Loading...
HomeMy WebLinkAboutBLD02-262w.w~ttc~a~w6~ iaz ~,ysve~, s~3ot Fat rowed. ww 9e36s P6aae: (360) 379-3JA8 Fmc (360) 385-7675 CITY OF PORT TOWNSEIVD CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE. Call 385-2294 for Inspection Permit Number: BLD02-262 Issued: 10/31/02 Parcel Number: 989 704 303 Job Address: 224/230 Ouincv Street Zoning: C-III Type: VV=N Occupancy: M/R-3 Nature of Work: Remove existing cedar shingle roofing on historic building. and realace with like. Owners: Franklin House LLC Contractor: Douglas Johnson and Co. Inc. - DOUGLJC055LE (206) 322-1399 GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: all roofmg materials to be installed per manufacturer's suecifications and UBC Chanter 15. REOi1iRED INSPECTIONS APPROVED/DATE DEMOLTITON All construction debris to be deposited in 7efferson County Landfill or other location in accordance with all local, state and federal laws. SEDIMENT CONTROL Sweep rights of way during construction as needed PEDESTRIAN PROTECTION Provide protection as needed per UBC SHEATHING Spaced sheathing boards min. 1" x 4" installed per / ~/L ~~OZ UBC Chapter IS Table 19B-2 i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 -~ Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street per City Ordinance for both downstairs mercantile space and upstairs dwelling unit. Final -Building 1. Co~ractors working on this project are required to have a Labor & Industries contractor's reeistratiog num r and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during constraction shall be temporarily stabi7nsed with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. l~ 3. A{I eleme~rts of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Deparlment is unable to pass 5nal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fors non- residential project. , 8. Atl building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building Department ®379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2