No Chanee
Nature of Work: Replace rim foist and replace or sister several floor foists in mudroom/laundrv area
Occupant Load: No Chanee
Owner: William Gardiner Contractor: Tonv Goldenbere - GOLDEC*075NC
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving the
site and to eliminate tracking of soil onto the street
FOUNDATION/FLOOR FRAMING
Rim joist /~
~aS~-ems ~-' ~ ~ ~3
Joists - if closer than 18" to the earth, must be pressure-
~ ~' I~ ~~~~
treated or wood of natural resistance to decay.
Vents - I sq. foot per 150 sq. feet
Crawl space access
Positive Connection
Treated Wood to Concrete
Shield under Posts
6 mil black poly
FINAL
Building Number -check for 5" numbers
Smoke Detectors
Final -Building
~~
Call 48 hours before you dig for utility line locates
1-800.424-5555
Permit # 81d)U2466
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor 8c Industries contractor's registration
number and a City business license.. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until PublirWorks
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works aonroval must be received nrior to
scheduling the Building Deuartment's final inscection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a noo-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no .inspections are done
by the Building Department within one year. Call for at least one inspection per year ao keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 boors before you dig for utility line locates
1-800.424-5555
Page 2 of 2