HomeMy WebLinkAboutBLD02-262w.w~ttc~a~w6~
iaz ~,ysve~, s~3ot
Fat rowed. ww 9e36s
P6aae: (360) 379-3JA8 Fmc (360) 385-7675
CITY OF PORT TOWNSEIVD
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE.
Call 385-2294 for Inspection
Permit Number: BLD02-262 Issued: 10/31/02 Parcel Number: 989 704 303
Job Address: 224/230 Ouincv Street Zoning: C-III Type: VV=N Occupancy: M/R-3
Nature of Work: Remove existing cedar shingle roofing on historic building. and realace with like.
Owners: Franklin House LLC Contractor: Douglas Johnson and Co. Inc. -
DOUGLJC055LE (206) 322-1399
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: all roofmg materials to be installed per manufacturer's suecifications and
UBC Chanter 15.
REOi1iRED INSPECTIONS
APPROVED/DATE
DEMOLTITON
All construction debris to be deposited in 7efferson
County Landfill or other location in accordance with
all local, state and federal laws.
SEDIMENT CONTROL
Sweep rights of way during construction as needed
PEDESTRIAN PROTECTION
Provide protection as needed per UBC
SHEATHING
Spaced sheathing boards min. 1" x 4" installed per
/ ~/L ~~OZ
UBC Chapter IS Table 19B-2
i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
-~
Building Numbers - 5" numbers of contrasting color
posted near main entrance of building and visible
from street per City Ordinance for both downstairs
mercantile space and upstairs dwelling unit.
Final -Building
1. Co~ractors working on this project are required to have a Labor & Industries contractor's reeistratiog
num r and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Z. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt
fencing and graveled construMion entrance (see attached details). Adjacent rights-of-way shall be kept
free of dirt debris. Soils exposed during constraction shall be temporarily stabi7nsed with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
l~
3. A{I eleme~rts of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Deparlment is unable to pass 5nal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fors non-
residential project. ,
8. Atl building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building
Department ®379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2