CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLDO2-2618-1 Issued: 03/18/03 Parcel Number: 943-200-035
Job Address: 1417 Center Street Zoning: RR=II Type: VV=N Occupancy: R-3JIT-1
Occupant Load: No change
Nature of Work: Revision #t: width of one overhead shoo door increased from 6 feet to 7 feet; impervious
surface recalculated and drainaee plan submitted -see attached.
Owner: Teresa Comstock Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: see original permit BLD02-261 for other inspections.
RF.nITiRED iNSPECTiONS APPROVED/DATE
FRAMING
Walls
Overhead Door
FINAL
Final -Building /
cJ~ ~~ S(Z`1/C7j
Ca1148 hours before you digior utility line locates
1-800-424-5555
Page 1 of 2
Buildivg Pem~it #BLD02-261R-1
GENERAL CONDTI'IONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istrstion~
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris.
Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc.
Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced waD panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project unfit Pu61ic Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspeMion.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. '
8. Ail building permits ezpire if no progress has been made within siz months, or if no inspeMions are
done by the Building Department within one year. Call for at least one inspection per year to keep yoor
building permit acfive.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-5086 urior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
I-800.424-5555
Page 3 of 2
..,~ -
City of Port Townund
watermen & x~a snaams
isi Quincy sa«t mite 30~
Port Townsend WA 98368
Phone 379-3208 Fax 383-7673
r-1
u
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-261 Issued: 11/22/02 Parcel Nwnber: 943-200-035
Job Address: 1417 Center Street Zouing: RR=II Type: VV=N
Occupant Load: 212 Nature of Work; New Workshou with ADU upstairs.
Occupancy: R-3/U-1
Owner: Teresa Comstock Contractor: Home Town Construction Inc. - HOMETC1994CL
GENERAL CONDTITONS APPLY -SEE PAGE 4 and 5
SEPARATE PERMITS REOUIIiED;
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per attached details
SLAB
n
Setbacks - F=10', R=10', S=5' f ~~'i; j~~
~
Forms I *~
~
Monolithic Slab ,
Reinforcement
Interior footings
Anchor Bolts - % " @ 36" o.c.
Engineered Holdowns
Alternate Braced Wall Panels
Porch Fiers
~~
FLOOR FRAMING
Engineered BCI plan to be on-site @ time of inspection
Joists
Blocking
Shield under Posts
Positive Connection
Treated Wood to Concrete
En 'neered Holdowns
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
. _ x
Building Permit NBLD02-461
REQUIRED INSPECTIONS APPROVED/DATF,
PLUMBING:
Rough-In (D-V-T & Clean Outs)
Water Supply
Gas Supply
Water Hammer Arrestor @ clothes & dishwasher
Hose Bibs (bacldlow protection. required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior,
terminate 6" - 24" above ground
_
MECHAHICAL
LPG Fireplace `
3 ~~ ~ 03
~ 5 S~ed
Electric Wall Heater t
Whole House Ventilation /b ~°i'~~ '~'"-~
Source Specific Fans ~ L L ~ ~~_
Environmental Air Exhaust ducting (with
backdraft damper), insulation (R-4) and
terminus (located 3' from opening)
FRAMING
Walls ,. _ f
~~~' ~$ ~~
Engineered Shear Walls
Roof
3f 6 1<03 ~ Cl'~-
Attic Venting -ridge & soffrt ~ ~
Ceilings
Posts, beams & headers
Windows -egress
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sfrcker must be on
windows & doors at inspection time
Fresh Air Intake -window ports
Air Seal
Doors Ufactor - .10 or better
Rafter Positive Connection
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Permit kBLD02-261
RE UIRED INSPECTIONS APPROVED/DATE
•
INSi1LATION ~ ~~~ 3131 a3
Floor (R-30 ) ~
Wall (R-21) ~ ~L ~ ~~,,~
Ceiling (R-30 ); Attic (R-38 )
Baffles
Vapor Bamer: paint & batts
DRY WALL NAILING
Walls
Ceiling
Usable Space under Stays
House/Shop Occupancy Sepazation
FINAL
O~~S-9-o3
Public Works Ign-
House Number - 5"numbers
Plumbing
Mechanical
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
~~ ~~ ~
q~p~j
Z
GENERAL CONDITIONS
1. Contractors wonting on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-ske anti inspeMed
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construMion entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils ezposed during construction shall be temporary stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deTciencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
• Ca1148 hours before you dig for utility line locates
I-800.424-5555
Page 4 of 5
- i
Building Pmnit #BLD02-261 -
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed sod inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
•